CN103729682B - 一种三相不平衡判别方法 - Google Patents
一种三相不平衡判别方法 Download PDFInfo
- Publication number
- CN103729682B CN103729682B CN201410025652.0A CN201410025652A CN103729682B CN 103729682 B CN103729682 B CN 103729682B CN 201410025652 A CN201410025652 A CN 201410025652A CN 103729682 B CN103729682 B CN 103729682B
- Authority
- CN
- China
- Prior art keywords
- urgent
- phase imbalance
- phase
- data
- degree
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明涉及一种三相不平衡判别方法,先分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据,给出最大相电流的急迫指数因子和配变检修急迫度的影响因子;再建立急迫指数模型和综合急迫度;最后对不同配变的三相不平衡改造的急迫度进行星级评价,分析台区配变情况。本发明方法给电网工作人员提供一个更科学更有效的三相不平衡的判别方式,以指导三相不平衡的配变台区改造。
Description
技术领域
本发明涉及数据处理技术,特别是一种三相不平衡判别方法。
背景技术
在配电台区中,变压器担负着配电和送电的重要的任务,是配电台区的中心枢纽。配电台区的线路网络则为变压器的传输电能的通道。科学的、合理的线路网络结构是变压器的安全、优质和低损供电的重要的保证。而三相负荷平衡既是平衡台区线路网络结构合理性的重要根据也是变压器正常运行的基本要求,三相负荷能否平衡,不仅关系到变压器供电的可靠性和稳定性,而且关系到变压器供电的损耗率。当前在电网运行过程中,三相不平衡已经成为常态。三相不平衡会带来变压器损耗增加、零序电流过大,局部金属件温升过高甚至烧断线路、烧毁变压器等严重后果。而且三相不平衡与低电压、低功率因数等异常存在明显的相关性,因此,对三相不平衡进行有针对性的改造显得尤为必要。
目前,较流行的对三相不平衡的筛选规则是基于一定的经验基础和实践基础,但是也存在一定的局限性。特别地,例如,一些严重三相不平衡情况没有被纳入范畴,没有建立系统的三相不平衡判别模型,无法对三相不平衡的严重程度做出评价。增加了电网的工作负责度。总体来看,这些方法在计算方面比较复杂,且计算量也较大,效果不理想。
发明内容
本发明的目的在于提供一种判别效果好、精度高的三相不平衡判别方法。
为实现上述目的,本发明的技术方案是:一种三相不平衡判别方法,先分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据,给出最大相电流的急迫指数因子和配变检修急迫度的影响因子;再建立急迫指数模型和综合急迫度;最后对不同配变的三相不平衡改造的急迫度进行星级评价,分析台区配变情况;
其中,所述急迫指数模型,具体建立步骤如下:
S01:对三相不平衡的数据进行预处理,根据数据分布,剔除异常数据,修复缺失数据;
S02:定义关于最大相电流的急迫指数因子,作为模型的一个变量,其中,是常数,为第i台配变的最大相电流,IAi,IBi,ICi分别为A、B、C三相的电流;
S03:计算三相电流的不平衡度,其中为第i台配变的最大和最小相电流,根据三相电流不平衡度定义配变检修急迫度的影响因子,作为模型的另一个变量,其中,是常数,为集合中元素的个数,为采集时点三相电流不平衡度属于所对应的下标的集合,取,;
S04:建立急迫指数模型,其中为示性函数,;为一天中三相电流不平衡度大于的采集时点个数;为配变改造的急迫指数,当时,配变改造最为急迫,需马上对变压器进行报修;
S05:在一个月内,若有10天或10天以上出现三相不平衡,则认为此配变属于三相不平衡,假设一个月内天的三相不平衡急迫指数分别为:,则可得此配变在一个月内的三相不平衡综合急迫指数为:,其中为示性函数,。
所述三相不平衡判别方法还包括如下步骤,
S21:从用电信息采集系统中获取相关数据;
S22:通过分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据;
S23:将预处理后的数据代入到急迫指数模型中;
S24:计算出各分区配变三相不平衡的急迫指数,对不同配变的三相不平衡改造的急迫度进行星级评价。
相较于现有技术,本发明具有以下有益效果:本发明的三相不平衡判别方法,先采集历史数据并作预处理,再建立二元方程的模型,从而代入数据检验台区配变三相不平衡的严重程度,给电网工作人员提供一个更科学更有效的三相不平衡的判别方式,以指导三相不平衡的配变台区改造。
附图说明
图1是本发明实施例的方法建立模型的流程图。
图2是本发明实施例的方法检验三相不平衡的严重程度的流程图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围。
如图1所示,本发明一种三相不平衡判别方法,先分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据,给出最大相电流的急迫指数因子和配变检修急迫度的影响因子;再建立急迫指数模型和综合急迫度;最后对不同配变的三相不平衡改造的急迫度进行星级评价,分析台区配变情况;
其中,所述急迫指数模型,具体建立步骤如下:
S01:对三相不平衡的数据进行预处理,根据数据分布,剔除异常数据,修复缺失数据;
S02:定义关于最大相电流的急迫指数因子,作为模型的一个变量,其中,是常数,为第i台配变的最大相电流,IAi,IBi,ICi分别为A、B、C三相的电流;
S03:计算三相电流的不平衡度,其中为第i台配变的最大和最小相电流,根据三相电流不平衡度定义配变检修急迫度的影响因子,作为模型的另一个变量,其中,是常数,为集合中元素的个数,为采集时点三相电流不平衡度属于所对应的下标的集合,取,;
S04:建立急迫指数模型,其中为示性函数,;为一天中三相电流不平衡度大于的采集时点个数;为配变改造的急迫指数,当时,配变改造最为急迫,需马上对变压器进行报修;
S05:在一个月内,若有10天或10天以上出现三相不平衡,则认为此配变属于三相不平衡。假设一个月内天的三相不平衡急迫指数分别为:,则可得此配变在一个月内的三相不平衡综合急迫指数为:,其中为示性函数,。
如图2所示,本发明所述三相不平衡判别方法还包括如下步骤,
S21:从用电信息采集系统中获取相关数据;
S22:通过分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据;
S23:将预处理后的数据代入到急迫指数模型中;
S24:计算出各分区配变三相不平衡的急迫指数,对不同配变的三相不平衡改造的急迫度进行星级评价。
以上是本发明的较佳实施例,凡依本发明技术方案所作的改变,所产生的功能作用未超出本发明技术方案的范围时,均属于本发明的保护范围。
Claims (2)
1.一种三相不平衡判别方法,其特征在于:先分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据,给出最大相电流的急迫指数因子和配变检修急迫度的影响因子;再建立急迫指数模型和综合急迫度;最后对不同配变的三相不平衡改造的急迫度进行星级评价,分析台区配变情况;
其中,所述急迫指数模型,具体建立步骤如下:
S01:对三相不平衡的数据进行预处理,根据数据分布,剔除异常数据,修复缺失数据;
S02:定义关于最大相电流的急迫指数因子作为模型的一个变量,其中,a1,a2是常数,为第i台配变的最大相电流,IAi,IBi,ICi分别为A、B、C三相的电流;
S03:计算三相电流的不平衡度其中为第i台配变的最大和最小相电流,根据三相电流不平衡度定义配变检修急迫度的影响因子作为模型的另一个变量,其中,b1,b2是常数,j为集合w中元素的个数,为采集时点三相电流不平衡度属于[ηa,ηb]所对应的下标的集合,取ηa=60%,ηb=90%;
S04:建立急迫指数模型其中Hk为示性函数,k为一天中三相电流不平衡度大于ηb的采集时点个数;ζ∈[0,1]为配变改造的急迫指数,当ζ=1时,配变改造最为急迫,需马上对变压器进行报修;
S05:在一个月内,若有10天或10天以上出现三相不平衡,则认为此配变属于三相不平衡,假设一个月内P天的三相不平衡急迫指数分别为:ζ1,ζ2,…ζP,则可得此配变在一个月内的三相不平衡综合急迫指数为:其中Mp为示性函数,
2.根据权利要求1所述的一种三相不平衡判别方法,其特征在于:所述三相不平衡判别方法还包括如下步骤,
S21:从用电信息采集系统中获取相关数据;
S22:通过分析实际三相不平衡的数据分布,剔除异常数据,修复缺失数据;
S23:将预处理后的数据代入到急迫指数模型中;
S24:计算出各分区配变三相不平衡的急迫指数,对不同配变的三相不平衡改造的急迫度进行星级评价。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410025652.0A CN103729682B (zh) | 2014-01-21 | 2014-01-21 | 一种三相不平衡判别方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410025652.0A CN103729682B (zh) | 2014-01-21 | 2014-01-21 | 一种三相不平衡判别方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103729682A CN103729682A (zh) | 2014-04-16 |
CN103729682B true CN103729682B (zh) | 2016-08-17 |
Family
ID=50453744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410025652.0A Active CN103729682B (zh) | 2014-01-21 | 2014-01-21 | 一种三相不平衡判别方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103729682B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111490540B (zh) * | 2020-05-18 | 2023-05-12 | 江苏电力信息技术有限公司 | 基于三相不平衡度判定的配变台区指标大数据生成方法 |
CN112132330B (zh) * | 2020-09-11 | 2021-11-30 | 国网山东省电力公司临沂供电公司 | 一种电网相位不平衡判断和调整方法 |
CN113127469B (zh) * | 2021-04-27 | 2023-03-24 | 国网内蒙古东部电力有限公司信息通信分公司 | 一种三相不平衡数据的缺失值的填补方法及系统 |
CN114336691A (zh) * | 2021-12-29 | 2022-04-12 | 广东电网有限责任公司 | 三相负荷不平衡监测方法、装置、计算机设备和存储介质 |
CN118249234B (zh) * | 2024-05-29 | 2024-07-19 | 山西济达电气股份有限公司 | 一种具备环保节能功能的智能高压成套开关设备 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050117267A (ko) * | 2004-06-10 | 2005-12-14 | (주)드림파워텍 | 3상모터 선전류 평형과 전압보상 콘덴서를 이용한전력절감기 |
CN102570459A (zh) * | 2012-02-15 | 2012-07-11 | 中国电力科学研究院 | 一种电压质量的监控方法 |
CN103401238A (zh) * | 2013-08-02 | 2013-11-20 | 深圳市双合电气股份有限公司 | 一种基于总体测辨法的电力负荷建模方法 |
-
2014
- 2014-01-21 CN CN201410025652.0A patent/CN103729682B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050117267A (ko) * | 2004-06-10 | 2005-12-14 | (주)드림파워텍 | 3상모터 선전류 평형과 전압보상 콘덴서를 이용한전력절감기 |
CN102570459A (zh) * | 2012-02-15 | 2012-07-11 | 中国电力科学研究院 | 一种电压质量的监控方法 |
CN103401238A (zh) * | 2013-08-02 | 2013-11-20 | 深圳市双合电气股份有限公司 | 一种基于总体测辨法的电力负荷建模方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103729682A (zh) | 2014-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103729682B (zh) | 一种三相不平衡判别方法 | |
CN106505593B (zh) | 一种基于大数据的配变三相不平衡分析与负荷调整的方法 | |
CN107464048B (zh) | 一种基于研究态的日前计划安全校核方法 | |
CN107766971B (zh) | 一种基于检修风险的电力设备运维计划优排方法 | |
CN106126901B (zh) | 一种多维度信息融合的变压器可用状态在线评估方法 | |
CN107516896B (zh) | 一种基于决策树剪枝算法的负荷恢复方案生成方法 | |
Vignesh et al. | An experimental study on the load modelling using PMU measurements | |
CN105119288A (zh) | 一种多回直流频率限制控制器的协调控制及参数优化方法 | |
CN103560497B (zh) | 一种基于电网拓扑调整的短路电流限制方法 | |
CN104331742A (zh) | 基于多目标拟态物理学的输电线路差异化运维优化方法及系统 | |
CN104091289A (zh) | 基于接线模式规则的大规模配电网n-1快速校验方法 | |
CN102982420A (zh) | 基于多目标决策理想点法的资产全寿命周期评估方法 | |
CN113052473A (zh) | 一种基于故障率和静态安全分析的电网风险分析方法 | |
CN109829246B (zh) | 一种基于参数综合可疑度的线路参数辨识方法 | |
CN103903103A (zh) | 基于流程化的跨区域电网运行方式在线模型参数收集方法 | |
Gupta et al. | Power system network equivalents: Key issues and challenges | |
CN104332994A (zh) | 配电网的供电平衡方法 | |
CN106374455B (zh) | 一种220kV城市电网分区最大供电能力计算方法 | |
CN104112240A (zh) | 一种基于拓扑岛分析的停电分析方法 | |
Jensen et al. | Hosting Capacity: A Tool for Modernizing the Grid | |
Abdelouadoud et al. | Iterative linear cuts strenghtening the second-order cone relaxation of the distribution system optimal power flow problem | |
CN105512816B (zh) | 快速确定电网电压和无功分布重要影响因素的方法 | |
Duan et al. | Research on the application of maximal tree method based on fuzzy clustering for Power Quality Evaluation | |
CN111310855B (zh) | 一种基于MapReduce的多数据源规划态数据融合方法 | |
Nowak et al. | Measurement-based network model reduction of distribution systems using two-port networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |