CN204185854U - Based on the recyclable steel strand abnormity soldier pile of prestressing technique - Google Patents

Based on the recyclable steel strand abnormity soldier pile of prestressing technique Download PDF

Info

Publication number
CN204185854U
CN204185854U CN201420639760.2U CN201420639760U CN204185854U CN 204185854 U CN204185854 U CN 204185854U CN 201420639760 U CN201420639760 U CN 201420639760U CN 204185854 U CN204185854 U CN 204185854U
Authority
CN
China
Prior art keywords
pile body
concrete pile
pipe
steel strand
abnormity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420639760.2U
Other languages
Chinese (zh)
Inventor
陆加伟
滕坤
周俊杰
曹亚强
蔡伟珍
戴林建
马俐玲
朱斌
郭飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Institute of building science group Limited by Share Ltd
Jiangsu Dingda Building New Technology Co., Ltd.
Original Assignee
CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE Co Ltd
JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE Co Ltd, JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd filed Critical CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE Co Ltd
Priority to CN201420639760.2U priority Critical patent/CN204185854U/en
Application granted granted Critical
Publication of CN204185854U publication Critical patent/CN204185854U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of recyclable steel strand abnormity soldier pile based on prestressing technique, comprise: concrete pile body, described concrete pile body inside has at least one built-in pipe, described built-in pipe is U-shaped, the bottom fold place of described built-in pipe is positioned at bottom concrete pile body, two ends of described built-in pipe pass the top of concrete pile body, are equipped with U-shaped prestress wire in described built-in pipe.By the way, the utility model is simple and reasonable, after pile body completes main purpose, discharges stretching end prestressing force, can pull out steel strand easily by mechanical force, reach the object of recovery.

Description

Based on the recyclable steel strand abnormity soldier pile of prestressing technique
Technical field
The utility model relates to all construction project fields such as building, municipal administration, traffic, water conservancy, electric power, industry, particularly relates to a kind of recyclable steel strand abnormity soldier pile based on prestressing technique.
Background technology
Base pit engineering technical scheme is mainly considered from aspects such as security reliability, economic rationality, difficulty of construction, construction periods.Prestressed reinforced concrete stake is widely used in present base pit engineering.Prestressed concrete refers to cracking resistance in order to improve reinforced concrete member and avoids reinforced concrete member to occur crack too early, and in concrete component prefabrication process by presstressed reinforcing steel to its in advance stress application to improve a kind of method of component performance.Prestress wire in existing prestressed concrete pile can not reclaim after pile body completes main purpose or recovery difficult larger.
Utility model content
The technical problem that the utility model mainly solves is to provide a kind of recyclable steel strand abnormity soldier pile based on prestressing technique, simple and reasonable, after pile body completes main purpose, discharge stretching end prestressing force, steel strand can be pulled out easily by mechanical force, reach the object of recovery.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: provide a kind of recyclable steel strand abnormity soldier pile based on prestressing technique, comprise: concrete pile body, described concrete pile body inside has at least one built-in pipe, described built-in pipe is U-shaped, the bottom fold place of described built-in pipe is positioned at bottom concrete pile body, and two ends of described built-in pipe pass the top of concrete pile body, are equipped with U-shaped prestress wire in described built-in pipe.
In the utility model preferred embodiment, be closed pyramid-shaped structures or conical structure bottom described concrete pile body.
In the utility model preferred embodiment, described concrete pile body inside has a hollow round hole, and described hollow round hole extends along the length direction of concrete pile body, extends upwardly to concrete pile body top and forms opening, extend downward bottom concrete pile body, but do not pass concrete pile body.
In the utility model preferred embodiment, the cross section outline of described concrete pile body comprises two straight flanges be parallel to each other and is positioned at two arc-shaped edges at straight flange two ends.
In the utility model preferred embodiment, the inside of described concrete pile body also has many arrangements of reinforcement.
In the utility model preferred embodiment, described built-in pipe is PE pipe, and the inner surface of described built-in pipe has polytetrafluorethylecoatings coatings.
The beneficial effects of the utility model are: the utility model is based on the recyclable steel strand abnormity soldier pile of prestressing technique, simple and reasonable, after pile body completes main purpose, discharge stretching end prestressing force, steel strand can be pulled out easily by mechanical force, reach the object of recovery.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of the utility model based on recyclable steel strand abnormity soldier pile one preferred embodiment of prestressing technique;
Fig. 2 is that the A-A of Fig. 1 is to sectional view.
In accompanying drawing, the mark of each parts is as follows: 1, concrete pile body, and 11, straight flange, 12, arc-shaped edges, 2, built-in pipe, 3, U-shaped prestress wire, 4, hollow round hole.
Detailed description of the invention
Be clearly and completely described to the technical scheme in the utility model embodiment below, obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 and Fig. 2, the utility model embodiment comprises:
A kind of recyclable steel strand abnormity soldier pile based on prestressing technique, comprise: concrete pile body 1, the inside of described concrete pile body 1 also has many arrangement of reinforcement (not shown)s, be the pyramid-shaped structures closed or conical structure bottom described concrete pile body 1, pile body can be reduced and press down soil body resistance in process.
Described concrete pile body 1 inside has at least one built-in pipe 2, as shown in Figure 2, preferred four built-in pipes in the present embodiment, described built-in pipe 2 is in U-shaped, the bottom fold place of described built-in pipe 2 is positioned at bottom concrete pile body 1, two ends of described built-in pipe 2 pass the top of concrete pile body 1, U-shaped prestress wire 3 is equipped in described built-in pipe 2, the bottom natural of described U-shaped steel strand 3 forms an anchored end, two ends of described U-shaped prestress wire 3 pass from two of built-in pipe 2 ends respectively, form stretching end, before pile body bears external load, at stretching end, stretch-draw is carried out to steel strand, apply compressive pre-stress, improve bending resistance and the rigidity of pile body, postpone the time that crack occurs, increase the durability of pile body, after pile body completes main purpose, discharge stretching end prestressing force, pull out steel strand by mechanical force, reach the object of recovery.
Preferably, described concrete pile body 1 inside has a hollow round hole 4, described hollow round hole 4 extends along the length direction of concrete pile body 1, opening is formed at concrete pile body 1 top, described hollow round hole extends downward bottom concrete pile body 1, but does not run through concrete pile body, and the advantage of this hollow round hole 4 to save material, give full play to circular arch effect, reduce resistance at pile body pressing down in process.
The cross section outline of described concrete pile body comprises two straight flanges be parallel to each other 11 and is positioned at two arc-shaped edges 12 at straight flange 11 two ends, forms odd-shaped cross section, mainly by circular arch as appropriate force transmission mechanism.
Described built-in pipe 2 is PE pipe, the inner surface of described built-in pipe 2 has polytetrafluorethylecoatings coatings, the surperficial smoother of polytetrafluorethylecoatings coatings, like this after pile body completes main purpose, during pull-out steel strand, more laborsaving.
The beneficial effects of the utility model are: the utility model is based on the recyclable steel strand abnormity soldier pile of prestressing technique, simple and reasonable, after pile body completes main purpose, discharge stretching end prestressing force, steel strand can be pulled out easily by mechanical force, reach the object of recovery.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model description to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present utility model.

Claims (6)

1. the recyclable steel strand abnormity soldier pile based on prestressing technique, it is characterized in that, comprise: concrete pile body, described concrete pile body inside has at least one built-in pipe, described built-in pipe is U-shaped, the bottom fold place of described built-in pipe is positioned at bottom concrete pile body, and two ends of described built-in pipe pass the top of concrete pile body, are equipped with U-shaped prestress wire in described built-in pipe.
2. the recyclable steel strand abnormity soldier pile based on prestressing technique according to claim 1, it is characterized in that, be closed pyramid-shaped structures or conical structure bottom described concrete pile body.
3. the recyclable steel strand abnormity soldier pile based on prestressing technique according to claim 1, it is characterized in that, described concrete pile body inside has a hollow round hole, described hollow round hole extends along the length direction of concrete pile body, extend upwardly to concrete pile body top and form opening, extend downward bottom concrete pile body, but do not pass concrete pile body.
4. the recyclable steel strand abnormity soldier pile based on prestressing technique according to claim 1, it is characterized in that, the cross section outline of described concrete pile body comprises two straight flanges be parallel to each other and is positioned at two arc-shaped edges at straight flange two ends.
5. the recyclable steel strand abnormity soldier pile based on prestressing technique according to claim 1, it is characterized in that, the inside of described concrete pile body also has many arrangements of reinforcement.
6. the recyclable steel strand abnormity soldier pile based on prestressing technique according to claim 1, it is characterized in that, described built-in pipe is PE pipe, and the inner surface of described built-in pipe has polytetrafluorethylecoatings coatings.
CN201420639760.2U 2014-10-31 2014-10-31 Based on the recyclable steel strand abnormity soldier pile of prestressing technique Active CN204185854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420639760.2U CN204185854U (en) 2014-10-31 2014-10-31 Based on the recyclable steel strand abnormity soldier pile of prestressing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420639760.2U CN204185854U (en) 2014-10-31 2014-10-31 Based on the recyclable steel strand abnormity soldier pile of prestressing technique

Publications (1)

Publication Number Publication Date
CN204185854U true CN204185854U (en) 2015-03-04

Family

ID=52617865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420639760.2U Active CN204185854U (en) 2014-10-31 2014-10-31 Based on the recyclable steel strand abnormity soldier pile of prestressing technique

Country Status (1)

Country Link
CN (1) CN204185854U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343119A (en) * 2014-10-31 2015-02-11 江苏鼎达建筑新技术有限公司 Recyclable steel strand irregular support pile based on pre-stress technique
CN112962590A (en) * 2021-01-28 2021-06-15 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343119A (en) * 2014-10-31 2015-02-11 江苏鼎达建筑新技术有限公司 Recyclable steel strand irregular support pile based on pre-stress technique
CN112962590A (en) * 2021-01-28 2021-06-15 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof
CN112962590B (en) * 2021-01-28 2023-05-23 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN201217847Y (en) Plug-in type preformed hole grouting reinforcement lapping connection component
CN203097017U (en) Connecting structure between prefabricated infilled wall and prefabricated column or prefabricated shear wall
CN103924680B (en) Prestressing without bondn is connected precast concrete beam square steel tube concrete column combination node with regular reinforcement
CN102704471A (en) Prestress solid concrete preformed pile
CN102535743A (en) Unbonded prestressed steel concrete beam
CN204185854U (en) Based on the recyclable steel strand abnormity soldier pile of prestressing technique
CN202416260U (en) Transverse prestressed reinforced structure of concrete aqueduct
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN202730755U (en) H-shaped support pile
CN204326094U (en) The polygon steel pile foundation of transmission of electricity steel pipe pole
CN104343119A (en) Recyclable steel strand irregular support pile based on pre-stress technique
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN204298836U (en) A kind of pile film cofferdam skeleton structure
CN203701434U (en) Reinforcement horizontal locating ladder for shear wall
CN202644525U (en) Variable cross-section prestress reinforced concrete tubular pile
CN201730107U (en) Pile foundation of electric steel tube tower
CN202745041U (en) Precast concrete special-shaped pile
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN203625886U (en) Prefabricated concrete square pile with high strength
CN204326067U (en) From anchoring prestress soldier pile
CN103938732A (en) Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN204510649U (en) A kind of prefabricated component combined staircase
CN103924685B (en) Prestress connected concrete beam round steel tube concrete column node
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN203878566U (en) Reinforced prefabricated concrete square pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Jiangsu Dingda Building New Technology Co., Ltd.

Patentee after: Changzhou Institute of building science group Limited by Share Ltd

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Jiangsu Dingda Building New Technology Co., Ltd.

Patentee before: Changzhou Architectural Research Institute Co., Ltd.