JP2015140648A - Construction method for frame, and frame - Google Patents

Construction method for frame, and frame Download PDF

Info

Publication number
JP2015140648A
JP2015140648A JP2014016163A JP2014016163A JP2015140648A JP 2015140648 A JP2015140648 A JP 2015140648A JP 2014016163 A JP2014016163 A JP 2014016163A JP 2014016163 A JP2014016163 A JP 2014016163A JP 2015140648 A JP2015140648 A JP 2015140648A
Authority
JP
Japan
Prior art keywords
frame
foundation
column
foundation frame
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2014016163A
Other languages
Japanese (ja)
Inventor
英樹 秋谷
Hideki Akitani
英樹 秋谷
修一 大前
Shuichi Omae
修一 大前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KYOYO CO Ltd
Original Assignee
KYOYO CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KYOYO CO Ltd filed Critical KYOYO CO Ltd
Priority to JP2014016163A priority Critical patent/JP2015140648A/en
Publication of JP2015140648A publication Critical patent/JP2015140648A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a frame that can be inexpensively installed in a short period of time, and a construction method for the same.SOLUTION: A construction method for a frame includes the steps of: burying a plurality of foundation frames 110 in a ground surface; inserting a support 120 into the foundation frame 110; erecting an erection member 130 on a top surface of the foundation frame 110 by fixing the erection member 130 to a side surface of the support 120; mounting a heavy load support frame body 140 on an upper end of each support 120; and infilling a fixing material into the foundation frame 110.

Description

本発明は、架台の施工方法及び架台に関する。   The present invention relates to a method for constructing a gantry and a gantry.

近年、太陽光に代表される“再生可能エネルギー”が注目されている。わが国においても、昨今、多数の大規模太陽光発電所が建設されるようになった。   In recent years, “renewable energy” represented by sunlight has attracted attention. In Japan, many large-scale solar power plants have recently been built.

大規模太陽光発電所においては、広大な敷地に、ソーラーパネルを多数並べて設置するとともに、大型の蓄電器も併せて設置する必要がある。   In a large-scale solar power plant, it is necessary to install a large number of solar panels alongside a large site on a vast site.

このような蓄電器をはじめとする重量物を載置するための架台の施工方法について報告がなされている。重量物を支持する観点から、架台の柱脚の強度を上げる必要があるが、非特許文献1には、基礎コンクリートで支持された柱脚が開示されている(付図1.6)。   There has been a report on a method of constructing a gantry for placing such heavy objects including a capacitor. From the viewpoint of supporting heavy objects, it is necessary to increase the strength of the column base of the gantry, but Non-Patent Document 1 discloses a column base supported by foundation concrete (Appended Figure 1.6).

鋼管構造設計施工指針・同解説、1980年、社団法人日本建築学会、p256−p262Steel pipe structure design and construction guidelines and explanation, 1980, Architectural Institute of Japan, p256-p262

しかしながら、非特許文献1に記載の柱脚では、強度は保たれるものの、基礎コンクリートを施工する必要があるため、長期間の工期を必要とし、工費が高くなっていた。また、架台を設置するために、複数の柱脚を略同一の高さレベルで立設させる場合があるが、柱脚間で高さの違いが生じ、架台全体にわたりゆがみが発生した場合、そのゆがみを補正するには、基礎コンクリートを一度撤去して柱脚を埋設し直す必要があった。このため、大規模太陽光発電所といった施工の迅速性が求められる現場では、施工性の点で課題を残していた。   However, in the column base described in Non-Patent Document 1, although the strength is maintained, since it is necessary to construct the foundation concrete, a long construction period is required and the construction cost is high. In addition, in order to install the pedestal, there are cases where multiple column bases are erected at substantially the same height level, but when there is a difference in height between the column bases, In order to correct the distortion, it was necessary to remove the foundation concrete and re-embed the column base. For this reason, in the field | area where the quickness of construction is calculated | required like a large-scale solar power plant, the subject was left with the point of workability.

本発明は、上記事情に鑑みてなされたものであり、短期間かつ低コストで設置することのできる架台及びその施工方法を提供することを目的とする。   This invention is made | formed in view of the said situation, and it aims at providing the gantry which can be installed in a short period of time and low cost, and its construction method.

上記目的を達成するため、本発明の第1の観点に係る架台の施工方法は、
地盤面に基礎枠を複数埋設する工程と、
前記基礎枠内に支柱を挿入する工程と、
前記支柱の側面に架設部材を固定して、前記架設部材を前記基礎枠の上面に架設する工程と、
各々の前記支柱の上端に、重量物支持枠体を取り付ける工程と、
前記基礎枠内に固定材を充填する工程と、
を含む。
In order to achieve the above object, a method for constructing a gantry according to the first aspect of the present invention includes:
A process of embedding multiple foundation frames on the ground surface;
Inserting a column into the foundation frame;
Fixing an erection member on a side surface of the column, and erection the erection member on an upper surface of the foundation frame;
Attaching a heavy load support frame to the upper end of each of the columns;
Filling the base frame with a fixing material;
including.

例えば、前記架設部材によって、地面から各々の前記支柱の上端までの高さを揃える。   For example, the height from the ground to the upper end of each column is made uniform by the erection member.

例えば、重量物は、蓄電器である。   For example, the heavy object is a capacitor.

本発明の第2の観点に係る架台は、
地盤面に複数埋設された基礎枠と、
前記基礎枠内に挿入された支柱と、
前記支柱の側面に固定されるとともに、前記基礎枠の上面に架設された架設部材と、
各々の前記支柱の上端に取り付けられた重量物支持枠体と、
前記基礎枠内に充填された固定材と、
を備える。
The mount according to the second aspect of the present invention is:
A foundation frame embedded in the ground surface,
Struts inserted into the foundation frame;
Affixed to the side surface of the support column, and an erection member erected on the upper surface of the foundation frame,
A heavy load support frame attached to the upper end of each of the columns;
A fixing material filled in the foundation frame;
Is provided.

例えば、前記架設部材によって、地面から各々の前記支柱の上端までの高さが揃えられている。   For example, the height from the ground to the upper end of each of the columns is aligned by the erection member.

例えば、重量物は、蓄電器である。   For example, the heavy object is a capacitor.

本発明によれば、短期間かつ低コストで設置することのできる架台及びその施工方法を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the gantry which can be installed in a short period of time and low cost, and its construction method can be provided.

本発明の一実施形態である蓄電器架台を模式的に表した斜視図である。It is the perspective view which represented typically the electrical storage stand which is one Embodiment of this invention. (a)は、基礎枠、支柱及び高さ調節部材(架設部材)を模式的に表した斜視図である。(b)は、基礎枠、支柱及び高さ調節部材(架設部材)を模式的に表した平面図である。(A) is the perspective view which represented the foundation frame, the support | pillar, and the height adjustment member (erection member) typically. (B) is the top view which represented typically the foundation frame, the support | pillar, and the height adjustment member (erection member). (a)は、基礎枠、支柱、高さ調節部材(架設部材)及び蓄電器支持枠体を模式的に表した側面図である。(b)は、基礎枠、支柱、高さ調節部材(架設部材)及び蓄電器支持枠体を模式的に表した側面図である。(A) is the side view which represented typically the foundation frame, the support | pillar, the height adjustment member (erection member), and the capacitor | condenser support frame. (B) is the side view which represented typically the foundation frame, the support | pillar, the height adjustment member (construction member), and the capacitor | condenser support frame. (a)は、基礎枠を6個設けた場合を模式的に表した平面図、(b)は、基礎枠を4個設けた場合を模式的に表した平面図、(c)は、基礎枠を8個設けた場合を模式的に表した平面図、(d)は、基礎枠を9個設けた場合を模式的に表した平面図である。(A) is a plan view schematically showing a case where six foundation frames are provided, (b) is a plan view schematically showing a case where four foundation frames are provided, and (c) is a basis. The top view which represented typically the case where eight frames are provided, (d) is the top view which represented typically the case where nine basic frames are provided.

以下、本発明の実施形態について詳細に説明する。まず、本発明の実施形態に係る蓄電器架台100を、図面を参照して説明する。   Hereinafter, embodiments of the present invention will be described in detail. First, a battery stand 100 according to an embodiment of the present invention will be described with reference to the drawings.

図1に示すように、本発明の実施形態に係る蓄電器架台100は、地中に埋設された基礎枠110と、基礎枠110内に挿入された支柱120と、支柱120の側面に固定され基礎枠110の上面に架設された高さ調節部材(架設部材)130と、支柱120の上端に取りつけられた蓄電器支持枠体(重量物支持枠体)140と、を備える。なお、本発明の実施形態に係る蓄電器架台100は、大規模太陽光発電所の敷地内に設置される重量物架台であり、重量3トン〜8トン程度の大型の蓄電器(図示せず)を載せるものである。   As shown in FIG. 1, the battery stand 100 according to the embodiment of the present invention includes a foundation frame 110 embedded in the ground, a column 120 inserted into the foundation frame 110, and a foundation fixed to the side surface of the column 120. A height adjusting member (erection member) 130 erected on the upper surface of the frame 110 and a capacitor support frame body (heavy object support frame body) 140 attached to the upper end of the support column 120 are provided. In addition, the capacitor | condenser stand 100 which concerns on embodiment of this invention is a heavy article stand installed in the site | part of a large-scale solar power plant, A large-sized capacitor | condenser (not shown) about 3 to 8 tons in weight is attached. It is to be placed.

基礎枠110は、図1、図2に示すように、矩形状のコンクリート枠であり、上面及び下面が開放した枡形状のプレキャストコンクリート製品からなる。基礎枠110は、後述するように、蓄電器を設置する場所の地盤面に掘削された、6箇所の設置穴に埋設されている。基礎枠110内には、後述するように、コンクリート材(固定材)112が充填され、それによって、支柱120が基礎枠110内の所定位置、高さに立設、固定される。   As shown in FIGS. 1 and 2, the foundation frame 110 is a rectangular concrete frame, and is made of a cocoon-shaped precast concrete product whose upper and lower surfaces are open. As will be described later, the foundation frame 110 is embedded in six installation holes excavated on the ground surface where the capacitor is installed. As will be described later, the foundation frame 110 is filled with a concrete material (fixing material) 112, whereby the support column 120 is erected and fixed at a predetermined position and height in the foundation frame 110.

支柱120は、蓄電器支持枠体140を支持する役割を果たす支持部材である。支柱120として本実施形態では、図1、図2に示すように、H形鋼が用いられている。支柱120の下部120aは、基礎枠110内に挿入されており、支柱120の上部120bは、基礎枠110の上面の開口部より突出している(図2(a)、図3)。後述するように、支柱120の上下方向の中程の側面には、高さ調節部材(架設部材)130が取りつけられている(図2、図3)。   The support 120 is a support member that plays a role of supporting the storage battery support frame 140. In this embodiment, as shown in FIGS. 1 and 2, an H-section steel is used as the support 120. The lower part 120a of the support column 120 is inserted into the foundation frame 110, and the upper part 120b of the support column 120 protrudes from the opening on the upper surface of the foundation frame 110 (FIGS. 2A and 3). As will be described later, a height adjusting member (erection member) 130 is attached to the middle side surface of the support column 120 in the vertical direction (FIGS. 2 and 3).

高さ調節部材(架設部材)130は、図1−図3に示すように、地面から6本の支柱120各々の上端までの高さH(図3(a)、(b))を揃える役割を果たす部材である。その形状は、L字形をなし、その長さは、基礎枠110の一辺の長さより長い。高さ調節部材130のフランジ130aにはボルト孔が形成され、基礎枠110の上面に架設された状態で、2本のボルト122を介して支柱120の側面に取りつけられている(図2、図3)。高さ調節部材130は、基礎枠110の上面に架設されているため、後述するように、基礎枠110内にコンクリート材(固定材)が充填されて固化するまでの間、支柱120の下部120aを基礎枠110内に保持させた状態を維持することができる。なお、本実施形態の高さ調節部材130の材質は、ステンレス鋼であるが、所定強度を確保可能なアルミニウムや、塗装した普通鋼等を用いてもよい。   As shown in FIGS. 1 to 3, the height adjustment member (construction member) 130 has a role of aligning the height H (FIGS. 3A and 3B) from the ground to the upper ends of the six columns 120. It is the member which fulfills. Its shape is L-shaped, and its length is longer than the length of one side of the foundation frame 110. A bolt hole is formed in the flange 130a of the height adjusting member 130, and is attached to the side surface of the column 120 via two bolts 122 in a state of being laid on the upper surface of the foundation frame 110 (FIGS. 2 and 2). 3). Since the height adjusting member 130 is installed on the upper surface of the foundation frame 110, as will be described later, the lower portion 120a of the support column 120 is filled until the foundation frame 110 is filled with a concrete material (fixing material) and solidified. Can be maintained in the base frame 110. In addition, although the material of the height adjustment member 130 of this embodiment is stainless steel, you may use the aluminum which can ensure predetermined intensity | strength, the coated plain steel, etc.

蓄電器支持枠体140は、図1に示すように、6本の支柱120の各々の上端に支持されるように架設されている。より具体的には、蓄電器支持枠体140は、2本の桁材140aと、桁材140aをつなぐ3本の横架材140bと、4本の平面ブレース材140cと、からなっている。桁材140a及び横架材140bは、固定ボルト(図示せず)を介して各々の支柱120の上端に固定されている。また、平面ブレース材140cは、固定ボルト142によって桁材140aの端部に取りつけられたガセットプレートに固定されている。さらに、各支柱位置には、ブレース材146が設けられている。ブレース材146の一端は支柱120の上端部近傍に固定ボルト144を介して固定され、他端は桁材140a又は横架材140bの下面に固定ボルト144を介して固定されている。桁材140a、横架材140b及び平面ブレース材140cは、蓄電器(図示せず)を載せる役割を果たし、ブレース材146は、蓄電器架台100の機械的強度及び耐震性を高める役割を果たす。なお、本実施形態の蓄電器支持枠体140の材質は、ステンレス鋼であるが、上述のようにアルミニウム、普通鋼等を用いてもよい。   As shown in FIG. 1, the battery support frame 140 is constructed so as to be supported on the upper ends of the six columns 120. More specifically, the capacitor support frame 140 includes two girder members 140a, three horizontal members 140b that connect the girder members 140a, and four flat brace members 140c. The beam member 140a and the horizontal member 140b are fixed to the upper ends of the respective columns 120 via fixing bolts (not shown). Further, the flat brace material 140c is fixed to a gusset plate attached to the end of the beam member 140a by a fixing bolt 142. Further, a brace material 146 is provided at each column position. One end of the brace material 146 is fixed to the vicinity of the upper end portion of the support column 120 via a fixing bolt 144, and the other end is fixed to the lower surface of the beam member 140a or the horizontal member 140b via a fixing bolt 144. The girder material 140a, the horizontal frame material 140b, and the flat brace material 140c play a role of placing a capacitor (not shown), and the brace material 146 plays a role of increasing the mechanical strength and earthquake resistance of the capacitor frame 100. In addition, although the material of the capacitor | condenser support frame 140 of this embodiment is stainless steel, you may use aluminum, common steel, etc. as mentioned above.

次に、本発明の実施形態に係る蓄電器架台100の施工方法を、図面を参照して説明する。   Next, the construction method of the battery stand 100 according to the embodiment of the present invention will be described with reference to the drawings.

本発明の実施形態に係る蓄電器架台100の施工方法は、
(A)地盤面に基礎枠110を6個埋設する工程と、
(B)基礎枠110内に支柱120を挿入する工程と、
(C)支柱120の側面に高さ調節部材(架設部材)130を固定して、高さ調節部材130を基礎枠110の上面に架設する工程と、
(D)各々の支柱120の上端に、蓄電器支持枠体(重量物支持枠体)140を取り付ける工程と、
(E)基礎枠110内にコンクリート材(固定材)112を充填する工程と、
を含む。
The construction method of the battery stand 100 according to the embodiment of the present invention is as follows:
(A) a step of burying six foundation frames 110 on the ground surface;
(B) inserting the column 120 into the foundation frame 110;
(C) fixing the height adjusting member (erection member) 130 to the side surface of the support column 120 and erection the height adjusting member 130 on the upper surface of the foundation frame 110;
(D) attaching a capacitor support frame (heavy object support frame) 140 to the upper end of each support 120;
(E) filling the concrete material (fixing material) 112 in the foundation frame 110;
including.

上記工程(A)について説明する。工程(A)では、蓄電器架台100を設ける場所の地盤面に6箇所の設置穴を縦横に等間隔(3×2)で掘削し(図1、図4(a))、これらの設置穴に基礎枠110を埋設し、基礎枠110と設置穴との隙間を確実に埋め戻す(図3)。   The step (A) will be described. In the step (A), six installation holes are excavated at equal intervals (3 × 2) vertically and horizontally on the ground surface where the capacitor base 100 is provided (FIGS. 1 and 4A). The foundation frame 110 is buried, and the gap between the foundation frame 110 and the installation hole is reliably backfilled (FIG. 3).

次に、上記工程(B)について説明する。工程(B)では、基礎枠110内に支柱120の下部120aを挿入する。   Next, the said process (B) is demonstrated. In the step (B), the lower portion 120 a of the support column 120 is inserted into the foundation frame 110.

次に、上記工程(C)について説明する。工程(C)では、地面から各々の支柱120の上端までの高さH(図3(a)、(b))を揃えるように、支柱120の側面に高さ調節部材(架設部材)130を固定して、高さ調節部材130を基礎枠110の上面に架設する。例えば、蓄電器架台100を設ける場所の地盤面に不陸があることで、又は設置穴の深さが異なることで、6個の基礎枠110の上面の高さが揃っていない場合がある。例えば、6個のうち1個の基礎枠110の上面の高さが他の箇所よりもΔhだけ高くなっている場合、その支柱120箇所の高さ調節部材130を、他の支柱120の取付位置よりもΔhだけ高い位置に取りつける。こうすることで、6本の支柱120の上端までの高さHを揃えることができる。高さ調節部材130の長さは、基礎枠110の外形長さよりも長いため(図2)、高さ調節部材130を基礎枠110の上面に架設することができる。このように、高さ調節部材130によって、工程(E)にて基礎枠110内にコンクリート材(固定材)112を充填する前に、支柱120を基礎枠110内に仮支持しておくことができる。なお、図3(b)に示すように、支柱120の側面に長孔120cを形成し、この長孔120cを介して高さ調節部材130を取り付けるようにすると、仮支持時における高さ調節部材130の最終的な高さ微調整を容易に行うことができる。   Next, the said process (C) is demonstrated. In the step (C), a height adjusting member (erection member) 130 is provided on the side surface of the column 120 so that the height H (FIGS. 3A and 3B) from the ground to the upper end of each column 120 is aligned. The height adjustment member 130 is installed on the upper surface of the foundation frame 110 by fixing. For example, the height of the top surfaces of the six foundation frames 110 may not be uniform due to unevenness in the ground surface where the capacitor base 100 is provided or due to different depths of the installation holes. For example, when the height of the upper surface of one of the six base frames 110 is higher by Δh than the other portions, the height adjusting members 130 at the 120 struts are attached to the mounting positions of the other struts 120. It is mounted at a position higher than Δh. By doing so, the heights H up to the upper ends of the six columns 120 can be made uniform. Since the length of the height adjusting member 130 is longer than the outer length of the foundation frame 110 (FIG. 2), the height adjusting member 130 can be installed on the upper surface of the foundation frame 110. Thus, before the concrete material (fixing material) 112 is filled in the foundation frame 110 in the step (E) by the height adjusting member 130, the support column 120 can be temporarily supported in the foundation frame 110. it can. As shown in FIG. 3B, when a long hole 120c is formed in the side surface of the support 120 and the height adjusting member 130 is attached through the long hole 120c, the height adjusting member at the time of temporary support is provided. The final height fine adjustment of 130 can be easily performed.

次に、上記工程(D)について説明する。工程(D)では、各々の支柱120の上端に、蓄電器支持枠体140を取り付ける。より具体的には、図1に示すように、桁材140aと、横架材140bと、を各々の支柱120の上端に固定ボルト(図示せず)を介して取りつける。また、4本の平面ブレース材140cを固定ボルト142によって桁材140aの端部にガセットプレートを介して取りつける。さらに、12本のブレース材146の一端を支柱120の上端部近傍に固定ボルト144を介して取りつけ、ブレース材146の他端を桁材140a又は横架材140bの下面に固定ボルト144を介して取りつける。   Next, the said process (D) is demonstrated. In the step (D), the capacitor support frame 140 is attached to the upper end of each column 120. More specifically, as shown in FIG. 1, the beam member 140a and the horizontal member 140b are attached to the upper end of each column 120 via a fixing bolt (not shown). Further, the four flat brace members 140c are attached to the end portions of the beam member 140a by the fixing bolts 142 through the gusset plates. Further, one end of the twelve brace members 146 is attached to the vicinity of the upper end portion of the support column 120 via a fixing bolt 144, and the other end of the brace member 146 is attached to the lower surface of the beam member 140a or the horizontal member 140b via the fixing bolt 144. Install.

次に、上記工程(E)について説明する。工程(E)では、基礎枠110内にコンクリート材(固定材)112を充填する。高さ調節部材(架設部材)130によって各支柱120の上端は高さが揃えられた状態で、基礎枠110内に仮支持されているため、あらためて支柱120の高さ調整することなく、基礎枠110内にコンクリート材(固定材)112を充填することができる。基礎枠110内にコンクリート材(固定材)112を充填することで、蓄電器架台100の機械的強度及び耐震性を向上させることができる。なお、固定材としては、モルタルを用いてもよい。   Next, the said process (E) is demonstrated. In step (E), a concrete material (fixing material) 112 is filled into the foundation frame 110. Since the upper ends of the columns 120 are temporarily supported by the height adjusting member (erection member) 130 in a state in which the heights are aligned, the foundation frame is re-adjusted without adjusting the height of the column 120 again. 110 can be filled with a concrete material (fixing material) 112. By filling the foundation frame 110 with the concrete material (fixing material) 112, the mechanical strength and the earthquake resistance of the battery stand 100 can be improved. In addition, you may use a mortar as a fixing material.

以上説明したように、本発明の実施形態に係る蓄電器架台100の施工方法では、基礎枠110を地盤面に埋設させ、支柱120や蓄電器支持枠体140を組み立てた後に基礎枠110内にコンクリート材(固定材)112を充填して施工する。従来のコンクリート基礎を施した架台では、コンクリート基礎施工のための専門の施工者を要し、また、コンクリート基礎が安定してから架台を設置するものであったため、時間及びコストがかかっていた。本発明の実施形態に係る蓄電器架台100の施工方法では、従来必要であったコンクリート基礎を施すことなく、簡便に蓄電器架台100を設置することができるため、架台設置の工期を大幅に短縮し、工事コストを抑えることができる。   As described above, in the construction method of the battery stand 100 according to the embodiment of the present invention, the foundation frame 110 is embedded in the ground surface, and the support 120 and the battery support frame 140 are assembled and then the concrete material is placed in the foundation frame 110. (Fixing material) 112 is filled and installed. The conventional gantry with the concrete foundation requires a special builder for concrete foundation construction, and the gantry is installed after the concrete foundation is stabilized, which takes time and cost. In the construction method of the battery gantry 100 according to the embodiment of the present invention, the capacitor gantry 100 can be simply installed without applying the concrete foundation that has been necessary in the past. Construction costs can be reduced.

また、本発明の実施形態に係る蓄電器架台100の施工方法は、高さ調節部材(架設部材)130を用いることで、地面から各々の支柱120の上端までの高さH(図3(a)、(b))を簡便に揃えることができる。従来のコンクリート基礎を施した架台では、支柱の高さが不揃いであった場合には、コンクリート基礎を一度撤去して、再度施工し直す必要があり、時間及びコストのかかるものであった。一方、本発明の実施形態に係る蓄電器架台100では、蓄電器架台100を設ける場所の地盤面に不陸があることで、又は基礎枠110を埋設するための設置穴の深さが異なることで、6個の基礎枠110の上面の高さ位置が揃っていない場合でも、支柱120の側面に高さ調節部材(架設部材)130を取りつけることで、地面から各々の支柱120の上端までの高さH(図3(a)、(b))を簡便に揃えることができる。このため、複数本の支柱120によって支えられる蓄電器架台100全体のゆがみを簡便に解消することができる。   Moreover, the construction method of the battery stand 100 according to the embodiment of the present invention uses the height adjusting member (erection member) 130 to increase the height H from the ground to the upper end of each column 120 (FIG. 3A). , (B)) can be easily arranged. In a conventional gantry with a concrete foundation, if the heights of the columns are not uniform, it is necessary to remove the concrete foundation and re-install it, which takes time and cost. On the other hand, in the battery stand 100 according to the embodiment of the present invention, the ground surface of the place where the battery stand 100 is provided is uneven or the depth of the installation hole for burying the foundation frame 110 is different. Even when the height positions of the upper surfaces of the six foundation frames 110 are not aligned, the height from the ground to the upper end of each column 120 can be obtained by attaching the height adjusting member (erection member) 130 to the side surface of the column 120. H (FIGS. 3A and 3B) can be easily arranged. For this reason, the distortion of the whole battery stand 100 supported by the plurality of support columns 120 can be easily eliminated.

また、本発明の実施形態に係る蓄電器架台100の支柱120は、高さ調整された後に基礎枠110内に充填されたコンクリート材(固定材)112で堅固に支持されるため、大型の蓄電器といった重量物を載せた場合でも、機械的強度及び耐震性に優れた構造となっている。   In addition, the column 120 of the battery stand 100 according to the embodiment of the present invention is firmly supported by the concrete material (fixing material) 112 filled in the foundation frame 110 after the height adjustment, and thus a large-sized battery Even when a heavy object is placed, the structure is excellent in mechanical strength and earthquake resistance.

なお、この発明は上記実施の形態に限定されず、種々の変形及び応用が可能である。例えば、本実施形態においては、蓄電器(図示せず)を載せる蓄電器架台100の形態について説明したが、蓄電器以外の重量物であっても載せることができる。例えば、防災無線、防犯カメラ、照明等を載せてもよい。また、架台上に載せる物の大きさ、用途等に鑑みて、支柱120の長さや蓄電器支持枠体140の大きさを変更することができる。   In addition, this invention is not limited to the said embodiment, A various deformation | transformation and application are possible. For example, in the present embodiment, the configuration of the capacitor stand 100 on which the capacitor (not shown) is mounted has been described, but a heavy object other than the capacitor can also be mounted. For example, a disaster prevention radio, a security camera, lighting, or the like may be placed. In addition, the length of the support 120 and the size of the capacitor support frame 140 can be changed in view of the size of the object to be placed on the gantry, the application, and the like.

また、本実施形態においては、地面から各々の支柱120の上端までの高さH(図3(a)、(b))を揃えるように、支柱120の側面に高さ調節部材(架設部材)130を固定する形態について説明したが、設置穴に基礎枠110を埋設した時点で各々の基礎枠110の上面の高さを揃えることができた場合には、高さ調整をする必要がない。   In the present embodiment, a height adjusting member (an erection member) is provided on the side surface of the column 120 so that the height H (FIGS. 3A and 3B) from the ground to the upper end of each column 120 is aligned. Although the form which fixes 130 was demonstrated, when the height of the upper surface of each foundation frame 110 was able to be equalized at the time of embedding the foundation frame 110 in the installation hole, it is not necessary to adjust height.

また、本実施形態においては、図3(b)に示したように、支柱120の側面に長孔120cを形成し、この長孔120cを介して高さ調節部材(架設部材)130を取り付ける形態について説明したが、高さ調節部材130の取りつけ位置の高さを調整することのできる機構であれば適宜採用することができる。例えば、支柱120の側面に長孔を形成したプレートを取りつけ、その長孔を介して高さ調節部材130を取り付けてもよい。   Further, in the present embodiment, as shown in FIG. 3B, a long hole 120c is formed in the side surface of the support column 120, and a height adjusting member (erection member) 130 is attached through the long hole 120c. However, any mechanism that can adjust the height of the mounting position of the height adjusting member 130 can be used as appropriate. For example, a plate in which a long hole is formed on the side surface of the column 120 may be attached, and the height adjusting member 130 may be attached through the long hole.

また、本実施形態においては、図1、図3(a)に示したように、ブレース材146で上部を架台支持する形態について説明したが、架台上に載せる物の重量が小さく、ブレース材146無しでも機械的強度及び耐震性が保たれる場合には、ブレース材146を備えていなくてもよい。   In the present embodiment, as shown in FIGS. 1 and 3A, the form in which the upper part is supported by the brace material 146 has been described. However, the weight of the object placed on the gantry is small, and the brace material 146 is used. The brace material 146 may not be provided if the mechanical strength and the earthquake resistance are maintained even without the brace.

また、本実施形態においては、図1、図4(a)に示したように、蓄電器架台100を設ける場所の地盤面に、基礎枠110を埋設するための設置穴を6個掘削した形態について説明したが、架台上に載せる物の大きさや形状に鑑み、図4(b)に示すように設置穴4個でも、図4(c)に示すように設置穴8個でもよい。また、図4(d)に示すように、設置穴9個として、蓄電器支持枠体140を2列ずつ並べるように配置してもよい。基礎枠110を埋設するための設置穴の数や、蓄電器支持枠体140の配列の仕方は、架台上に載せる物の大きさや形状に応じて、適宜変更することができる。   Moreover, in this embodiment, as shown in FIG. 1, FIG. 4 (a), about the form which excavated six installation holes for embedding the foundation frame 110 in the ground surface of the place in which the electrical storage stand 100 is provided. As described above, in view of the size and shape of the object to be placed on the gantry, it may be four installation holes as shown in FIG. 4 (b) or eight installation holes as shown in FIG. 4 (c). Moreover, as shown in FIG.4 (d), you may arrange | position the storage device support frame 140 so that it may arrange in two rows as nine installation holes. The number of installation holes for embedding the base frame 110 and the manner in which the capacitor support frame 140 is arranged can be appropriately changed according to the size and shape of an object to be placed on the gantry.

また、本実施形態においては、図1−4に示したように、長尺状の高さ調節部材(架設部材)130の形態について説明したが、支柱120の側面に固定でき、基礎枠110の上面に架橋できる断面形状の高さ調節部材(架設部材)130であれば、各種の形鋼材を採用することができる。   Moreover, in this embodiment, as shown to FIGS. 1-4, although the form of the elongate height adjustment member (erection member) 130 was demonstrated, it can fix to the side surface of the support | pillar 120 and the foundation frame 110 of FIG. As long as the height adjusting member (erection member) 130 having a cross-sectional shape that can be cross-linked to the upper surface, various shape steel materials can be adopted.

また、本実施形態においては、図1−3に示したように、平面視して矩形からなる基礎枠110の形態について説明したが、その形状は、円形や六角形などでもよい。   Moreover, in this embodiment, as shown to FIGS. 1-3, although the form of the base frame 110 which consists of a rectangle in planar view was demonstrated, the shape may be circular, a hexagon, etc.

また、本実施形態においては、図1−4に示したように、上面及び下面が開放した形状の基礎枠110を用いた形態について説明したが、上面のみが開放しており底面を有する形状の基礎枠110を用いてもよい。   Moreover, in this embodiment, as shown to FIGS. 1-4, although the form using the foundation frame 110 of the shape where the upper surface and the lower surface were open | released was demonstrated, only the upper surface is open and it has the shape which has a bottom face. A base frame 110 may be used.

100 蓄電器架台
110 基礎枠
112 コンクリート材(固定材)
120 支柱
120a 下部
120b 上部
120c 長孔
122 ボルト
130 高さ調節部材(架設部材)
130a フランジ
140 蓄電器支持枠体(重量物支持枠体)
140a 桁材
140b 横架材
140c 平面ブレース材
142 固定ボルト
144 固定ボルト
146 ブレース材
100 Capacitor stand 110 Foundation frame 112 Concrete material (fixing material)
120 Post 120a Lower 120b Upper 120c Long hole 122 Bolt 130 Height adjustment member (erection member)
130a Flange 140 Capacitor support frame (heavy object support frame)
140a Beam member 140b Horizontal member 140c Plane brace material 142 Fixing bolt 144 Fixing bolt 146 Brace material

Claims (6)

地盤面に基礎枠を複数埋設する工程と、
前記基礎枠内に支柱を挿入する工程と、
前記支柱の側面に架設部材を固定して、前記架設部材を前記基礎枠の上面に架設する工程と、
各々の前記支柱の上端に、重量物支持枠体を取り付ける工程と、
前記基礎枠内に固定材を充填する工程と、
を含む架台の施工方法。
A process of embedding multiple foundation frames on the ground surface;
Inserting a column into the foundation frame;
Fixing an erection member on a side surface of the column, and erection the erection member on an upper surface of the foundation frame;
Attaching a heavy load support frame to the upper end of each of the columns;
Filling the base frame with a fixing material;
Construction method of the gantry including
前記架設部材によって、地面から各々の前記支柱の上端までの高さを揃える、
ことを特徴とする請求項1に記載の施工方法。
The installation member aligns the height from the ground to the upper end of each column,
The construction method according to claim 1, wherein:
重量物は、蓄電器である、
ことを特徴とする請求項1又は2に記載の施工方法。
The heavy object is a capacitor,
The construction method according to claim 1 or 2, characterized in that.
地盤面に複数埋設された基礎枠と、
前記基礎枠内に挿入された支柱と、
前記支柱の側面に固定されるとともに、前記基礎枠の上面に架設された架設部材と、
各々の前記支柱の上端に取り付けられた重量物支持枠体と、
前記基礎枠内に充填された固定材と、
を備える架台。
A foundation frame embedded in the ground surface,
Struts inserted into the foundation frame;
Affixed to the side surface of the support column, and an erection member erected on the upper surface of the foundation frame,
A heavy load support frame attached to the upper end of each of the columns;
A fixing material filled in the foundation frame;
A gantry equipped with.
前記架設部材によって、地面から各々の前記支柱の上端までの高さが揃えられている、
ことを特徴とする請求項4に記載の架台。
The height from the ground to the upper end of each column is aligned by the erection member,
The gantry according to claim 4.
重量物は、蓄電器である、
ことを特徴とする請求項4又は5に記載の架台。
The heavy object is a capacitor,
The gantry according to claim 4 or 5, characterized in that.
JP2014016163A 2014-01-30 2014-01-30 Construction method for frame, and frame Pending JP2015140648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014016163A JP2015140648A (en) 2014-01-30 2014-01-30 Construction method for frame, and frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014016163A JP2015140648A (en) 2014-01-30 2014-01-30 Construction method for frame, and frame

Publications (1)

Publication Number Publication Date
JP2015140648A true JP2015140648A (en) 2015-08-03

Family

ID=53771194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014016163A Pending JP2015140648A (en) 2014-01-30 2014-01-30 Construction method for frame, and frame

Country Status (1)

Country Link
JP (1) JP2015140648A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165184A (en) * 2017-07-17 2017-09-15 安徽晶润新能源有限公司 A kind of wind-solar hybrid power generation station foundation structure
CN107165183A (en) * 2017-07-17 2017-09-15 安徽晶润新能源有限公司 A kind of solar power plant foundation construction method
CN107165189A (en) * 2017-07-17 2017-09-15 安徽晶润新能源有限公司 A kind of solar power plant foundation structure
CN107338805A (en) * 2017-07-17 2017-11-10 安徽晶润新能源有限公司 A kind of wind-solar hybrid power generation station foundation construction method
CN107360751A (en) * 2017-07-17 2017-11-21 安徽光鼎晶新能源科技有限公司 A kind of sand-fixing greening method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080035831A1 (en) * 2006-08-12 2008-02-14 Rodin Martin D Device for forming concrete
JP2009097244A (en) * 2007-10-17 2009-05-07 Ibigawa Concrete Kogyo Kk Concrete block and locking member for erecting pole
JP2012255817A (en) * 2011-06-07 2012-12-27 Sanyo Electric Co Ltd Display system
JP2013238010A (en) * 2012-05-14 2013-11-28 Kyoyo Co Ltd Solar panel mounting and method of constructing solar panel mounting

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080035831A1 (en) * 2006-08-12 2008-02-14 Rodin Martin D Device for forming concrete
JP2009097244A (en) * 2007-10-17 2009-05-07 Ibigawa Concrete Kogyo Kk Concrete block and locking member for erecting pole
JP2012255817A (en) * 2011-06-07 2012-12-27 Sanyo Electric Co Ltd Display system
JP2013238010A (en) * 2012-05-14 2013-11-28 Kyoyo Co Ltd Solar panel mounting and method of constructing solar panel mounting

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165184A (en) * 2017-07-17 2017-09-15 安徽晶润新能源有限公司 A kind of wind-solar hybrid power generation station foundation structure
CN107165183A (en) * 2017-07-17 2017-09-15 安徽晶润新能源有限公司 A kind of solar power plant foundation construction method
CN107165189A (en) * 2017-07-17 2017-09-15 安徽晶润新能源有限公司 A kind of solar power plant foundation structure
CN107338805A (en) * 2017-07-17 2017-11-10 安徽晶润新能源有限公司 A kind of wind-solar hybrid power generation station foundation construction method
CN107360751A (en) * 2017-07-17 2017-11-21 安徽光鼎晶新能源科技有限公司 A kind of sand-fixing greening method
CN107165184B (en) * 2017-07-17 2019-09-27 合肥市智慧桥信息科技有限公司 A kind of wind-solar hybrid power generation station foundation structure
CN107165189B (en) * 2017-07-17 2019-10-01 安徽晶润新能源有限公司 A kind of solar power plant foundation structure
CN107165183B (en) * 2017-07-17 2019-10-01 安徽晶润新能源有限公司 A kind of solar power plant foundation construction method
CN107338805B (en) * 2017-07-17 2019-10-01 合肥市智慧桥信息科技有限公司 A kind of wind-solar hybrid power generation station foundation construction method

Similar Documents

Publication Publication Date Title
JP5592514B2 (en) How to install the solar panel mount
US20150159337A1 (en) Device for anchoring constructions in the ground
JP3184322U (en) Solar panel mount
JP3165884U (en) Foundation structure of solar panel device
JP2015140648A (en) Construction method for frame, and frame
JP5499194B1 (en) Solar panel mounting base
JP2015078578A (en) Solar power panel
KR101879141B1 (en) Foundation reinforcement structure for solar photovoltaic apparatus
JP2013238010A (en) Solar panel mounting and method of constructing solar panel mounting
JP2015104245A (en) Photovoltaic power generation panel frame
JP6139831B2 (en) Installation structure and construction method of solar panel mount
JP3203114U (en) Pole basic structure
JP5956214B2 (en) Foundation structure for the solar cell module support
KR101353488B1 (en) Multiple supporting file foundation
JP6021588B2 (en) Stand
CN212278174U (en) Pressure-setting type truss photovoltaic tracking support
JP3172512U (en) Supporting device for solar panel
JP5602292B1 (en) Installation structure of solar panel mount and installation method of solar panel mount
JP5787660B2 (en) Mounting device for solar cell panel and installation method thereof
CN204112827U (en) A kind of communications tower
CN204258707U (en) Monolithic oblique single-axis solar tracking system truss for agricultural facilities
JP5166632B1 (en) Method of constructing foundation foundation using foundation platform and foundation platform used therefor
JP2012122320A (en) Foundation structure of solar cell array
JP2015098725A (en) Photovoltaic power generation panel stand and installation method for the same
JP6103600B2 (en) Installation method of solar power generation unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170106

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171108

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171128

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20180529