CN103661802B - The installation exercise method of fittings - Google Patents

The installation exercise method of fittings Download PDF

Info

Publication number
CN103661802B
CN103661802B CN201310644625.7A CN201310644625A CN103661802B CN 103661802 B CN103661802 B CN 103661802B CN 201310644625 A CN201310644625 A CN 201310644625A CN 103661802 B CN103661802 B CN 103661802B
Authority
CN
China
Prior art keywords
installation phase
segmentation
fittings
installation
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310644625.7A
Other languages
Chinese (zh)
Other versions
CN103661802A (en
Inventor
马富彬
赵荣彬
蔡磊
黄炼
薛钱柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU NEW TIMES SHIPBUILDING Co Ltd
Original Assignee
JIANGSU NEW TIMES SHIPBUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU NEW TIMES SHIPBUILDING Co Ltd filed Critical JIANGSU NEW TIMES SHIPBUILDING Co Ltd
Priority to CN201310644625.7A priority Critical patent/CN103661802B/en
Publication of CN103661802A publication Critical patent/CN103661802A/en
Application granted granted Critical
Publication of CN103661802B publication Critical patent/CN103661802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The invention discloses a kind of installation exercise method of fittings, it comprises the in-built part of ship and the in-built part of non-ship; The in-built part of ship comprises always organizes installation phase, region installation phase, system installation phase; After total group of installation phase refers to that more than two or two segmentations carry out total group, carry out fitting-out installation phase, this stage mainly installs the counter gathering pipe that fills of some segmentations and is in two fittingss closed up between segmentation; The in-built part of non-ship comprises the vertical installation phase of group, segmentation installation phase, unit assembling stage; The vertical installation phase consideration of group cannot put into some pipe fittings, the fittings that segmentation is installed after division system is finished; Segmentation installation phase is also known as segmentation pre outfitting; The unit assembling stage belongs to the category of pre outfitting, according to the feature of engine room arrangement, whole area of aircraft cabins is divided into several unit, installs in a fixing place.The present invention is divided into each stage, increases work efficiency, and shortens the installation period of fittings.

Description

The installation exercise method of fittings
Technical field
The present invention relates to a kind of operational method, particularly relate to a kind of installation exercise method of fittings.
Background technology
Ship ' s equipment refers to that hull keystone configuration has been made, machinery after ship launching, electrically, the installation of electronic machine.The fittings of boats and ships is exactly the thing on all ships except hull and marine powerplant.The installation exercise method of existing fittings adopts independent components and parts to install, and inefficiency, the installation period of fittings is long.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of installation exercise method of fittings, and it is divided into each stage, increases work efficiency, and shortens the installation period of fittings.
The present invention solves above-mentioned technical matters by following technical proposals: a kind of installation exercise method of fittings, is characterized in that, it comprises the in-built part of ship and the in-built part of non-ship;
The in-built part of ship comprises always organizes installation phase, region installation phase, system installation phase; After total group of installation phase refers to that more than two or two segmentations carry out total group, carry out fitting-out installation phase, this stage mainly installs the counter gathering pipe that fills of some segmentations and is in two fittingss closed up between segmentation, if simultaneously when crane capacity allows, segmentation front equipment base and some midget plants, all can be divided into the installation of this stage; Region installation phase mainly installs some main equipments, complete cross section carry between gathering pipe, the equipment adapter of land regions, inclined ladder between upper lower platform, main exhaust pipe and some do not carry out the pipeline of modeling; System installation phase refers in pipeline installation process produces closure workmanship process features according to pipeline system material characteristic and segmentation, the special a kind of installation phase divided out;
The in-built part of non-ship comprises the vertical installation phase of group, segmentation installation phase, unit assembling stage; The vertical installation phase consideration of group cannot put into some pipe fittings, the fittings that segmentation is installed after division system is finished; Segmentation installation phase is also known as segmentation pre outfitting, most pipe fitting and part fittings are installed in this stage and are terminated, substantially be in this stage segmentation and be inverted and be sidelong position, pipe fitting on all decks reverse side and sidewall and fittings, all can be divided into this stage installs, and will notice that the pipe fitting of all installations and fittings must not exceed segmented edges when dividing; The unit assembling stage belongs to the category of pre outfitting, according to the feature of engine room arrangement, whole area of aircraft cabins is divided into several unit, installs, carry out integral hoisting and install the process of locating to designated area, cabin after installing in a fixing place.
Preferably, described region installation phase refers in depressed place and carries installation phase and harbour installation phase.
Positive progressive effect of the present invention is: the present invention enables professional call the modeling situation of cabin fittings in time, timely communication docking, the good setting having divided the installation phase such as pipe Xi part, iron Xi part, shorten the installation period of fittings, increasing work efficiency, providing condition for shortening shipbuilding period.
Detailed description of the invention
The installation exercise method of fittings of the present invention comprises the in-built part of ship and the in-built part of non-ship, and the in-built part of ship comprises always organizes installation phase, region installation phase, system installation phase; After total group of installation phase refers to that more than two or two segmentations carry out total group, carry out fitting-out installation phase, this stage mainly installs the counter gathering pipe that fills of some segmentations and is in two fittingss closed up between segmentation, as hanging beam, inclined ladder etc.; If simultaneously when crane capacity allows, segmentation front equipment base and some midget plants, all can be divided into the installation of this stage; Region installation phase refers in depressed place and carries installation phase and harbour installation phase, this stage mainly installs some main equipments, complete cross section carry between gathering pipe, the equipment adapter of land regions, inclined ladder between upper lower platform, main exhaust pipe and some do not carry out the pipeline of modeling, as steam companion line pipe, valve remote control pipe-line etc.; System installation phase refers in pipeline installation process produces the features such as closure workmanship flow process according to pipeline system material characteristic and segmentation, the special a kind of installation phase divided out.These pipelines, in the modeling of segmentation stage, ship install whole road pipe according to pipeline system, belong to the in-built category of ship.Such as: the copper pipe in fresh water system, the PVC(polyvinylchloride on the piping of upper strata)/PE(polyethylene) pipe etc.; The in-built part of non-ship comprises the vertical installation phase of group, segmentation installation phase, unit assembling stage; The vertical installation phase of group is commonly called as the batten down stage, the consideration of this stage cannot put into some pipe fitting, fittingss etc. that segmentation is installed after division system is finished, and as the vertical ladder in part cargo tank heating pipe, cabin communication cabin component, double bottom ballast tank suction inlet, heavy caliber valve member, cabin, marks time; Segmentation installation phase is also known as segmentation pre outfitting, and most pipe fitting and part fittings are installed in this stage and terminated; Substantially be in this stage segmentation and be inverted and be sidelong position, pipe fitting on all decks reverse side and sidewall and fittings, all can be divided into this stage installs, and will notice that the pipe fitting of all installations and fittings must not exceed segmented edges when dividing, generally within segmented edges 300mm; The unit assembling stage belongs to the category of pre outfitting, according to the feature of engine room arrangement, whole area of aircraft cabins is divided into several unit, installs, carry out integral hoisting and install the process of locating to designated area, cabin after installing in a fixing place.The unit assembling stage owing to not needing directly to install in hull structure, so do not stand by hull structure group and the impact of block assembly.
The present invention makes the installation of fittings be not limited to and install fittings from sectional forming ability, need to consider operation reach, part fittings need be considered to organize vertical installation, arrive segmentation again to install, because the factors such as error also need to consider that total group is installed, such actv. shortens ssection fitting-out part installation period, decreases ssection fitting-out part setting pressure etc., creates conditions for shortening shipbuilding period.
The present invention enables professional call the modeling situation of cabin fittings in time, timely communication docking, has well divided the setting of the installation phase such as pipe Xi part, iron Xi part, has shortened the installation period of fittings, increasing work efficiency, providing condition for shortening shipbuilding period.
Above-described specific embodiment; the technical matters of solution of the present invention, technical scheme and beneficial effect are further described; be understood that; the foregoing is only specific embodiments of the invention; be not limited to the present invention; within the spirit and principles in the present invention all, any amendment made, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (2)

1. an installation exercise method for fittings, is characterized in that, it comprises the in-built part of ship and the in-built part of non-ship;
The in-built part of ship comprises always organizes installation phase, region installation phase, system installation phase; After total group of installation phase refers to that more than two or two segmentations carry out total group, carry out fitting-out installation phase, this stage mainly installs the counter gathering pipe that fills of some segmentations and is in two fittingss closed up between segmentation, if simultaneously when crane capacity allows, segmentation front equipment base and some midget plants, all can be divided into the installation of this stage; Region installation phase mainly installs some main equipments, complete cross section carry between gathering pipe, the equipment adapter of land regions, inclined ladder between upper lower platform, main exhaust pipe and some do not carry out the pipeline of modeling; System installation phase refers in pipeline installation process produces closure workmanship process features according to pipeline system material characteristic and segmentation, the special a kind of installation phase divided out;
The in-built part of non-ship comprises the vertical installation phase of group, segmentation installation phase, unit assembling stage; The vertical installation phase consideration of group cannot put into some pipe fittings, the fittings that segmentation is installed after division system is finished; Segmentation installation phase is also known as segmentation pre outfitting, most pipe fitting and part fittings are installed in this stage and are terminated, be in this stage segmentation and be inverted and be sidelong position, pipe fitting on all decks reverse side and sidewall and fittings, all can be divided into this stage installs, and will notice that the pipe fitting of all installations and fittings must not exceed segmented edges when dividing; The unit assembling stage belongs to the category of pre outfitting, according to the feature of engine room arrangement, whole area of aircraft cabins is divided into several unit, installs, carry out integral hoisting and install the process of locating to designated area, cabin after installing in a fixing place.
2. the installation exercise method of fittings as claimed in claim 1, is characterized in that, described region installation phase refers in depressed place and carries installation phase and harbour installation phase.
CN201310644625.7A 2013-12-05 2013-12-05 The installation exercise method of fittings Active CN103661802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310644625.7A CN103661802B (en) 2013-12-05 2013-12-05 The installation exercise method of fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310644625.7A CN103661802B (en) 2013-12-05 2013-12-05 The installation exercise method of fittings

Publications (2)

Publication Number Publication Date
CN103661802A CN103661802A (en) 2014-03-26
CN103661802B true CN103661802B (en) 2016-01-20

Family

ID=50300825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310644625.7A Active CN103661802B (en) 2013-12-05 2013-12-05 The installation exercise method of fittings

Country Status (1)

Country Link
CN (1) CN103661802B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104590486B (en) * 2015-01-22 2017-01-18 启东丰顺船舶重工有限公司 Pre-outfitting technology for finished product oil and chemical ship engine room
CN110282077B (en) * 2018-03-19 2022-04-01 江苏现代造船技术有限公司 Construction method for binding bridge segment in shipbuilding process
CN110171530B (en) * 2019-05-29 2021-05-04 广船国际有限公司 Method for manufacturing and mounting segmented structure
CN110877673B (en) * 2019-10-18 2021-09-21 沪东中华造船(集团)有限公司 Method for preassembling short pipe at ship segmented curved plate
CN111392594A (en) * 2020-03-24 2020-07-10 上海外高桥造船有限公司 Hoisting method for bulk carrier cabin block and bulk carrier built by using same
CN112249261A (en) * 2020-10-29 2021-01-22 广船国际有限公司 Building method of ship defense area
CN112550625B (en) * 2020-12-07 2021-11-02 沪东中华造船(集团)有限公司 Building method of double-chimney block of ship
CN113715986A (en) * 2021-08-17 2021-11-30 中船澄西船舶修造有限公司 Basin fitting-out unit installation method
CN113788127A (en) * 2021-10-28 2021-12-14 江南造船(集团)有限责任公司 Method for segmental construction and outfitting of large chimney of container ship
CN114954832A (en) * 2022-06-29 2022-08-30 上海外高桥造船有限公司 Main hull total segmentation building method and ship

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05178272A (en) * 1991-12-27 1993-07-20 Ishikawajima Harima Heavy Ind Co Ltd Compartment outfitting method for ship
JPH07215268A (en) * 1994-01-31 1995-08-15 Mitsubishi Heavy Ind Ltd Fitting-out method in vessel
CN1948081A (en) * 2006-11-03 2007-04-18 大连船舶重工集团有限公司 Assembly ship building unit element, modularization designing method
CN1948080A (en) * 2006-11-03 2007-04-18 大连船舶重工集团有限公司 Outfitting construction method of boats and ships
CN101032995A (en) * 2007-04-06 2007-09-12 上海外高桥造船有限公司 Method of installing ship bilge equipment
CN101570234A (en) * 2008-04-29 2009-11-04 江南造船(集团)有限责任公司 Method for assembling and lifting engine room section
CN102320349A (en) * 2011-07-07 2012-01-18 大连荣升船舶设备制造有限公司 The ship ' s equipment method
CN102582784A (en) * 2012-03-30 2012-07-18 南通明德重工有限公司 Process for sectionally putting up ship berths or docks
CN102874378A (en) * 2012-10-29 2013-01-16 南通润邦海洋工程装备有限公司 Cabin basin fitting-out process

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05178272A (en) * 1991-12-27 1993-07-20 Ishikawajima Harima Heavy Ind Co Ltd Compartment outfitting method for ship
JPH07215268A (en) * 1994-01-31 1995-08-15 Mitsubishi Heavy Ind Ltd Fitting-out method in vessel
CN1948081A (en) * 2006-11-03 2007-04-18 大连船舶重工集团有限公司 Assembly ship building unit element, modularization designing method
CN1948080A (en) * 2006-11-03 2007-04-18 大连船舶重工集团有限公司 Outfitting construction method of boats and ships
CN101032995A (en) * 2007-04-06 2007-09-12 上海外高桥造船有限公司 Method of installing ship bilge equipment
CN101570234A (en) * 2008-04-29 2009-11-04 江南造船(集团)有限责任公司 Method for assembling and lifting engine room section
CN102320349A (en) * 2011-07-07 2012-01-18 大连荣升船舶设备制造有限公司 The ship ' s equipment method
CN102582784A (en) * 2012-03-30 2012-07-18 南通明德重工有限公司 Process for sectionally putting up ship berths or docks
CN102874378A (en) * 2012-10-29 2013-01-16 南通润邦海洋工程装备有限公司 Cabin basin fitting-out process

Also Published As

Publication number Publication date
CN103661802A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103661802B (en) The installation exercise method of fittings
US20130199792A1 (en) Subsea collection and containment system for hydrocarbon emissions
CN105416508A (en) Method for increasing outfitting pre-installation ratio
CN102582784B (en) Process for sectionally putting up ship berths or docks
CN204567976U (en) A kind of ballast chamber overvoltage protection structure
CN104590486B (en) Pre-outfitting technology for finished product oil and chemical ship engine room
CN105972375A (en) Unmanned shipborne pipeline repairing fixture
CN106015784B (en) Unmanned boat contained pipeline connector
CN111022002A (en) Wellhead environment simulation platform device and simulation method for deepwater oil and gas production system
CN103216678A (en) Grouting air sac method for suspending sea pipe
CN103910029A (en) Engine room pump compartment fitting-out method for self-propelled drag suction dredger ship
CN111232145A (en) Overall layout of deepwater semi-submersible production platform
CN207580088U (en) A kind of lakes fitted type bulk carrier pipe does arrangement
CN202828085U (en) Seawater pipeline structure capable of preventing pipeline corrosion and lightening pipeline weight
CN211547601U (en) Rubber type breakwater with adjustable floating height
CN104494792A (en) Transportation device and transportation method for ocean engineering structures
CN110949639B (en) Method for repairing mooring state of sea valve of surface ship and plugging tool suitable for method
CN208058147U (en) A kind of mounting device of single side seat board peculiar to vessel
CN103925410A (en) Emergency repair device for submarine pipelines
CN102975834A (en) Method for changing depth finder under water
CN110906102A (en) Emergent accuse oil device under water
CN203111460U (en) Generator module multifunctional channel for floating production storage and offloading vessel
CN110777728A (en) Rubber type breakwater with adjustable floating height
CN109322292A (en) A kind of vane type oil spilling recycling oil fence
CN103101608A (en) Auxiliary quick floating device of water surface floating building and application method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant