CN103669418A - Novel maintenance and construction method for drainage settlement post-pouring belt - Google Patents
Novel maintenance and construction method for drainage settlement post-pouring belt Download PDFInfo
- Publication number
- CN103669418A CN103669418A CN201310747138.3A CN201310747138A CN103669418A CN 103669418 A CN103669418 A CN 103669418A CN 201310747138 A CN201310747138 A CN 201310747138A CN 103669418 A CN103669418 A CN 103669418A
- Authority
- CN
- China
- Prior art keywords
- settlement
- pouring
- solid brick
- construction method
- pouring belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a novel maintenance and construction method for a drainage settlement post-pouring belt. The maintenance and construction method includes the following steps that (1), formworks are laid at intervals at the top end of the settlement post-pouring belt, and the upper portions of the formworks are covered with a safety net;(2), a solid brick wall is built on a multi-layer foundation mat on one side of the settlement post-pouring belt, drainage holes are formed at certain intervals in the bottom end of the solid brick wall, and a steel screen grid is installed on the outer side walls of the drainage holes; (3), a batten is installed on the inner side wall of the solid brick wall; (4), steel pipe supports are installed between the batten and a high layer foundation mat on the other side of the settlement post-pouring belt, one end of each steel pipe support abuts against the batten, and the other end of each steel pipe support abuts against the high layer foundation mat. By the adoption of the method, a maintained structure of the settlement post-pouring belt in the construction process is stable and safe.
Description
Technical field
The present invention relates to pouring after settlement maintenance construction method, relate in particular to a kind of new hydrophobic place pouring after settlement maintenance construction method.
Background technology
For watering construction band after solving that the differential settlement of highrise building main tower and annex arranges, be called pouring after settlement.In construction, have high-rise and tier building sole plate links together and highly different situations, because high-rise building and tier building need to separate with pouring after settlement, the time of building of pouring after settlement is more late again, therefore needed before backfill the pouring after settlement maintenance of laying bricks.After having built, it carries out again backfill and ground construction.When the residing basement sole plate of pouring after settlement is changed into initiatively and being dredged by passive leak stopping, the part seepage of basement sole plate drains in collecting well by drainage blanket, on sole plate, without impact, the surface water on ground drains in collecting well by gutter, guarantees that ground is dry.At this moment the maintenance of pouring after settlement is just even more important.
By retrieval, learn the patent of having authorized:
1 application number is: the Chinese patent of CN201220346188.1 discloses " a kind of constructing structure of basement roof pouring after settlement safeguard measure ", this structure discloses a kind of constructing structure of basement roof pouring after settlement safeguard measure, it comprises the waterproof roll being laid on respectively on the basement roof that is positioned at pouring after settlement both sides, on the waterproof roll layer of every side, built respectively body of wall by laying bricks or stones, the inside top of per pass body of wall has been built respectively L shaped groove; At per pass wall outer side wall and basement roof intersection, be equipped with respectively water-swellable sealing adhesive tape, on water-swellable sealing adhesive tape top and above being positioned at the waterproof roll in water-swellable sealing adhesive tape outside, built pea gravel concreten topping; On two L shaped grooves, be erected with the lumps of wood, on the lumps of wood, be equipped with template, in template and on each body of wall top, wall outer side wall, be wiped with cement sand bed; Be positioned at cement sand bed in template and cement sand bed and the horizontal direction at each body of wall top and be provided with angle, on cement sand bed, scribble coating.
2 application numbers are: the Chinese patent of CN201210246324.4 discloses " a kind of construction method of basement roof pouring after settlement safeguard measure ", and it comprises the following steps: (1) carries out antirust processing by the reinforcing bar in pouring after settlement; (2) difference laying water-proof coiled material on the basement roof that is positioned at pouring after settlement both sides; (3) difference masonry panel on waterproof roll, the inside top of per pass body of wall is built into respectively L shaped groove; (4) at per pass wall outer side wall and basement roof intersection, lay respectively adhesive tape; (5) on adhesive tape top and above being positioned at the waterproof roll in water-swellable sealing adhesive tape outside, build pea gravel concreten topping; (6) on two L shaped grooves, set up the lumps of wood; (7) on the lumps of wood, lay template; (8) in template and on each body of wall top, wall outer side wall, smear cement sand bed; (9) at cement sand bed coating.
1-2 item patent is basement roof pouring after settlement protection, is not suitable for basement sole plate and by passive leak stopping, changes the initiatively pouring after settlement at the place of dredging into and protect.
Summary of the invention
The object of the invention is to overcome the shortcoming of prior art, provide a kind of simple in structure, construction cost is low, can reach good hydrophobic effect, and pouring after settlement has also carried out a kind of new hydrophobic place pouring after settlement maintenance construction method of good maintenance.
A kind of new hydrophobic of the present invention place pouring after settlement maintenance construction method, it comprises the following steps:
(1) at interval, pouring after settlement top, lay template, on described template top, cover safety net;
(2) on the multilayer sole plate that is positioned at pouring after settlement one side, build solid brick wall by laying bricks or stones, in described solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed;
(3) described solid brick within the walls sidewall flitch is installed;
(4) between described flitch and the high-rise sole plate of pouring after settlement opposite side, steel pipe support is installed, described steel pipe support one end withstands on flitch and the other end withstands on high-rise sole plate.
The beneficial effect of the inventive method is: basement sole plate is changed into the maintenance construction method of the pouring after settlement of initiatively dredging place by passive leak stopping, the firm safety of enclosed structure at construction period pouring after settlement does not affect pouring after settlement when both sides tier building and high-story architecture construction.The maintenance of pouring after settlement is protected underground chamber base base plate draining system in addition, in solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed.
Accompanying drawing explanation
Accompanying drawing is for adopting the constructing structure schematic diagram of a kind of new hydrophobic of the present invention place pouring after settlement maintenance construction method.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
A kind of new hydrophobic of the present invention place pouring after settlement maintenance construction method as shown in drawings, it comprises the following steps:
(1) at pouring after settlement 3 intervals, top, lay template 4, on described template 4 tops, cover safety net; (2) on the multilayer sole plate 1 that is positioned at pouring after settlement 3 one sides, build solid brick wall 7 by laying bricks or stones, in described solid brick wall 7 bottoms, weep hole 5 is set at a certain distance, at described weep hole 5 lateral walls, expanded metal lath grid 6 is installed; (3) at described solid brick wall 7 inside walls, flitch 8 is installed; (4) between described flitch 8 and the high-rise sole plate 2 of pouring after settlement 3 opposite sides, steel pipe support 9 is installed, described steel pipe support 9 one end withstand on flitch 8 and the other end withstands on high-rise sole plate 2.
Embodiment 1
(1) at pouring after settlement 3 intervals, top, lay template 4, on described template 4 tops, cover safety net; (2) on the multilayer sole plate 1 that is positioned at pouring after settlement 3 one sides, build solid brick wall 7 by laying bricks or stones, in described solid brick wall 7 bottoms, weep hole 5 is set at a certain distance, at described weep hole 5 lateral walls, expanded metal lath grid 6 is installed; (3) at described solid brick wall 7 inside walls, flitch 8 is installed; (4) between described flitch 8 and the high-rise sole plate 2 of pouring after settlement 3 opposite sides, steel pipe support 9 is installed, described steel pipe support 9 one end withstand on flitch 8 and the other end withstands on high-rise sole plate 2.
In the firm safety of enclosed structure of construction period pouring after settlement, when both sides tier building and high-story architecture construction, do not affect pouring after settlement after testing.The maintenance of pouring after settlement is protected underground chamber base base plate draining system in addition, in solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed.
Claims (1)
1. a new hydrophobic place pouring after settlement maintenance construction method, is characterized in that it comprises the following steps:
(1) at interval, pouring after settlement top, lay template, on described template top, cover safety net;
(2) on the multilayer sole plate that is positioned at pouring after settlement one side, build solid brick wall by laying bricks or stones, in described solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed;
(3) described solid brick within the walls sidewall flitch is installed;
(4) between described flitch and the high-rise sole plate of pouring after settlement opposite side, steel pipe support is installed, described steel pipe support one end withstands on flitch and the other end withstands on high-rise sole plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310747138.3A CN103669418B (en) | 2013-12-25 | 2013-12-25 | A kind of hydrophobic place pouring after settlement maintenance construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310747138.3A CN103669418B (en) | 2013-12-25 | 2013-12-25 | A kind of hydrophobic place pouring after settlement maintenance construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103669418A true CN103669418A (en) | 2014-03-26 |
CN103669418B CN103669418B (en) | 2016-05-18 |
Family
ID=50308132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310747138.3A Active CN103669418B (en) | 2013-12-25 | 2013-12-25 | A kind of hydrophobic place pouring after settlement maintenance construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103669418B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571001A (en) * | 2018-05-17 | 2018-09-25 | 福建省惠东建筑工程有限公司 | A kind of alter-pouring strips mould plate and its supporting process |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100096958A (en) * | 2009-02-25 | 2010-09-02 | 유성석 | Manhole of sewer pipe |
CN202247922U (en) * | 2011-01-07 | 2012-05-30 | 中国建筑第四工程局有限公司 | Water lowering and discharging device for water collecting well in blind ditch with deep base pit |
CN102747750A (en) * | 2012-07-17 | 2012-10-24 | 天津住宅集团建设工程总承包有限公司 | Construction method for post-pouring settlement belt protective measures of basement top plates |
CN202672194U (en) * | 2012-07-17 | 2013-01-16 | 天津住宅集团建设工程总承包有限公司 | Construction structure for protection measures of settled post-cast strips of basement roof-plates |
CN103195102A (en) * | 2013-04-23 | 2013-07-10 | 中建七局第二建筑有限公司 | Post-cast strip form support structure and method for underground waterproof shear walls |
-
2013
- 2013-12-25 CN CN201310747138.3A patent/CN103669418B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100096958A (en) * | 2009-02-25 | 2010-09-02 | 유성석 | Manhole of sewer pipe |
CN202247922U (en) * | 2011-01-07 | 2012-05-30 | 中国建筑第四工程局有限公司 | Water lowering and discharging device for water collecting well in blind ditch with deep base pit |
CN102747750A (en) * | 2012-07-17 | 2012-10-24 | 天津住宅集团建设工程总承包有限公司 | Construction method for post-pouring settlement belt protective measures of basement top plates |
CN202672194U (en) * | 2012-07-17 | 2013-01-16 | 天津住宅集团建设工程总承包有限公司 | Construction structure for protection measures of settled post-cast strips of basement roof-plates |
CN103195102A (en) * | 2013-04-23 | 2013-07-10 | 中建七局第二建筑有限公司 | Post-cast strip form support structure and method for underground waterproof shear walls |
Non-Patent Citations (1)
Title |
---|
《施工技术》杂志社: "《钢筋混凝土工程施工新技术典型案例与分析》", 31 May 2011, 机械工业出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571001A (en) * | 2018-05-17 | 2018-09-25 | 福建省惠东建筑工程有限公司 | A kind of alter-pouring strips mould plate and its supporting process |
Also Published As
Publication number | Publication date |
---|---|
CN103669418B (en) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203411994U (en) | Support pile basement outer wall structure | |
CN102747750B (en) | Construction method for post-pouring settlement belt protective measures of basement top plates | |
CN202416382U (en) | Waterproof structure of basement | |
CN103266724B (en) | Drainage structure of planted roof | |
CN102808418B (en) | Firm structure for preventing and controlling freeze-thaw collapse of side slope in cold region and construction method for firm structure | |
RU2462560C1 (en) | Underground part of concrete wall with wall drain | |
CN203654302U (en) | Light-weight combined assembly suitable for abrupt slope anchoring | |
CN105201025B (en) | Basement waterproofing construction and its construction method | |
CN104775440A (en) | Mineshaft-type underground garage deep foundation pit supporting structure | |
CN104314090A (en) | Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof | |
CN205636758U (en) | Full chiltern stratum dry dock side slope support structure | |
CN104234089B (en) | The construction method that a kind of basement guarded drainage combines | |
CN201593204U (en) | Water-proof drainage structure of basement external wall water back face | |
CN108755696A (en) | A kind of rapid construction of pit earthwork at raining season method | |
CN203654329U (en) | Novel maintenance construction structure for sedimentation post-cast strip in dredge position | |
CN204780944U (en) | Soil structure is kept off to additional formula in foundation ditch limit | |
CN103669418B (en) | A kind of hydrophobic place pouring after settlement maintenance construction method | |
CN210766835U (en) | Foundation beam side vertical face waterproof structure | |
CN105696543B (en) | A kind of method that dam front row is seeped when red mud dump constructs sub- dam | |
CN202672194U (en) | Construction structure for protection measures of settled post-cast strips of basement roof-plates | |
CN103374915B (en) | Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof | |
CN105544621A (en) | Building structure for lowering designed anti-floating water level of heap slope building | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN204492031U (en) | The water proof structure of planted roof deformation joint | |
CN204715364U (en) | A kind of foundation pit support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20180914 Granted publication date: 20160518 |
|
PP01 | Preservation of patent right | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20190618 Granted publication date: 20160518 |
|
PD01 | Discharge of preservation of patent |