CN103670413B - Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit - Google Patents

Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit Download PDF

Info

Publication number
CN103670413B
CN103670413B CN201210378536.8A CN201210378536A CN103670413B CN 103670413 B CN103670413 B CN 103670413B CN 201210378536 A CN201210378536 A CN 201210378536A CN 103670413 B CN103670413 B CN 103670413B
Authority
CN
China
Prior art keywords
coombe
exploitation
influence area
ditch
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210378536.8A
Other languages
Chinese (zh)
Other versions
CN103670413A (en
Inventor
王旭锋
张东升
张杨
范钢伟
张呈国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210378536.8A priority Critical patent/CN103670413B/en
Publication of CN103670413A publication Critical patent/CN103670413A/en
Application granted granted Critical
Publication of CN103670413B publication Critical patent/CN103670413B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention belongs to Mineral Engineering field, under being specifically related to slow down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit.Manifest abnormal problem to solve shallow buried coal seam broadwall ore deposit pressure under coombe, the present invention proposes when shallow buried coal seam broadwall is carried out in coombe development area, and earth's surface coombe developmental state is considered as an important factor in order.According to mining effect angle and the disrumpent feelings angle of overlying strata, the influence area of coombe to exploitation is divided into without influence area, influence area and strong influence area.The determination keeping away ditch exploitation the position of terminal mining line with exploit along ditch that work plane arranges should according to following principle: keep away ditch exploit time, work plane the position of terminal mining line should be positioned at outside the strong influence area of coombe; When exploiting along ditch, the boundary position of the nearly ditch side of work plane should within the region that overlying strata height is greater than fissure zone height.The method relate to calculating parameter few, be easy to field conduct, safety is high, can be widely used in the wide scale security exploitation of shallow buried coal seam under coombe.

Description

Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit
Technical field
The invention belongs to Mineral Engineering field, under being specifically related to slow down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit.
Background technology
Along with the continuous enforcement of China's development of the West Regions state basic policy, the developing focus of coal resources in China has started to shift to western part.Compared with southwestern coalfield, coalfield, northwest surface vegetation is sparse, water and soil conservation ability is more weak, earth's surface water erosion is serious, coombe in length and breadth, greatly, landform is incoherent, and relative relief has more than 100 rice, mostly is coombe development area in slope body occurrence change.The adverse effect that surface relief produces seam mining by increasing theoretical research and engineering practice confirm.Such as, in old mine Pillar Recovery process, repeatedly there is the unexpected unstable phenomenon of irregular coal column, cause large area roof fall in the safe group of Inner Mongol gouy; In the progradation of new mine coal wall, stope can be pressed suddenly, and intensity exceedes pushes up first weighting always, then after advancing certain distance, returns to normal again, the theoretical unaccountable phenomenon of these conventional ore deposit pressures, all relevant with Coal Face Passing Through earth's surface coombe.Under coombe during shallow buried coal seam broadwall, manifest abnormal phenomenon for a series of ore deposits pressures such as hydraulic support pushed down, coal wall caving are serious, there is the problem of poor stability, high cost in existing technical measures, has a strong impact on the safety in production of mine.
Summary of the invention
Abnormal problem is manifested in order to solve shallow buried coal seam broadwall ore deposit pressure under coombe, the present invention proposes shallow buried coal seam broadwall ore deposit under slowing down coombe and press the method manifested, the method is convenient to practical operation, can be widely used in the wide scale security exploitation of coal resources under coombe.
For achieving the above object, the present invention adopts following technical scheme: when carrying out exploitation and disposing, for reducing or avoiding coombe on the impact of exploitation, by change work plane the position of terminal mining line and adjustment advance of the face direction, realize avoiding keeping away ditch exploitation or moving towards exploiting along ditch of exploitation along coombe of coombe exploitation; When keeping away ditch exploitation, according to mining effect angle (δ), overlying strata are disrumpent feelings angle be divided into the influence area of coombe to exploitation without influence area (I), influence area (II) and strong influence area (III), work plane the position of terminal mining line (1) should be positioned at outside the strong influence area of coombe (III); When exploiting along ditch, the boundary position (2) of the nearly ditch side of work plane should be greater than within the region of fissure zone height (h) at overlying strata height (H).
The present invention slows down the beneficial effect of pressure process for show in shallow buried coal seam broadwall ore deposit under coombe:
(1) effectively can slow down shallow buried coal seam broadwall ore deposit pressure under coombe and manifest the impacts such as abnormal hydraulic support pushed down, the coal wall caving caused be serious, ensure the safe working of mine;
(2) deficiency of shallow buried coal seam longwall mining method under current coombe is made up;
(3) the method applicability is strong, easy to implement, can improve the rate of recovery of coal resources to greatest extent.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, embodiments of the present invention are further described:
Accompanying drawing is the schematic diagram that the present invention slows down pressure process for show in shallow buried coal seam broadwall ore deposit under coombe.
In figure: 1-keep away ditch exploitation work plane stop adopting position, 2-exploits nearly ditch side work plane boundary position along ditch, 3-coombe slope push up, the line of demarcation of 4-influence area and strong influence area, I-without influence area, II-influence area, the strong influence area of III-, δ-mining effect angle, -overlying strata are disrumpent feelings angle, the fissure zone height of h-position 2 correspondence, the overlying strata height of H-position 2 correspondence.
Detailed description of the invention
When carrying out exploitation and disposing, for reducing or avoiding the movable impact on exploitation of coombe slope body, by changing work plane the position of terminal mining line and adjustment advance of the face direction, realize keeping away ditch exploitation or exploiting along ditch.
With reference to accompanying drawing, when keeping away ditch exploitation, according to mining effect angle (δ), overlying strata are disrumpent feelings angle the influence area of coombe to exploitation is divided into without influence area (I), influence area (II) and strong influence area (III).Mining effect angle (δ) and the disrumpent feelings angle of overlying strata can be consulted by the field data in each mining area and obtain.When top, coombe slope (3) is subject to mining influence, the position residing for work plane is namely without the line of demarcation of influence area (I) and influence area (II); Push up (3) by coombe slope and do the disrumpent feelings angle of overlying strata the corresponding line of demarcation of influence area (II) and strong influence area (III), position (4) i.e..Work plane the position of terminal mining line (1) should be positioned at outside the strong influence area of coombe (III).When exploiting along ditch, the boundary position (2) of the nearly ditch side of work plane should be greater than within the region of fissure zone height (h) at overlying strata height (H).Overlying strata height (H) can be obtained by the borehole data consulting mining area.The feature that when considering shallow buried coal seam broadwall under the body of coombe slope, fissure zone is grown, the field measurement data (fissure zone height is 10 ~ 14 times of mining height) of mining area shallow buried coal seam broadwall are grown, the design formulas of fissure zone height (h): h=10.9M+10.62 when obtaining shallow buried coal seam broadwall under the body of coombe slope in conjunction with UDEC numerical result, laboratory results of Physical and coombe.
In formula: h-fissure zone height, m.
M-mining height, m.

Claims (1)

1. one kind slow down coombe under shallow buried coal seam broadwall ore deposit press the method manifested, it is characterized in that: when carrying out exploitation and disposing, for reducing or avoiding coombe on the impact of exploitation, by change work plane the position of terminal mining line and adjustment advance of the face direction, realize avoiding keeping away ditch exploitation or moving towards exploiting along ditch of exploitation along coombe of coombe exploitation; When keeping away ditch exploitation, according to mining effect angle (δ), overlying strata are disrumpent feelings angle be divided into the influence area of coombe to exploitation without influence area (I), influence area (II) and strong influence area (III), work plane the position of terminal mining line (1) should be positioned at outside the strong influence area of coombe (III); When exploiting along ditch, the boundary position (2) of the nearly ditch side of work plane should be greater than within the region of fissure zone height (h) at overlying strata height (H).
CN201210378536.8A 2012-09-21 2012-09-21 Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit Active CN103670413B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210378536.8A CN103670413B (en) 2012-09-21 2012-09-21 Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210378536.8A CN103670413B (en) 2012-09-21 2012-09-21 Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit

Publications (2)

Publication Number Publication Date
CN103670413A CN103670413A (en) 2014-03-26
CN103670413B true CN103670413B (en) 2016-03-02

Family

ID=50309102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210378536.8A Active CN103670413B (en) 2012-09-21 2012-09-21 Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit

Country Status (1)

Country Link
CN (1) CN103670413B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115860314B (en) * 2023-02-14 2023-05-09 北京科技大学 Method and system for preventing and controlling coal seam working face impact danger based on surface ditch

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4887935A (en) * 1987-12-23 1989-12-19 Bochumer Eisenhutte Heintzmann Gmbh & Co. Kg Method of controlling the movement of a longwall excavation front, especially the face or breast of a coal seam
CN101109283A (en) * 2007-08-20 2008-01-23 太原理工大学 quantitative decision method for feasibility of mining above hollow
RU2341657C1 (en) * 2007-06-15 2008-12-20 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method of prevention of development entries in coal bed areas
CN101509378A (en) * 2008-02-17 2009-08-19 刘玉德 Shallow buried thin bedrock coal bed short wall continuous mining technology suitable condition classification method
CN102536238A (en) * 2012-01-09 2012-07-04 中国矿业大学 Mining method for large-inclined angle laminar non-coal solid mineral deposit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4887935A (en) * 1987-12-23 1989-12-19 Bochumer Eisenhutte Heintzmann Gmbh & Co. Kg Method of controlling the movement of a longwall excavation front, especially the face or breast of a coal seam
RU2341657C1 (en) * 2007-06-15 2008-12-20 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method of prevention of development entries in coal bed areas
CN101109283A (en) * 2007-08-20 2008-01-23 太原理工大学 quantitative decision method for feasibility of mining above hollow
CN101509378A (en) * 2008-02-17 2009-08-19 刘玉德 Shallow buried thin bedrock coal bed short wall continuous mining technology suitable condition classification method
CN102536238A (en) * 2012-01-09 2012-07-04 中国矿业大学 Mining method for large-inclined angle laminar non-coal solid mineral deposit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冲沟发育矿区浅埋煤层采动坡体活动机理及其控制研究;王旭锋;《中国博士学位论文全文数据库工程科技Ⅰ辑》;20100215(第2期);第3页、第9页、第18页、第21-25页、第43页及第97页 *

Also Published As

Publication number Publication date
CN103670413A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
AU2019376347B2 (en) A method for coal mining based on frozen aquifer for underground longwall face under water-conservation condition
Guo et al. Subsidence control and farmland conservation by solid backfilling mining technology
CN109209293B (en) Comprehensive outburst prevention construction method for rock cross-cut outburst coal seam
CN103790586B (en) Long-wall overlying strata settlement coordination water-preserving coal mining method
CN100560937C (en) A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method
CN104314570B (en) Long thick ore body Wall ore reclaims and the transitional exploitation method of open air trestle
CA2986062C (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN104775816B (en) Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions
Liu et al. Undersea safety mining of the large gold deposit in Xinli District of Sanshandao Gold Mine
WO2015196939A1 (en) Solid filling mining design method under a water body
Wang et al. Mechanism of mining-induced slope movement for gullies overlaying shallow coal seams
Yuan Theories and techniques of coal bed methane control in China
CN104504180A (en) Method for classifying damages by water during loess gully runoff mining
CN104141506A (en) Mine pressure control method of intense mine pressure appearance fully mechanized top coal caving face
CN109162713A (en) A kind of double resource pit mining modes of coal water not changing overlying strata hydrogeologic condition
CN104612753B (en) What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines
CN103670413B (en) Under slowing down coombe, the method manifested is pressed in shallow buried coal seam broadwall ore deposit
Cheng et al. Numerical simulation and analysis of surface and surrounding rock failure in deep high-dip coal seam mining
RU2477792C1 (en) Method for defining height of water conveying cracks zone over mined-out area at stratified deposits
CN109026140A (en) A method of with band and the artificial water proof stratum of solid-filling coal-mining technique
CN104763423B (en) Technology for mining powder ore by inverse well rock drilling
CN204163730U (en) Slurry shield Slurry treatment system mud pit
CN103267984B (en) A kind of method of discrimination of ultra-close coal seam/group
CN104806245B (en) Protecting method for long-wall strip type coordinated skip-mining under earth and rockfill dams
Wang et al. Measurement of the strong pressure appearance laws with hard roof and full mechanized mining extra thick coal seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant