CN103628727B - Electric power bracing frame - Google Patents

Electric power bracing frame Download PDF

Info

Publication number
CN103628727B
CN103628727B CN201310596710.0A CN201310596710A CN103628727B CN 103628727 B CN103628727 B CN 103628727B CN 201310596710 A CN201310596710 A CN 201310596710A CN 103628727 B CN103628727 B CN 103628727B
Authority
CN
China
Prior art keywords
flange
framework
bar
isometrical
isometrical bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310596710.0A
Other languages
Chinese (zh)
Other versions
CN103628727A (en
Inventor
唐自强
陈卫东
石建
李庆先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310596710.0A priority Critical patent/CN103628727B/en
Publication of CN103628727A publication Critical patent/CN103628727A/en
Application granted granted Critical
Publication of CN103628727B publication Critical patent/CN103628727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of electric power bracing frame, comprise the isometrical bar of two root flange assemblings, it is characterized in that: the upper end of the described isometrical bar of two root flange assemblings is connected on framework termination respectively by joint flange, described framework termination is made up of framework platform and two steel pipes be welded on framework platform base, is provided with substation framework stull between the described isometrical bar of two root flange assemblings.The overall favorable anti-corrosion effect of the present invention, and the framework termination of flange assembling truss column and bottom concrete frame all adopt and directly produce in factory, direct transport, directly assemble assembling at the construction field (site), avoid carrying out job site welding, effective minimizing construction error and the available protecting secure connection of structure reinforcing bars and inscribed methods orchid, makes the total quality of substation framework post be guaranteed; In addition, can also the strength character of the available protecting body of rod.

Description

Electric power bracing frame
Technical field
The present invention relates to a kind of electric power bracing frame, belong to electricity substation truss column.
Background technology
Current transformer substation framework post mainly adopts concrete frame and substation framework termination to be welded, the concrete frame joint of bottom all adopts the traditional handicraft of " the pre-buried steel ring of bar head, job site human weld ", there is the problem that joint welding quality and antiseptic property cannot effectively control, in transformer station's longtime running, there is potential safety hazard.Therefore, are objects that the present invention studies for the problems referred to above.
Summary of the invention
The object of the invention is to the shortcoming overcoming transformer substation framework post multiple-spot welded joint solder technology, and provide one can significantly improve anticorrosion and quality of connection, can reduce cost of production, be conducive to the electric power bracing frame applied.
Technical program of the present invention lies in:
A kind of electric power bracing frame, comprise the isometrical bar of two root flange assemblings, it is characterized in that: the upper end of the described isometrical bar of two root flange assemblings is connected on framework termination respectively by joint flange, described framework termination is made up of framework platform and two steel pipes be welded on framework platform base, is provided with substation framework stull between the described isometrical bar of two root flange assemblings.
Wherein, described steel pipe lower end is provided with joint flange, the isometrical bar of described flange assembling comprises the isometrical bar of annular concrete, and the two ends of the isometrical bar of described annular concrete are respectively equipped with joint flange, and the periphery of the isometrical bar of described annular concrete is provided with one deck thin-wall steel tube.
Described joint flange comprises the cylinder core cylinder be connected on the isometrical rod end head of annular concrete, the periphery of described cylinder core cylinder is provided with a circle flanged plate vertically and hangs gusset, described extension gusset near the isometrical bar of annular concrete, described flanged plate and uniform some reinforcement gussets on hanging between gusset cylinder core cylinder perisporium.
Described flanged plate is evenly equipped with some flange connecting holes.
Described extension gusset is evenly equipped with some pier nose holes in order to the main muscle of fixing concrete bar.
Cylinder core cylinder periphery wall between extension gusset and the isometrical bar of annular concrete is also provided with anchor bar.
The invention has the advantages that: the overall favorable anti-corrosion effect of the present invention, and the framework termination of flange assembling truss column and bottom concrete frame all adopt and directly produce in factory, direct transport, directly assemble assembling at the construction field (site), avoid carrying out job site welding, effective minimizing construction error and the available protecting secure connection of structure reinforcing bars and inscribed methods orchid, makes the total quality of substation framework post be guaranteed; In addition, can also the strength character of the available protecting body of rod.
Accompanying drawing explanation
Fig. 1 is the assembly structure schematic diagram of the embodiment of the present invention.
Fig. 2 is that the A of Fig. 1 is to partial enlargement structural representation.
Fig. 3 is that the 1-1 of Fig. 2 is to sectional structure schematic diagram.
Fig. 4 is that the 2-2 of Fig. 2 is to sectional structure schematic diagram.
Fig. 5 is that the 3-4 of Fig. 4 is to sectional structure schematic diagram.
Fig. 6 is that the 4-4 of Fig. 2 is to sectional structure schematic diagram.
Fig. 7 is that the 5-5 of Fig. 6 is to sectional structure schematic diagram.
Detailed description of the invention
For above-mentioned feature and advantage of the present invention can be become apparent, special embodiment below, and coordinate accompanying drawing, be described in detail below.
Referring to figs. 1 to Fig. 7, the present invention relates to a kind of electric power bracing frame, comprise the isometrical bar of two root flange assemblings, the upper end of the described isometrical bar of two root flange assemblings is connected on framework termination 1 respectively by joint flange, described framework termination is made up of framework platform and two steel pipes be welded on framework platform base, is provided with substation framework stull 3 between the described isometrical bar of two root flange assemblings.
Above-mentioned steel pipe lower end is provided with joint flange 4, the isometrical bar of described flange assembling comprises the isometrical bar 2 of annular concrete, the two ends of the isometrical bar of described annular concrete are respectively equipped with joint flange 5, and the periphery of the isometrical bar of described annular concrete is provided with one deck thin-wall steel tube 13.
Above-mentioned joint flange comprises the cylinder core cylinder 11 be connected on the isometrical rod end head of annular concrete, the periphery of described cylinder core cylinder is provided with a circle flanged plate 12 vertically and hangs gusset 10, described extension gusset near the isometrical bar of annular concrete, described flanged plate and uniform some reinforcement gussets 8 on hanging between gusset cylinder core cylinder perisporium.
Above-mentioned flanged plate is evenly equipped with some flange connecting holes 6.
Above-mentioned extension gusset is evenly equipped with some pier nose holes 7 in order to the main muscle of fixing concrete bar.
Cylinder core cylinder periphery wall between extension gusset and the isometrical bar of annular concrete is also provided with anchor bar 9.
Specific embodiment of the invention process: is as shown in Figure 1 the substation framework post of Flange joint.Substation framework post is made up of two parts, and top is divided into framework termination, and bottom is divided into two to be made up of the isometrical bar of flange assembling of fastener for connection, and upper part is connected by flange and bolt with lower part.
Upper part constructs: framework termination is by steel pipe and framework platform welding, steel pipe bottom arranges adpting flange, and flanged plate arranges several bolts hole, and the quantity of bolt hole is determined by Force Calculation and detailing requiments, flange arranges reinforcement gusset, and the thickness of flange is calculated by stressing conditions to be determined.
Lower part constructs: the isometrical bar of two root flange assemblings consists of fastener for connection, the joint of the isometrical bar of flange assembling adopts Flange joint (flange arrangement as shown in Figure 6), flange diameter is identical with concrete isometrical bar external diameter, flange adopts galvanizing preservative treatment, flanged plate arranges several bolts hole, the quantity of bolt hole is determined by Force Calculation and detailing requiments, the flange other end is for hanging gusset, hang hole count on gusset to be directly proportional to the number of steel bars of the isometrical bar of concrete, flange arranges reinforcement gusset, the thickness of flange is calculated by stressing conditions to be determined, for crackle appears in the joint reducing concrete frame, flange arranges anchor bar.After concrete frame segment structure reinforcing bar penetrates and hangs gusset, be anchored with extension gusset after stretch-draw and pier nose process, the isometrical bar of concrete is connected with flanged plate by bolt.
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.

Claims (1)

1. an electric power bracing frame, comprise the isometrical bar of two root flange assemblings, it is characterized in that: the upper end of the described isometrical bar of two root flange assemblings is connected on framework termination respectively by joint flange, described framework termination is made up of framework platform and two steel pipes be welded on framework platform base, is provided with substation framework stull between the described isometrical bar of two root flange assemblings; Described steel pipe lower end is provided with joint flange, and the isometrical bar of described flange assembling comprises the isometrical bar of annular concrete, and the two ends of the isometrical bar of described annular concrete are respectively equipped with joint flange, and the periphery of the isometrical bar of described annular concrete is provided with one deck thin-wall steel tube; Described joint flange comprises the cylinder core cylinder be connected on the isometrical rod end head of annular concrete, the periphery of described cylinder core cylinder is provided with a circle flanged plate vertically and hangs gusset, described extension gusset near the isometrical bar of annular concrete, described flanged plate and uniform some reinforcement gussets on hanging between gusset cylinder core cylinder perisporium; Described flanged plate is evenly equipped with some flange connecting holes; Described extension gusset is evenly equipped with some pier nose holes in order to the main muscle of fixing concrete bar; Cylinder core cylinder periphery wall between extension gusset and the isometrical bar of annular concrete is also provided with anchor bar.
CN201310596710.0A 2013-11-25 2013-11-25 Electric power bracing frame Active CN103628727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310596710.0A CN103628727B (en) 2013-11-25 2013-11-25 Electric power bracing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310596710.0A CN103628727B (en) 2013-11-25 2013-11-25 Electric power bracing frame

Publications (2)

Publication Number Publication Date
CN103628727A CN103628727A (en) 2014-03-12
CN103628727B true CN103628727B (en) 2015-12-02

Family

ID=50210146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310596710.0A Active CN103628727B (en) 2013-11-25 2013-11-25 Electric power bracing frame

Country Status (1)

Country Link
CN (1) CN103628727B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638665A (en) * 2016-12-29 2017-05-10 福州万山电力咨询有限公司 Assembly type equipment bracket for substation and mounting method of assembly type equipment bracket
CN108457520A (en) * 2018-03-01 2018-08-28 中国二十二冶集团有限公司 Precast concrete bridge structure installation method
CN110159052B (en) * 2019-04-29 2024-05-14 国网甘肃省电力公司建设分公司 Power transformation framework

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200949327Y (en) * 2006-09-28 2007-09-19 中国电力工程顾问集团中南电力设计院 Herringbone framework bolted connection column cap
CN202099809U (en) * 2010-12-30 2012-01-04 国家电网公司 EHV steel pipe plug-type foundation and EHV iron tower
CN102322172A (en) * 2011-07-15 2012-01-18 清华大学 Power facility tower with cone hollow interlayer concrete-filled steel tube lattice structure
CN202466616U (en) * 2012-02-07 2012-10-03 浙江瑞能通信科技有限公司 Prefabricated-assembled-embedded type weight system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IN180647B (en) * 1993-03-11 1998-02-28 Daya Ranjit Senanayake

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200949327Y (en) * 2006-09-28 2007-09-19 中国电力工程顾问集团中南电力设计院 Herringbone framework bolted connection column cap
CN202099809U (en) * 2010-12-30 2012-01-04 国家电网公司 EHV steel pipe plug-type foundation and EHV iron tower
CN102322172A (en) * 2011-07-15 2012-01-18 清华大学 Power facility tower with cone hollow interlayer concrete-filled steel tube lattice structure
CN202466616U (en) * 2012-02-07 2012-10-03 浙江瑞能通信科技有限公司 Prefabricated-assembled-embedded type weight system

Also Published As

Publication number Publication date
CN103628727A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN209636806U (en) A kind of steel support structure
CN103362119B (en) Large-size rebar cage exempt from the method that is welded to connect and syndeton
CN203845725U (en) Wall-attached hoop structure of tower crane
CN103628727B (en) Electric power bracing frame
CN203905425U (en) Elevator shaft construction-tool operating platform and safety protection integrated structure
CN205714211U (en) A kind of grooved confined concrete Tunnel system
CN203514309U (en) Steel strand anchorage device base
CN206319597U (en) A kind of cantilever steel girder erecting device
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN203487767U (en) Cross plate scaffold
CN103967042B (en) Mounting correction tool for protection corner angle of frame column and manufacturing method thereof
CN203475422U (en) Concrete tubular pile extension device
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN203514323U (en) Connection component
CN206844097U (en) Low clearance diaphragm wall reinforcement cage structure under a kind of high-voltage line
CN203613796U (en) Recoverable eave tile bolt formwork system of steel-reinforced concrete column
CN210368656U (en) Staple bolt device is adhered to pier construction bridge type scaffold lift platform
CN204225098U (en) Overweight reinforcing cage
CN103510514A (en) Steel strand anchorage device base
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN203684400U (en) Externally wrapped assembled concrete filled steel tubular column and steel beam connection node
CN203361596U (en) Auxiliary support of integrated lifting operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant