CN103758258A - Laminated slab type concrete shear wall construction method - Google Patents

Laminated slab type concrete shear wall construction method Download PDF

Info

Publication number
CN103758258A
CN103758258A CN201110459511.6A CN201110459511A CN103758258A CN 103758258 A CN103758258 A CN 103758258A CN 201110459511 A CN201110459511 A CN 201110459511A CN 103758258 A CN103758258 A CN 103758258A
Authority
CN
China
Prior art keywords
construction method
concrete shear
wall construction
wallboard
prefabricated panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110459511.6A
Other languages
Chinese (zh)
Inventor
顾振良
孙召龙
唐永峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Original Assignee
CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp filed Critical CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Priority to CN201110459511.6A priority Critical patent/CN103758258A/en
Publication of CN103758258A publication Critical patent/CN103758258A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a laminated slab type concrete shear wall construction method which includes the steps of wallboard assembly, a floor slab assembly and concreting. The wallboard assembly step includes: 1) fixing a wallboard position control square timber; 2) measuring a horizontal elevation control cushion block; 3) mounting a wallboard fixing support; 4) connecting water and electricity pipelines; 5) mounting additional reinforcements; 6) pouring reinforced position steel bar binders and reinforced position formworks. The construction method is fine in product quality, excellent in waterproof performance, high in construction speed and fine in structural performance.

Description

Superimposed board-like concrete shear force wall construction method
Technical field
The present invention relates to a kind of construction method, particularly a kind of superimposed board-like concrete shear force wall construction method, belongs to technical field of building construction.
Background technology
The core that prefabricated assembled superimposed board-like concrete shear wall structure system is residential industrialized building structure technology, has realized the batch production of the agent structure in house and has produced.Batch production is produced, on-the-spot installation, and the overall continuity of local cast-in-situ concrete implementation structure, fundamentally changes extensive build model, realizes residential structure part standard, modularization.
Summary of the invention
The object of this invention is to provide a kind of standardized superimposed board-like concrete shear force wall construction method.
In order to realize above-mentioned object, technical scheme of the present invention is: a kind of superimposed board-like concrete shear force wall construction method, comprise wallboard assembling, floor assembling, concreting step, and described wallboard installation step is as follows:
1) the fixing position of wallboards control lumps of wood;
2) measure and place horizontal absolute altitude control cushion block;
3) fixing wall-panels supports is installed;
4) hydroelectric line connects;
5) additional bar is installed;
6) cast is strengthened position reinforcing bar binding and is strengthened position formwork;
In described step 2) in, prefabricated panel end opening leaves the space that is not less than 50mm, adopts cushion block special to adjust absolute altitude and the levelling of prefabricated panel.
The space that described prefabricated panel end opening leaves is 45mm.
The space that described prefabricated panel end opening leaves is 40mm.
Construction method good product quality of the present invention, water resistance is good, speed of application is fast, structural performance is good.
The specific embodiment
Before lifting wallboard, first check whether body of wall vertical reinforcement reserved location meets standard, if any deviation, need first adjust, should be than the little 30mm of headroom size in the middle of two wallboards.
According to typesetting arrangement diagram is installed, at every wallboard two ends, far from position, the both walls limit stationary positioned flitch at 25cm place, termination, clear up base surface.
Prefabricated panel end opening leaves the space (for example can leave 40mm or 45mm) that is not less than 50mm, adopts cushion block special to adjust absolute altitude and the levelling of prefabricated panel.In each bottom, piece wallboard two ends, place cushion block special, and measure with level gauge, make it on same horizontal absolute altitude.
Every block of wallboard needs two diagonal braces to fix, and at every prefabricated panel top 2/3 At The Height, has pre-buried connector in advance, and diagonal brace is connected by the reserved connector of special bolt and wallboard.Diagonal brace bottom is carried out anchoring dress with ground with expansion bolt.
In wallboard installation process, water power work is carried out interleave operation, in the wallboard having installed, connects or radiation hydroelectric line.
After hydroelectric line connects or laid, civil engineering bar bender carries out wall plate piecing place additional bar and installs.
The positions such as the wall end of superimposed board-like concrete shear wall structure, L-type angle, T-shaped angle need arrange cast-in-place constrained edge member, with superimposed sheet shear wall effectively in conjunction with, form entirety, to meet shockproof requirements.
Until the installation of edge constraint member reinforcing steel bar and after checking and accepting on inspection; start to carry out template installation; the template at cast-in-place edge constraint member position should adopt the sizing punching block or the wooden model that prepare in advance; during installation, to reach standard accurately, to guarantee the surface quality at cast-in-place position and batch quality that connects with prefabricated panel.
Above-described embodiment does not limit the present invention in any way, and every employing is equal to replaces or technical scheme that the mode of equivalent transformation obtains all drops in protection scope of the present invention.

Claims (4)

1. a superimposed board-like concrete shear force wall construction method, comprises wallboard assembling, floor assembling, concreting step, it is characterized in that described wallboard installation step is as follows:
1) the fixing position of wallboards control lumps of wood;
2) measure and place horizontal absolute altitude control cushion block;
3) fixing wall-panels supports is installed;
4) hydroelectric line connects;
5) additional bar is installed;
6) cast is strengthened position reinforcing bar binding and is strengthened position formwork.
2. superimposed board-like concrete shear force wall construction method according to claim 1, is characterized in that: in described step 2) in, prefabricated panel end opening leaves the space that is not less than 50mm, adopts cushion block special to adjust absolute altitude and the levelling of prefabricated panel.
3. superimposed board-like concrete shear force wall construction method according to claim 2, is characterized in that: the space that described prefabricated panel end opening leaves is 45mm.
4. superimposed board-like concrete shear force wall construction method according to claim 2, is characterized in that: the space that described prefabricated panel end opening leaves is 40mm.
CN201110459511.6A 2011-12-31 2011-12-31 Laminated slab type concrete shear wall construction method Pending CN103758258A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110459511.6A CN103758258A (en) 2011-12-31 2011-12-31 Laminated slab type concrete shear wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110459511.6A CN103758258A (en) 2011-12-31 2011-12-31 Laminated slab type concrete shear wall construction method

Publications (1)

Publication Number Publication Date
CN103758258A true CN103758258A (en) 2014-04-30

Family

ID=50525567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110459511.6A Pending CN103758258A (en) 2011-12-31 2011-12-31 Laminated slab type concrete shear wall construction method

Country Status (1)

Country Link
CN (1) CN103758258A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201107A (en) * 2015-09-30 2015-12-30 长沙远大住宅工业集团有限公司 Construction method for stacked plate type shear wall of underground garage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888344A (en) * 2006-04-07 2007-01-03 陈信孚 Composite thermal insulation concrete load-bearing wall
CN1888343A (en) * 2006-04-07 2007-01-03 陈信孚 Composite thermal insulation concrete shear wall
CN201217855Y (en) * 2008-06-12 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Precast concrete shearing force wall formed with heat preservation decoration surface
CN101555709A (en) * 2008-12-09 2009-10-14 南京华韵建筑科技发展有限公司 Mounting process for composite insulating concrete shear wall
CN101603335A (en) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 The precast concrete shear wall and the production method of one-shot forming band heat insulation facing
US20100218443A1 (en) * 2008-01-24 2010-09-02 Nucor Corporation Composite wall system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888344A (en) * 2006-04-07 2007-01-03 陈信孚 Composite thermal insulation concrete load-bearing wall
CN1888343A (en) * 2006-04-07 2007-01-03 陈信孚 Composite thermal insulation concrete shear wall
US20100218443A1 (en) * 2008-01-24 2010-09-02 Nucor Corporation Composite wall system
CN201217855Y (en) * 2008-06-12 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Precast concrete shearing force wall formed with heat preservation decoration surface
CN101603335A (en) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 The precast concrete shear wall and the production method of one-shot forming band heat insulation facing
CN101555709A (en) * 2008-12-09 2009-10-14 南京华韵建筑科技发展有限公司 Mounting process for composite insulating concrete shear wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙传彪,叶乃阔: "叠合板式混凝土剪力墙施工技术控制要点", 《安徽科技》, no. 9, 30 September 2011 (2011-09-30), pages 46 - 48 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201107A (en) * 2015-09-30 2015-12-30 长沙远大住宅工业集团有限公司 Construction method for stacked plate type shear wall of underground garage

Similar Documents

Publication Publication Date Title
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN103422672A (en) Construction method for reinforced concrete prefabricated house
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN106193292A (en) A kind of steel frame assembled integral reinforced concrete shear wall structure system
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN102140841A (en) Construction method of building superstructure in high-rise steel-concrete mixed structure with few supporting formworks
CN104032904A (en) Combined assembled type stairway
CN104712141A (en) Construction method of cast-in-place reinforced concrete dense ribbed beam floor
CN104863296A (en) Integrally modular steel bar truss floor plate and construction method thereof
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN111733873A (en) Construction method of assembled subway station
CN107165316A (en) It is a kind of be easily installed, the assembling type steel structure out-hung panel node that is molded and its construction technology
CN112482559A (en) Assembled steel structure building system and construction method
CN103758258A (en) Laminated slab type concrete shear wall construction method
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN105926820B (en) Construction method for precast beam steel support plate resistance mesh combined floor
CN110258878B (en) Hidden beam assembled disassembly-free heat preservation floor structure
CN203977742U (en) A kind of combination assembled stair
CN103321405A (en) Large-formwork lifting-type construction method for shear wall or cylinder concrete structure
CN113090013A (en) Construction method for simultaneously constructing deformation joint shear wall without supporting wood formwork
CN1963110A (en) Construction method for large-space rebuilding and double-girder replacement of bearing wall made of brick and concrete
CN204040449U (en) A kind of built-in fitting of Cantilever Beams scaffold
CN216787893U (en) Prefabricated shear wall positioner
CN108660930B (en) Bottom template integral hoisting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140430