CN103701347A - 一种基于多目标优化的mmc冗余子模块配置方法 - Google Patents

一种基于多目标优化的mmc冗余子模块配置方法 Download PDF

Info

Publication number
CN103701347A
CN103701347A CN201410004749.3A CN201410004749A CN103701347A CN 103701347 A CN103701347 A CN 103701347A CN 201410004749 A CN201410004749 A CN 201410004749A CN 103701347 A CN103701347 A CN 103701347A
Authority
CN
China
Prior art keywords
redundancy submodule
reliability
mmc
redundancy
submodule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410004749.3A
Other languages
English (en)
Other versions
CN103701347B (zh
Inventor
王宝安
谭风雷
商姣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201410004749.3A priority Critical patent/CN103701347B/zh
Publication of CN103701347A publication Critical patent/CN103701347A/zh
Application granted granted Critical
Publication of CN103701347B publication Critical patent/CN103701347B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Inverter Devices (AREA)

Abstract

本发明公开了一种基于多目标优化的MMC冗余子模块配置方法,属于多电平电力电子变换器的控制技术领域。主要包括以下步骤:(1)确定MMC系统的可靠性RM;(2)确定MMC系统冗余子模块有效利用率EM;(3)确定冗余子模块数量转换函数CM;(4)建立并求解多目标优化函数TM。该方法主要是从MMC系统可靠性RM、冗余子模块有效利用率EM和冗余子模块数量转换函数CM这三个目标出发,建立了多目标优化函数TM,求解最优冗余子模块数量。在保证系统可靠性的前提下,节约成本,有利于系统的经济运行。

Description

一种基于多目标优化的MMC冗余子模块配置方法
技术领域
本发明涉及电力电子技术领域,特别涉及一种基于多目标优化的MMC冗余子模块配置方法。
背景技术
目前,模块化多电平MMC变换器已经在高压直流输电系统(HVDC)得到了较好的应用。
模块化多电平MMC相对传统多电平技术有着很多优点。传统二极管钳位型多电平技术,随着电平数的增加,钳位二极管增加,直流侧电容电压的均衡控制较难,算法复杂,二极管钳位型三电平一般使用较多,但很难使用在更高的电平领域。H桥级联型多电平技术,采用模块化控制,使得控制变得相对简单,但是应用于高压直流输电系统(HVDC)时,网侧电压须经过多重移相变压器,通过二极管整流后,给各个功率模块提高直流电压,这样使得整个装置的成本和体积变大,不利于高压直流输电系统(HVDC)的发展。然而模块化多电平MMC技术,同样采用模块化控制,高度模块化,拓展容易,冗余设计简单,无需使用多重化移相变压器,大大减小了装置体积和重量,减少了成本和损耗。因此,模块化多电平技术在高压直流输电系统(HVDC)领域越来越受到人们的关注,将来将会成为高压直流输电系统(HVDC)的主要拓扑结构。
高压直流输电系统(HVDC)正常、稳定的工作在输配电领域是非常重要的。但是模块化多电平功率模块较多,随着功率模块的长期使用,必然会出现损坏的现象,这就会影响模块化多电平变换器的正常工作,影响正常的输配电,对电网造成一定损失。在此背景下,通过冗余子模块的配置和使用,来提高系统的可靠性就变得十分重要了。冗余子模块配置越多,系统可靠性越高,但是成本较高,冗余子模块利用率较差,不经济;冗余子模块配置越少,成本较低,但是系统的可靠性得不到保障。因此,合理有效的配置冗余子模块数量就变得十分重要了。但是,目前并没有冗余子模块的配置方法。
针对冗余子模块的配置方法,当前在高压直流输电系统中,主要是根据保守原则,结合工程经验和实际情况来选择冗余子模块数量。目前,有相关文献对冗余子模块的配置做出了分析,但是未能给出具体的配置方法;不过也有文献对冗余子模块的配置做了深入研究,只是给出了冗余子模块配置的大概范围,未能更加深入的研究。基于以上的分析,本发明提出了一种基于多目标优化的MMC冗余子模块配置方法,主要从系统可靠性、冗余子模块有效利用率和冗余子模块数量这三个目标出发,建立了多目标优化函数,求解最优冗余子模块数量。
发明内容
为了克服上述现有技术的缺点,本发明提供了一种基于多目标优化的MMC冗余子模块配置方法。该方法主要是从系统可靠性、冗余子模块有效利用率和冗余子模块数量这三个目标出发,建立了多目标优化函数,求解最优冗余子模块数量。
本发明提供一种基于多目标优化的MMC冗余子模块配置方法,其特征在于,主要包括以下步骤:
步骤(1):根据工程实际,结合正常工作时的模块数量N和单个模块SM的可靠性R,确定MMC系统的可靠性RM
步骤(2):借助建立MMC系统的可靠性RM的思想,建立冗余子模块数量n与冗余子模块有效利用率EM的函数关系;
步骤(3):为了便于多目标优化问题的统一求解,将冗余子模块数量n进行变换,转换到[0,1];
步骤(4):MMC冗余子模块配置目标:系统可靠性尽可能的高,冗余子模块有效利用率尽可能的高,冗余子模块数量尽可能的少。基于上述三个目标,建立了系统可靠性、冗余子模块有效利用率和冗余子模块数量的多目标优化函数TM,求解最优冗余子模块数n。
步骤(1):确定MMC系统的可靠性R
首先,确定单个模块SM的可靠性R,对于单个SM只考虑IGBT,二极管和电容器,则可以得到单个SM的可靠性R:
R = R 1 2 R 2 2 R 3
(1)
其中,R1为单个IGBT的可靠性,R2为单个二极管的可靠性,R3为单个电容器的可靠性。
然后,根据正常工作时的模块数量N和单个模块SM的可靠性R,可以得到A相上桥臂的可靠性RA1
R A 1 = Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i )
(2)
最后,假设MMC系统的可靠性R只与模块SM的可靠性R有关,其他设备暂不考虑,则可以得到MMC系统的可靠性R
R M = [ Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) ] 6
(3)
步骤(2):确定MMC系统冗余子模块有效利用率E
首先,借助建立A相上桥臂可靠性RA1的思想,得到A相上桥臂冗余子模块有效数量:
Q A 1 = Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i )
(4)
然后,同理可以得到MMC系统的冗余子模块有效数量QM
Q M = 6 Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i )
(5)
最后,根据冗余子模块数量n,可以得到MMC系统的冗余子模块有效利用率E
E M = Q M 6 n = 1 n Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i )
(6)
步骤(3):确定冗余子模块数量转换函数CM
首先,冗余子模块数量n的目标:在满足高可靠性的前提下,冗余子模块数量n越小越好,即:
CM(n)=min(n)
(7)
然后,为了便于多目标优化问题的统一求解,将其转换到[0,1],转化公式为:
C M ( n ) = max ( N - n N )
(8)
步骤(4):建立并求解多目标优化函数TM
首先,基于步骤(1)、(2)和(3),建立系统可靠性、冗余子模块有效利用率和冗余子模块数量的多目标优化函数:
R M ( n ) = max { [ Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) ] 6 } E M ( n ) = max { 1 n Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i ) } C M ( n ) = max ( N - n N )
(9)
然后,为了便于求解最优冗余子模块数n,引入权值系数w1,w2和w3,将三个目标函数统一为一个目标函数:
T M = w 1 R M + w 2 E M + w 3 C M w 1 + w 2 + w 3 = 1
(10)
与现有技术相比,本发明有如下优势:
1.本发明综合考虑系统可靠性、冗余子模块有效利用率和冗余子模块数量这三个因素,求解得到的最优冗余子模块数量,更能体现实际工程情况;
2.本发明给出了具体的冗余子模块配置方法和步骤。
附图说明
图1为本发明模块化多电平变换器的拓扑结构图;
图2为本发明单个功率模块SM的结构图;
图3为本发明冗余子模块配置方法流程图;
图4为本发明MMC系统的可靠性R、冗余子模块有效利用率E、冗余子模块数量转换函数CM和目标函数TM随冗余子模块数量n的变化图。
具体实施方式
下面结合附图对本发明进一步说明。
图1是本发明模块化多电平变换器的拓扑结构图,图中u,v和w表示模块化多电平变换器的交流进线端,SM代表单个功率模块,Ls表示桥臂电抗器,udc表示直流侧电容电,N表示正常工作时的模块数量,n表示冗余子模块数量。
图2是本发明单个功率模块SM的结构图。T1,T2表示IGBT,D1,D2表示二极管,C表示电容器。
图3是本发明冗余子模块配置方法流程图,其主要包括以下步骤:
步骤(1):确定MMC系统的可靠性R
根据工程实际,结合正常工作时的模块数量N和单个模块SM的可靠性R,确定MMC系统的可靠性RM
步骤(2):确定MMC系统冗余子模块有效利用率E
借助建立MMC系统的可靠性RM的思想,建立冗余子模块数量n与冗余子模块有效利用率EM的函数关系;
步骤(3):确定冗余子模块数量转换函数CM
为了便于多目标优化问题的统一求解,将冗余子模块数量n进行变换,转换到[0,1];
步骤(4):建立并求解多目标优化函数TM
MMC冗余子模块配置目标:系统可靠性尽可能的高,冗余子模块有效利用率尽可能的高,冗余子模块数量尽可能的少。基于上述三个目标,建立了系统可靠性、冗余子模块有效利用率和冗余子模块数量的多目标优化函数,求解最优冗余子模块数n。
步骤(1):确定MMC系统的可靠性R
首先,确定单个模块SM的可靠性R,对于单个SM只考虑IGBT,二极管和电容器,则可以得到单个SM的可靠性R:
R = R 1 2 R 2 2 R 3
(11)
其中,R1为单个IGBT的可靠性,R2为单个二极管的可靠性,R3为单个电容器的可靠性。
然后,根据正常工作时的模块数量N和单个模块SM的可靠性R,可以得到A相上桥臂的可靠性RA1
R A 1 = Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i )
(12)
最后,假设MMC系统的可靠性R只与模块SM的可靠性R有关,其他设备暂不考虑,则可以得到MMC系统的可靠性R
R M = [ Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) ] 6
(13)
步骤(2):确定MMC系统冗余子模块有效利用率E
首先,借助建立A相上桥臂可靠性RA1的思想,得到A相上桥臂冗余子模块有效数量:
Q A 1 = Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i )
(14)
然后,同理可以得到MMC系统的冗余子模块有效数量QM
Q M = 6 Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i )
(15)
最后,根据冗余子模块数量n,可以得到MMC系统的冗余子模块有效利用率E
E M = Q M 6 n = 1 n Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i )
(16)
步骤(3):确定冗余子模块数量转换函数CM
首先,冗余子模块数量n的目标:在满足高可靠性的前提下,冗余子模块数量n越小越好,即:
CM(n)=min(n)
(17)
然后,为了便于多目标优化问题的统一求解,将其转换到[0,1],转化公式为:
C M ( n ) = max ( N - n N )
(18)
步骤(4):建立并求解多目标优化函数TM
首先,基于步骤(1)、(2)和(3),建立系统可靠性、冗余子模块有效利用率和冗余子模块数量的多目标优化函数:
R M ( n ) = max { [ Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) ] 6 } E M ( n ) = max { 1 n Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i ) } C M ( n ) = max ( N - n N )
(19)
然后,为了便于求解最优冗余子模块数n,引入权值系数w1,w2和w3,将
三个目标函数统一为一个目标函数:
T M = w 1 R M + w 2 E M + w 3 C M w 1 + w 2 + w 3 = 1
(20)
图4为本发明MMC系统的可靠性R、冗余子模块有效利用率E、冗余子模块数量转换函数CM和目标函数TM随冗余子模块数量n的变化图。其中,假定N=100,R=0.98,w1=0.6,w2=0.2,w3=0.2(对于工程实际,N和R必然是确定的,w1,w2和w3是由系统可靠性和成本权衡得到的,在一定范围内可以选择的)。
根据前面的分析,结合表达式(19)和(20),并利用工程实际选择N,R,w1,w2和w3,则可以得到最优冗余子模块数量n与N的关系,将两者的关系绘制成表格,这样便于工程实际的查阅,快速选择最优冗余子模块的数量n。表1给出了当R=0.98,w1=0.6,w2=0.2,w3=0.2时,最优冗余子模块数量n与N的关系表格。
表1最优冗余子模块数量n(R=0.98,w1=0.6,w2=0.2,w3=0.2)
N 50 100 150 200 250 300
n 5 7 9 11 12 14
TM 0.8209 0.8416 0.8531 0.8610 0.8675 0.8731
RM 0.9952 0.9914 0.9912 0.9925 0.9840 0.9886
本发明提供了一种基于多目标优化的MMC冗余子模块配置方法。该方法主要是从系统可靠性、冗余子模块有效利用率和冗余子模块数量这三个目标出发,建立了多目标优化函数,求解最优冗余子模块数量。能够在保证系统可靠性的前提下,节约成本,有利于系统的经济运行。

Claims (5)

1.一种基于多目标优化的模块化多电平变换器MMC冗余子模块配置方法,其特征在于,主要包括以下步骤:
步骤(1):根据工程实际,结合正常工作时的模块数量N和单个模块SM的可靠性R,确定MMC系统的可靠性RM
步骤(2):借助建立MMC系统的可靠性RM的思想,建立冗余子模块数量n与冗余子模块有效利用率EM的函数关系;
步骤(3):为了便于多目标优化问题的统一求解,将冗余子模块数量n进行变换,转换到[0,1]区间;
步骤(4):MMC冗余子模块配置目标:系统可靠性尽可能的高,冗余子模块有效利用率尽可能的高,冗余子模块数量尽可能的少,基于上述三个目标,建立了系统可靠性、冗余子模块有效利用率和冗余子模块数量的多目标优化函数TM,求解最优冗余子模块数n。
2.根据权利要求1所述的一种基于多目标优化的模块化多电平变换器MMC冗余子模块配置方法,其特征在于所述步骤(1)具体包括:首先,确定单个模块SM的可靠性R,对于单个SM只考虑绝缘栅双极晶体管IGBT、二极管和电容器,则可以得到单个SM的可靠性R:
R = R 1 2 R 2 2 R 3 - - - ( 1 )
其中,R1为单个IGBT的可靠性,R2为单个二极管的可靠性,R3为单个电容器的可靠性。
然后,根据正常工作时的模块数量N和单个模块SM的可靠性R,可以得到A相上桥臂的可靠性RA1
R A 1 = Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) - - - ( 2 )
最后,假设MMC系统的可靠性R只与模块SM的可靠性R有关,其他设备暂不考虑,则可以得到MMC系统的可靠性R
R M = [ Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) ] 6 - - - ( 3 )
3.根据权利要求2所述的一种基于多目标优化的模块化多电平变换器MMC冗余子模块配置方法,其特征在于所述步骤(2)具体包括:首先,借助建立A相上桥臂可靠性RA1的思想,得到A相上桥臂冗余子模块有效数量:
Q A 1 = Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i ) - - - ( 4 )
然后,同理可以得到MMC系统的冗余子模块有效数量QM
Q M = 6 Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i ) - - - ( 5 )
最后,根据冗余子模块数量n,可以得到MMC系统的冗余子模块有效利用率E
E M = Q M 6 n = 1 n Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i ) - - - ( 6 )
4.根据权利要求3所述的一种基于多目标优化的模块化多电平变换器MMC冗余子模块配置方法,其特征在于所述步骤(3)具体包括:首先,冗余子模块数量n的目标:在满足高可靠性的前提下,冗余子模块数量n越小越好,即:
CM(n)=min(n)            (7)
然后,为了便于多目标优化问题的统一求解,将其转换到[0,1],转化公式为:
C M ( n ) = max ( N - n N ) - - - ( 8 )
5.根据权利要求4所述的一种基于多目标优化的模块化多电平变换器MMC冗余子模块配置方法,其特征在于所述步骤(4)具体包括:首先,基于步骤(1)、(2)和(3),建立系统可靠性、冗余子模块有效利用率和冗余子模块数量的多目标优化函数:
R M ( n ) = max { [ Σ i = 0 n ( C N + n i ( 1 - R ) i R N + n - i ) ] 6 } E M ( n ) = max { 1 n Σ i = 0 n i ( C N + n i ( 1 - R ) i R N + n - i ) } C M ( n ) = max ( N - n N ) - - - ( 9 )
然后,为了便于求解最优冗余子模块数n,引入权值系数w1,w2和w3,将三个目标函数统一为一个目标函数:
T M = w 1 R M + w 2 E M + w 3 C M w 1 + w 2 + w 3 = 1 - - - ( 10 )
CN201410004749.3A 2014-01-06 2014-01-06 一种基于多目标优化的mmc冗余子模块配置方法 Expired - Fee Related CN103701347B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410004749.3A CN103701347B (zh) 2014-01-06 2014-01-06 一种基于多目标优化的mmc冗余子模块配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410004749.3A CN103701347B (zh) 2014-01-06 2014-01-06 一种基于多目标优化的mmc冗余子模块配置方法

Publications (2)

Publication Number Publication Date
CN103701347A true CN103701347A (zh) 2014-04-02
CN103701347B CN103701347B (zh) 2016-05-04

Family

ID=50362778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410004749.3A Expired - Fee Related CN103701347B (zh) 2014-01-06 2014-01-06 一种基于多目标优化的mmc冗余子模块配置方法

Country Status (1)

Country Link
CN (1) CN103701347B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106452143A (zh) * 2016-10-31 2017-02-22 华北电力大学 基于载波移相的模块化多电平换流器mmc热冗余策略
CN106533227A (zh) * 2016-11-23 2017-03-22 华北电力大学(保定) 一种模块化多电平换流器冗余容错控制方法
CN106899031A (zh) * 2017-02-28 2017-06-27 湖南大学 一种柔性直流输电系统中全桥mmc换流阀冗余度优化方法
CN105790621B (zh) * 2016-05-06 2018-09-18 南昌工程学院 一种级联多电平变流器svm调制策略评估方法
CN109002618A (zh) * 2018-07-25 2018-12-14 赛特雷德(重庆)科技有限公司 一种星载综合电子系统自动化设计方法
CN110098754A (zh) * 2019-04-25 2019-08-06 国网冀北电力有限公司 一种考虑备用冗余的mmc冗余子模块有效利用率计算方法
CN110489774A (zh) * 2019-06-19 2019-11-22 广东志成冠军集团有限公司 一种模块化多电平功率放大器冗余度设计方法
CN111181701A (zh) * 2019-12-12 2020-05-19 南京工程学院 一种基于双目标优化的电能路由器冗余子模块配置方法
CN112307618A (zh) * 2020-10-29 2021-02-02 国网江苏省电力有限公司南京供电分公司 基于nsga-ii的mmc最优冗余数量配置方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788788A (zh) * 2010-01-05 2010-07-28 华北电力大学 基于电网状态识别的多目标机组组合智能优化系统
CN102130441A (zh) * 2011-03-16 2011-07-20 中国电力科学研究院 模块化多电平换流器的柔性直流输电系统的保护配置方法
CN102170110A (zh) * 2011-03-16 2011-08-31 中国电力科学研究院 一种模块化多电平换流器阀保护方法
CN102867124A (zh) * 2012-09-12 2013-01-09 华北电力大学 一种mmc子模块冗余配置及可靠性的计算方法
CN103187724A (zh) * 2013-02-25 2013-07-03 国网智能电网研究院 一种模块化多电平柔性直流输电系统子模块冗余控制方法
CN103227464A (zh) * 2013-03-22 2013-07-31 南京南瑞继保电气有限公司 一种柔性直流输电控制系统子模块冗余配置方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788788A (zh) * 2010-01-05 2010-07-28 华北电力大学 基于电网状态识别的多目标机组组合智能优化系统
CN102130441A (zh) * 2011-03-16 2011-07-20 中国电力科学研究院 模块化多电平换流器的柔性直流输电系统的保护配置方法
CN102170110A (zh) * 2011-03-16 2011-08-31 中国电力科学研究院 一种模块化多电平换流器阀保护方法
CN102867124A (zh) * 2012-09-12 2013-01-09 华北电力大学 一种mmc子模块冗余配置及可靠性的计算方法
CN103187724A (zh) * 2013-02-25 2013-07-03 国网智能电网研究院 一种模块化多电平柔性直流输电系统子模块冗余控制方法
CN103227464A (zh) * 2013-03-22 2013-07-31 南京南瑞继保电气有限公司 一种柔性直流输电控制系统子模块冗余配置方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王朝亮等: "模块化多电平换流器的子模块冗余配置计算方法", 《电力系统自动化》, vol. 37, no. 16, 25 August 2013 (2013-08-25) *
高鹏: "基于多目标优化的改进克隆小生境算法研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》, 15 October 2009 (2009-10-15) *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105790621B (zh) * 2016-05-06 2018-09-18 南昌工程学院 一种级联多电平变流器svm调制策略评估方法
CN106452143B (zh) * 2016-10-31 2019-08-20 华北电力大学 基于载波移相的模块化多电平换流器mmc热冗余策略
CN106452143A (zh) * 2016-10-31 2017-02-22 华北电力大学 基于载波移相的模块化多电平换流器mmc热冗余策略
CN106533227A (zh) * 2016-11-23 2017-03-22 华北电力大学(保定) 一种模块化多电平换流器冗余容错控制方法
CN106899031A (zh) * 2017-02-28 2017-06-27 湖南大学 一种柔性直流输电系统中全桥mmc换流阀冗余度优化方法
CN106899031B (zh) * 2017-02-28 2019-04-19 湖南大学 一种柔性直流输电系统中全桥mmc换流阀冗余度优化方法
CN109002618A (zh) * 2018-07-25 2018-12-14 赛特雷德(重庆)科技有限公司 一种星载综合电子系统自动化设计方法
CN110098754A (zh) * 2019-04-25 2019-08-06 国网冀北电力有限公司 一种考虑备用冗余的mmc冗余子模块有效利用率计算方法
CN110098754B (zh) * 2019-04-25 2020-11-06 国网冀北电力有限公司 一种考虑备用冗余的mmc冗余子模块有效利用率计算方法
CN110489774A (zh) * 2019-06-19 2019-11-22 广东志成冠军集团有限公司 一种模块化多电平功率放大器冗余度设计方法
CN110489774B (zh) * 2019-06-19 2023-04-18 广东志成冠军集团有限公司 一种模块化多电平功率放大器冗余度设计方法
CN111181701A (zh) * 2019-12-12 2020-05-19 南京工程学院 一种基于双目标优化的电能路由器冗余子模块配置方法
CN112307618A (zh) * 2020-10-29 2021-02-02 国网江苏省电力有限公司南京供电分公司 基于nsga-ii的mmc最优冗余数量配置方法

Also Published As

Publication number Publication date
CN103701347B (zh) 2016-05-04

Similar Documents

Publication Publication Date Title
CN103701347A (zh) 一种基于多目标优化的mmc冗余子模块配置方法
CN102570864B (zh) 一种模块化多电平换流器在线损耗计算方法
CN102739100B (zh) 三电平三相四桥臂变流器
CN105024397A (zh) 海上风电经vsc-mtdc输电并网系统的动态模拟系统
CN101882785B (zh) 一种含分布式电源的智能配电网络潮流分析装置及方法
CN107644118B (zh) 一种集成储能的智能配电软开关时序优化方法
CN106712107B (zh) 一种应用于并网变流器并联运行的优化功率分配方法
CN108134384A (zh) 交错连接软开关混合型多电平直流互联变流器
CN103605850A (zh) 一种带子模块闭锁功能的mmc等效建模方法
CN103166489A (zh) 一种三相高功率因数整流器的控制电路
CN201467005U (zh) 基于igbt并联的大功率半桥pebb
CN109742961A (zh) 一种模块化多电平换流器的热平衡控制方法
CN103762828A (zh) 一种多级电力电子变换器系统的控制方法及装置
CN102857142A (zh) 多路mppt电路及太阳能光伏逆变器
CN104485661A (zh) 一种基于节点类型转换的潮流自动调整方法
CN203104320U (zh) 一种实现可调和均流的大功率并联开关电源电路
CN103236788B (zh) 自举式双输入直流变换器
CN203151389U (zh) 一种三相高功率因数整流器的控制电路
CN206041795U (zh) 用于多路全桥逆变模块的实时保护装置
CN206004320U (zh) 模块化多电平换流器的仿真装置
Jayarathna et al. Load flow analysis of low voltage dc networks with photovoltaic
CN202168006U (zh) 多路mppt电路及太阳能光伏逆变器
CN110048427A (zh) 一种多端柔性直流配电网潮流保护定值计算方法
CN102931674B (zh) 一种多端模块化多电平直流输电系统及其接地极确定方法
CN103825453B (zh) 一种变结构多输入高增益直流变换器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20190106