CN103741226B - Jute batch peeling machine - Google Patents

Jute batch peeling machine Download PDF

Info

Publication number
CN103741226B
CN103741226B CN201310533244.1A CN201310533244A CN103741226B CN 103741226 B CN103741226 B CN 103741226B CN 201310533244 A CN201310533244 A CN 201310533244A CN 103741226 B CN103741226 B CN 103741226B
Authority
CN
China
Prior art keywords
jute
bar
needle
decortication
dejacketer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310533244.1A
Other languages
Chinese (zh)
Other versions
CN103741226A (en
Inventor
李先强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi High Tech Zone Talent Vocational Training School Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310533244.1A priority Critical patent/CN103741226B/en
Publication of CN103741226A publication Critical patent/CN103741226A/en
Application granted granted Critical
Publication of CN103741226B publication Critical patent/CN103741226B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Preliminary Treatment Of Fibers (AREA)
  • Soil Working Implements (AREA)

Abstract

Jute batch peeling machine, it is connected and fixed device, power set formation primarily of jute propulsion plant, jute dejacketer, jute, jute propulsion plant is rotated backward by about two parallel rollers jute is advanced to the device that can pull out in dejacketer, again, jute dejacketer is the device advancing the jute arrived to carry out scraping decortication by upper and lower two parallel band pin rollers, being connected and fixed device is be connected and fixed by each device with connecting iron, and power set are exactly driven fuel dynamic engine or motor.

Description

Jute batch peeling machine
Technical field
What the present invention relates to is a kind of machinery that can carry out decortication fast in bulk to the epidermin of jute.
Background technology
Jute belongs to fibre plant crops, the epidermin of jute is the important fibrous raw material of a lot of industrial products, yellow harl has: toughness, elasticity, fine and soft, the feature that silver color break-up is bright, therefore tossa is the important source material of Chinese textile industry in history, in China, the plantation amount of jute is only second to cotton.In China, along with the development of chemical industry, the replacement of Xylonite fiber is impacted, the output of jute once reduced once, but again along with the raising of thought of people understanding, people like the product of healthy string more, the meticulous separation process technology of tossa there has also been breakthrough, and the output of jute needs again to add.
The available corpus fibrosum of jute is organized in jute plant stem epidermal area, jute epidermal area is except containing a large amount of fibers, also containing a large amount of plant connective tissue bodies, corpus fibrosum just comprises, be distributed in connective tissue inside, fixed by connective tissue, surround, be difficult to corpus fibrosum to be separated with connective tissue body.The epidermal area of jute, also as other plant epidermis, is attached to tightly on trunk body, is difficult to them to be separated.Since history, the method that people extract fiber from jute plant has a complicated technical process: 1. immersion process, exactly the jute plant of harvesting is compressed into water to soak, the connective tissue body in jute epidermal area is allowed to rot, remove connective tissue body to fetter the encirclement of corpus fibrosum, also relieve epidermal area to being close to of trunk body, depend on, this immersion process generally will more than two week period; 2. exfoliating process is exactly the separation process the tossa body soaked and trunk body, this process need people with hand one by one corpus fibrosum and trunk body separately, each be all staff work point from, workload is very large.The decortication work of jute will in operation under dampness, and the connective tissue body echoing silt and rot, there will be that pulling of corpus fibrosum twines, the situation such as to fracture of trunk body, therefore, the decortication work of jute is the careful workmanship process of a kind of complexity, so far, mechanical energy is not had to replace this work veritably.
Summary of the invention
In order to people can from the craft decortication work of jute numerous and diverse, slowly, dirty and messy in break away from, summing up experience from practice in person, jute batch peeling machine has been invented in research, it can be peeled to the jute soaked in large quantities, continuously, rapidly, and decortication is clean, is not afraid of silt, does not produce winding, do not fracture stem.
Jute batch peeling machine taked technical scheme of dealing with problems is: jute batch peeling machine is primarily of jute propulsion plant, jute dejacketer, body is connected and fixed device, power set are formed, jute propulsion plant by upper and lower two parallel counter-rotational propelling rollers, jute is arranged shape to advance in bulk in dejacketer, the device that stem can be pulled out again, jute dejacketer is the device by upper and lower two parallel counter-rotational band pin rollers, the jute arrived being scraped up and down decortication, it is each device device connecting iron and carry out being connected and fixed that body is connected and fixed device, power set are exactly driven fuel dynamic engine or motor.
The decortication work of the batch peeling machine of jute is carried out after jute is soaked, and at this moment just the corpus fibrosum of jute and stem body can be separated.Propulsion plant on jute batch peeling machine and dejacketer are all rotate backward work by the upper and lower two propelling rollers paralleled, microscler gap between two parallel propelling rollers is exactly the position of jute process, jute be with heavy Nogata formula between this microscler gap through and can arrange and continue through in bulk.Two of propulsion plant advance roller just to produce propelling action, roller that therefore its surface is just coarse a little, and two advance rotating backward of roller the row's shape jute be clipped between gap will to be pushed ahead.Two decortication rollers on jute dejacketer will carry out scraper plane action to the row's shape jute by its gap, the surface of two decortication rollers has been covered with needle-like bar, these needle-like bars are that the aperture on the belt leather of relevant position stretches out, the jute epidermis of these needle-like pole pair processes carries out scraper plane, tossa body is easy to just be twined on these needle-like bars by scraper plane, rotated by roller with these needle-like bars, when forwarding the tangent position that decortication roller is separated with driving belt to, needle-like bar is very fast to be exited from the aperture of driving belt, but the corpus fibrosum be wrapped on needle-like bar can not exit together below belt thereupon, so needle-like bar is separated with corpus fibrosum, corpus fibrosum is released outlet by the corpus fibrosum constantly advanced below, and jute stem continues to be pushed into, out barely from behind finally.
The groundwork device of jute batch peeling machine is propulsion plant and dejacketer, these two kinds of devices are all the rotation relations of some rollers, no matter it is that to provide with motor or driven fuel dynamic engine be not main technical problem that its power provides, the problem that its power provides need not be described in detail.
The beneficial effect of jute batch peeling machine is: jute batch peeling machine utilizes two parallel propelling rollers to advance jute, the jute of decortication roller to process of two parallel band needle-like bars is utilized again to peel up and down, make the decortication of jute can arrange shape, advance decortication in batches, continuously, cost savings artificial.
Accompanying drawing explanation
Fig. 1 is the side sectional median plane figure of jute batch peeling machine.
Fig. 2 is the dejacketer structural principle solid outer surface figure in jute batch peeling machine.
In figure, 1. peel roller, 2. driving belt, 3. transmission roller, 4. advances roller, 6. needle-like bar, 7. fiber outlet, 8. connects iron, 9. supports iron prop, 10. jute stem, 11. apertures, 12. rotating shafts, 13. belt pulleys, 14. belts, 15. gearboxes, 16. power switches, 17. motor.
Detailed description of the invention
Below in conjunction with accompanying drawing, jute batch peeling machine is further described.
The side sectional median plane figure of a jute batch peeling machine is shown in figure.This Fig. 1 just can illustrate the operation principle of jute peeling machine.The main device of the jute batch peeling machine of Fig. 1 is all upper and lower two corresponding relations, and the jute that favourable middle part is passed through carries out comprehensive decortication at upper and lower position.To be upper and lower two parallel propelling rollers (4) be clipped in the middle jute the device of pushing ahead propulsion plant, two propulsion plants are had before and after this jute batch peeling machine in Fig. 1, a propulsion plant is responsible for a jute and is internally advanced above, after one be responsible for jute to pull out from inside.Why two propulsion plants will be installed? because there is certain length this jute batch peeling machine inside, obtain folder thrust from the jute that entrance enters above to advance, but the tail of jute is firm stopped advance once disengaging folder thrust, there occurs and be detained inside, but rear portion also has a propulsion plant, just prevents trapping phenomena.See in Fig. 1 and have the decortication roller (1) of upper and lower two parallel band pins to rotate backward in the middle part of jute batch peeling machine, the propulsive force direction that this folder thrust rotating backward generation and propulsion plant above produce is contrary, but the folder thrust rotating backward product of this decortication roller (1) does not stop the advance of jute, can only be that scraper plane is produced to the epidermin of jute, the needle-like bar (6) that this scraper plane is peeled in roller (1) exactly produces the scraper plane of corpus fibrosum to be pullled, the very fast and advancing stem body of corpus fibrosum is separated, corpus fibrosum after separation peeled roller (1) be brought in fiber outlet (7) pile up, this accumulation takes minimizing away by people.
The subject matter that jute batch peeling machine will solve is the structure problem of jute dejacketer.Fig. 2 is the structure principle chart of the dejacketer in jute batch peeling machine.In Fig. 2, upper and lower two parallel decortication rollers (1) are covered with needle-like bar (6) equably, every bar needle-like bar (6) each aperture (11) again on corresponding driving belt (2), jute dejacketer can be separated corpus fibrosum scraper plane and not occur again to pull that to twine obstruction be the result combined by these needle-like bars (6) and aperture (11) to decortication roller (1): dense needle-like bar (6) carries out scraper plane to the jute epidermis passed through, corpus fibrosum scraper plane is ripped and departs from jute stem, corpus fibrosum along with needle-like bar (6) be transferred to driving belt (2) with decortication roller (1) be separated tangent position time, needle-like bar (6) is backed off from the aperture (11) driving belt (2), corpus fibrosum is but stayed driving belt (2) and is above continued to move to go out from fiber outlet (7).Upper and lower two decortications rollers (1) of jute batch peeling machine rotate backward work, totally smooth jute epidermis whole body scraper plane simultaneously.The power supply devices such as motor (17), belt pulley (13), belt (14), power switch are also illustrated in Fig. 2, and connect iron (8), in fact, jute batch peeling machine also can adopt driven fuel dynamic engine to provide power.

Claims (1)

1. a jute batch peeling machine, primarily of jute propulsion plant, jute dejacketer, body is connected and fixed device, power set are formed, jute propulsion plant by upper and lower two parallel counter-rotational propelling rollers, jute is arranged shape to advance in bulk in dejacketer, the device that stem can be pulled out again, jute dejacketer is the device by upper and lower two parallel counter-rotational decortication rollers, the jute arrived being scraped up and down decortication, it is device with connecting iron and each device being carried out be connected and fixed that body is connected and fixed device, power set are exactly driven fuel dynamic engine or motor, it is characterized in that: described two decortication rollers are up and down rotated by two driving belts respectively, the surface of two decortications roller (1) has been covered with needle-like bar (6) all equably, each aperture (11) on the corresponding driving belt of every bar needle-like bar (6) (2), dense needle-like bar (6) carries out scraper plane to the jute epidermis passed through, corpus fibrosum scraper plane is ripped and departs from jute stem, corpus fibrosum along with needle-like bar (6) be transferred to driving belt (2) with decortication roller (1) be separated tangent position time, needle-like bar (6) exits from the aperture (11) driving belt (2), corpus fibrosum is but stayed driving belt (2) and is above continued to move to be sent out from fiber outlet (7).
CN201310533244.1A 2013-11-03 2013-11-03 Jute batch peeling machine Expired - Fee Related CN103741226B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310533244.1A CN103741226B (en) 2013-11-03 2013-11-03 Jute batch peeling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310533244.1A CN103741226B (en) 2013-11-03 2013-11-03 Jute batch peeling machine

Publications (2)

Publication Number Publication Date
CN103741226A CN103741226A (en) 2014-04-23
CN103741226B true CN103741226B (en) 2016-01-06

Family

ID=50498289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310533244.1A Expired - Fee Related CN103741226B (en) 2013-11-03 2013-11-03 Jute batch peeling machine

Country Status (1)

Country Link
CN (1) CN103741226B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110129894B (en) * 2019-05-24 2021-12-14 邳州市景鹏创业投资有限公司 Sectional fiber peeling and rod-removing device for ramie

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2844147Y (en) * 2005-07-29 2006-12-06 咸宁市农业机械化研究所 A type ramie three off lines
CN201198502Y (en) * 2008-05-13 2009-02-25 陈秋望 Direct-feeding redecorticating power decorticating machine
CN202671721U (en) * 2012-06-05 2013-01-16 湖北工业大学 Marching type ramine stripping machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2844147Y (en) * 2005-07-29 2006-12-06 咸宁市农业机械化研究所 A type ramie three off lines
CN201198502Y (en) * 2008-05-13 2009-02-25 陈秋望 Direct-feeding redecorticating power decorticating machine
CN202671721U (en) * 2012-06-05 2013-01-16 湖北工业大学 Marching type ramine stripping machine

Also Published As

Publication number Publication date
CN103741226A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN105780130A (en) Full-automatic ramie decorticator
CN103215654B (en) Automatic ramie stalk separator
CN105455049A (en) Full-automatic production system and method of crabsticks
CN104630903A (en) Novel sisal fiber extraction method and device
CN103741226B (en) Jute batch peeling machine
CN203709216U (en) Chestnut husking machine with rubber-covered rollers
CN201205072Y (en) Bristle automatic hair carding machine
CN203021702U (en) Leather fiber decomposing machine
CN203801298U (en) Fast sugarcane leaf removal machine in harvest
CN203947114U (en) The leather stretching device of safety
CN102581915B (en) Peeling fluffer of cotton stalks
CN104818534A (en) Bidirectional sectional feeding automatic fiber extractor
CN105950794B (en) Fresh sheepskin depilator
CN205321118U (en) Full -automatic production system of crab meat stick
CN103918403A (en) Fast leaf stripping machine for sugarcane harvesting
CN202588168U (en) Sheep debristling machine
CN102138388A (en) Smashed straw machine
CN204625840U (en) Multi-functional plant fiber extractor
WO2011086564A1 (en) Automatic high speed jute ribboning machine and the process thereof
CN201905049U (en) Crop straw smashing and returning machine
CN204491045U (en) A kind of ramie hulling machine
CN206776642U (en) Donkey hide unhairing machine
CN204589384U (en) A kind of batch (-type) pineapple leaves scraping machine
CN204930325U (en) A kind of mushroom removes leg machine
CN201047000Y (en) Automatic flax breaker

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Li Xianqiang

Inventor before: Hong Man

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151124

Address after: Fangchenggang Shangsi county the Guangxi Zhuang Autonomous Region 535000 Si Jing Yang Zhen Road No. 45

Applicant after: Li Xianqiang

Address before: 535000, C2bB402, two, Bailey, Qinzhou, the Guangxi Zhuang Autonomous Region

Applicant before: Hong Man

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181213

Address after: 230031 B-1014, 10 floor, business office building, Wo Ye garden, Shushan District, Hefei, Anhui.

Patentee after: HEFEI WISDOM LOTUT INTELLECTUAL PROPERTY Co.,Ltd.

Address before: No. 45 Jingdong Road, Siyang Town, Shangsi County, Fangchenggang City, 535000 Guangxi Zhuang Autonomous Region

Patentee before: Li Xianqiang

Effective date of registration: 20181213

Address after: 233010 409 Wu Wan Road, Yuhui District, Bengbu, Anhui

Patentee after: BENGBU JINSHI NEW MATERIAL Co.,Ltd.

Address before: 230031 B-1014, 10 floor, business office building, Wo Ye garden, Shushan District, Hefei, Anhui.

Patentee before: HEFEI WISDOM LOTUT INTELLECTUAL PROPERTY Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20190712

Address after: Ganquan road Shushan District of Hefei City, Anhui Province, 230000 West hillock road to the South Wild Garden commercial office building room B-1512

Patentee after: ANHUI YINGLONG INDUSTRIAL DESIGN Co.,Ltd.

Address before: 233010 No. 409 Wuwan Road, Yuhui District, Bengbu City, Anhui Province

Patentee before: BENGBU JINSHI NEW MATERIAL Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191218

Address after: 065400 Hanzhuang village, Qukou Town, Xianghe County, Langfang City, Hebei Province

Patentee after: Xianghe Xietian construction equipment Leasing Co.,Ltd.

Address before: Ganquan road Shushan District of Hefei City, Anhui Province, 230000 West hillock road to the South Wild Garden commercial office building room B-1512

Patentee before: ANHUI YINGLONG INDUSTRIAL DESIGN Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200325

Address after: 233400 building 111, No.8 pedestrian street, middle section of Yuwang Road, Huaiyuan County, Bengbu City, Anhui Province

Patentee after: Huaiyuan Hanbang Technology Consulting Co.,Ltd.

Address before: 065400 Hanzhuang village, Qukou Town, Xianghe County, Langfang City, Hebei Province

Patentee before: Xianghe Xietian construction equipment Leasing Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230113

Address after: 276000 413, block B, Chuangxin building, high tech Industrial Development Zone, Linyi City, Shandong Province

Patentee after: Linyi high tech Zone Talent vocational training school Co.,Ltd.

Address before: 233400 building 111, No.8, pedestrian street, middle section of Yuwang Road, Huaiyuan County, Bengbu City, Anhui Province

Patentee before: Huaiyuan Hanbang Technology Consulting Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

CF01 Termination of patent right due to non-payment of annual fee