CN103676754B - Machine of closing a position construction behavior monitoring method - Google Patents

Machine of closing a position construction behavior monitoring method Download PDF

Info

Publication number
CN103676754B
CN103676754B CN201310727329.3A CN201310727329A CN103676754B CN 103676754 B CN103676754 B CN 103676754B CN 201310727329 A CN201310727329 A CN 201310727329A CN 103676754 B CN103676754 B CN 103676754B
Authority
CN
China
Prior art keywords
closing
machine
construction
grid
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310727329.3A
Other languages
Chinese (zh)
Other versions
CN103676754A (en
Inventor
钟桂良
陈万涛
邱向东
尹习双
刘金飞
赖刚
刘永亮
宋述军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201310727329.3A priority Critical patent/CN103676754B/en
Publication of CN103676754A publication Critical patent/CN103676754A/en
Application granted granted Critical
Publication of CN103676754B publication Critical patent/CN103676754B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to hydraulic engineering concrete pouring construction Quality Control Technology, spy it discloses one and closes a position machine construction behavior monitoring method, solves to lack in conventional art the machine of closing a position effectively is controlled the problem that management hand brings hidden danger to concrete pouring construction quality.In the present invention, the operation to the machine of closing a position monitors in real time, the vibrator real-time monitoring data got in conjunction with concrete vibrating Quality Monitoring Control System, carry out closing a position the identification of machine construction behavior and evaluation, and then can determine whether the duty arbitrarily closing a position in machine working hour, judge whether to use in arbitrary region in face, storehouse the machine of closing a position close a position construction, judge and remind the construction phenomenons lack of standardization such as appearance " with the Dai Ping that shakes ", provide technical support for concrete pouring construction quality control.The present invention is applicable to hydraulic engineering concrete pouring construction quality control.

Description

Machine of closing a position construction behavior monitoring method
Technical field
The present invention relates to hydraulic engineering concrete pouring construction Quality Control Technology, particularly to machine construction behavior monitoring method of closing a position.
Background technology
It is the critical process of concreting that concrete spreading paves, and is the important factor in order of the follow-up operation implementation result that vibrates. Construction uses the machine of closing a position carry out the construction that paves of closing a position, thus machine of closing a position behavior of constructing is directly connected to close a position the quality paved, right Concrete pouring construction quality has a major impact, and is distinctly claimed and must vibrate after closing a position again in job specfication.
At present job site machine construction management of closing a position is extensive, lacks and the machine of closing a position effectively is controlled management, after being concerned only with operation of vibrating The final phenomenon such as bleeding, ignores pilot process quality control, there is " with the Dai Ping that shakes " and (does not i.e. use the machine of closing a position to put down after discharging Storehouse, directly vibrates with vibrator until stockpile liquidization and flow shakeouts) phenomenon, the most often bring stockpile top to vibrate insertion depth Can not well overlap the cold seam in appearance local with next layer not, major part concrete is crossed and is shaken and bring aggregate separated etc. to have a strong impact on The problem of concrete pouring construction quality;Meanwhile, machine operating personnel's level of closing a position is very different, it is difficult to ensure to close a position effect, mixed Solidifying soil became uneven, brings hidden danger to concrete pouring construction quality.
The problems referred to above have become the common fault of concrete pouring construction quality control, so that employing becomes more meticulous, intelligentized technology Means monitor the construction behavior of the machine of closing a position effectively, and judge that evaluation construction of closing a position is the most qualified by monitoring result, execute with auxiliary Work administrative staff effectively control construction technology quality of closing a position.
Summary of the invention
The technical problem to be solved is: proposes one and closes a position machine construction behavior monitoring method, solves to lack in conventional art The weary problem that the effectively control management hand of the machine of closing a position is brought hidden danger to concrete pouring construction quality.
The present invention solves above-mentioned technical problem and be the technical scheme is that
Machine of closing a position construction behavior monitoring method, comprises the following steps:
A. the positional information of machine of closing a position is obtained in real time;
B. head and the direct north angle information of machine of closing a position are obtained in real time;
C. positional information and the head of the machine of closing a position obtained are sent to monitoring central server with direct north angle information;
D. monitoring central server calculates the construction track of machine of closing a position and construction area of closing a position;
E. monitoring central server transfers the construction of closing a position vibrator real-time monitoring data combination that the Quality Monitoring Control System that vibrates obtains The construction behavior of the machine of closing a position is analyzed judging by region.
Further, in step a, obtain the positional information of the machine of closing a position in real time by installing location equipment on the machine of closing a position.
Further, in step b, obtain head and the direct north of the machine of closing a position in real time by installing orientation equipment on the machine of closing a position Angle information.
Further, in step c, it is wirelessly transferred by WIFI or the position of the machine of closing a position obtained is believed by 3G wireless signal transmission Breath and head send monitoring central server to direct north angle information.
Further, in step e, described vibrator real-time monitoring data is included: region of having vibrated, vibrate duration and vibrate slotting Enter the degree of depth.
Further, in step e, the concrete grammar that the described construction behavior to the machine of closing a position is analyzed judging includes:
Face, construction storehouse, machine place of closing a position is divided into several grids, judges for each grid, if this grid is at the machine of closing a position Close a position in construction area and this grid vibrate duration in normal range (NR), the insertion depth that vibrates in normal range (NR), then judge this net Lattice close a position machine construction normally;If this grid this grid in construction area closed a position by the machine of closing a position vibrates not yet when receiving storehouse, then judge This grid is covered by machine transition of closing a position, and uncovered position is constructed;If this grid is not in construction area closed a position by the machine of closing a position and this grid shakes Smash that duration is partially long, this grid vibrates, and insertion depth is partially deep, then this grid is that " with the Dai Ping that shakes " constructs phenomenon overlay area.
Further, the method further comprises the steps of:
F. the result being analyzed the construction behavior of the machine of closing a position judging is sent to monitor client by monitoring central server, described Monitor client is graphically changed mode and is represented the result that this analysis judges.
Further, step f also includes: the analysis judged result that monitoring central server is sent by monitor client resolves, If " with the Dai Ping that shakes " phenomenon occurs, then send warning to remind construction manager to process in time.
The invention has the beneficial effects as follows: the work progress of the machine of closing a position is monitored, and combination vibrates real-time monitoring data to closing a position The construction behavior of machine judges, reports to the police to construction manager in time, for concrete when finding construction behavior lack of standardization Pouring construction quality control provides technical support, reduces hidden danger.
Detailed description of the invention
The machine construction behavior monitoring method it is contemplated that proposition one is closed a position, solves to lack the effective control to the machine of closing a position in conventional art The problem that tubulation reason hand brings hidden danger to concrete pouring construction quality.Its core concept is: monitor the machine of closing a position in real time, (region of having vibrated, vibrate duration and shaking for the vibrator real-time monitoring data that gets in conjunction with concrete vibrating Quality Monitoring Control System Smash insertion depth), the identification of the machine construction behavior that carries out closing a position and evaluation, and then can determine whether the work in machine working hour of arbitrarily closing a position State, judge whether to use in arbitrary region in face, storehouse the machine of closing a position close a position construction, judge and remind appearance " with the Dai Ping that shakes " etc. no Standard construction phenomenon, provides technical support for concrete pouring construction quality control.
Below in conjunction with being embodied as means, the solution of the present invention is further described:
First, obtain, by installation location equipment (satellite fix or ultra-wideband position or laser positioning) on the machine of closing a position, machine of closing a position Real time position P(x, y, z);Machine machine of closing a position is obtained by installing orientation equipment (electronic compass or satellite orientation) on the machine of closing a position Head and the real-time angle α of direct north;
Above-mentioned Monitoring Data is transferred to the processor unit in machine driver's cabin of closing a position, and then, data are passed through wireless by processor unit Communication module (WIFI or 3G) is transmitted back to monitoring central server, and the service terminal software that server is disposed calculates machine construction of closing a position Working trajectory, construction area of closing a position;Meanwhile, service end transfer vibrate quality intelligent monitoring system obtain vibrator monitor in real time Machine construction behavior of closing a position is analyzed judging by data (region of having vibrated, vibrate duration and the insertion depth that vibrates).
Concrete analysis mode is as follows: face, construction storehouse, machine place of closing a position is divided into some grids, judges for each grid; If this grid is closed a position in construction area at the machine of closing a position, this grid vibrates duration is in normal range (NR) and this grid vibrates insertion depth In normal range (NR), then this grid closes a position machine construction normally;If this grid is closed a position in construction area at the machine of closing a position, this grid is being received Vibrate not yet during storehouse, then this grid is covered by machine transition of closing a position, and uncovered position is constructed;If this grid is not closed a position construction at the machine of closing a position In region, this grid vibrates, and duration is partially long, this grid vibrates, and insertion depth is partially deep, then this grid is that " with the Dai Ping that shakes " (i.e. unloads Do not use the machine of closing a position to close a position after material, directly vibrate with vibrator until stockpile liquidization and flow shakeouts) construction phenomenon overlay area.
Finally, service end will close a position machine construction behavior monitoring and evaluation result issue monitor client, the mode graphically changed is shown To construction manager, and send warning when calculating discovery " with the Dai Ping that shakes " in real time to remind construction manager to process in time.
Passing through above-mentioned steps, it is achieved that the monitoring function to machine construction behavior of closing a position, to closing a position, machine construction behavior is judged, And when construction behavior lack of standardization occurs in real time to construction manager early warning, provide skill for concrete pouring construction quality control Art supports.

Claims (6)

1. machine of closing a position construction behavior monitoring method, it is characterised in that comprise the following steps:
A. the positional information of machine of closing a position is obtained in real time;
B. head and the direct north angle information of machine of closing a position are obtained in real time;
C. positional information and the head of the machine of closing a position obtained are sent to monitoring central server with direct north angle information;
D. monitoring central server calculates the construction track of machine of closing a position and construction area of closing a position;
E. monitoring central server transfers the construction of closing a position vibrator real-time monitoring data combination that the Quality Monitoring Control System that vibrates obtains The construction behavior of the machine of closing a position is analyzed judging by region;
In step e, described vibrator real-time monitoring data is included: region of having vibrated, vibrate duration and the insertion depth that vibrates;
The concrete grammar that the described construction behavior to the machine of closing a position is analyzed judging includes:
Face, construction storehouse, machine place of closing a position is divided into several grids, judges for each grid, if this grid is at the machine of closing a position Close a position in construction area and this grid vibrate duration in normal range (NR), the insertion depth that vibrates in normal range (NR), then judge this net Lattice close a position machine construction normally;If this grid this grid in construction area closed a position by the machine of closing a position vibrates not yet when receiving storehouse, then judge This grid is covered by machine transition of closing a position, and uncovered position is constructed;If this grid is not in construction area closed a position by the machine of closing a position and this grid shakes Smash that duration is partially long, this grid vibrates, and insertion depth is partially deep, then this grid is that " with the Dai Ping that shakes " constructs phenomenon overlay area;Described " with the Dai Ping that shakes " does not use the machine of closing a position to close a position after referring to discharging, directly vibrates with vibrator until stockpile liquidization and flow shakeouts.
Machine of closing a position the most as claimed in claim 1 construction behavior monitoring method, it is characterised in that in step a, by closing a position Location equipment is installed on machine and obtains the positional information of the machine of closing a position in real time.
Machine of closing a position the most as claimed in claim 1 construction behavior monitoring method, it is characterised in that in step b, by closing a position Orientation equipment is installed on machine and obtains head and the direct north angle information of the machine of closing a position in real time.
Machine of closing a position the most as claimed in claim 1 construction behavior monitoring method, it is characterised in that in step c, pass through WIFI It is wirelessly transferred or 3G wireless signal transmission is by the positional information of machine of closing a position obtained and head and direct north angle information transmission To monitoring central server.
Machine of closing a position the most as claimed in claim 1 construction behavior monitoring method, it is characterised in that the method further comprises the steps of:
F. the result being analyzed the construction behavior of the machine of closing a position judging is sent to monitor client by monitoring central server, described Monitor client is graphically changed mode and is represented the result that this analysis judges.
Machine of closing a position the most as claimed in claim 5 construction behavior monitoring method, it is characterised in that also include in step f: monitoring The analysis judged result that monitoring central server is sent by client resolves, if there is " with the Dai Ping that shakes " phenomenon, then sends Report to the police to remind construction manager to process in time.
CN201310727329.3A 2013-12-25 2013-12-25 Machine of closing a position construction behavior monitoring method Active CN103676754B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310727329.3A CN103676754B (en) 2013-12-25 2013-12-25 Machine of closing a position construction behavior monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310727329.3A CN103676754B (en) 2013-12-25 2013-12-25 Machine of closing a position construction behavior monitoring method

Publications (2)

Publication Number Publication Date
CN103676754A CN103676754A (en) 2014-03-26
CN103676754B true CN103676754B (en) 2016-08-24

Family

ID=50314659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310727329.3A Active CN103676754B (en) 2013-12-25 2013-12-25 Machine of closing a position construction behavior monitoring method

Country Status (1)

Country Link
CN (1) CN103676754B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103901869B (en) * 2014-04-22 2016-10-05 中国电建集团成都勘测设计研究院有限公司 The quality control method of concrete construction
CN104320381A (en) * 2014-10-08 2015-01-28 中国电建集团成都勘测设计研究院有限公司 Method of communication between spreading machine monitoring device and server
CN104950791A (en) * 2015-06-29 2015-09-30 中国电建集团成都勘测设计研究院有限公司 Concrete spreading quality control method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9176235B2 (en) * 2008-04-11 2015-11-03 Caterpillar Trimble Control Technologies Llc System and method for presenting topographical data for an earthmoving operation
CN103308015B (en) * 2013-05-16 2016-05-25 中国电建集团成都勘测设计研究院有限公司 Concrete vibrating effective coverage range method of real-time

Also Published As

Publication number Publication date
CN103676754A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103669358B (en) Concrete spreading machine construction method for real-time monitoring
CN103901869B (en) The quality control method of concrete construction
CN103676754B (en) Machine of closing a position construction behavior monitoring method
CN103308015B (en) Concrete vibrating effective coverage range method of real-time
CN103309306B (en) Concrete vibrating quality monitoring communication network-building method
CN107643508A (en) Indoor locating system
CN103747535B (en) Method, apparatus and system for recovering CAPWAP control channel
CN105787816A (en) Water utilization monitoring and management system for hydrants in city
CN106681223B (en) A kind of rock-fill dams dam facing watering amount intelligent monitor system and its monitoring method
CN111856992A (en) Engineering machinery monitoring system based on Internet of things
CN106383357A (en) Navigation information flow system simulating operation of satellite navigation system
CN108389008A (en) Power distribution network resource management system
CN205353350U (en) Indoor location navigation based on feeder
CN103676905B (en) Unwinding machine construction behavior monitoring system
CN114584925A (en) Operation safety monitoring method and device
CN207115111U (en) A kind of bituminous pavement paving rolls managing and control system
CN103902842A (en) Analysis method of concrete blank layer covering time
CN203630606U (en) Flattening machine construction behavior monitoring system
CN103389709A (en) Vehicle-mounted information service system of construction machinery and vehicle-mounted terminal
CN105183028A (en) Concrete intelligent mixing temperature control system and method
RU2580067C2 (en) Anti-theft system and method for vehicle with communication device and working equipment
CN204010072U (en) A kind of passive door control system
CN103696427A (en) Real-time manual vibrating bar monitoring and positioning system
CN107046439A (en) Big Dipper distribution automation system
CN109803305A (en) A kind of radio station remote monitoring method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant