CN103699804B - 一种实时监测风电机组运行时的功率出力偏差的方法 - Google Patents

一种实时监测风电机组运行时的功率出力偏差的方法 Download PDF

Info

Publication number
CN103699804B
CN103699804B CN201310752836.2A CN201310752836A CN103699804B CN 103699804 B CN103699804 B CN 103699804B CN 201310752836 A CN201310752836 A CN 201310752836A CN 103699804 B CN103699804 B CN 103699804B
Authority
CN
China
Prior art keywords
wind
running
wind turbines
generating set
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310752836.2A
Other languages
English (en)
Other versions
CN103699804A (zh
Inventor
徐创学
王智微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian TPRI Power Station Information Technology Co Ltd
Original Assignee
Xian TPRI Power Station Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian TPRI Power Station Information Technology Co Ltd filed Critical Xian TPRI Power Station Information Technology Co Ltd
Priority to CN201310752836.2A priority Critical patent/CN103699804B/zh
Publication of CN103699804A publication Critical patent/CN103699804A/zh
Application granted granted Critical
Publication of CN103699804B publication Critical patent/CN103699804B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种实时监测风电机组运行时的功率出力偏差的方法,包括以下步骤:依据计算得出的标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj,得出两者之间的线性关系式;依据该线性关系式,计算风电机组运行时的电功率Pi对应的风电机组迎风风速Vi;绘制出风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi的二维散点图,同时叠加风电机组出厂功率-风速设计曲线;计算出每一散点处风电机组运行时的电功率Pi与电功率设计值Ps,i的实时功率出力偏差Sp,i。本发明通过比较得出的实时功率出力偏差Sp,i与功率出力偏差规定值的大小,当实时功率出力偏差Sp,i小于功率出力偏差规定值时,即该风电机组运行性能良好。

Description

一种实时监测风电机组运行时的功率出力偏差的方法
【技术领域】
本发明属于风力发电技术领域,具体涉及一种实时监测风电机组运行时的功率出力偏差的方法。
【背景技术】
风能是一种清洁的可再生能源,作为风能利用的主要形式,风力发电是目前技术最成熟、最具规模化开发条件和商业化发展前景的可再生能源发电方式之一。风力发电机组投产发电后,其出力是否能达到风电机组的标称出力,运行是否稳定,是风电场运营单位最为关心的问题,也是决定风电场运营经济指标的重要因素。
传统的考核测试方法是在某一段时间内记录风电机组轮毂高度处的风速和在该风速下机组的输出功率,在按照标准计算可取的风向扇区内,记录相关数据。最后利用Bin分析的方法计算出功率曲线,进而分析该台机组发电性能的优劣。在整个测试过程中,存在以下几个问题。
1、需要对机组的运行性能、风电机组的实时净功率和其周围气象情况进行长时间的数据采集。且由于这种方法由于机组给定功率曲线涉及切入风速和切出风速,因此这种考核方法所用的时间较长。有时可能由于当地风速较低或风速频率分布较集中,绘制一个完整的功率曲线图可能要花几年的时间,用人工的方法费时费力。
2、按照考核标准的定义,风力发电机组的功率曲线是机组输出功率随10min平均风速变化的关系曲线,通过实际测试的方式得到。这种测试得到的功率曲线具有独特性,是针对具体的风场而言,当适用于其他的风场时,仍然需要进行修正。由于自然风风速、风向变化的不确定性,尤其是山区地形的复杂,使得准确测试风力发电机组功率曲线有较多困难。
3、随风电机组提供的技术规范和用户手册,都会描述该机型在标准空气密度下的功率曲线,这个功率曲线通常是通过计算得到的理论功率曲线,或者是在一定的模拟环境下通过试验而绘制出来的。
4、由于需统计风速的地方多、时间长等原因,致使风速数据具有海量、存储困难等特征,因此很多地方只保留每小时风速的均值和方差,以及统计当年的实际风速数据,而不会保留所有实际的风速数据。当统计得到新的风速数据时,则更新风速均值和方差。因数据的不足而造成评估模型常失真。
5、存在空气密度随温度的变化而变化所造成的影响问题。
从以上分析可知:目前这些方法在精度、实时性及数据的完整性上都存在一定的问题,对风机实际特性监测都有一定的影响,如何针对具体的风场条件,实时对风机性能数据进行采集、管理和修正、分析,并制定一套有效的技术方案是目前计算和监测风机运行特性的技术突破点。
【发明内容】
本发明的目的在于针对现有技术的不足,提供了一种实时监测风电机组运行时的功率出力偏差的方法。
为达到上述目的,本发明采用的技术方案是:
一种实时监测风电机组运行时的功率出力偏差的方法,包括以下步骤:
1)采集若干组风电机组运行时的历史测风塔风速Vcf和历史风机机舱顶风速Vfj,并将采集的历史测风塔风速Vcf和历史风机机舱顶风速Vfj分别折算为标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj,其折算公式如下:
V b , cf = V cf · T b · P sj ( 273 + t sj ) · P b 3 - - - ( 1 )
V b , fj = V fj · T b · P sj ( 273 + t sj ) · P b 3 - - - ( 2 )
式中:Psj——风电机组来流压力,取风电机组运行时的大气压,kPa;
tsj——风电机组来流温度,取风电机组运行时的实时环境温度,℃;
Tb——标准绝对气温,℃;
Pb——标准大气压强,kPa;
2)根据步骤1)得出的若干组标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj进行线性拟合,得出线性系数K和B,其计算公式如下:
Vb,cf=K·Vb,fj+B (3)
3)采集风电机组运行时的实时风机机舱顶风速Vfj,i并折算为标准空气密度的实时风机机舱顶风速Vb,fj,i,再根据步骤2)得出的线性系数K和B,计算与电功率Pi相对应的风电机组运行时的风电机组迎风风速Vi,其计算公式如下:
Vi=K·Vb,fj,i+B (4)
式中:i为实时采集风电机组运行时的风机机舱顶风速的记录数,且i=1,2,…,n;
4)绘制出风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi的二维散点图,同时叠加风电机组出厂功率-风速设计曲线;
5)采用偏差统计的方法,计算二维散点图上每一散点处风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi对应的电功率设计值Ps,i,并计算出每一散点处风电机组运行时的电功率Pi与电功率设计值Ps,i的实时功率出力偏差Sp,i,其计算公式如下:
S p , i = Σ 1 n ( P i - P s , i ) 2 n - 1 - - - ( 5 )
式中:Sp,i——实时功率出力偏差,kW。
本发明进一步改进在于:步骤1)中,至少采集50组风电机组运行时的历史测风塔风速Vcf和历史风机机舱顶风速Vfj
与现有技术相比,本发明的优点如下:
本发明一种实时监测风电机组运行时的功率出力偏差的方法,该方法基于风电机组实时/历史数据库,实时采集风电场相关生产数据,包括实时风速、机组实时功率、大气压力以及环境温度,然后将这些数据换算成标准条件下的环境工况值,通过自动绘制功率风速特性曲线,结合电功率设计值,对结果数据进行在线离散度偏差比较,从而实时监测出风电机组在这一段时间内和当前时期内运行性能是否良好;本发明所有的计算过程都是计算机自动完成,避免人为的输入干扰,保证数据的客观性和可靠性。
【附图说明】
图1为某型号1.25MW风电机组实时运行中的功率风速特性曲线。
【具体实施方式】
下面结合附图和具体实施例对本发明作进一步说明。
本发明一种实时监测风电机组运行时的功率出力偏差的方法,包括以下步骤:
1)采集若干组风电机组运行时的历史测风塔风速Vcf和历史风机机舱顶风速Vfj,并将采集的历史测风塔风速Vcf和历史风机机舱顶风速Vfj分别折算为标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj,其折算公式如下:
V b , cf = V cf · T b · P sj ( 273 + t sj ) · P b 3 - - - ( 1 )
V b , fj = V fj · T b · P sj ( 273 + t sj ) · P b 3 - - - ( 2 )
式中:Psj——风电机组来流压力,取风电机组运行时的大气压,kPa;
tsj——风电机组来流温度,取风电机组运行时的实时环境温度,℃;
Tb——标准绝对气温,取288.15℃;
Pb——标准大气压强,取1013kPa;
参见表1,为采集并折算后的若干组风电机组运行时的标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj
表1:
Vb,cf Vb,fj Vb,cf Vb,fj Vb,cf Vb,fj
1.909 1.828 7.026 6.896 10.086 8.740
2.294 2.279 7.129 7.046 10.337 9.266
3.153 3.133 7.387 6.768 10.455 10.143
3.582 3.539 7.415 7.263 10.808 10.269
3.690 3.647 7.512 6.863 10.817 10.143
3.959 3.777 7.634 6.194 11.196 10.139
4.272 4.105 7.714 7.209 11.270 11.087
4.514 4.344 7.811 6.841 11.825 11.009
4.707 4.428 8.000 7.917 12.025 11.960
5.165 5.139 8.033 7.793 12.261 10.310
5.329 5.240 8.120 7.177 12.392 11.942
5.410 5.138 8.220 8.040 12.526 10.802
5.504 5.087 8.318 7.487 12.762 11.125
5.806 5.192 8.355 7.048 12.947 11.646
5.858 5.217 8.406 7.884 13.014 11.650
5.900 5.604 8.453 7.447 13.206 11.532
5.931 5.774 8.581 8.432 13.485 12.443
5.958 5.852 8.753 8.660 13.529 11.341
6.036 5.492 8.753 8.652 13.767 11.572
6.185 5.394 8.924 8.188 13.808 12.386
6.206 5.569 8.924 7.891 13.971 13.440
6.307 5.472 8.965 8.404 14.065 13.580
6.525 5.930 8.977 7.608 14.511 12.691
6.618 6.294 9.216 8.944 14.738 13.253
6.637 6.003 9.237 8.202 14.824 13.588
6.732 6.148 9.411 8.711 14.962 14.464
6.879 6.538 9.615 8.594 15.031 14.833
6.949 6.709 9.792 9.011 15.682 15.228
6.962 6.898 9.850 8.723 15.812 15.732
6.987 6.458 9.972 9.066 16.158 15.911
2)根据步骤1)得出的若干组标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj进行线性拟合,得出线性系数K和B,其计算公式如下:
Vb,cf=K·Vb,fj+B (3)
经过对表1中的标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj进行线性拟合后,得出线性系数K=1.065564426和B=0.113149149。
3)采集风电机组运行时的实时风机机舱顶风速Vfj,i并折算为标准空气密度的实时风机机舱顶风速Vb,fj,i,再根据步骤2)得出的线性系数K和B,计算计算与电功率Pi相对应的风电机组运行时的风电机组迎风风速Vi,其计算公式如下:
Vi=K·Vb,fj,i+B (4)
式中:i为实时采集风电机组运行时的风机机舱顶风速的记录数,且i=1,2,…,n;
参见表2,为实时采集并计算后的与电功率Pi相对应的风电机组运行时的风电机组迎风风速Vi
表2:
Vi Pi Vi Pi Vi Pi
8.318 570.250 11.942 1261.900 15.788 1250.400
10.360 926.460 13.971 1256.700 10.236 775.500
12.976 1254.300 15.682 1296.000 11.185 974.670
10.325 1007.800 12.628 1235.100 10.808 965.440
7.821 392.500 10.443 1021.600 10.654 921.750
12.261 1264.200 16.158 1289.000 10.430 921.000
8.602 562.250 14.824 1272.100 13.206 1243.400
10.283 890.800 11.188 1163.000 12.583 1213.000
9.935 737.600 10.440 1034.100 11.483 1068.400
11.835 1282.400 14.391 1282.200 13.485 1223.200
10.423 981.000 14.793 1224.600 11.299 1243.000
11.196 945.500 14.870 1271.300 12.947 1269.000
13.596 1311.000 12.577 1275.600 12.467 1093.300
8.210 437.000 12.648 1246.000 12.645 1236.300
13.529 1276.700 12.762 1264.900 12.400 1224.500
13.649 1277.600 14.443 1267.100 12.155 1212.700
10.198 749.640 12.770 1231.500 10.183 949.000
14.387 1267.500 13.014 1195.500 10.161 903.500
12.444 1267.000 11.948 1044.000 11.772 963.330
14.962 1254.800 14.738 1197.300 5.981 192.750
11.958 1072.400 9.292 621.670 11.825 992.030
14.449 1250.100 11.772 1048.000 12.392 1191.000
15.812 1272.500 11.976 1245.100 8.831 568.500
11.456 1100.600 12.060 1183.000 10.633 861.140
14.794 1285.300 15.031 1278.100 8.916 623.710
10.854 1128.300 9.920 837.300 8.511 503.250
14.511 1275.100 12.860 1218.000 10.337 885.500
12.839 1261.600 12.848 1256.400 12.499 1220.400
12.478 1088.300 12.608 1055.000 13.767 1274.100
13.677 1173.900 9.216 737.000 8.474 542.000
4)绘制出风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi的二维散点图,同时叠加风电机组出厂功率-风速设计曲线,如图1所示。
5)采用偏差统计的方法,计算二维散点图上每一散点处风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi对应的电功率设计值Ps,i,并计算出每一散点处风电机组运行时的电功率Pi与电功率设计值Ps,i的实时功率出力偏差Sp,i,其计算公式如下:
S p , i = Σ 1 n ( P i - P s , i ) 2 n - 1 - - - ( 5 )
式中:Sp,i——实时功率出力偏差,kW。
依据表2的风电机组运行时的电功率Pi与电功率设计值Ps,i,计算得出实时功率出力偏差Sp,i为:59.14958kW。
本发明通过比较步骤5)得出的实时功率出力偏差Sp,i与功率出力偏差规定值的大小,当实时功率出力偏差Sp,i小于功率出力偏差规定值时,即该风电机组运行性能良好。
在线监测风电机组运行性能有两个方面。
a.历史工况运行监测
即用历史一段时间内的功率风速运行数据进行偏差统计,该结果表明该段时间内的风机总体运行出力特性,根据统计结果,风电机组运行时的正常区间为0‐100,其偏差值越大,表明数据离散度越大,代表其出力控制特性越差,如上面结果为59.15,属合理范围,无须进行人工干预。
b.实时工况运行监测
将当前实时的功率和风速引入到功率特性曲线中,实时计算当前偏差,根据统计结果,风电机组运行时的正常区间为0-100,实时计算的偏差值越大,表明当前工况离规定值越大,代表其出力控制特性越差。当该值超过偏差界限时,我们可分析当前机组出现异常工况,需要进一步进行分析和处理。

Claims (2)

1.一种实时监测风电机组运行时的功率出力偏差的方法,其特征在于,包括以下步骤:
1)采集若干组风电机组运行时的历史测风塔风速Vcf和历史风机机舱顶风速Vfj,并将采集的历史测风塔风速Vcf和历史风机机舱顶风速Vfj分别折算为标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj,其折算公式如下:
V b , cf = V cf · T b · P sj ( 273 + t sj ) · P b 3 - - - ( 1 )
V b , fj = V fj · T b · P sj ( 273 + t sj ) · P b 3 - - - ( 2 )
式中:Psj——风电机组来流压力,取风电机组运行时的大气压,kPa;
tsj——风电机组来流温度,取风电机组运行时的实时环境温度,℃;
Tb——标准绝对气温,℃;
Pb——标准大气压强,kPa;
2)根据步骤1)得出的若干组标准空气密度的测风塔风速Vb,cf和标准空气密度的风机机舱顶风速Vb,fj进行线性拟合,得出线性系数K和B,其计算公式如下:
Vb,cf=K·Vb,fj+B (3)
3)采集风电机组运行时的实时风机机舱顶风速Vfj,i并折算为标准空气密度的实时风机机舱顶风速Vb,fj,i,再根据步骤2)得出的线性系数K和B,计算与电功率Pi相对应的风电机组运行时的风电机组迎风风速Vi,其计算公式如下:
Vi=K·Vb,fj,i+B (4)
式中:i为实时采集风电机组运行时的风机机舱顶风速的记录数,且i=1,2,…,n;
4)绘制出风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi的二维散点图,同时叠加风电机组出厂功率-风速设计曲线;
5)采用偏差统计的方法,计算二维散点图上每一散点处风电机组运行时的电功率Pi与其对应的风电机组迎风风速Vi对应的电功率设计值Ps,i,并计算出每一散点处风电机组运行时的电功率Pi与电功率设计值Ps,i的实时功率出力偏差Sp,i,其计算公式如下:
S p , i = Σ 1 n ( P i - P s , i ) 2 n - 1 - - - ( 5 )
式中:Sp,i——实时功率出力偏差,kW。
2.根据权利要求1所述的一种实时监测风电机组运行时的功率出力偏差的方法,其特征在于,步骤1)中,至少采集50组风电机组运行时的历史测风塔风速Vcf和历史风机机舱顶风速Vfj
CN201310752836.2A 2013-12-31 2013-12-31 一种实时监测风电机组运行时的功率出力偏差的方法 Active CN103699804B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310752836.2A CN103699804B (zh) 2013-12-31 2013-12-31 一种实时监测风电机组运行时的功率出力偏差的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310752836.2A CN103699804B (zh) 2013-12-31 2013-12-31 一种实时监测风电机组运行时的功率出力偏差的方法

Publications (2)

Publication Number Publication Date
CN103699804A CN103699804A (zh) 2014-04-02
CN103699804B true CN103699804B (zh) 2017-02-08

Family

ID=50361331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310752836.2A Active CN103699804B (zh) 2013-12-31 2013-12-31 一种实时监测风电机组运行时的功率出力偏差的方法

Country Status (1)

Country Link
CN (1) CN103699804B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104819107B (zh) * 2015-05-13 2017-07-28 北京天源科创风电技术有限责任公司 一种风电机组功率曲线异常漂移的诊断方法及系统
CN106368908A (zh) * 2016-08-30 2017-02-01 华电电力科学研究院 一种基于scada系统风电机组功率曲线测试方法
CN106894950B (zh) * 2017-03-09 2019-02-12 华电电力科学研究院 一种基于风电机组传动特性的功率特性验证方法
CN107194092B (zh) * 2017-05-27 2021-11-05 中国电力科学研究院 微地形风场仿真分析中外围流场长度的确定方法
CN115422503B (zh) * 2022-07-22 2023-10-17 中广核新能源(定远)有限公司 风力发电机组功率曲线绘制方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182629A (zh) * 2011-03-29 2011-09-14 国网电力科学研究院 基于风资源实时监测数据的弃风电量评估方法
CN102737474A (zh) * 2011-04-07 2012-10-17 胡茂林 基于智能视频的室内人员异常行为的监视和报警

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101215503B1 (ko) * 2011-02-21 2012-12-26 삼성중공업 주식회사 풍력발전기의 나셀 풍속 보정 시스템 및 그 방법

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182629A (zh) * 2011-03-29 2011-09-14 国网电力科学研究院 基于风资源实时监测数据的弃风电量评估方法
CN102737474A (zh) * 2011-04-07 2012-10-17 胡茂林 基于智能视频的室内人员异常行为的监视和报警

Also Published As

Publication number Publication date
CN103699804A (zh) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103699804B (zh) 一种实时监测风电机组运行时的功率出力偏差的方法
CN101592538B (zh) 一种基于实测数据风电场稳态输出功率的计算方法
CN102760191B (zh) 基于转速分群的双馈机组风电场等值建模系统及方法
CN103886179B (zh) 一种基于尾流效应分群的风电场风机聚合方法
CN103617308B (zh) 一种风电场频域等效模型的构建方法
CN103094920B (zh) 一种直驱式风电机组风电场等值方法
CN107947228B (zh) 基于Markov理论的含风电电力系统随机稳定性分析方法
CN110198047B (zh) 一种考虑风电场同调等值的电力系统功角稳定分析方法
CN103219725A (zh) 一种基于实时运行数据的风电场等值建模方法
CN106815773A (zh) 一种风电场功率特性评估方法
CN113205210B (zh) 复杂地形风电场风速与功率预测方法、系统、设备及存储介质
CN103440405A (zh) 基于实测数据的风电场稳态建模方法及系统
CN104675629A (zh) 一种变速风力发电机组的最大风能捕获方法
CN105023099B (zh) 一种考虑湍流强度的风力发电机出力评估方法
Yu et al. Wind speed modeling and energy production simulation with Weibull sampling
CN109408849A (zh) 一种基于同调机组分群的风电场动态等值方法
CN104504285A (zh) 一种计及撬棒保护的双馈风电场等值建模方法
CN105825002A (zh) 一种基于动态灰关联分析法的风电场动态等值建模方法
CN108062722B (zh) 基于风速变异系数的山地风电场模型风机机械功率计算方法
CN105896599A (zh) 一种考虑风机特性的风机出力多指标评估方法
CN116451454A (zh) 一种基于风-浪资源的风机和波浪能装置联合开发最优配置选型方法
CN113642884B (zh) 一种电网失电情况下风电场发电量损失统计方法及系统
CN109190845B (zh) 一种两阶段动态优化短期风电功率预测方法
CN103696913B (zh) 一种实时监测风电机组运行时的风能利用偏差的方法
CN104951654A (zh) 基于控制变量抽样的大规模风电场可靠性评估方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: XI'AN TPRI POWER STATION INFORMATION TECHNOLOGY CO

Free format text: FORMER OWNER: XI'AN THERMAL POWER RESEARCH INSTITUTE CO., LTD.

Effective date: 20150401

Free format text: FORMER OWNER: XI'AN TPRI POWER STATION INFORMATION TECHNOLOGY CO., LTD.

Effective date: 20150401

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 710032 XI'AN, SHAANXI PROVINCE TO: 710075 XI'AN, SHAANXI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150401

Address after: 710075 Xi'an City, Shaanxi province high tech Zone Torch Hotel, block B, 11

Applicant after: XI'AN TPRI POWER STATION INFORMATION TECHNOLOGY CO., LTD.

Address before: 710032 Xingqing Road, Shaanxi, China, No. 136, No.

Applicant before: Xi'an Thermal Power Research Institute Co., Ltd.

Applicant before: XI'AN TPRI POWER STATION INFORMATION TECHNOLOGY CO., LTD.

CB03 Change of inventor or designer information

Inventor after: Xu Chuangxue

Inventor after: Wang Zhiwei

Inventor before: Wang Zhiwei

Inventor before: Xu Chuangxue

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant