CN103726674A - Lattice-column dismounting method - Google Patents

Lattice-column dismounting method Download PDF

Info

Publication number
CN103726674A
CN103726674A CN201310739077.6A CN201310739077A CN103726674A CN 103726674 A CN103726674 A CN 103726674A CN 201310739077 A CN201310739077 A CN 201310739077A CN 103726674 A CN103726674 A CN 103726674A
Authority
CN
China
Prior art keywords
lattice column
post
column
chain block
lattice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310739077.6A
Other languages
Chinese (zh)
Other versions
CN103726674B (en
Inventor
李涛
顾阳华
戴中剑
张捷
邱晨斌
柯辰良
钱玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201310739077.6A priority Critical patent/CN103726674B/en
Publication of CN103726674A publication Critical patent/CN103726674A/en
Application granted granted Critical
Publication of CN103726674B publication Critical patent/CN103726674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a lattice-column dismounting method. Firstly, the upper portion of a lattice column to be dismounted is cut, so that the lattice column is divided into an upper column section and a lower column portion body; a chain block is arranged on the upper column section, one end of the chain block is provided with a stay cable, the other end of the chain block is provided with a pothook, the upper end of the lower column portion body is hooked by the pothook, and the chain block is tightened through the stay cable; then inclined cutting is conducted on the lower portion of the lower column portion body, so that the lower column portion body is divided into a column body middle section and a column lower section; finally, the lower end of the column body middle section is pulled sideward through a pulling rope, the pothook is gradually released downwards at the same time, and therefore the column body middle section is taken down. When the lattice column is dismounted, the chain block is used for lifting, so that impact damage to the structure caused by an existing crushing method is avoided, and meanwhile fragment high-altitude falling accidents are eliminated. Thus, because the main body of the lattice column can be used after being stored, very prominent economic benefits are obtained.

Description

Lattice column method for dismounting
Technical field
The invention belongs to the realm of building construction, relate in particular to a kind of lattice column method for dismounting.
Background technology
Present stage, the interim lattice column of great majority is removed to adopt and is cut broken method, specifically refers in a side of lattice column and sets up interim pin hand system, from top to bottom, lattice column is broken into fritter, is then deposited in place wait and moves.
The method, on the one hand, lattice column is after fragmentation, and fragment can not carry out other and utilize, and can only serve as building waste and sell off, very unfortunate; On the other hand, even if take certain damping and safety prevention measure in shattering process, but in the process of lattice column fragmentation, there is the danger of falling from high altitude in the fragment not only dropping, and shattering process to structure cause vibrations and impact, cause structure to leave potential safety hazard.
Therefore, how providing a kind of can lattice column method for dismounting safety and that can improve lattice column recycling rate be those skilled in the art's technical problems urgently to be resolved hurrily.
Summary of the invention
The object of the present invention is to provide a kind of lattice column method for dismounting, can guarantee the roughly integrality after lattice column dismounting, both safety, can improve again the recycling rate of lattice column.
To achieve the above object, the present invention adopts following technical scheme:
A kind of lattice column method for dismounting, comprises the steps:
The first step, cuts on the top of pre-demolition lattice column, makes described lattice column be divided into post epimere and post sub-body;
Second step arranges Chain block on described post epimere, and one end of described Chain block has drag-line, and the other end of described Chain block is provided with hook, and described hook catches on the upper end of described post sub-body, and tightens up described Chain block by described drag-line;
The 3rd step, carries out oblique cutting in the bottom of described post sub-body, makes described post sub-body be divided into post main body stage casing and post hypomere;
The 4th step, by the lower end in post main body stage casing described in pulling rope layback, progressively transfers described hook, thereby takes off described post main body stage casing, to recycle simultaneously.
Preferably, in above-mentioned lattice column method for dismounting, described lattice column comprises the web that four blocks of angle steel and some longitudinal separation along described four blocks of angle steel arrange, and described web is connected to form a hollow rectangle post by four blocks of angle steel, and described post epimere comprises at least one block of web.
Preferably, in the described first step, on the top of pre-demolition lattice column, carry out horizontal resection, the distance of the end face of lattice column is 40-60 centimetre described in the positional distance of horizontal resection.
Preferably, in described second step, described hook catches on the bottom that is positioned at the web of the top on described post sub-body.
Preferably, in described the 3rd step, the angular range of oblique cutting is 30-60 degree.
Preferably, in described the 3rd step, the angle of oblique cutting is 45 degree.
Lattice column method for dismounting provided by the invention, first cuts on the top of pre-demolition lattice column, makes described lattice column be divided into post epimere and post sub-body; On described post epimere, Chain block is set again, one end of described Chain block has drag-line, and the other end of described Chain block is provided with hook, and described hook catches on the upper end of described post sub-body, and tightens up described Chain block by described drag-line; Then in the bottom of described post sub-body, carry out oblique cutting, make described post sub-body be divided into post main body stage casing and post hypomere; Finally, by the lower end in post main body stage casing described in pulling rope layback, progressively transfer described hook, thereby take off described post main body stage casing, to recycle, it compares the method that existing lattice column fragmentation is reclaimed afterwards simultaneously, and it has the following advantages:
First: be to preserve the integrality of lattice column, make it can do secondary utilization.The whole section of lattice column for example removing made the construction interface (as later stage end well retaining wall) of required framed bent as top, permanent hole steel concrete shuttering, significantly reduced high framed bent service condition, increased the safety of construction.Also saved the input of the steel work (i iron, channel-section steel or shaped steel) of again buying for erection construction interface.Therefore, there is significant economic effect meaning.
Second: during dismounting, adopt cucurbit lifting, the impact injury of having avoided existing breaking method to cause structure.
The 3rd: safe and reliable, avoid the personnel's incident of injury that causes falling object from high altitude to produce because of fault.
The the 4th: be convenient to reclaim, reduce and stack the material disappearance causing while moving.
Accompanying drawing explanation
Lattice column method for dismounting of the present invention is provided by following embodiment and accompanying drawing.
Fig. 1 to Fig. 4 is each step structural representation of the lattice column method for dismounting of one embodiment of the invention;
In figure, 11-post epimere, 12-post main body stage casing, 13-post hypomere, 2-Chain block, 21-drag-line 22-hook, 3-pulling rope.
The specific embodiment
Below will be described in further detail lattice column method for dismounting of the present invention.
Below with reference to accompanying drawings the present invention is described in more detail, has wherein represented the preferred embodiments of the present invention, should be appreciated that those skilled in the art can revise the present invention described here and still realize advantageous effects of the present invention.Therefore, following description is appreciated that extensively knowing for those skilled in the art, and not as limitation of the present invention.
For object of the present invention, feature are become apparent, below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described.It should be noted that, accompanying drawing all adopts very the form of simplifying and all uses non-ratio accurately, only in order to convenient, the object of the aid illustration embodiment of the present invention lucidly.
Metro station engineering space enclosing structure adopts all the other steel supporting forms of first road concrete support, and vertical supporting adopts lattice column form to come rest concrete support and steel support link.Top board construction to structure is complete, according to design, need to cut off lattice column.
The present embodiment discloses a kind of lattice column method for dismounting, comprises the steps:
The first step, as shown in Figure 1, cuts on the top of pre-demolition lattice column, i.e. the first cut point makes described lattice column be divided into post epimere 11 and post sub-body.Described lattice column comprises the web 102 that four blocks of angle steel 101 and some longitudinal separation along described four blocks of angle steel 101 arrange, described web 102 is connected to form a hollow rectangle post by four blocks of angle steel 101, described post epimere 11 comprises at least one block of web 102, so can be so that Chain block 2 is set.
Preferably, in above-mentioned lattice column method for dismounting, on the top of pre-demolition lattice column, carry out horizontal resection, the distance of the end face of lattice column is 40-60 centimetre described in the positional distance of horizontal resection.The position of described horizontal resection, be as far as possible close to the end face of lattice column, will guarantee to comprise a web 102 in described post epimere 11 simultaneously, so that described Chain block 2 is set on this web 102, will be conducive in addition cutting.Described in the positional distance of horizontal resection, the distance of the end face of lattice column is 40-60 centimetre, considers above-mentioned three factors and determines.
Second step as shown in Figure 2, arranges Chain block 2 on described post epimere 11, one end of described Chain block 2 has drag-line 21, the other end of described Chain block 2 is provided with hook 22, and described hook 22 catches on the upper end of described post sub-body, and tightens up described Chain block 2 by described drag-line 21.By Chain block 2 is set; not only can be laborsaving, and can realize steadily transferring of subsequent columns main body stage casing 12, be not only conducive to guard column main body stage casing 12; and can prevent that lattice column from impacting structure in cutting and decentralization process, plays the object of protection structure
Preferably, in above-mentioned lattice column method for dismounting, described hook 22 catches on the bottom that is positioned at the web 102 of the top on described post sub-body, thus can make to link up with 22 and post sub-body between connection more firm, and do not need hanging hole is additionally set yet, saved manpower and materials.
The 3rd step, as shown in Figure 3, carries out oblique cutting in the bottom of described post sub-body, i.e. the second cut point makes described post sub-body be divided into post main body stage casing 12 and post hypomere 13.
Preferably, in above-mentioned lattice column method for dismounting, the angular range of oblique cutting is 30-60 degree.This angular range can be so that cutting.In the present embodiment, the angle of oblique cutting is 45 degree.
The 4th step, as shown in Figure 4, by the lower end in post main body stage casing 12 described in pulling rope 3 laybacks, progressively transfers described hook 22, thereby takes off described post main body stage casing 12 to recycle simultaneously.One end 3 of described pulling rope is sheathed on the lower end in described post main body stage casing 12.
Compare the method that existing lattice column fragmentation is reclaimed afterwards, lattice column method for dismounting provided by the invention, during dismounting, adopt Chain block 2 liftings, the impact injury of not only having avoided existing breaking method to cause structure, eliminated the security incident that fragment falling from high altitude causes simultaneously, in addition, owing to can having preserved the main part of lattice column, it is post main body stage casing 12, can recycle this post main body stage casing 12, the whole section of lattice column for example removing made the construction interface (as later stage end well retaining wall) of required framed bent as top, permanent hole steel concrete shuttering, significantly reduced high framed bent service condition, increased the safety of construction.Also the input of having saved the steel work (i iron, channel-section steel or shaped steel) of again buying for erection construction interface, therefore, has the economic benefit of highly significant.

Claims (6)

1. a lattice column method for dismounting, is characterized in that, comprises the steps:
The first step, cuts on the top of pre-demolition lattice column, makes described lattice column be divided into post epimere and post sub-body;
Second step arranges Chain block on described post epimere, and one end of described Chain block has drag-line, and the other end of described Chain block is provided with hook, and described hook catches on the upper end of described post sub-body, and tightens up described Chain block by described drag-line;
The 3rd step, carries out oblique cutting in the bottom of described post sub-body, makes described post sub-body be divided into post main body stage casing and post hypomere;
The 4th step, by the lower end in post main body stage casing described in pulling rope layback, progressively transfers described hook, thereby takes off described post main body stage casing, to recycle simultaneously.
2. lattice column method for dismounting according to claim 1, it is characterized in that, described lattice column comprises the web that four blocks of angle steel and some longitudinal separation along described four blocks of angle steel arrange, described web is connected to form a hollow rectangle post by four blocks of angle steel, and described post epimere comprises at least one block of web.
3. lattice column method for dismounting according to claim 2, is characterized in that, in the described first step, on the top of pre-demolition lattice column, carries out horizontal resection, and the distance of the end face of lattice column is 40-60 centimetre described in the positional distance of horizontal resection.
4. lattice column method for dismounting according to claim 3, is characterized in that, in described second step, described hook catches on the bottom that is positioned at the web of the top on described post sub-body.
5. lattice column method for dismounting according to claim 1, is characterized in that, in described the 3rd step, the angular range of oblique cutting is 30-60 degree.
6. lattice column method for dismounting according to claim 5, is characterized in that, in described the 3rd step, the angle of oblique cutting is 45 degree.
CN201310739077.6A 2013-12-27 2013-12-27 Lattice column method for dismounting Active CN103726674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310739077.6A CN103726674B (en) 2013-12-27 2013-12-27 Lattice column method for dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310739077.6A CN103726674B (en) 2013-12-27 2013-12-27 Lattice column method for dismounting

Publications (2)

Publication Number Publication Date
CN103726674A true CN103726674A (en) 2014-04-16
CN103726674B CN103726674B (en) 2016-01-13

Family

ID=50450945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310739077.6A Active CN103726674B (en) 2013-12-27 2013-12-27 Lattice column method for dismounting

Country Status (1)

Country Link
CN (1) CN103726674B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339482A (en) * 2018-10-15 2019-02-15 上海宝钢节能环保技术有限公司 A kind of boring method of underground flue
CN115110530A (en) * 2022-08-22 2022-09-27 浙江交工集团股份有限公司 Construction method of ultra-deep foundation pit reinforced concrete support dismantling structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01191100A (en) * 1988-01-26 1989-08-01 Toda Constr Co Ltd Breaking and recovering method for block-shaped dismantled body
JP2004204506A (en) * 2002-12-25 2004-07-22 Kansai Electric Power Co Inc:The Base rod apparatus for hoisting concrete pole, and method of cutting and recovering concrete pole using the same
CN101838986A (en) * 2009-03-17 2010-09-22 上海市机械施工有限公司 Disassembling tool type lattice column and construction method thereof
CN102493676A (en) * 2011-12-20 2012-06-13 中国三冶集团有限公司结构制造安装工程公司 Method for dismounting single-layer dome netty structure of large gas storage cabinet top system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01191100A (en) * 1988-01-26 1989-08-01 Toda Constr Co Ltd Breaking and recovering method for block-shaped dismantled body
JP2004204506A (en) * 2002-12-25 2004-07-22 Kansai Electric Power Co Inc:The Base rod apparatus for hoisting concrete pole, and method of cutting and recovering concrete pole using the same
CN101838986A (en) * 2009-03-17 2010-09-22 上海市机械施工有限公司 Disassembling tool type lattice column and construction method thereof
CN102493676A (en) * 2011-12-20 2012-06-13 中国三冶集团有限公司结构制造安装工程公司 Method for dismounting single-layer dome netty structure of large gas storage cabinet top system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339482A (en) * 2018-10-15 2019-02-15 上海宝钢节能环保技术有限公司 A kind of boring method of underground flue
CN115110530A (en) * 2022-08-22 2022-09-27 浙江交工集团股份有限公司 Construction method of ultra-deep foundation pit reinforced concrete support dismantling structure
CN115110530B (en) * 2022-08-22 2024-04-26 浙江交工集团股份有限公司 Reinforced concrete support dismantling structure for ultra-deep foundation pit and construction method thereof

Also Published As

Publication number Publication date
CN103726674B (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN103485343B (en) Filling pile head processing method
CN105155553B (en) Concrete support Static crushing combines green Demolition Construction method with split the law
CN109356167A (en) Brace in Deep Footing Groove removes system and construction method
CN103233589A (en) Method for dismantling chimney by means of rope sawing and cutting method
CN103726674B (en) Lattice column method for dismounting
CN103590599B (en) From compacted clamping apparatus and using method
CN202520316U (en) Suspended safety isolator used in construction of tunnel shaft
CN206941586U (en) A kind of device for improving pile crown and abolishing efficiency
CN104032767A (en) Tower crane foundation in deep foundation pit and construction method of tower crane foundation
CN103334433B (en) A kind of construction method of pile pulling
CN204627124U (en) A kind of folding guardrail
CN103742193B (en) The mounting method of the soft filter pipe of a kind of underground goaf hydraulic fill
CN102677680A (en) Dismantling method for concrete waist beam
CN208455503U (en) Bridging toughening structural system
CN212235665U (en) Quick escape passage
CN104963344B (en) The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out
CN209686259U (en) Pier stud type highway bridge column removes device
CN204826697U (en) Railway continuous beam construction safety protective guard strides
CN107100661A (en) A kind of prefabricated assembled ultra-high performance concrete flue sheet structure
CN105155552B (en) The retracting device of foundation ditch interim cable bolting steel strand wires and recovery method
CN216517046U (en) Safety protective guard for aluminum formwork construction operation
CN213869893U (en) Reserved structure for long-term construction of subway station end
CN204940910U (en) Concrete support Static crushing dismounting structure
CN107338811A (en) Construction method that is a kind of while pouring the root architecture post of deformation joint two

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant