- CN102320349A CN102320349A CN201110188799A CN201110188799A CN102320349A CN 102320349 A CN102320349 A CN 102320349A CN 201110188799 A CN201110188799 A CN 201110188799A CN 201110188799 A CN201110188799 A CN 201110188799A CN 102320349 A CN102320349 A CN 102320349A
- Authority
- CN
- China
- Prior art keywords
- dimensional modeling
- ship
- fitting
- design apparatus
- hull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The present invention relates to outfitting construction method of boats and ships in a kind of ship building industry, may further comprise the steps: on design apparatus, set up the fitting-out three-dimensional modeling and arrange according to the three-dimensional modeling structure of hull; Be arranged on the design apparatus corresponding design corresponding figures according to the fitting-out three-dimensional modeling and paint parts; On design apparatus, figure is painted parts and be placed on the corresponding site that the fitting-out three-dimensional modeling is arranged respectively, and the recording operation process; On the entity boats and ships, realize fitting-out according to recording process.The present invention has changed traditional ship ' s equipment mode, has improved construction environment, has alleviated labour intensity, has shortened construction period, and can reduce construction cost greatly.
Description
Technical field
The present invention relates to outfitting construction method of boats and ships in a kind of ship building industry, more particularly, relate to a kind of ship ' s equipment method based on three dimensional design.
Background technology
Along with ship domain design progress with building technology, the increasing of Description of Ship, the expansion of hull, the ship ' s equipment method seems more and more important.Traditional ship ' s equipment need carry out operation on hull, work capacity is big, poor working environment, and difficulty of construction is big, and long construction period, especially for the workmen, need expend huge manual labor and could accomplish ship ' s equipment.Trace it to its cause, the execution conditions on the boats and ships can not show a candle to job shop, and the equipment of job shop can not be transported on the boats and ships, have therefore improved the difficulty of ship ' s equipment.And the parts assembling of ship ' s equipment needs the social worker personnel on boats and ships, to accomplish, and error appears in the design of these parts, processing and installation easily.Therefore, not only cost is high to adopt traditional ship ' s equipment method, and difficulty is high, long construction period.
Summary of the invention
The technical matters that the present invention will solve is, to the above-mentioned defective of prior art, a kind of ship ' s equipment method is provided; Its purpose is to solve in traditional ship ' s equipment work progress; Because parts need assembling aboard ship, and execution conditions are limited on the boats and ships, cause construction period to prolong; Construction cost improves, problems such as difficulty of construction increase.
The technical solution adopted for the present invention to solve the technical problems is: construct a kind of ship ' s equipment method, may further comprise the steps:
S1) on design apparatus, setting up the fitting-out three-dimensional modeling according to the three-dimensional modeling structure of hull arranges;
S2) be arranged on the design apparatus corresponding design corresponding figures according to the fitting-out three-dimensional modeling and paint parts;
S3) on design apparatus, figure is painted parts and be placed on the corresponding site that the fitting-out three-dimensional modeling is arranged respectively, and the recording operation process;
S4) on the entity boats and ships, realize fitting-out according to recording process.
The three-dimensional modeling structure of the hull in ship ' s equipment method of the present invention, step S1) is the three-dimensional modeling structure of the hull that has been used to manufacture a finished product.
In ship ' s equipment method of the present invention, step S1) design apparatus described in comprises computer equipment.
In ship ' s equipment method of the present invention, also need be according to step S2) in figure paint parts and accurately make cooresponding physical components, be used on the entity boats and ships, realizing fitting-out.
In ship ' s equipment method of the present invention, step S3) the recording operation process described in comprises: record is installed each figure and is painted order, the position of parts, the combination of interface.
The ship ' s equipment method of embodiment of the present invention has following beneficial effect: can improve ship ' s equipment efficient greatly, reduce workmen's working strength, reduce difficulty of construction, shorten construction week.
Description of drawings
Fig. 1 is the diagram of circuit of illustrative steps of an embodiment of ship ' s equipment method of the present invention.
Fig. 2 is the diagram of circuit of illustrative steps of another embodiment of ship ' s equipment method of the present invention.
The specific embodiment
As shown in Figure 1; In ship ' s equipment method first embodiment of the present invention; At first according to the draw three-dimensional modeling of hull of physical size reduce in scale on design apparatus of hull; This design apparatus can be that computing machine or other have the equipment of this function, and this moment, the accuracy rate of three-dimensional modeling can be grasped according to the entity situation, and for example numerical value unit is accurate to 0.01mm.Then fitting-out three-dimensional modeling layout is set up in design on the three-dimensional modeling structure of this hull.Then according to each parts of fitting-out three-dimensional modeling layout design, for example main frame, control desk or the like, numerical value unit's accuracy rate should be consistent with the accuracy rate of hull three-dimensional modeling here, to guarantee carrying out smoothly of fitting-out process.Then on design apparatus, figure is painted the corresponding site that parts are placed on the fitting-out three-dimensional modeling layout that forms according to the hull three-dimensional modeling respectively again; And the process of recording operation; For example: the position of installation, mode, in proper order, interface or the like, will make the workmen can clearly understand whole construction course through the operating process that this three-dimensional simulation write down.To on design apparatus, be printed as drawing then, and transfer to production and processing department and produce, to replace the process of traditional processing on hull according to each parts of fitting-out three-dimensional modeling layout design.After each parts production was accomplished, the workmen just can be according to the operating process of above-mentioned record at the enterprising oceangoing ship fitting-out of navigating of hull.
As shown in Figure 2; In ship ' s equipment method second embodiment of the present invention; At first according to the draw three-dimensional modeling of hull of physical size reduce in scale on design apparatus of hull; This design apparatus can be that computing machine or other have the equipment of this function, and this moment, the accuracy rate of three-dimensional modeling can be grasped according to the entity situation, and for example numerical value unit is accurate to 0.01mm.Then fitting-out three-dimensional modeling layout is set up in design on the three-dimensional modeling structure of this hull.Then according to each parts of fitting-out three-dimensional modeling layout design, for example main frame, control desk or the like, numerical value unit's accuracy rate should be consistent with the accuracy rate of hull three-dimensional modeling here, to guarantee carrying out smoothly of fitting-out process.To on design apparatus, be printed as drawing, and transfer to production and processing department and produce, to replace the process of traditional processing on hull according to each parts of fitting-out three-dimensional modeling layout design.When production department are produced; Design division then designs; On design apparatus, figure is painted the corresponding site that parts are placed on the fitting-out three-dimensional modeling layout that forms according to the hull three-dimensional modeling respectively; And the process of recording operation, for example: the position of installation, mode, in proper order, interface or the like, will make the workmen can clearly understand whole construction course through the operating process that this three-dimensional simulation write down.After each parts production was accomplished, the workmen just can be according to the operating process of above-mentioned record at the enterprising oceangoing ship fitting-out of navigating of hull.
Claims (5)
1. ship ' s equipment method is characterized in that: may further comprise the steps:
S1) on design apparatus, setting up the fitting-out three-dimensional modeling according to the three-dimensional modeling structure of hull arranges;
S2) be arranged on the design apparatus corresponding design corresponding figures according to the fitting-out three-dimensional modeling and paint parts;
S3) on design apparatus, figure is painted parts and be placed on the corresponding site that the fitting-out three-dimensional modeling is arranged respectively, and the recording operation process;
S4) on the entity boats and ships, realize fitting-out according to recording process.
2. ship ' s equipment method according to claim 1 is characterized in that: the three-dimensional modeling structure of the hull step S1) is the three-dimensional modeling structure of the hull that has been used to manufacture a finished product.
3. ship ' s equipment method according to claim 1 is characterized in that: the design apparatus step S1) comprises computer equipment.
4. ship ' s equipment method according to claim 1 is characterized in that: also need be according to step S2) in figure paint parts and accurately make cooresponding physical components, be used on the entity boats and ships, realizing fitting-out.
5. ship ' s equipment method according to claim 1 is characterized in that: the recording operation process step S3) comprises: record is installed each figure and is painted order, the position of parts, the combination of interface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110188799A CN102320349A (en) | 2011-07-07 | 2011-07-07 | The ship ' s equipment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110188799A CN102320349A (en) | 2011-07-07 | 2011-07-07 | The ship ' s equipment method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102320349A true CN102320349A (en) | 2012-01-18 |
Family
ID=45448236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110188799A Pending CN102320349A (en) | 2011-07-07 | 2011-07-07 | The ship ' s equipment method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102320349A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102874378A (en) * | 2012-10-29 | 2013-01-16 | 南通润邦海洋工程装备有限公司 | Cabin basin fitting-out process |
CN103507912A (en) * | 2013-09-12 | 2014-01-15 | 南通明德重工有限公司 | Installation process of chemical carrier cargo hold fitting-out parts |
CN103661802A (en) * | 2013-12-05 | 2014-03-26 | 江苏新时代造船有限公司 | Method for installing outfitting parts |
CN103921895A (en) * | 2014-04-15 | 2014-07-16 | 南通长航船舶配件有限公司 | Drag suction dredger machine bow pump cabin area, bow area and upper-layer building area outfitting method |
CN103921896A (en) * | 2014-04-15 | 2014-07-16 | 南通长航船舶配件有限公司 | Dredge hopper fitting-out method for self-propelled trailing suction hopper dredger |
CN105129019A (en) * | 2015-08-05 | 2015-12-09 | 广船国际有限公司 | Ship cabin outfitting integrity inspection method |
CN105416508A (en) * | 2015-12-01 | 2016-03-23 | 上海船厂船舶有限公司 | Method for increasing outfitting pre-installation ratio |
CN107571967A (en) * | 2017-09-21 | 2018-01-12 | 南通如港船舶配套机械有限公司 | A kind of outfitting construction method of boats and ships |
CN107651104A (en) * | 2017-09-22 | 2018-02-02 | 南通如港船舶配套机械有限公司 | A kind of outfitting construction method of boats and ships |
CN112231841A (en) * | 2020-10-23 | 2021-01-15 | 广州文船重工有限公司 | Method for processing outfitting parts |
-
2011
- 2011-07-07 CN CN201110188799A patent/CN102320349A/en active Pending
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102874378A (en) * | 2012-10-29 | 2013-01-16 | 南通润邦海洋工程装备有限公司 | Cabin basin fitting-out process |
CN103507912A (en) * | 2013-09-12 | 2014-01-15 | 南通明德重工有限公司 | Installation process of chemical carrier cargo hold fitting-out parts |
CN103661802A (en) * | 2013-12-05 | 2014-03-26 | 江苏新时代造船有限公司 | Method for installing outfitting parts |
CN103661802B (en) * | 2013-12-05 | 2016-01-20 | 江苏新时代造船有限公司 | The installation exercise method of fittings |
CN103921895A (en) * | 2014-04-15 | 2014-07-16 | 南通长航船舶配件有限公司 | Drag suction dredger machine bow pump cabin area, bow area and upper-layer building area outfitting method |
CN103921896A (en) * | 2014-04-15 | 2014-07-16 | 南通长航船舶配件有限公司 | Dredge hopper fitting-out method for self-propelled trailing suction hopper dredger |
CN105129019A (en) * | 2015-08-05 | 2015-12-09 | 广船国际有限公司 | Ship cabin outfitting integrity inspection method |
CN105129019B (en) * | 2015-08-05 | 2017-06-16 | 广船国际有限公司 | A kind of inspection method of ship's space outfititem integrality |
CN105416508A (en) * | 2015-12-01 | 2016-03-23 | 上海船厂船舶有限公司 | Method for increasing outfitting pre-installation ratio |
CN107571967A (en) * | 2017-09-21 | 2018-01-12 | 南通如港船舶配套机械有限公司 | A kind of outfitting construction method of boats and ships |
CN107651104A (en) * | 2017-09-22 | 2018-02-02 | 南通如港船舶配套机械有限公司 | A kind of outfitting construction method of boats and ships |
CN112231841A (en) * | 2020-10-23 | 2021-01-15 | 广州文船重工有限公司 | Method for processing outfitting parts |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102320349A (en) | The ship ' s equipment method | |
CN104289748B (en) | A kind of large thin-wall covering adaptively equal wall thickness milling system and its processing method | |
CN103313517B (en) | A kind of pcb board drilling and positioning method | |
CN104476118A (en) | Manufacturing method of airplane chemical milling skin three-dimensional chemical milling sample plate | |
CN105608274A (en) | Tribon M3 ship design software based quick lofting method for molded line of anchor platform | |
CN101866179A (en) | Boat segmental hoisting simulation system restricted by three-dimensional space | |
CN102660741A (en) | Numeric control processing method for single-curvature-degree coating chemically-milling sample plate | |
CN110158818A (en) | A kind of quick method of construction of the flat curtain based on BIM model | |
CN103373476A (en) | Flexible tool for detecting and machining aircraft wing panel profile and detecting and machining method | |
Zhao-hui et al. | Survey on flexible shipbuilding technologies for curved ship-blocks | |
KR20140127038A (en) | Automatic creating method for 2D file from 3D file | |
CN103631996A (en) | Product structure and process parallel design method based on model maturity | |
CN102831281B (en) | The aided modeling method in two-dimensional working face is set up in GOCAD software | |
CN104317996A (en) | Method for designing and evaluating center of gravity of airplane | |
CN103559361B (en) | A kind of optimization method of component strength and stress analysis method thereof | |
CN104192264A (en) | Ship curved surface planking mark making method | |
CN204773625U (en) | 3D is actuating mechanism for printer | |
CN103514323A (en) | Ship anchor system parametrization design and cat anchor simulation system | |
CN102915390A (en) | Design method for artificial stone machine tool frame and design method for PCB (printed circuit board) drilling machine frame | |
CN202498542U (en) | Encryption type movable model card | |
KR20110071357A (en) | System for prior prediction of erection and method thereof | |
CN104973215A (en) | Global dynamic virtual reality carrying method based on precision database | |
CN103985020A (en) | Radio frequency identification-based marine outfitting production management control system | |
Cang et al. | 3D simulation-based support systems in PLM solution for offshore and marine industry | |
CN102279587A (en) | Two-dimensional digital control processing method for metal workpiece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120118 |