CN103643631A - Cement concrete bridge deck pavement layer with temperature adjusting function - Google Patents

Cement concrete bridge deck pavement layer with temperature adjusting function Download PDF

Info

Publication number
CN103643631A
CN103643631A CN201310621679.1A CN201310621679A CN103643631A CN 103643631 A CN103643631 A CN 103643631A CN 201310621679 A CN201310621679 A CN 201310621679A CN 103643631 A CN103643631 A CN 103643631A
Authority
CN
China
Prior art keywords
hollow
cement concrete
frp
hollow frp
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310621679.1A
Other languages
Chinese (zh)
Other versions
CN103643631B (en
Inventor
赵军
李光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201310621679.1A priority Critical patent/CN103643631B/en
Publication of CN103643631A publication Critical patent/CN103643631A/en
Application granted granted Critical
Publication of CN103643631B publication Critical patent/CN103643631B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a cement concrete bridge deck pavement layer with a temperature adjusting function and belongs to the technical field of bridge construction. The cement concrete bridge deck pavement layer is composed of fiber reinforcement polymer (FRP) ribs, hollow FRP ribs, hollow FRP clamping pipes and cement concrete. The FRP ribs are distributed in the bridge deck pavement layer evenly and longitudinally, the hollow FRP ribs are distributed in the bridge deck pavement layer evenly and transversely, adjacent two hollow FRP ribs are connected through the hollow FRP clamping pipes, the hollow FRP ribs and the hollow FRP clamping pipes are connected to form communicated hollow ducts, and water inlets and water outlets are formed in the hollow ducts. By means of the cement concrete bridge deck pavement layer, the internal temperature of the cement concrete can be effectively adjusted, development of the cement concrete strength is guaranteed, cracks are reduced, ice and snow on the bridge surface in winter can be melted fast, damage of deicing salt on a bridge main body structure is removed, and the cement concrete bridge deck pavement layer has great significance on prolonging the service life of a bridge.

Description

The Cement Concrete Deck Paving Course with temp regulating function
Technical field
The present invention relates to bridge construction technical field, particularly relate to a kind of Cement Concrete Deck Paving Course with temp regulating function.
Background technology
Bridge deck pavement is a kind of special accessory structure in bridge engineering; mainly play protection bridge construction main body and provide comfortable, safe surface feature effect for driving a vehicle; also to bear the direct effect of wheel load simultaneously, and the effect of bearing extraneous load together with girder.Cement Concrete Deck Paving Course is one of primary structure form of deck paving, is mainly used in the situation that the bridge main body rigidity of structure is larger, while being reinforced concrete structure as girder.
Cement Concrete Deck Paving Course is that large area is exposed to airborne thin-slab structure, concrete surface very easily produces crack, after crack occurs, the anti-permeability performance of bridge deck pavement significantly reduces, cause rainwater or hazardous medium to infiltrate in the layer of mating formation and cause corrosion of steel bar, thereby bridge deck pavement is damaged.After Winter Snow, bridge floor easily freezes, and for guaranteeing the normal current of bridge floor, at bridge floor, using deicer salts is one of Main Means thawing ice and snow.Due to a large amount of uses of deicer salts, cause chlorion wherein to infiltrate in bridge deck pavement and bridge main body structure, cause corrosion of steel bar, cause potential safety hazard.From the use present situation of bridge, because cement concrete produces, bridge deck pavement and the agent structure that crack and corrosion of steel bar cause ftractures, breakage has become one of Major Diseases of bridge construction.The too early degeneration of the structure function causing due to reinforcement corrosion or the application life that Lack of support has shortened structure greatly.In addition, bridge deck pavement belongs to large area concrete structure, and the heat of hydration producing in concrete construction makes non-uniform temperature in concrete, easily occurs crack, has a strong impact on workmanship and normal use.
Fiber-reinforced polymer (FRP) muscle is as a kind of advanced composite material (ACM) with features such as high-strength, lightweight, corrosion-resistant, endurances, use it in bridge deck pavement, can replace traditional reinforcing bar directly stressed, solve the corrosion of steel bar problem in bridge deck pavement, but and the corrosion of steel bar problem in the bridge main body structure that unresolved bridge floor freezes or deicer salts causes.
Summary of the invention
The present invention is directed to the disease that existing Cement Concrete Deck Paving Course easily produces crack and corrosion of steel bar, and the normal rough sledding of using of freezed in winter impact, a kind of Cement Concrete Deck Paving Course with temp regulating function is provided.
For achieving the above object, the technical solution used in the present invention is: a kind of Cement Concrete Deck Paving Course with temp regulating function, described Cement Concrete Deck Paving Course is comprised of FRP muscle, hollow FRP muscle, hollow FRP button pipe and cement concrete, FRP flaccidity of tendon and muscle is to being uniformly distributed in bridge deck pavement, hollow FRP muscle is laterally uniformly distributed in bridge deck pavement, adjacent two hollow FRP muscle connect by hollow FRP button pipe, described hollow FRP muscle and hollow FRP button pipe are connected to form the hollow duct of connection, and described hollow duct is provided with water inlet and delivery port.
The two ends of described hollow FRP muscle are provided with perpendicular to hollow FRP muscle and the termination that is structure as a whole with it, and the two ends of hollow FRP button pipe are provided with perpendicular to hollow FRP button pipe and the termination that is structure as a whole with it.
The termination length of described hollow FRP muscle is 20 ㎜, and the termination length of described hollow FRP button pipe is 10 ㎜.
Described hollow FRP muscle adopts construction structure glue to be connected with hollow FRP button pipe.
Described hollow FRP muscle and hollow FRP button pipe include hollow duct, and described hollow duct outer peripheral face is axially enclosed with the glue matrix forming with polymer and metal dust, in described glue matrix, is also provided with fiber reinforced material.
Described polymer is a kind of, two or more any combination in epoxy resin, vinyl esters or unsaturated polyester (UP).
Described metal dust is iron powder, aluminium powder or comminuted steel shot.
Described fiber reinforced material is carbon fiber, glass fiber, aramid fiber, polyethylene fibre or basalt fibre.
Described FRP muscle diameter is 10 ~ 12 ㎜, and described hollow FRP muscle internal diameter is 10 ㎜, and described hollow FRP button bore is 16 ㎜.
Useful good effect of the present invention is: the Cement Concrete Deck Paving Course with temp regulating function that the present invention proposes, can effectively regulate cement concrete internal temperature, guarantee the development of cement concrete strength, reduce the generation in crack, can effectively solve because the bridge deck pavement disease problem that construction temperature, maintenance environment and the foster means of pipe etc. cause, can melt fast bridge floor ice and snow in winter simultaneously, eliminate the infringement of deicer salts to bridge main body structure, significant application life to extending bridge.
Accompanying drawing explanation
Fig. 1 is the structural representation of hollow FRP muscle of the present invention;
Fig. 2 is the structural representation of hollow FRP button pipe of the present invention;
Fig. 3 is structural representation of the present invention;
Fig. 4 is hollow FRP muscle of the present invention and button pipe generalized section.
In figure: 1, water inlet, 2, delivery port, 3, FRP muscle, 4, hollow FRP muscle, 5, hollow FRP detains pipe, 6, hollow FRP muscle termination, 7, hollow FRP detains pipe end, 8, hollow duct, 9, fiber reinforced material, 10, metal dust, 11, polymer.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated.
Embodiment mono-
Referring to Fig. 1-Fig. 4, a kind of Cement Concrete Deck Paving Course with temp regulating function of the present invention, described Cement Concrete Deck Paving Course is comprised of FRP muscle 3, hollow FRP muscle 4, hollow FRP button pipe 5 and cement concrete, FRP muscle 3 is longitudinally uniformly distributed in bridge deck pavement, hollow FRP muscle 4 is laterally uniformly distributed in bridge deck pavement, adjacent two hollow FRP muscle 4 connect by hollow FRP button pipe 5, described hollow FRP muscle 4 and hollow FRP button pipe 5 are connected to form the hollow duct of connection, and described hollow duct is provided with water inlet 1 and delivery port 2.The two ends of described hollow FRP muscle 4 are provided with perpendicular to hollow FRP muscle 4 and the termination 6 that is structure as a whole with it, and the two ends of hollow FRP button pipe 5 are provided with perpendicular to hollow FRP button pipe 5 and the termination 7 that is structure as a whole with it.
Termination 6 length of described hollow FRP muscle 4 are 20 ㎜, and termination 7 length of described hollow FRP button pipe 5 are 10 ㎜.Described hollow FRP muscle 4 adopts construction structure glue to be connected with hollow FRP button pipe 5.
Described hollow FRP muscle comprises hollow duct 8, and described hollow duct 8 outer peripheral faces are axially enclosed with the glue matrix forming with polymer 11 and metal dust 10, in described glue matrix, are also provided with fiber reinforced material 9.
Described polymer 11 is epoxy vinyl ester resin, fiber reinforced material 9 is glass fiber, metal dust 10 is aluminium powder, the weight of fiber glass reinforcement 9 accounts for hollow glass fibre and strengthens 60% of polymer (GFRP) muscle 4 weight, the weight of glue matrix accounts for hollow glass fibre and strengthens 40% of polymer (GFRP) muscle 4 weight, and the weight of aluminium powder 10 accounts for 20% of glue matrix weight.
The internal construction of described hollow GFRP button pipe 5 is identical with the internal construction of hollow GFRP muscle 4.
Described FRP muscle diameter is 10 ~ 12 ㎜, and described hollow FRP muscle internal diameter is 10 ㎜, and described hollow FRP button bore is 16 ㎜.
During construction, selecting diameter is the vertical, horizontal reinforcing bar that the GFRP muscle 3 of 12 ㎜ and hollow GFRP muscle that internal diameter is 10 4 replace in Cement Concrete Deck Paving Courses, along deck paving, be wherein longitudinally GFRP muscle 3, along deck paving, be laterally hollow GFRP muscle 4, the connection employing internal diameter of transversal hollow GFRP muscle is that hollow GFRP button pipe 5 the brushing construction structure glue of 16 ㎜ connects.
GFRP muscle 3 is longitudinally evenly placed on to the lower floor of bridge deck pavement, hollow GFRP muscle 4 is laterally evenly placed on above GFRP muscle 3, and upwards erect hollow GFRP muscle 4 terminations 6, at vertical and horizontal GFRP muscle infall, adopt tied silk to carry out colligation, so that fixedly GFRP muscle 3 and hollow GFRP muscle 4 positions do not change.After the colligation of muscle material, at hollow GFRP button pipe 5 termination 7 inwall brushing construction structure glues, and hollow GFRP button pipe 5 terminations 7 are oppositely buckled in above hollow GFRP muscle 4 terminations 6, after building structure adhesive curing, whether the hollow duct that adopts douche check transversal hollow GFRP muscle 4 to form is unobstructed.If unobstructed, can carry out next procedure, carry out building of cement concrete; If blockage phenomenon, need fix a breakdown, guarantee the unobstructed of hollow duct.
In whole bridge deck pavement, be not to only have a water inlet 1 and delivery port 2, the quantity of concrete water inlet and delivery port can be divided according to the requirement of deck paving area, the ability of pouring water and longitudinal expansion joint subregion.
During winter construction, cement concrete needs the maintenance that heats up after building.Now can add hot water (water temperature is determined according to temperature) at water inlet 1 place, hollow duct, delivery port 2 places carry out the circulation of hot water, heat is passed to muscle net cement concrete around by hollow GFRP muscle 4 tube walls, at cement concrete surface, be incubated covering simultaneously, reach the temperature environment that cement concrete aquation needs, guarantee the development of cement concrete strength, can effectively reduce the generation of external crack simultaneously.
In the bridge operation phase, after Winter Snow, bridge floor easily freezes, and affects road.For removing bridge floor ice and snow, now can adopt at water inlet 1 place, hollow duct and pour into hot water, delivery port 2 places carry out the circulation of hot water, heat passes to the cement concrete of upper face by hollow GFRP muscle 4 tube walls, make bridge floor there will not be icing phenomenon or can thaw ice and snow fast, guarantee the normal current of bridge.
During hot weather construction, because large area bridge deck pavement cement concrete internal temperature is higher, because the effect of thermal stresses is easily ftractureed, can pour into cold water at water inlet 1 place, hollow duct, delivery port 2 places carry out the circulation of cold water, reduce the temperature of muscle net ambient water cement concrete, control concrete cracking.
Embodiment bis-
The present embodiment and embodiment mono-structure are basic identical, its difference is, described polymer 11 is unsaturated polyester (UP), fiber reinforced material 9 is carbon fiber, metal dust 10 is iron powder, the weight of carbon fibre reinforcement 9 accounts for hollow carbon fiber and strengthens 65% of polymer reinforcement 4 weight, and the weight of glue matrix accounts for hollow carbon fiber and strengthens 35% of polymer reinforcement 4 weight, and the weight of iron powder 10 accounts for 25% of glue matrix weight.
Embodiment tri-
The present embodiment and embodiment mono-structure are basic identical, its difference is, described polymer 11 is epoxy resin, fiber reinforced material 9 is basalt fibre, metal dust 10 is comminuted steel shot, the weight of basalt fibre reinforcing material 9 accounts for 75% of hollow basalt fiber-reinforced polymer muscle 4 weight, and the weight of glue matrix accounts for 25% of hollow basalt fiber-reinforced polymer muscle 4 weight, and the weight of powdered steel 10 accounts for 15% of glue matrix weight.

Claims (9)

1. a Cement Concrete Deck Paving Course with temp regulating function, it is characterized in that: described Cement Concrete Deck Paving Course is comprised of FRP muscle, hollow FRP muscle, hollow FRP button pipe and cement concrete, FRP flaccidity of tendon and muscle is to being uniformly distributed in bridge deck pavement, hollow FRP muscle is laterally uniformly distributed in bridge deck pavement, adjacent two hollow FRP muscle connect by hollow FRP button pipe, described hollow FRP muscle and hollow FRP button pipe are connected to form the hollow duct of connection, and described hollow duct is provided with water inlet and delivery port.
2. the Cement Concrete Deck Paving Course with temp regulating function according to claim 1, it is characterized in that: the two ends of described hollow FRP muscle are provided with perpendicular to hollow FRP muscle and the termination that is structure as a whole with it, the two ends of hollow FRP button pipe are provided with perpendicular to hollow FRP button pipe and the termination that is structure as a whole with it.
3. the Cement Concrete Deck Paving Course with temp regulating function according to claim 2, is characterized in that: the termination length of described hollow FRP muscle is 20 ㎜, and the termination length of described hollow FRP button pipe is 10 ㎜.
4. the Cement Concrete Deck Paving Course with temp regulating function according to claim 1, is characterized in that: described hollow FRP muscle adopts construction structure glue to be connected with hollow FRP button pipe.
5. the Cement Concrete Deck Paving Course with temp regulating function according to claim 1, it is characterized in that: described hollow FRP muscle and hollow FRP button pipe include hollow duct, described hollow duct outer peripheral face is axially enclosed with the glue matrix forming with polymer and metal dust, in described glue matrix, is also provided with fiber reinforced material.
6. the Cement Concrete Deck Paving Course with temp regulating function according to claim 5, is characterized in that: described polymer is a kind of, two or more any combination in epoxy resin, vinyl esters or unsaturated polyester (UP).
7. the Cement Concrete Deck Paving Course with temp regulating function according to claim 5, is characterized in that: described metal dust is iron powder, aluminium powder or comminuted steel shot.
8. the Cement Concrete Deck Paving Course with temp regulating function according to claim 5, is characterized in that: described fiber reinforced material is carbon fiber, glass fiber, aramid fiber, polyethylene fibre or basalt fibre.
9. the Cement Concrete Deck Paving Course with temp regulating function according to claim 1, is characterized in that: described FRP muscle diameter is 10 ~ 12 ㎜, and described hollow FRP muscle internal diameter is 10 ㎜, and described hollow FRP button bore is 16 ㎜.
CN201310621679.1A 2013-11-30 2013-11-30 There is the Cement Concrete Deck Paving Course of temp regulating function Active CN103643631B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310621679.1A CN103643631B (en) 2013-11-30 2013-11-30 There is the Cement Concrete Deck Paving Course of temp regulating function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310621679.1A CN103643631B (en) 2013-11-30 2013-11-30 There is the Cement Concrete Deck Paving Course of temp regulating function

Publications (2)

Publication Number Publication Date
CN103643631A true CN103643631A (en) 2014-03-19
CN103643631B CN103643631B (en) 2015-08-26

Family

ID=50248909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310621679.1A Active CN103643631B (en) 2013-11-30 2013-11-30 There is the Cement Concrete Deck Paving Course of temp regulating function

Country Status (1)

Country Link
CN (1) CN103643631B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005317A (en) * 2014-05-15 2014-08-27 江苏绿材谷新材料科技发展有限公司 Conductive heating composite bar for pavement snow melting and deicing and preparation method thereof
WO2016081847A1 (en) * 2014-11-20 2016-05-26 Structural Technologies Ip, Llc Segmental duct coupler devices, systems, and methods
CN106049277A (en) * 2016-05-30 2016-10-26 哈尔滨金玉科技开发有限公司 Bridge panel
CN106284021A (en) * 2016-08-01 2017-01-04 绍兴文理学院 The two-way, two-pipe arrangement of snow melt pipeline and method for arranging
CN113846529A (en) * 2021-10-21 2021-12-28 中建七局第四建筑有限公司 Bridge deck deicing temperature control system and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004003290A (en) * 2002-04-26 2004-01-08 Kurimoto Ltd Structure for preventing slippage between steel and concrete, and steel/concrete composite plate
KR100572931B1 (en) * 2005-10-27 2006-04-24 우경건설 주식회사 Prestressed concrete hollow slab bridge and it's manufacture method
CN1916327A (en) * 2006-08-11 2007-02-21 中材科技股份有限公司 Fiber wall with strong rib material of plastic
CN202181505U (en) * 2011-01-26 2012-04-04 张建忠 Anti-freezing bridge
CN202283795U (en) * 2011-09-07 2012-06-27 上海启鹏工程材料科技有限公司 Fiber reinforced plastic (FRP) bar composite stainless steel tube
CN103205932A (en) * 2013-04-23 2013-07-17 长沙理工大学 Pile-type anti-freezing system for bridge
CN203200658U (en) * 2013-05-06 2013-09-18 李永法 Highway bridge preventing accumulated snow in advance

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004003290A (en) * 2002-04-26 2004-01-08 Kurimoto Ltd Structure for preventing slippage between steel and concrete, and steel/concrete composite plate
KR100572931B1 (en) * 2005-10-27 2006-04-24 우경건설 주식회사 Prestressed concrete hollow slab bridge and it's manufacture method
CN1916327A (en) * 2006-08-11 2007-02-21 中材科技股份有限公司 Fiber wall with strong rib material of plastic
CN202181505U (en) * 2011-01-26 2012-04-04 张建忠 Anti-freezing bridge
CN202283795U (en) * 2011-09-07 2012-06-27 上海启鹏工程材料科技有限公司 Fiber reinforced plastic (FRP) bar composite stainless steel tube
CN103205932A (en) * 2013-04-23 2013-07-17 长沙理工大学 Pile-type anti-freezing system for bridge
CN203200658U (en) * 2013-05-06 2013-09-18 李永法 Highway bridge preventing accumulated snow in advance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005317A (en) * 2014-05-15 2014-08-27 江苏绿材谷新材料科技发展有限公司 Conductive heating composite bar for pavement snow melting and deicing and preparation method thereof
CN104005317B (en) * 2014-05-15 2016-08-31 江苏绿材谷新材料科技发展有限公司 A kind of conductive heater composite reinforcing that can be used for snow-ice melting system and preparation method thereof
WO2016081847A1 (en) * 2014-11-20 2016-05-26 Structural Technologies Ip, Llc Segmental duct coupler devices, systems, and methods
US11473302B2 (en) 2014-11-20 2022-10-18 Structural Technologies Ip, Llc Segmental duct coupler devices, systems, and methods
CN106049277A (en) * 2016-05-30 2016-10-26 哈尔滨金玉科技开发有限公司 Bridge panel
CN106284021A (en) * 2016-08-01 2017-01-04 绍兴文理学院 The two-way, two-pipe arrangement of snow melt pipeline and method for arranging
CN113846529A (en) * 2021-10-21 2021-12-28 中建七局第四建筑有限公司 Bridge deck deicing temperature control system and method

Also Published As

Publication number Publication date
CN103643631B (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN103643631B (en) There is the Cement Concrete Deck Paving Course of temp regulating function
CN104061004B (en) Tunnel Second Lining bar construction
CN104328924B (en) Reinforced concrete structure part method is carried out with fiber mesh muscle and early strong strength self-compaction mortar
CN104514572A (en) Rod body connecting device, anchor rod and manufacturing method thereof
CN113718777A (en) Mass concrete crack prevention construction method
CN207537877U (en) A kind of low drying shrinkage cement-based material bridge deck pavement structure of ultra-tough
CN107217597A (en) A kind of prestressed concrete bridge face is seamlessly connected the construction method of plate
CN108561162A (en) A kind of superelevation ground temperature tunnel support structure and construction method
CN101929131A (en) Method for reinforcing bonded prestressing force of transversely tensioning epoxy coating reinforcing steel bar of concrete beam slab
CN107558364A (en) A kind of low drying shrinkage cement-based material bridge deck pavement structure of ultra-tough and construction method
CN106836021B (en) A kind of pre-stress FRP sheet material Shear Strengthening beams of concrete experimental provision
US20140150427A1 (en) Geothermal system for regulating temperature of pavement and superstructures
CN206428553U (en) A kind of highway pavement Anti-freezing structure
CN105442432B (en) Utilize the bridge and construction method for heat is abandoned more than power plant melting ice and snow
CN108797397B (en) A kind of reparation construction method suitable for large longitudinal slope bridge floor
CN104746409A (en) PC track beam for preventing ice and snow from depositing and manufacturing method thereof
CN105036638A (en) Composite protection plate and preparation method thereof
CN205874971U (en) Functional type bridge deck pavement structure
CN206268634U (en) A kind of power station pressure pipeline water-tight corrosion-proof structure
CN209854528U (en) Toughness steel-concrete combined bridge floor
CN210460685U (en) Tunnel high performance supporting construction
CN104074114A (en) Three-dimensional honeycomb reinforced concrete product made from composite material and preparation method of product
CN211522716U (en) Asphalt pavement
CN111519527A (en) Flexible joint connecting structure for steel structure bridge panel and construction method thereof
CN202755309U (en) Combined bridge deck structure of asphalt-free steel and reactive powder concrete (RPC)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant