The monorail crane locomotive transportation resources that car load is allocated and transported safely and fast in gallery
Technical field
The present invention relates to transport field under coal mine.
Background technology
At present, monorail crane locomotive has become the important transportation equipment of down-hole mining tunnel, colliery transported material, and after Mining Area exploitation finishes, monorail crane locomotive is also maneuvered into accordingly other exploiting field and transports material.Conventionally in old mine between the exploiting field of same level because distance does not realize single track hanging beam circuit network, locomotive driving cabin, drive division, lifting beam and all kinds of pipeline, Circuits System completely knocked down can only be bundled on the car of large square position, transport other exploiting field to and assemble again use.Whole dismounting, transportation, assembling process, complicated loaded down with trivial details holding time is long, and the monorail crane locomotive fault re-assemblying is many, is difficult at short notice normally operation, has wasted manpower and materials and time, has had a strong impact on mine normal production.
Summary of the invention
The object of the invention is, for solving the deficiencies in the prior art, provides the transportation resources that car load is allocated and transported safely and fast in gallery of a kind of monorail crane locomotive.
For achieving the above object, technical scheme of the present invention is:
The monorail crane locomotive transportation resources that car load is allocated and transported safely and fast in gallery, is characterized in that, concrete steps are:
The first step, first according to prepare think allocation and transportation the size of monorail crane locomotive and the profile of joint number, process the transportation frame corresponding with its size and joint number, transportation frame is provided with one section of single track hanging beam; Reprocess the row size double track square position car corresponding with transportation frame with joint number, and by all transportation frame placement positioning on square position car separately.
Second step, according to monorail crane locomotive, respectively save again the size of pipe link, the processing and fabricating single track hanging beam short circuit head that energy level turns to accordingly, by short circuit head, the single track hanging beam on all transportation frames is movably connected, all square positions car and double track traction electric motor are coupled together, common group is listed as into row transports whole transport trolley of monorail crane locomotive again.
The 3rd step, whole the transport trolley that group has been listed as are transported to exploitation and finish rear exploiting field, rest in the transhipment station of monorail crane, the former single track hanging beam line end of transhipment station is adjusted downwards, adjust to transportation frame unwheeling on single track hanging beam equal height, then both are docking together; Then preparing to think that the monorail crane locomotive of allocation and transportation drives on the hanging beam of whole transport trolley; The flame-out lock of executing after traction electric motor comes to a complete stop, the junction of the hanging beam in the end of former single track hanging beam circuit and transportation frame unwheeling is taken apart, pipe link between each monorail crane locomotive joint is taken apart, and whole the transport trolley that is loaded with monorail crane locomotive with traction electric machine handlebar is transported to the new exploiting field that arranges single track hanging beam circuit;
The 4th step, the single track hanging beam circuit of new exploiting field transhipment station end is adjusted downwards, adjust to transportation frame unwheeling on single track hanging beam equal height, then both are docking together; Again the pipe link between each monorail crane locomotive joint is connected, check errorless; Start monorail crane locomotive, monorail crane locomotive is reached in whole transport trolley the single track hanging beam circuit of transhipment station, so far allocated and transported.
Good effect of the present invention is: when at the exploiting field of down-hole same level allocation and transportation monorail crane locomotive, realized integral transportation, avoided locomotive driving cabin, drive division, lifting beam and all kinds of pipeline, Circuits System completely knocked down and re-assemblied process, a large amount of manpower and materials and time have been saved, improved monorail crane locomotive service efficiency, guaranteed that mine normally keeps the safety in production.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention..
In figure: 1-double track traction electric motor, 2-transportation frame, 3-single track hanging beam, 4-short circuit head, 5-square position car, 6-pipe link, 7-monorail crane locomotive, 8-single track hanging beam circuit, 9-permutation transport trolley.
The specific embodiment
With reference to accompanying drawing, method of the present invention is described in detail below.
As shown in Figure 1, for achieving the above object, technical scheme of the present invention is: the transportation resources that car load is allocated and transported safely and fast in gallery of a kind of monorail crane locomotive, and concrete steps are:
The first step, first according to prepare think allocation and transportation the size of monorail crane locomotive 7 and the profile of joint number, process the transportation frame 2 corresponding with its size and joint number, transportation frame 2 is provided with one section of single track hanging beam 3; Reprocess a row size and the joint number double track square position car 5 corresponding with transportation frame 2, and by all transportation frame 2 placement positioning on square position car 5 separately.
Second step, again according to the size of the each joint of monorail crane locomotive 7 pipe link 6, the single track hanging beam short circuit head 4 that processing and fabricating accordingly can level turns to, by short circuit head 4, the single track hanging beam 3 on all transportation frames 2 is movably connected, all square positions car 5 and double track traction electric motor 1 are coupled together, common group is listed as into row transports the permutation transport trolley 9 of monorail crane locomotive 7 again.
The 3rd step, the permutation transport trolley 9 that group has been listed as are transported to exploitation and finish rear exploiting field, rest in the transhipment station of monorail crane, former single track hanging beam circuit 8 ends of transhipment station are adjusted downwards, adjust to transportation frame unwheeling on single track hanging beam 3 equal height, then both are docking together; Then preparing to think that the monorail crane locomotive 7 of allocation and transportation drives on the single track hanging beam 3 of whole transport trolley; The flame-out lock of executing after traction electric motor 1 comes to a complete stop, the junction of the hanging beam 3 in the end of former single track hanging beam circuit 8 and transportation frame unwheeling is taken apart, pipe link 6 between each monorail crane locomotive joint is taken apart, and the permutation transport trolley 9 that is loaded with monorail crane locomotive with traction electric motor 1 handle is transported to the new exploiting field that arranges single track hanging beam circuit;
The 4th step, the single track hanging beam circuit of new exploiting field transhipment station end (8 in similar Fig. 1) is adjusted downwards, adjust to transportation frame unwheeling on single track hanging beam 3 equal height, then both are docking together; Again the pipe link 4 between each monorail crane locomotive 7 joint is connected, check errorless; Start monorail crane locomotive 7, the single track hanging beam circuit (8 similar Fig. 1) that monorail crane locomotive 7 is reached in permutation transport trolley 9 to transhipment station is upper, has has so far allocated and transported.