CN103669418A - Novel maintenance and construction method for drainage settlement post-pouring belt - Google Patents

Novel maintenance and construction method for drainage settlement post-pouring belt Download PDF

Info

Publication number
CN103669418A
CN103669418A CN201310747138.3A CN201310747138A CN103669418A CN 103669418 A CN103669418 A CN 103669418A CN 201310747138 A CN201310747138 A CN 201310747138A CN 103669418 A CN103669418 A CN 103669418A
Authority
CN
China
Prior art keywords
settlement
pouring
solid brick
construction method
pouring belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310747138.3A
Other languages
Chinese (zh)
Other versions
CN103669418B (en
Inventor
王丽梅
张云富
刘亚雷
陆海英
赵猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201310747138.3A priority Critical patent/CN103669418B/en
Publication of CN103669418A publication Critical patent/CN103669418A/en
Application granted granted Critical
Publication of CN103669418B publication Critical patent/CN103669418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a novel maintenance and construction method for a drainage settlement post-pouring belt. The maintenance and construction method includes the following steps that (1), formworks are laid at intervals at the top end of the settlement post-pouring belt, and the upper portions of the formworks are covered with a safety net;(2), a solid brick wall is built on a multi-layer foundation mat on one side of the settlement post-pouring belt, drainage holes are formed at certain intervals in the bottom end of the solid brick wall, and a steel screen grid is installed on the outer side walls of the drainage holes; (3), a batten is installed on the inner side wall of the solid brick wall; (4), steel pipe supports are installed between the batten and a high layer foundation mat on the other side of the settlement post-pouring belt, one end of each steel pipe support abuts against the batten, and the other end of each steel pipe support abuts against the high layer foundation mat. By the adoption of the method, a maintained structure of the settlement post-pouring belt in the construction process is stable and safe.

Description

A kind of new hydrophobic place pouring after settlement maintenance construction method
Technical field
The present invention relates to pouring after settlement maintenance construction method, relate in particular to a kind of new hydrophobic place pouring after settlement maintenance construction method.
Background technology
For watering construction band after solving that the differential settlement of highrise building main tower and annex arranges, be called pouring after settlement.In construction, have high-rise and tier building sole plate links together and highly different situations, because high-rise building and tier building need to separate with pouring after settlement, the time of building of pouring after settlement is more late again, therefore needed before backfill the pouring after settlement maintenance of laying bricks.After having built, it carries out again backfill and ground construction.When the residing basement sole plate of pouring after settlement is changed into initiatively and being dredged by passive leak stopping, the part seepage of basement sole plate drains in collecting well by drainage blanket, on sole plate, without impact, the surface water on ground drains in collecting well by gutter, guarantees that ground is dry.At this moment the maintenance of pouring after settlement is just even more important.
By retrieval, learn the patent of having authorized:
1 application number is: the Chinese patent of CN201220346188.1 discloses " a kind of constructing structure of basement roof pouring after settlement safeguard measure ", this structure discloses a kind of constructing structure of basement roof pouring after settlement safeguard measure, it comprises the waterproof roll being laid on respectively on the basement roof that is positioned at pouring after settlement both sides, on the waterproof roll layer of every side, built respectively body of wall by laying bricks or stones, the inside top of per pass body of wall has been built respectively L shaped groove; At per pass wall outer side wall and basement roof intersection, be equipped with respectively water-swellable sealing adhesive tape, on water-swellable sealing adhesive tape top and above being positioned at the waterproof roll in water-swellable sealing adhesive tape outside, built pea gravel concreten topping; On two L shaped grooves, be erected with the lumps of wood, on the lumps of wood, be equipped with template, in template and on each body of wall top, wall outer side wall, be wiped with cement sand bed; Be positioned at cement sand bed in template and cement sand bed and the horizontal direction at each body of wall top and be provided with angle, on cement sand bed, scribble coating.
2 application numbers are: the Chinese patent of CN201210246324.4 discloses " a kind of construction method of basement roof pouring after settlement safeguard measure ", and it comprises the following steps: (1) carries out antirust processing by the reinforcing bar in pouring after settlement; (2) difference laying water-proof coiled material on the basement roof that is positioned at pouring after settlement both sides; (3) difference masonry panel on waterproof roll, the inside top of per pass body of wall is built into respectively L shaped groove; (4) at per pass wall outer side wall and basement roof intersection, lay respectively adhesive tape; (5) on adhesive tape top and above being positioned at the waterproof roll in water-swellable sealing adhesive tape outside, build pea gravel concreten topping; (6) on two L shaped grooves, set up the lumps of wood; (7) on the lumps of wood, lay template; (8) in template and on each body of wall top, wall outer side wall, smear cement sand bed; (9) at cement sand bed coating.
1-2 item patent is basement roof pouring after settlement protection, is not suitable for basement sole plate and by passive leak stopping, changes the initiatively pouring after settlement at the place of dredging into and protect.
Summary of the invention
The object of the invention is to overcome the shortcoming of prior art, provide a kind of simple in structure, construction cost is low, can reach good hydrophobic effect, and pouring after settlement has also carried out a kind of new hydrophobic place pouring after settlement maintenance construction method of good maintenance.
A kind of new hydrophobic of the present invention place pouring after settlement maintenance construction method, it comprises the following steps:
(1) at interval, pouring after settlement top, lay template, on described template top, cover safety net;
(2) on the multilayer sole plate that is positioned at pouring after settlement one side, build solid brick wall by laying bricks or stones, in described solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed;
(3) described solid brick within the walls sidewall flitch is installed;
(4) between described flitch and the high-rise sole plate of pouring after settlement opposite side, steel pipe support is installed, described steel pipe support one end withstands on flitch and the other end withstands on high-rise sole plate.
The beneficial effect of the inventive method is: basement sole plate is changed into the maintenance construction method of the pouring after settlement of initiatively dredging place by passive leak stopping, the firm safety of enclosed structure at construction period pouring after settlement does not affect pouring after settlement when both sides tier building and high-story architecture construction.The maintenance of pouring after settlement is protected underground chamber base base plate draining system in addition, in solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed.
Accompanying drawing explanation
Accompanying drawing is for adopting the constructing structure schematic diagram of a kind of new hydrophobic of the present invention place pouring after settlement maintenance construction method.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
A kind of new hydrophobic of the present invention place pouring after settlement maintenance construction method as shown in drawings, it comprises the following steps:
(1) at pouring after settlement 3 intervals, top, lay template 4, on described template 4 tops, cover safety net; (2) on the multilayer sole plate 1 that is positioned at pouring after settlement 3 one sides, build solid brick wall 7 by laying bricks or stones, in described solid brick wall 7 bottoms, weep hole 5 is set at a certain distance, at described weep hole 5 lateral walls, expanded metal lath grid 6 is installed; (3) at described solid brick wall 7 inside walls, flitch 8 is installed; (4) between described flitch 8 and the high-rise sole plate 2 of pouring after settlement 3 opposite sides, steel pipe support 9 is installed, described steel pipe support 9 one end withstand on flitch 8 and the other end withstands on high-rise sole plate 2.
Embodiment 1
(1) at pouring after settlement 3 intervals, top, lay template 4, on described template 4 tops, cover safety net; (2) on the multilayer sole plate 1 that is positioned at pouring after settlement 3 one sides, build solid brick wall 7 by laying bricks or stones, in described solid brick wall 7 bottoms, weep hole 5 is set at a certain distance, at described weep hole 5 lateral walls, expanded metal lath grid 6 is installed; (3) at described solid brick wall 7 inside walls, flitch 8 is installed; (4) between described flitch 8 and the high-rise sole plate 2 of pouring after settlement 3 opposite sides, steel pipe support 9 is installed, described steel pipe support 9 one end withstand on flitch 8 and the other end withstands on high-rise sole plate 2.
In the firm safety of enclosed structure of construction period pouring after settlement, when both sides tier building and high-story architecture construction, do not affect pouring after settlement after testing.The maintenance of pouring after settlement is protected underground chamber base base plate draining system in addition, in solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed.

Claims (1)

1. a new hydrophobic place pouring after settlement maintenance construction method, is characterized in that it comprises the following steps:
(1) at interval, pouring after settlement top, lay template, on described template top, cover safety net;
(2) on the multilayer sole plate that is positioned at pouring after settlement one side, build solid brick wall by laying bricks or stones, in described solid brick wall bottom, weep hole is set at a certain distance, at described weep hole lateral wall, expanded metal lath grid is installed;
(3) described solid brick within the walls sidewall flitch is installed;
(4) between described flitch and the high-rise sole plate of pouring after settlement opposite side, steel pipe support is installed, described steel pipe support one end withstands on flitch and the other end withstands on high-rise sole plate.
CN201310747138.3A 2013-12-25 2013-12-25 A kind of hydrophobic place pouring after settlement maintenance construction method Active CN103669418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310747138.3A CN103669418B (en) 2013-12-25 2013-12-25 A kind of hydrophobic place pouring after settlement maintenance construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310747138.3A CN103669418B (en) 2013-12-25 2013-12-25 A kind of hydrophobic place pouring after settlement maintenance construction method

Publications (2)

Publication Number Publication Date
CN103669418A true CN103669418A (en) 2014-03-26
CN103669418B CN103669418B (en) 2016-05-18

Family

ID=50308132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310747138.3A Active CN103669418B (en) 2013-12-25 2013-12-25 A kind of hydrophobic place pouring after settlement maintenance construction method

Country Status (1)

Country Link
CN (1) CN103669418B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571001A (en) * 2018-05-17 2018-09-25 福建省惠东建筑工程有限公司 A kind of alter-pouring strips mould plate and its supporting process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100096958A (en) * 2009-02-25 2010-09-02 유성석 Manhole of sewer pipe
CN202247922U (en) * 2011-01-07 2012-05-30 中国建筑第四工程局有限公司 Water lowering and discharging device for water collecting well in blind ditch with deep base pit
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN202672194U (en) * 2012-07-17 2013-01-16 天津住宅集团建设工程总承包有限公司 Construction structure for protection measures of settled post-cast strips of basement roof-plates
CN103195102A (en) * 2013-04-23 2013-07-10 中建七局第二建筑有限公司 Post-cast strip form support structure and method for underground waterproof shear walls

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100096958A (en) * 2009-02-25 2010-09-02 유성석 Manhole of sewer pipe
CN202247922U (en) * 2011-01-07 2012-05-30 中国建筑第四工程局有限公司 Water lowering and discharging device for water collecting well in blind ditch with deep base pit
CN102747750A (en) * 2012-07-17 2012-10-24 天津住宅集团建设工程总承包有限公司 Construction method for post-pouring settlement belt protective measures of basement top plates
CN202672194U (en) * 2012-07-17 2013-01-16 天津住宅集团建设工程总承包有限公司 Construction structure for protection measures of settled post-cast strips of basement roof-plates
CN103195102A (en) * 2013-04-23 2013-07-10 中建七局第二建筑有限公司 Post-cast strip form support structure and method for underground waterproof shear walls

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《施工技术》杂志社: "《钢筋混凝土工程施工新技术典型案例与分析》", 31 May 2011, 机械工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571001A (en) * 2018-05-17 2018-09-25 福建省惠东建筑工程有限公司 A kind of alter-pouring strips mould plate and its supporting process

Also Published As

Publication number Publication date
CN103669418B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN203411994U (en) Support pile basement outer wall structure
CN102747750B (en) Construction method for post-pouring settlement belt protective measures of basement top plates
CN202416382U (en) Waterproof structure of basement
CN103266724B (en) Drainage structure of planted roof
CN102808418B (en) Firm structure for preventing and controlling freeze-thaw collapse of side slope in cold region and construction method for firm structure
RU2462560C1 (en) Underground part of concrete wall with wall drain
CN203654302U (en) Light-weight combined assembly suitable for abrupt slope anchoring
CN105201025B (en) Basement waterproofing construction and its construction method
CN104775440A (en) Mineshaft-type underground garage deep foundation pit supporting structure
CN104314090A (en) Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN205636758U (en) Full chiltern stratum dry dock side slope support structure
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN201593204U (en) Water-proof drainage structure of basement external wall water back face
CN108755696A (en) A kind of rapid construction of pit earthwork at raining season method
CN203654329U (en) Novel maintenance construction structure for sedimentation post-cast strip in dredge position
CN204780944U (en) Soil structure is kept off to additional formula in foundation ditch limit
CN103669418B (en) A kind of hydrophobic place pouring after settlement maintenance construction method
CN210766835U (en) Foundation beam side vertical face waterproof structure
CN105696543B (en) A kind of method that dam front row is seeped when red mud dump constructs sub- dam
CN202672194U (en) Construction structure for protection measures of settled post-cast strips of basement roof-plates
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN105544621A (en) Building structure for lowering designed anti-floating water level of heap slope building
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN204492031U (en) The water proof structure of planted roof deformation joint
CN204715364U (en) A kind of foundation pit support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20160518

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20160518

PD01 Discharge of preservation of patent