CN103696495B - One is exempted to search formula built-in pipe - Google Patents

One is exempted to search formula built-in pipe Download PDF

Info

Publication number
CN103696495B
CN103696495B CN201210366782.1A CN201210366782A CN103696495B CN 103696495 B CN103696495 B CN 103696495B CN 201210366782 A CN201210366782 A CN 201210366782A CN 103696495 B CN103696495 B CN 103696495B
Authority
CN
China
Prior art keywords
pipe
built
elastic component
construction
exempted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210366782.1A
Other languages
Chinese (zh)
Other versions
CN103696495A (en
Inventor
施建华
梅运生
郑伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Original Assignee
GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd filed Critical GEZHOUBA GROUP FOUNDATION ENGINEERING Co Ltd
Priority to CN201210366782.1A priority Critical patent/CN103696495B/en
Publication of CN103696495A publication Critical patent/CN103696495A/en
Application granted granted Critical
Publication of CN103696495B publication Critical patent/CN103696495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

One is exempted to search formula built-in pipe, comprises built-in pipe, is fixed with in mouth of pipe one end of built-in pipe the elastic component be made up of steel wire or steel tendon, on the inwall that elastic component is welded on built-in pipe or outer wall.The present invention adopts elastic wire to combine with built-in pipe; solve the drawback of the pre-buried method of conventional steel pipe dexterously; improve the built-in pipe mouth of pipe and find out rate; reduce and repeat perforate to the destruction of building surface and internal construction; meet built-in fitting in the requirement of watering protective layer thickness in building body; reduce difficulty of construction and construction cost, considerably improve efficiency of construction accelerating construction progress, achieve good economic benefit.

Description

One is exempted to search formula built-in pipe
Technical field
The present invention relates to and a kind ofly bury assembly underground what water built-in pipe device in building body.
Background technology
The pre-buried mode of conventional concreting grout hole position built-in pipe mostly is that steel pipe is firm to direct reinforcement welding by design Kong Weikong; again the two ends mouth of pipe stopper of pipe laying or cotton yarn are closed; then in template, mark is carried out with red paint, need by one end of built-in pipe and template proximate (not meeting built-in fitting in the requirement of watering protective layer thickness in building body) during installation.This mode produces displacement because causing between template and built-in pipe in concrete placings process, the built-in pipe mouth of pipe or paint marks cannot be directly found after Many times form removal, built-in pipe finds out rate lower (being generally about 85%), particularly vertical shaft taper template system continuously sliding build between template and built-in pipe displacement larger, the rate of finding out of built-in pipe is extremely low (being generally about 10%), cause follow-up drilling construction difficulty large, often repeatedly perforate just can avoid the steel mesh reinforcement pore-creating buried underground, normal destruction waters the structure of building body and reinforcing bar, and high material consumption efficiency of construction is low, inapplicable in steel bar concrete pre-embedment grouting pipe.
Summary of the invention
Technical problem to be solved by this invention is to provide one and exempts to search formula built-in pipe; use this built-in pipe can improve the built-in pipe mouth of pipe and find out rate; reduce and repeat perforate to the destruction of building surface and internal construction; meet built-in fitting in the requirement of watering protective layer thickness in building body; reduce difficulty of construction and construction cost, significantly improve efficiency of construction.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: one is exempted to search formula built-in pipe, comprises built-in pipe, is fixed with elastic component in one end of the mouth of pipe of built-in pipe.
Described elastic component is steel wire or steel tendon elastomeric material.
On the inwall that described elastic component is welded on built-in pipe or outer wall.
Described elastic component is by fixing one end being connected to built-in pipe.
The open height of described fixing card is identical with the wall thickness of built-in pipe.
By exceeding the steel wire bent of built-in pipe opening part by being pressed in template, make it keep prestressing force elasticity, in casting process, the elastic component of built-in pipe is all the time by being pressed in template under the effect of elastic force, and steel wire head is exposed in form removal after-pouring surface.
One is exempted to search formula built-in pipe, comprises built-in pipe, and be provided with piston in built-in pipe one end, piston matches with spring, and spring is arranged in built-in pipe by spring supporting ring.
The mouth of pipe that the present invention achieves 99% in the application of pressure pipeline vertical shaft section taper climbing forms continuous placing finds out rate; substantially avoided repetition perforate and built-in fitting is met in the requirement of watering protective layer thickness in building body to the destruction of building surface and internal construction; reduce difficulty of construction and construction cost; considerably improve efficiency of construction and accelerate construction speed, achieve good economic benefit.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and example, the invention will be further described:
Fig. 1 is the structural representation outside elastic component of the present invention welding built-in pipe.
Fig. 2 is the structural representation in elastic component of the present invention welding built-in pipe.
Fig. 3 is the structural representation that elastic component of the present invention adopts when fixedly fastening.
Fig. 4 is the structural representation of the present invention when adopting piston.
Fig. 5 is scheme of installation of the present invention.
Detailed description of the invention
Concrete structure of the present invention is as follows:
As shown in Figure 1, one is exempted to search formula built-in pipe, and elastic component 2 is welded on the inwall of built-in pipe 1.
As shown in Figure 2, one is exempted to search formula built-in pipe, and elastic component 2 is welded on the outer wall of built-in pipe 1.
As shown in Figure 3, one is exempted to search formula built-in pipe, and elastic component 2 is connected to one end of built-in pipe 1 by fixing card 8, and the open height of fixing card 3 is identical with the wall thickness of built-in pipe 1.
In above-described embodiment, elastic component 2 is steel wire or steel tendon elastomeric material.
As shown in Figure 4, one is exempted to search formula built-in pipe, comprises built-in pipe 1, it is characterized in that: be provided with piston 3 in built-in pipe 1 one end, piston 3 matches with spring 5, and spring 5 is arranged in built-in pipe 1 by spring supporting ring 4.
Operating principle of the present invention is as follows:
Exempt from the formula of searching pre-buried tube method specific operation process as follows:
1, the length of elastic component 2 is chosen according to embedded pipe orifice and the possible maximum displacement+20cm of template 6.
2, built-in pipe 1 and elastic component 2 are made by Fig. 1-3, if shaping elastic component 2 is pacified by snap fit
Be contained on built-in pipe 1, as required built-in pipe 2 two ends closed.
3, settle built-in pipe 2 according to design pipe and be fixed with built-in pipe support 7 that (built-in pipe support 7 can adopt the structure that waters in building body or make separately according to physical condition, as long as maintenance firmly meets when building indeformable), require during installation that by the distance of one end of built-in pipe welding wire distance template 6 be 5cm, to the steel wire bent of steel pipe opening part be exceeded by being pressed in template 6, make it keep prestressing force elasticity, in casting process, the elastic component 2 of built-in pipe can all the time by being pressed in template 6 under the effect of elastic force.
4, the position that can judge built-in pipe after building body reaches solidifying phase form removal according to the steel wire head of building surface exposure is fast and accurately watered.
5, when adopting the piston shown in Fig. 4 during structure, can according to the position of the position judgment built-in pipe 1 of piston 3.

Claims (1)

1. exempt to search a formula built-in pipe, comprise built-in pipe (1), it is characterized in that: be fixed with elastic component (2) in one end of the mouth of pipe of built-in pipe (1); Described elastic component (2) is steel wire or steel tendon; On the inwall that described elastic component (2) is welded on built-in pipe (1) or outer wall;
Or described elastic component (2) is connected to one end of built-in pipe (1) by fixing card (8); The open height of described fixing card (3) is identical with the wall thickness of built-in pipe (1);
To the steel wire bent of built-in pipe opening part be exceeded by being pressed in template (6), it is made to keep prestressing force elasticity, in casting process, the elastic component (2) of built-in pipe is all the time by being pressed in template (6) under the effect of elastic force, and steel wire head is exposed in form removal after-pouring surface.
CN201210366782.1A 2012-09-28 2012-09-28 One is exempted to search formula built-in pipe Active CN103696495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210366782.1A CN103696495B (en) 2012-09-28 2012-09-28 One is exempted to search formula built-in pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210366782.1A CN103696495B (en) 2012-09-28 2012-09-28 One is exempted to search formula built-in pipe

Publications (2)

Publication Number Publication Date
CN103696495A CN103696495A (en) 2014-04-02
CN103696495B true CN103696495B (en) 2016-03-23

Family

ID=50358145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210366782.1A Active CN103696495B (en) 2012-09-28 2012-09-28 One is exempted to search formula built-in pipe

Country Status (1)

Country Link
CN (1) CN103696495B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104101317A (en) * 2014-07-02 2014-10-15 葛洲坝集团基础工程有限公司 Application of concrete steel bar detection instrument to grouting pre-buried pipe fast search
CN107313504B (en) * 2017-06-19 2019-05-14 中交二航局第四工程有限公司安徽分公司 Precast beam top plate built-in pipe locating rack and its manufacturing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4549385A (en) * 1984-09-12 1985-10-29 Cohen Alfred S Hanger for supporting pipe below steel reinforced concrete slab foundations
CN201232358Y (en) * 2008-06-13 2009-05-06 中建三局第二建设工程有限责任公司 Sleeve reservation and pre-embedded device on concrete floor
CN202055435U (en) * 2011-05-12 2011-11-30 中建七局第二建筑有限公司 Banister
CN202202572U (en) * 2011-06-30 2012-04-25 中建一局集团第三建筑有限公司 Rigid protective support for PVC (polyviny chloride) wiring tubes
CN202767247U (en) * 2012-09-28 2013-03-06 葛洲坝集团基础工程有限公司 Embedded pipe free of searching

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4549385A (en) * 1984-09-12 1985-10-29 Cohen Alfred S Hanger for supporting pipe below steel reinforced concrete slab foundations
CN201232358Y (en) * 2008-06-13 2009-05-06 中建三局第二建设工程有限责任公司 Sleeve reservation and pre-embedded device on concrete floor
CN202055435U (en) * 2011-05-12 2011-11-30 中建七局第二建筑有限公司 Banister
CN202202572U (en) * 2011-06-30 2012-04-25 中建一局集团第三建筑有限公司 Rigid protective support for PVC (polyviny chloride) wiring tubes
CN202767247U (en) * 2012-09-28 2013-03-06 葛洲坝集团基础工程有限公司 Embedded pipe free of searching

Also Published As

Publication number Publication date
CN103696495A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103147440B (en) Construction prestressed cable method
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN202482093U (en) Tower well seawater lifting system
CN103696495B (en) One is exempted to search formula built-in pipe
CN204475334U (en) Large diameter steel pipe sunk pile pile holding device
CN101058980A (en) Construction method for self-feeding anchor pile
CN103437772B (en) Pipe-jacking construction method of underground passage and tunnel structure
CN203462463U (en) Construction device of pile-peripheral cemented-soil cast-in-situ stiffening core pile
CN205348186U (en) Flexible pipe of adjustable length
CN202767247U (en) Embedded pipe free of searching
CN204185856U (en) Novel anti-floating anchor cable device
CN203270584U (en) One-way intercepting grouting head for grouting
CN202090352U (en) Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods
CN204298836U (en) A kind of pile film cofferdam skeleton structure
CN102747725A (en) Bored pile construction method with tiny disturbance
CN206530344U (en) A kind of jacking pipe joints antifriction injected hole construction
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN204185854U (en) Based on the recyclable steel strand abnormity soldier pile of prestressing technique
CN202323955U (en) High-pressure water jet system for assisting in inserting and driving steel sheet pile cofferdam
CN203977418U (en) Prevent cast-in-place pile concrete loss device
CN202580338U (en) Prestressed concrete cylinder pipe for jacking construction method
CN102677679A (en) Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN203668963U (en) Double-way water blocking device at combining portion of prefabricated bearing platform reserved hole and pile foundation
CN204326067U (en) From anchoring prestress soldier pile
CN201367735Y (en) Adjustable reinforced cable device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant