CN105608274A - Tribon M3 ship design software based quick lofting method for molded line of anchor platform - Google Patents

Tribon M3 ship design software based quick lofting method for molded line of anchor platform Download PDF

Info

Publication number
CN105608274A
CN105608274A CN201510973328.6A CN201510973328A CN105608274A CN 105608274 A CN105608274 A CN 105608274A CN 201510973328 A CN201510973328 A CN 201510973328A CN 105608274 A CN105608274 A CN 105608274A
Authority
CN
China
Prior art keywords
anchor
anchor platform
platform
plate
ship
Prior art date
Application number
CN201510973328.6A
Other languages
Chinese (zh)
Other versions
CN105608274B (en
Inventor
曾涛
王炬成
Original Assignee
江苏现代造船技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江苏现代造船技术有限公司 filed Critical 江苏现代造船技术有限公司
Priority to CN201510973328.6A priority Critical patent/CN105608274B/en
Publication of CN105608274A publication Critical patent/CN105608274A/en
Application granted granted Critical
Publication of CN105608274B publication Critical patent/CN105608274B/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design

Abstract

The invention discloses a Tribon M3 ship design software based quick lofting method for a molded line of an anchor platform. The method comprises the steps of creating a hawse pipe three-dimensional model; creating an anchor platform panel three-dimensional model; creating an anchor platform knee plate; importing an anchor platform direction view; creating an anchor platform auxiliary knee plate; and generating a line type file. The creation of a hawse pipe, an anchor platform panel, an anchor platform knee plate and an anchor platform auxiliary knee plate is finished by adopting Planar Hull in Tribon M3 ship design software, the lines fairing is finished by adopting LINES in the Tribon M3 ship design software and utilizing an approximate circle rule, and the line type file is produced, thereby facilitating structural modeling or machining data acquisition and use. With the adoption of the method, a lofting result is consistent with a detailed design principle drawing by 100% when a design principle is correct; and the lofting time is short and related work can be finished only by less than two working days in general.

Description

A kind of anchor bench-type line speedy lofting method based on Tribon M3 Ship Design software

Technical field

The present invention relates to a kind of anchor platform setting out method, belong to Marine engineering technical field, particularly a kind of based on TribonThe anchor bench-type line speedy lofting method of M3 Ship Design software.

Background technology

According to the requirement of ship production design product three-dimensional digital modeling integrality, need to count for anchor platform structureWord structural model creates, but reasonably method not only can complete structural model building work fast, can ensure simultaneouslyConsistent with detailed design principle drawing requirement. How the present invention just quick and precisely realizes based on TribonM3 Ship Design softwareMethod introduction and the explanation of anchor platform laying-down the lines.

In addition, the present invention compares conventional method and has following advantage:

1, the short checking time of more accurately can saving of setting-out time, only need to be less than just completing related work two working days;

2, need to not simulate verification by third-party design software modeling, only utilize TribonM3 Ship Design software completeBecome a series of related works.

3, can implementation structure model 100% integrality according to setting-out of the present invention.

4,, aspect accuracy, can accomplish with detailed meter principle drawing requirement in full accord.

Summary of the invention

The technical problem to be solved in the present invention is for above-mentioned the deficiencies in the prior art, and provides one can improve setting-outThe degree of accuracy, improves setting-out operating efficiency, possess good popularization and succession property based on TribonM3 Ship Design softwareAnchor bench-type line speedy lofting method.

For solving the problems of the technologies described above, the technical solution used in the present invention is:

An anchor bench-type line speedy lofting method based on TribonM3 Ship Design software, comprises the steps:

Step 1, hawse-pipe stereoscopic three-dimensional model creation: according to the locating information of hawse-pipe in hawse-pipe design drawing, usePILLAR pillar in TribonM3PlanarHull completes the building work of hawse-pipe structural upright threedimensional model.

Step 2, anchor deck plate threedimensional model creates: the location dimension information of anchor deck plate in foundation anchor platform design drawing,Use TribonM3PlanarHull to complete the threedimensional model building work of anchor deck plate.

Step 3, creates anchor platform bracket: according to anchor platform stiffeners cross section view in anchor platform bracket design drawing and location letterBreath, uses TribonM3PlanarHull, between the anchor deck plate having created and shiplines, creates successively some anchorsPlatform bracket; Every anchor platform bracket and ship hull plate molded line produce a ship hull plate intersection point, and the equal position of all ship hull plate intersection pointsOn the intersecting lens of anchor platform outside plate and ship hull plate; Every anchor platform bracket and anchor deck plate sideline produce an anchor deck plate sidelineIntersection point.

Step 4, anchor platform imports to view: the anchor platform in anchor platform design drawing is imported according to .DXF form to viewTribonM3PlanarHull, wherein, anchor platform is along hawse-pipe center line to fore castle deck from anchor deck plate to viewRemove the projection line of the projection line that anchor platform comprises anchor deck plate sideline to view and anchor platform outside plate and ship hull plate intersecting lens. Wherein,The projection line of the projection line in anchor deck plate sideline and anchor platform outside plate and ship hull plate intersecting lens, follow-up all referred to as outside plate intersection.

Step 5, creates the auxiliary bracket of anchor platform: the anchor platform importing in step 4 is in view, at adjacent two anchor platform bracketsBetween, crossing hawse-pipe center line increases by least one boost line, every boost line all with step 4 in outside plate intersection generation projectionIntersection point, according to the size of projection intersection point, creates the auxiliary bracket of anchor platform in relevant position according to step 3; Also be adjacent two anchor platformsBetween bracket, at least create the auxiliary bracket of an anchor platform, the every auxiliary bracket of anchor platform all produces a hull with ship hull plate molded lineOutside plate intersection point; The every auxiliary bracket of anchor platform all produces an anchor deck plate sideline intersection point with anchor deck plate sideline.

Step 6, linetype file generates: enter the LINES in TribonM3, by the hull producing in step 3 and step 5The three-dimensional coordinate of outside plate intersection point and anchor deck plate sideline intersection point, in typing LINES, carries out line style setting-out fairing operation successively, afterGeneration can be obtained the linetype file of use for the production of design setting model or process data.

Hawse-pipe design drawing in described step 1 is anchor mooring arrangement layout drawing.

In described step 3, anchor platform bracket design drawing is anchor lip layout drawing.

The thickness of the anchor platform bracket creating in described step 3 is 0.1mm.

The present invention adopts after said method, in the time that design principle is correct, can accomplish setting-out result and detailed design principleDrawing 100% is consistent; The setting-out working time is short, only uses under normal circumstances less than just completing related work two working days.

Brief description of the drawings

Fig. 1 has shown hawse-pipe of the present invention and the main cutaway view of anchor platform;

Fig. 2 has shown anchor deck plate front view;

Fig. 3 has shown anchor platform schematic perspective view;

Fig. 4 has shown that the anchor platform increasing after boost line is to view.

Wherein have: 1. fore castle deck; 2. hawse-pipe center line; 3. ship hull plate; 4. anchor platform bracket; 5. anchor platform outside plate; 6.Anchor deck plate; 61. anchor deck plate sidelines; 7. boost line.

Detailed description of the invention

Below in conjunction with accompanying drawing, the present invention is further detailed explanation with concrete preferred embodiments.

An anchor bench-type line speedy lofting method based on TribonM3 Ship Design software, comprises the steps:

Step 1, hawse-pipe stereoscopic three-dimensional model creation: according to the locating information of hawse-pipe in hawse-pipe design drawing, useThe hawse-pipe structural upright threedimensional model that PILLAR pillar in TribonM3PlanarHull completes as shown in Figure 1 createsWork.

Hawse-pipe design drawing in this step is preferably anchor mooring arrangement layout drawing, but also can be other drawings.

The locating information of above-mentioned hawse-pipe comprises the three-dimensional coordinate of the upper and lower end points of hawse-pipe, thereby knows hawse-pipe upper and lower sideThe accurate location information of point.

Above-mentioned TribonM3PlanarHul is the planar structure module in TribonM3 Ship Design software, belowRoughly the same.

Step 2, anchor deck plate threedimensional model creates: the location dimension information of anchor deck plate in foundation anchor platform design drawing,Use TribonM3PlanarHull to complete the threedimensional model building work of anchor deck plate as shown in Figure 1 to Figure 3.

Step 3, creates anchor platform bracket: according to anchor platform stiffeners cross section view in anchor platform bracket design drawing and location letterBreath, use TribonM3PlanarHull, between the anchor deck plate having created and shiplines, create successively some asAnchor platform bracket shown in Fig. 3, the quantity of anchor platform bracket is generally 8, but also can be set to as required 6,10 etc. otherQuantity.

8 anchor platform brackets and ship hull plate molded line produce 8 ship hull plate intersection points, and the equal position of these 8 ship hull plate intersection pointsOn the intersecting lens of anchor platform outside plate and ship hull plate.

Above-mentioned 8 ship hull plate intersection points are also the outermost end end points that 8 anchor platform brackets contact with ship hull plate, wherein2 ship hull plate intersection points point A ' and some B ' as shown in Figure 1.

8 anchor platform brackets and anchor deck plate sideline produce 8 anchor deck plate sideline intersection points, 8 anchor deck plate sideline intersection pointsPoint A, some B, some C, some D, some E, some F, some G and some H as shown in Figure 2 and Figure 4.

In addition, the anchor platform bracket design drawing in this step is preferably anchor lip layout drawing, but also can be other drawings.

Further, in this step, the thickness of the anchor platform bracket of establishment is preferably 0.1mm, thereby can obtain more accuratelyMolded line data.

Step 4, anchor platform imports to view: the anchor platform in anchor platform design drawing is imported according to .DXF form to viewTribonM3PlanarHull, wherein, anchor platform is along hawse-pipe center line to fore castle deck from anchor deck plate to viewRemove the projection line of the projection line that anchor platform comprises anchor deck plate sideline to view and anchor platform outside plate and ship hull plate intersecting lens. Wherein,The projection line of the projection line in anchor deck plate sideline and anchor platform outside plate and ship hull plate intersecting lens, follow-up all referred to as outside plate intersection.

Step 5, creates the auxiliary bracket of anchor platform: because known 8 intersection points are not enough to form the anchor platform profile of fairing, need againIncrease more intersection point. The anchor platform importing in step 4, in view, between adjacent two anchor platform brackets, is crossed in hawse-pipeHeart line increases by least one boost line as shown in Figure 4, every boost line all with step 4 in outside plate intersection produce as Fig. 4 instituteThe projection intersection point showing, also put M and put N. According to the size of projection intersection point, create anchor platform in relevant position according to step 3 auxiliaryBracket; Also be between adjacent two anchor platform brackets, at least to create the auxiliary bracket of an anchor platform, every anchor platform is assisted bracket all and shipExternal template line produces a ship hull plate intersection point; The every auxiliary bracket of anchor platform all produces an anchor table top with anchor deck plate sidelineEdges of boards line intersection point.

Step 6, linetype file generates: enter the LINES in TribonM3, by the hull producing in step 3 and step 5The three-dimensional coordinate of outside plate intersection point and anchor deck plate sideline intersection point, in typing LINES, according to approximate circle rule, carries out line style successivelySetting-out fairing operation, rear generation can be obtained the linetype file of use for the production of design setting model or process data.

More than describe the preferred embodiment of the present invention in detail, still, the present invention is not limited in above-mentioned embodimentDetail, within the scope of technical conceive of the present invention, can carry out multiple equivalents to technical scheme of the present invention, thisA little equivalents all belong to protection scope of the present invention.

Claims (4)

1. the anchor bench-type line speedy lofting method based on TribonM3 Ship Design software, is characterized in that: comprise as followsStep:
Step 1, hawse-pipe stereoscopic three-dimensional model creation: according to the locating information of hawse-pipe in hawse-pipe design drawing, usePILLAR pillar in TribonM3PlanarHull completes the building work of hawse-pipe structural upright threedimensional model;
Step 2, anchor deck plate threedimensional model creates: the location dimension information of anchor deck plate in foundation anchor platform design drawing, is usedTribonM3PlanarHull completes the threedimensional model building work of anchor deck plate;
Step 3, creates anchor platform bracket: according to anchor platform stiffeners cross section view and locating information in anchor platform bracket design drawing,Use TribonM3PlanarHull, between the anchor deck plate having created and shiplines, create successively some anchor platformsBracket; Every anchor platform bracket and ship hull plate molded line produce a ship hull plate intersection point, and all ship hull plate intersection points are all positioned atOn the intersecting lens of anchor platform outside plate and ship hull plate; Every anchor platform bracket and anchor deck plate sideline produce an anchor deck plate sideline and hand overPoint;
Step 4, anchor platform imports to view: the anchor platform in anchor platform design drawing is imported to Tribon to view according to .DXF formM3PlanarHull, wherein, anchor platform is to look to fore castle deck along hawse-pipe center line from anchor deck plate to view, anchor platformThe projection line of the projection line that comprises anchor deck plate sideline to view and anchor platform outside plate and ship hull plate intersecting lens; Wherein, anchor table topThe projection line of the projection line of edges of boards line and anchor platform outside plate and ship hull plate intersecting lens, follow-up all referred to as outside plate intersection;
Step 5, creates the auxiliary bracket of anchor platform: the anchor platform importing in step 4 in view, adjacent two anchor platform brackets itBetween, crossing hawse-pipe center line increases by least one boost line, every boost line all with step 4 in outside plate intersection generation projection friendshipPoint, according to the size of projection intersection point, creates the auxiliary bracket of anchor platform in relevant position according to step 3; Also be adjacent two anchor platform elbowsBetween plate, at least create the auxiliary bracket of an anchor platform, the every auxiliary bracket of anchor platform all produces outside a hull with ship hull plate molded linePlate intersection point; The every auxiliary bracket of anchor platform all produces an anchor deck plate sideline intersection point with anchor deck plate sideline;
Step 6, linetype file generates: enter the LINES in TribonM3, by the ship hull plate producing in step 3 and step 5The three-dimensional coordinate of intersection point and anchor deck plate sideline intersection point, in typing LINES, carries out line style setting-out fairing operation, rear generation successivelyCan obtain the linetype file of use for the production of design setting model or process data.
2. the anchor bench-type line speedy lofting method based on TribonM3 Ship Design software according to claim 1, its spyLevy and be: the hawse-pipe design drawing in described step 1 is anchor mooring arrangement layout drawing.
3. the anchor bench-type line speedy lofting method based on TribonM3 Ship Design software according to claim 1, its spyLevy and be: in described step 3, anchor platform bracket design drawing is anchor lip layout drawing.
4. the anchor bench-type line speedy lofting method based on TribonM3 Ship Design software according to claim 1, its spyLevy and be: the thickness of the anchor platform bracket creating in described step 3 is 0.1mm.
CN201510973328.6A 2015-12-23 2015-12-23 A kind of anchor station molded line rapid setting-out method based on Tribon M3 Ship Design softwares CN105608274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510973328.6A CN105608274B (en) 2015-12-23 2015-12-23 A kind of anchor station molded line rapid setting-out method based on Tribon M3 Ship Design softwares

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510973328.6A CN105608274B (en) 2015-12-23 2015-12-23 A kind of anchor station molded line rapid setting-out method based on Tribon M3 Ship Design softwares

Publications (2)

Publication Number Publication Date
CN105608274A true CN105608274A (en) 2016-05-25
CN105608274B CN105608274B (en) 2018-07-24

Family

ID=55988206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510973328.6A CN105608274B (en) 2015-12-23 2015-12-23 A kind of anchor station molded line rapid setting-out method based on Tribon M3 Ship Design softwares

Country Status (1)

Country Link
CN (1) CN105608274B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106372284A (en) * 2016-08-25 2017-02-01 福建东南造船有限公司 Side thruster lofting technology
CN107458540A (en) * 2017-07-31 2017-12-12 上海江南长兴重工有限责任公司 A kind of ship anchor chain barrel installation and locating method
CN108001614A (en) * 2017-12-08 2018-05-08 中船黄埔文冲船舶有限公司 A kind of lofting Design method of large-scale anchor station and anchor lip
CN108082391A (en) * 2017-12-08 2018-05-29 中船黄埔文冲船舶有限公司 A kind of lofting Design method of box anchor recess
CN109094717A (en) * 2018-09-20 2018-12-28 中船黄埔文冲船舶有限公司 The method of deploying of veneer bilge keelson
CN109094724A (en) * 2018-09-28 2018-12-28 中船黄埔文冲船舶有限公司 A kind of anchor lip lofting Design method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101407246A (en) * 2008-11-14 2009-04-15 大连船舶重工集团有限公司 Method for fairing and mounting shipping anchor lug and hawse pipe
US20090152392A1 (en) * 2007-12-17 2009-06-18 The Boeing Company Parametric geometry model for a blended wing body
CN103625603A (en) * 2013-12-12 2014-03-12 沪东中华造船(集团)有限公司 Lofting production method of anchor recess of planking thickness line of hull
CN104097745A (en) * 2014-07-21 2014-10-15 上海外高桥造船有限公司 Drawing method for deck side line of ship bow
CN104346828A (en) * 2013-07-24 2015-02-11 上海船舶工艺研究所 Part-level hull three-dimensional model reconstruction method for Tribon M3

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090152392A1 (en) * 2007-12-17 2009-06-18 The Boeing Company Parametric geometry model for a blended wing body
CN101407246A (en) * 2008-11-14 2009-04-15 大连船舶重工集团有限公司 Method for fairing and mounting shipping anchor lug and hawse pipe
CN104346828A (en) * 2013-07-24 2015-02-11 上海船舶工艺研究所 Part-level hull three-dimensional model reconstruction method for Tribon M3
CN103625603A (en) * 2013-12-12 2014-03-12 沪东中华造船(集团)有限公司 Lofting production method of anchor recess of planking thickness line of hull
CN104097745A (en) * 2014-07-21 2014-10-15 上海外高桥造船有限公司 Drawing method for deck side line of ship bow

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
徐靖,陆礼香,黄凯: "TRIBON M3锚台生产设计放样", 《船舶设计通讯》 *
苏延浩等: "船舶锚系三维放样设计与拉锚虚拟实验分析", 《造船技术》 *
袁红莉,熊云峰: "运输船舶锚链简和锚台的设计和放样", 《江苏船舶》 *
顾宁,王炬成等: "地方船厂数字化造船技术开发与应用态势研究", 《江苏船舶》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106372284A (en) * 2016-08-25 2017-02-01 福建东南造船有限公司 Side thruster lofting technology
CN106372284B (en) * 2016-08-25 2019-11-26 福建东南造船有限公司 A kind of Side Thrusters setting-out technique
CN107458540A (en) * 2017-07-31 2017-12-12 上海江南长兴重工有限责任公司 A kind of ship anchor chain barrel installation and locating method
CN107458540B (en) * 2017-07-31 2019-02-22 江南造船(集团)有限责任公司 A kind of ship anchor chain barrel installation and locating method
CN108082391A (en) * 2017-12-08 2018-05-29 中船黄埔文冲船舶有限公司 A kind of lofting Design method of box anchor recess
CN108001614B (en) * 2017-12-08 2019-10-11 中船黄埔文冲船舶有限公司 It is a kind of large size anchor station and anchor lip lofting Design method
CN108001614A (en) * 2017-12-08 2018-05-08 中船黄埔文冲船舶有限公司 A kind of lofting Design method of large-scale anchor station and anchor lip
CN108082391B (en) * 2017-12-08 2019-12-03 中船黄埔文冲船舶有限公司 A kind of lofting Design method of box anchor recess
CN109094717A (en) * 2018-09-20 2018-12-28 中船黄埔文冲船舶有限公司 The method of deploying of veneer bilge keelson
CN109094724A (en) * 2018-09-28 2018-12-28 中船黄埔文冲船舶有限公司 A kind of anchor lip lofting Design method
CN109094724B (en) * 2018-09-28 2020-02-07 中船黄埔文冲船舶有限公司 Anchor lip lofting design method

Also Published As

Publication number Publication date
CN105608274B (en) 2018-07-24

Similar Documents

Publication Publication Date Title
CN102592035B (en) Method for predicating surface roughness and surface topography simulation of car milling compound machining
CN104102765A (en) BIM (Building Information Modeling)-based curtain wall parametrization design method
CN105781064A (en) Floor tile laying construction method based on building information modeling (BIM)
CN102622472B (en) Method for analyzing load and stress distribution and stress levels of composite mechanical connection pins
CN104462646B (en) A kind of quality evaluating method of ship flame forming plate
CN101339574B (en) Concrete stirring vane die face design system and method based on springback compensation
CN102722615B (en) Technique information expressing method based on three-dimensional model
CN105302959B (en) A kind of six axis grinding and polishing industrial robot off-line programing methods
CN102866671B (en) Large-arc ruled surface numerical control machining cutter path planning method
CN102866672B (en) Online detecting method of numerical control machining middle state of plane structural member
CN103790378B (en) building engineering construction equipment and construction method
CN104708824A (en) 3D (three-dimensional) printing adaptive slicing method capable of reserving model features
CN104331555A (en) Slicing processing method aiming at non-closed STL model with boundaries
CN104281729B (en) A kind of BIM methods manufactured applied to steel building Digital manufacturing
CN101866179B (en) Boat segmental hoisting simulation system restricted by three-dimensional space
CN103694605B (en) PVC foaming aluminum plastic building mould
CN102081693B (en) Pretreatment method used in three-dimensional processing of thin-walled complicated curved surface part
CN103345580B (en) Based on the parallel CFD method of lattice Boltzmann method
CN104899345B (en) Method for determining complex-curved shape workpiece laser shot forming technological parameter
CN103692654B (en) The method of three-dimensional printing fabrication techniques three-dimensional periodic structure Meta Materials
CN105550388A (en) Process model generation method and apparatus for sheet metal process
CN105550386A (en) Precast concrete deepening design method based on Revit
CN104385590B (en) A kind of method that 3 D-printing system carries out product self-inspection
CN104965947B (en) A kind of bridge three-dimensional design method based on BIM technology
CN102831259B (en) Automatic generation method of drawing for three-dimensional concrete structural reinforcement

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
GR01 Patent grant