CN103726666A - Full-prefabricated structure component locating supporting construction method - Google Patents

Full-prefabricated structure component locating supporting construction method Download PDF

Info

Publication number
CN103726666A
CN103726666A CN201410007996.9A CN201410007996A CN103726666A CN 103726666 A CN103726666 A CN 103726666A CN 201410007996 A CN201410007996 A CN 201410007996A CN 103726666 A CN103726666 A CN 103726666A
Authority
CN
China
Prior art keywords
support
supports
prefabricated post
steel plate
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410007996.9A
Other languages
Chinese (zh)
Other versions
CN103726666B (en
Inventor
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sijian Construction Group Co Ltd
Original Assignee
成军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 成军 filed Critical 成军
Priority to CN201410007996.9A priority Critical patent/CN103726666B/en
Publication of CN103726666A publication Critical patent/CN103726666A/en
Application granted granted Critical
Publication of CN103726666B publication Critical patent/CN103726666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a full-prefabricated structure component locating supporting construction method which comprises the steps of prefabricated column oblique support fixing, prefabricated beam supporting, a prefabricated plate supporting, full-prefabricated structure supporting and the like. According to the method, construction is convenient, and effect is good. Implementation is easy, the technical problem that components such as a full-prefabricated structure beam plate column are high in mounting accuracy, and a bearing frame needs to be high in strength is solved, revolving materials are saved, and construction effect is improved.

Description

Full assembly structure member positioning supports construction method
Technical field
The present invention relates to a kind of full assembly structure member positioning supports construction method.
Background technology
In full-prefabricated assembly structural, PC structure floor bulk is assembled, the members such as slab column are installed high accuracy and are required bearing frame high strength, the construction technology of traditional fastener type steel pipe scaffold, and construction effect is low, precision bearing capacity is poor, cannot meet the needs of full assembly structure construction.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, effective full assembly structure member positioning supports construction method.
Technical solution of the present invention is:
A full assembly structure member positioning supports construction method, is characterized in that: comprise the following steps:
(1) prefabricated post diagonal brace is fixed
The support of prefabricated post adopts steel plate to fix, and adopts the welding of 14mm steel plate;
Before tower crane lifting, constructor is fixed on supporting steel plate in prefabricated post behind relevant position at lifting component, after the line of throwing according to surveyor in prefabricated post is in place, constructor is by the steel pipe support of diagonal brace on supporting steel plate and on the strong point of showing up;
(2) precast beam supports
The support of precast beam adopts speed to connect frame as support system, by the position of each support column unwrapping wire after floor has been cleared up, accurate positioning;
The jacking that beam low speed is connect to frame support customizes processing; The pre-buried S10 bolt of the prefabricated post at beam two ends is supported;
(3) precast plate supports
Wooden frame on jacking is that the 100*100 lumps of wood supports as line;
(4) full assembly structure supports
A, superposed beam dish pin socket joint tool type scaffold:
Figure 2014100079969100002DEST_PATH_IMAGE002
B, superimposed sheet bracing frame:
Figure 2014100079969100002DEST_PATH_IMAGE004
Easy construction of the present invention, effective.Easy to implement, solved the members such as full precast construction slab column and high accuracy has been installed and requires the high-intensity technical barrier of bearing frame, saved circulation material, improved construction effect.
Below in conjunction with embodiment, the invention will be further described.
The specific embodiment
A full assembly structure member positioning supports construction method, comprises the following steps:
(1) prefabricated post diagonal brace is fixed
The support of prefabricated post adopts steel plate to fix, and adopts the welding of 14mm steel plate;
Before tower crane lifting, constructor is fixed on supporting steel plate in prefabricated post behind relevant position at lifting component, after the line of throwing according to surveyor in prefabricated post is in place, constructor is by the steel pipe support of diagonal brace on supporting steel plate and on the strong point of showing up;
(2) precast beam supports
The support of precast beam adopts speed to connect frame as support system, by the position of each support column unwrapping wire after floor has been cleared up, accurate positioning;
The jacking that beam low speed is connect to frame support customizes processing; The pre-buried S10 bolt of the prefabricated post at beam two ends is supported;
(3) precast plate supports
Wooden frame on jacking is that the 100*100 lumps of wood supports as line;
(4) full assembly structure supports
A, superposed beam dish pin socket joint tool type scaffold:
B, superimposed sheet bracing frame:
This shows excellent effect of the present invention.

Claims (1)

1. a full assembly structure member positioning supports construction method, is characterized in that: comprise the following steps:
(1) prefabricated post diagonal brace is fixed
The support of prefabricated post adopts steel plate to fix, and adopts the welding of 14mm steel plate;
Before tower crane lifting, constructor is fixed on supporting steel plate in prefabricated post behind relevant position at lifting component, after the line of throwing according to surveyor in prefabricated post is in place, constructor is by the steel pipe support of diagonal brace on supporting steel plate and on the strong point of showing up;
(2) precast beam supports
The support of precast beam adopts speed to connect frame as support system, by the position of each support column unwrapping wire after floor has been cleared up, accurate positioning;
The jacking that beam low speed is connect to frame support customizes processing; The pre-buried S10 bolt of the prefabricated post at beam two ends is supported;
(3) precast plate supports
Wooden frame on jacking is that the 100*100 lumps of wood supports as line;
(4) full assembly structure supports
A, superposed beam dish pin socket joint tool type scaffold:
B, superimposed sheet bracing frame:
Figure 2014100079969100001DEST_PATH_IMAGE004
CN201410007996.9A 2014-01-08 2014-01-08 Full assembly structure component positioning supports construction method Active CN103726666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410007996.9A CN103726666B (en) 2014-01-08 2014-01-08 Full assembly structure component positioning supports construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410007996.9A CN103726666B (en) 2014-01-08 2014-01-08 Full assembly structure component positioning supports construction method

Publications (2)

Publication Number Publication Date
CN103726666A true CN103726666A (en) 2014-04-16
CN103726666B CN103726666B (en) 2016-02-17

Family

ID=50450937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410007996.9A Active CN103726666B (en) 2014-01-08 2014-01-08 Full assembly structure component positioning supports construction method

Country Status (1)

Country Link
CN (1) CN103726666B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476583A (en) * 2017-08-18 2017-12-15 国网上海市电力公司 A kind of concrete assembled building builds construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2411291Y (en) * 2000-03-30 2000-12-20 昆明理工大学 External prestressed structure for integral prestressed prefabricated sheet-pile buidling
JP2005188102A (en) * 2003-12-25 2005-07-14 Shimizu Corp Structure of building and construction method
CN201661086U (en) * 2010-03-15 2010-12-01 中山市快而居房屋预制件有限公司 Fully-prefabricated assembled integral reinforced concrete house
CN203174770U (en) * 2013-04-19 2013-09-04 深圳海龙建筑制品有限公司 Connection structure of prefabricated column and construction site base and building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2411291Y (en) * 2000-03-30 2000-12-20 昆明理工大学 External prestressed structure for integral prestressed prefabricated sheet-pile buidling
JP2005188102A (en) * 2003-12-25 2005-07-14 Shimizu Corp Structure of building and construction method
CN201661086U (en) * 2010-03-15 2010-12-01 中山市快而居房屋预制件有限公司 Fully-prefabricated assembled integral reinforced concrete house
CN203174770U (en) * 2013-04-19 2013-09-04 深圳海龙建筑制品有限公司 Connection structure of prefabricated column and construction site base and building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱勇年: "《高层建筑施工》", 30 April 2007, 中国建筑工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476583A (en) * 2017-08-18 2017-12-15 国网上海市电力公司 A kind of concrete assembled building builds construction method

Also Published As

Publication number Publication date
CN103726666B (en) 2016-02-17

Similar Documents

Publication Publication Date Title
JP3184322U (en) Solar panel mount
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN204278223U (en) Prefabricated case beam steel bar binding clamping fixture
CN106592775B (en) A kind of high-accuracy built-in fitting reinforces mounting device and method, purposes
JP2014163073A (en) Support frame mounting fitting, and photovoltaic power generation panel installation system
CN103835527A (en) Detachable shoring device and application thereof
CN104120802A (en) Simple method for mounting and locating seismic isolation support
CN102926554B (en) Steel hanging seat shuttering supporting and construction method thereof
JP5956214B2 (en) Foundation structure for the solar cell module support
CN103726666A (en) Full-prefabricated structure component locating supporting construction method
JP2015140648A (en) Construction method for frame, and frame
CN205119990U (en) Connection survey frame
CN204299181U (en) A kind of the fixed support that plate hangs mould falls
JP5819449B2 (en) Solar panel support jig
CN104481163B (en) A kind of L beam construction equipment for building structure reinforcing and method
CN104328795A (en) Locator for tower frame connection stand bar and mounting foundation bolt and using method of locator for tower frame connection stand bars and mounting foundation bolts
CN205172019U (en) Big shaped steel constructs horizontal migration device
CN105464367A (en) Reinforcing device for concrete upstand string formwork
CN103195079A (en) Installation type templates, installation type template group and set of installation type template devices
CN204040471U (en) A kind of Novel direct piece cap template
CN105586830A (en) Bridge template support
CN202114437U (en) Positioning device for foundation bolts
CN104846734A (en) Unit-assembly type steel trestle
JP2010084477A (en) Seismic control structure
CN204551517U (en) Round equipment is foot bolt positioning disk fundamentally

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Jiang Jian

Inventor after: Jiang Xiaoqian

Inventor after: Cheng Wei

Inventor after: Jiang Xiaobo

Inventor after: Xing Jianfeng

Inventor after: Wu Jun

Inventor after: Zhou Lifei

Inventor before: Cheng Jun

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160105

Address after: 226300, Nantong, Jiangsu province Tongzhou District Jinsha New Town West Building New Village No. 2

Applicant after: Jiang Jian

Applicant after: Jiang Xiaoqian

Address before: Tongzhou District Xingyuan road Jiangsu city of Nantong province sunshine mansion 226300 Building No. 63 room 2208

Applicant before: Cheng Jun

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201207

Address after: 226300 New Century Avenue 999, Nantong high tech Zone, Jiangsu Province

Patentee after: NANTONG SIJIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: 226300, Nantong, Jiangsu province Tongzhou District Jinsha New Town West Building New Village No. 2

Patentee before: Jiang Jian

Patentee before: Jiang Xiaoqian