CN103628474A - Manufacturing method for connecting hollow prestressed square piles by using bolts - Google Patents

Manufacturing method for connecting hollow prestressed square piles by using bolts Download PDF

Info

Publication number
CN103628474A
CN103628474A CN201210308229.2A CN201210308229A CN103628474A CN 103628474 A CN103628474 A CN 103628474A CN 201210308229 A CN201210308229 A CN 201210308229A CN 103628474 A CN103628474 A CN 103628474A
Authority
CN
China
Prior art keywords
plate
bolt
pile
hole
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210308229.2A
Other languages
Chinese (zh)
Inventor
高军峰
袁振
张承军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongji Pile Industry Co Ltd
Original Assignee
Shanghai Zhongji Pile Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongji Pile Industry Co Ltd filed Critical Shanghai Zhongji Pile Industry Co Ltd
Priority to CN201210308229.2A priority Critical patent/CN103628474A/en
Publication of CN103628474A publication Critical patent/CN103628474A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a manufacturing method for connecting hollow prestressed square piles by using bolts. The manufacturing method is applied to the process of pile sinking, the second section pile and the first section pile need to be connected, and then pressure continues to be exerted downwards. According to the manufacturing method, the technology that a mechanical method is used for connecting the piles is directly adopted, and connecting flanges combined with the bolts only need to be adopted in pile heads needing to be connected. According to the problems existing in a traditional end plate welding method for the hollow prestressed concrete square piles and a pulp anchor method used in the pile connecting process, the mechanical bolt connecting technology can be applied to the hollow square pile connecting construction, and therefore the construction speed is increased and the manufacturing method can be popularized and applied in similar projects.

Description

Bolt connects the preparation method of pre-stress hollow square pile
Technical field
The invention belongs to building field, be specifically related to the preparation method that a kind of mechanical method of direct employing connects the bolt connection pre-stress hollow square pile of stake.
Background technology
When pile extension is very long, because pile-driver tower height is limited, can only prefabricate, segmentation squeezes into, or in pile driving process, when stake is actual, the length of burying is greater than stake during every joint length, i.e. first segment stake beat to stake, lean near the ground, but still do not meet the pile penetration requirement of design code, second section stake and first segment stake need be coupled together, then continue downward injection (pressure), in piling process by stake spreading.The reliability of the joint of stake is very important, must guarantee that joint has enough intensity.The joint of reinforced concrete pile generally adopts welding steel joint, and pile extension method has Jointing, flange pile extension and slurry anchor method.Jointing is that its surface should keep clean at upper and lower two joint stake Si Jiao side, end and the pre-buried mild steel steel plates of end face.When joint stake is instantly beaten to the operation height of being convenient to welding (apart from ground 1m left and right, should make pile top avoid pan soil interlayer) simultaneously, upper joint stake is sling with pile frame, aim at lower joint pile crown.With instrument, two mutual correction for direction verticality in 90 °, tamp and weld with the pre-buried iron plate of stake end face with iron plate at uneven place, play movement.Check errorless after, with spot welding, four jiaos of connecting angles and pre-embedded steel slab are welded temporarily, again check after position and verticality, immediately by two welder diagonal angle symmetrical weldings, in welding, should prevent that node from causing that because thermal stresses produces welding deformation end body is crooked.Welding should be full continuously, and should shorten weld interval as far as possible, to prevent fixed phenomenon.Jointing is applicable to all kinds of soil layers.Be applicable to that bearing capacity of single pile is high, slenderness ratio is large, pile foundation is intensive or must be through certain thickness compared with hardpan, the more difficult stake of pile sinking.When preformed pile adopts static pressure type square pile, the joint of stake can adopt slurry anchor method pile extension (also claiming sulphide mastic bonding), and joint is that the anchor hole that dowel inserts lower joint stake is stretched out in upper joint stake, and pours into the sulphide mastic of fusing, is secure bond after cooling.This joint design is simple, less expensive, but its on-the-spot mixing quality is subject to human factor large, and effect is also to be tested.
Summary of the invention
For the problems referred to above, main purpose of the present invention is that the bolt that provides a kind of mechanical method of direct employing to connect stake connects the preparation method of pre-stress hollow square pile.
The present invention solves above-mentioned technical problem by following technical proposals: a kind of bolt connects the preparation method of pre-stress hollow square pile, and the method comprises the steps:
(1). prepare two flanged plates: on two flanged plates, be all equipped with some bolts hole;
(2). prepare upper head plate: on having, be with sprocket hole on upper head plate, upper head plate is a foursquare metal sheet, the center of foursquare metal sheet is provided with circular hole, between upper band sprocket hole and upper circular hole, be also provided with welding plate, described upper welding plate is welded to connect in upper head plate and flanged plate;
(3). prepare bottom plate: on bottom plate, have lower band sprocket hole, bottom plate is a foursquare metal sheet, the center of foursquare metal sheet is provided with lower circular hole, between lower band sprocket hole and lower circular hole, be also provided with lower welding plate, described lower welding plate is welded to connect another piece in bottom plate and flanged plate;
(4). adopt screw rod to connect by bolt hole two flanged plates, the position that screw rod exposes bolt hole is provided with bolt;
(5). on described upper head plate, be connected with joint stake, on described bottom plate, be connected with lower joint stake, joint stake in lifting, upper joint stake is alignd with lower joint stake, then adopt bolt temporary fixed, in the time of should basseting on lower joint stake top on the spot at least 1m during pile extension, carry out, and the axis of joint stake and lower joint is overlapped;
(6). the bolt described in step (4) is tightened one by one, after hammering for several times, bolt is tightened one time again, then spot welding or screw thread dabbing is fixed, finally brushing pitch is blue or green paints, and all fill up mastic asphalt in the gap of upper welding plate and flanged plate welding, and all fill up mastic asphalt in the gap of lower welding plate and flanged plate welding.
In specific embodiments of the invention, described step adds the spring washer of bolt looseness while preventing hammering or is welded with after (6).
In specific embodiments of the invention, in described step (2), the 1/3-1/2 that the diameter range of upper circular hole is the square length of side, upper band sprocket hole is 12, described upper band sprocket hole is evenly distributed on foursquare four limits.
In specific embodiments of the invention, in described step (3), the 1/3-1/2 that the diameter range of lower circular hole is the square length of side, upper band sprocket hole is 12, described lower band sprocket hole is evenly distributed on foursquare four limits.
Positive progressive effect of the present invention is: the preparation method who the invention provides bolt connection pre-stress hollow square pile has the following advantages: the present invention is a kind of being applied in pile driving process, second section stake and first segment stake need be coupled together, then continue downward injection (pressure); The present invention directly adopts mechanical means to connect the technology of stake, and the pile crown that only need connect at needs adopts adpting flange described in the invention joint bolt; The present invention is directed to the problem that pre-stressed concrete hollow square stake tradition end plate welding and slurry anchor method pile extension exist, proposition can be applied to mechanical bolt link technique hollow square pile pile connection construction, has improved speed of application, can in similar engineering, be applicable.
Accompanying drawing explanation
Fig. 1 is the structural representation of upper head plate.
Fig. 2 is the structural representation of bottom plate.
Fig. 3 is the structural representation of flanged plate.
Fig. 4 is upper head plate is connected structure elevation with flanged plate.
Fig. 5 is the present invention's overall structure schematic diagram in use.
The specific embodiment
Below in conjunction with accompanying drawing, provide preferred embodiment of the present invention, to describe technical scheme of the present invention in detail.Fig. 1 is the structural representation of upper head plate, and Fig. 2 is the structural representation of bottom plate, and Fig. 3 is the structural representation of flanged plate.As Figure 1-3: flanged plate 8 comprises two: on two flanged plates 8, be all equipped with some bolts hole 81, on upper head plate 2, have and be with sprocket hole 1, upper head plate 2 is a foursquare metal sheet, the center of foursquare metal sheet is provided with circular hole 21, between upper band sprocket hole 1 and upper circular hole 21, be also provided with welding plate 3, upper welding plate 3 is welded to connect in upper head plate 2 and flanged plate 8, on bottom plate 5, have lower band sprocket hole 4, bottom plate 5 is a foursquare metal sheet, the center of foursquare metal sheet is provided with lower circular hole 51, between lower band sprocket hole 4 and lower circular hole 51, be also provided with lower welding plate 6, lower welding plate 6 is welded to connect another piece in bottom plate 5 and flanged plate 8,
Fig. 4 is upper head plate is connected structure elevation with flanged plate.Fig. 5 is the present invention's overall structure schematic diagram in use, adopts screw rod 9 to connect by bolt hole 81 two flanged plates 8, and the position that screw rod 9 exposes bolt hole 81 is provided with bolt 7;
On upper head plate 2, be connected with joint stake 100, on bottom plate 5, be connected with lower joint stake 200, joint stake 100 in lifting, upper joint stake 100 is alignd with lower joint stake 200, then adopt bolt 7 temporary fixed, in the time of should basseting on lower joint stake 200 tops on the spot at least 1m during pile extension, carry out, and the axis of joint stake 100 and lower joint 200 is overlapped; Conservative in practice is a bit that distance is the 2m that bassets.
Above-mentioned bolt 7 is tightened one by one, after hammering for several times, bolt 7 is tightened one time again, then spot welding or screw thread dabbing is fixed, finally brushing pitch is blue or green paints, and all fill up mastic asphalt in upper welding plate 3 and the gap of flanged plate 8 welding, and all fill up mastic asphalt in lower welding plate 5 and the gap of flanged plate 8 welding.In concrete enforcement, after above-mentioned steps, add the spring washer of bolt looseness while preventing hammering or be welded with.
In concrete enforcement, the 1/3-1/2 that the diameter range of upper circular hole 21 is the square length of side, upper band sprocket hole 1 is 12, upper band sprocket hole 1 is evenly distributed on foursquare four limits.In the example showing at Fig. 1, be about 1/2, also can select as required other value scope.
In concrete enforcement, the 1/3-1/2 that the diameter range of lower circular hole 51 is the square length of side, upper band sprocket hole 4 is 12, lower band sprocket hole 4 is evenly distributed on foursquare four limits.In the example showing at Fig. 2, be about 1/2, also can select as required other value scope.
Pile extension of the present invention adopts flange bolt to connect, and this pile extension pattern is easy to be reliable, and a pile only needs to connect for 20 minutes.The problem occurring in piling, is mainly lower joint stake while first squeezing into, and corner connection place of minority flange has a little distortion, and this problem can be solved by improving dolly.
The present invention is applied in pile driving process, second section stake and first segment stake need be coupled together, then continue downward injection (pressure); The present invention directly adopts mechanical means to connect the technology of stake, and the pile crown that only need connect at needs adopts adpting flange described in the invention joint bolt; The present invention is directed to the problem that pre-stressed concrete hollow square stake tradition end plate welding and slurry anchor method pile extension exist, proposition can be applied to mechanical bolt link technique hollow square pile pile connection construction, has improved speed of application, can in similar engineering, be applicable.
More than show and described basic principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and manual, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications; these changes and improvements all fall in the claimed scope of the invention, and the claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (4)

1. bolt connects a preparation method for pre-stress hollow square pile, it is characterized in that: the method comprises the steps:
(1). prepare two flanged plates (8): on two flanged plates (8), be all equipped with some bolts hole (81);
(2). prepare upper head plate (2): on upper head plate (2), have upper band sprocket hole (1), upper head plate (2) is a foursquare metal sheet, the center of foursquare metal sheet is provided with circular hole (21), between upper band sprocket hole (1) and upper circular hole (21), be also provided with upper welding plate (3), described upper welding plate (3) is welded to connect in upper head plate (2) and flanged plate (8);
(3). prepare bottom plate (5): on bottom plate (5), have lower band sprocket hole (4), bottom plate (5) is a foursquare metal sheet, the center of foursquare metal sheet is provided with lower circular hole (51), between lower band sprocket hole (4) and lower circular hole (51), be also provided with lower welding plate (6), described lower welding plate (6) is welded to connect another piece in bottom plate (5) and flanged plate (8);
(4). adopt screw rod (9) to connect by bolt hole (81) two flanged plates (8), the position that screw rod (9) exposes bolt hole (81) is provided with bolt (7);
(5). on described upper head plate (2), be connected with joint stake (100), on described bottom plate (5), be connected with lower joint stake (200), joint stake (100) in lifting, upper joint stake (100) is alignd with lower joint stake (200), then adopt bolt (7) temporary fixed, in the time of should basseting on lower joint stake (200) top on the spot at least 1m during pile extension, carry out, and joint stake (100) is overlapped with the axis of lower joint (200);
(6). the bolt (7) described in step (4) is tightened one by one, after hammering for several times, bolt (7) is tightened one time again, then spot welding or screw thread dabbing is fixed, finally brushing pitch is blue or green paints, and all fill up mastic asphalt in upper welding plate (3) and the gap of flanged plate (8) welding, and all fill up mastic asphalt in lower welding plate (5) and the gap of flanged plate (8) welding.
2. bolt according to claim 1 connects the preparation method of pre-stress hollow square pile, it is characterized in that, described step adds the spring washer of bolt looseness while preventing hammering or is welded with after (6).
3. bolt according to claim 1 connects the preparation method of pre-stress hollow square pile, it is characterized in that, in described step (2), the 1/3-1/2 that the diameter range of upper circular hole (21) is the square length of side, upper band sprocket hole (1) is 12, and described upper band sprocket hole (1) is evenly distributed on foursquare four limits.
4. bolt according to claim 1 connects the preparation method of pre-stress hollow square pile, it is characterized in that, in described step (3), the 1/3-1/2 that the diameter range of lower circular hole (51) is the square length of side, upper band sprocket hole (4) is 12, and described lower band sprocket hole (4) is evenly distributed on foursquare four limits.
CN201210308229.2A 2012-08-27 2012-08-27 Manufacturing method for connecting hollow prestressed square piles by using bolts Pending CN103628474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210308229.2A CN103628474A (en) 2012-08-27 2012-08-27 Manufacturing method for connecting hollow prestressed square piles by using bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210308229.2A CN103628474A (en) 2012-08-27 2012-08-27 Manufacturing method for connecting hollow prestressed square piles by using bolts

Publications (1)

Publication Number Publication Date
CN103628474A true CN103628474A (en) 2014-03-12

Family

ID=50209901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210308229.2A Pending CN103628474A (en) 2012-08-27 2012-08-27 Manufacturing method for connecting hollow prestressed square piles by using bolts

Country Status (1)

Country Link
CN (1) CN103628474A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350529A (en) * 2015-10-12 2016-02-24 江苏科技大学 Pile extension device for lengthening pile leg
CN106400781A (en) * 2016-11-04 2017-02-15 宁波大学 Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile
CN107989029A (en) * 2017-11-24 2018-05-04 华中科技大学 A kind of stake is connected system and its construction method with stake
CN108221974A (en) * 2017-12-19 2018-06-29 山西云度知识产权服务有限公司 A kind of pre- rounding staking pilework of assembled architecture
CN108457268A (en) * 2018-04-28 2018-08-28 中交航局第工程有限公司 A kind of piling bar afloat joining limiter and its application method
CN108625359A (en) * 2018-07-20 2018-10-09 中铁七局集团第二工程有限公司 A kind of prefabricated GFRP pipe concretes hollow splicing stake
CN108661045A (en) * 2018-07-20 2018-10-16 东北大学 A kind of prefabricated GFRP pipe concretes spliced pile
CN109024562A (en) * 2018-10-29 2018-12-18 中南大学 A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion
CN113653044A (en) * 2021-08-10 2021-11-16 大成科创基础建设股份有限公司 Construction method of deep soft soil pipe pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08260455A (en) * 1995-03-22 1996-10-08 Satake Tekko Kk Joint structure of concrete pile
CN1425831A (en) * 2003-01-10 2003-06-25 颜肖鸿 Butt device for prefabricated concrete pile and its producing method
CN2878509Y (en) * 2006-01-27 2007-03-14 中港第三航务工程局 PHC tube pile
CN201695391U (en) * 2009-11-10 2011-01-05 宁波海港工程有限公司 Tubular pile flange type joint and splicing tool thereof
CN202164600U (en) * 2011-06-03 2012-03-14 广东三和管桩有限公司 Anti-corrosion joint for prestressed concrete pipe pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08260455A (en) * 1995-03-22 1996-10-08 Satake Tekko Kk Joint structure of concrete pile
CN1425831A (en) * 2003-01-10 2003-06-25 颜肖鸿 Butt device for prefabricated concrete pile and its producing method
CN2878509Y (en) * 2006-01-27 2007-03-14 中港第三航务工程局 PHC tube pile
CN201695391U (en) * 2009-11-10 2011-01-05 宁波海港工程有限公司 Tubular pile flange type joint and splicing tool thereof
CN202164600U (en) * 2011-06-03 2012-03-14 广东三和管桩有限公司 Anti-corrosion joint for prestressed concrete pipe pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
国振喜: "《简明钢筋混凝土结构构造手册 第3版》", 31 January 2010 *
姚治邦: "《建筑材料实用配方手册》", 31 May 1991 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350529A (en) * 2015-10-12 2016-02-24 江苏科技大学 Pile extension device for lengthening pile leg
CN106400781A (en) * 2016-11-04 2017-02-15 宁波大学 Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile
CN107989029B (en) * 2017-11-24 2023-09-15 华中科技大学 Pile-to-pile connection system and construction method thereof
CN107989029A (en) * 2017-11-24 2018-05-04 华中科技大学 A kind of stake is connected system and its construction method with stake
CN108221974A (en) * 2017-12-19 2018-06-29 山西云度知识产权服务有限公司 A kind of pre- rounding staking pilework of assembled architecture
CN108457268A (en) * 2018-04-28 2018-08-28 中交航局第工程有限公司 A kind of piling bar afloat joining limiter and its application method
CN108457268B (en) * 2018-04-28 2023-12-26 中交一航局第一工程有限公司 Steel pile water butt joint limiter and use method thereof
CN108625359A (en) * 2018-07-20 2018-10-09 中铁七局集团第二工程有限公司 A kind of prefabricated GFRP pipe concretes hollow splicing stake
CN108661045A (en) * 2018-07-20 2018-10-16 东北大学 A kind of prefabricated GFRP pipe concretes spliced pile
CN108661045B (en) * 2018-07-20 2023-11-24 东北大学 Precast GFRP pipe concrete spliced pile
CN109024562A (en) * 2018-10-29 2018-12-18 中南大学 A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion
CN109024562B (en) * 2018-10-29 2024-03-15 中南大学 Graded-propulsion large-diameter long prefabricated pipe pile and construction method thereof
CN113653044A (en) * 2021-08-10 2021-11-16 大成科创基础建设股份有限公司 Construction method of deep soft soil pipe pile

Similar Documents

Publication Publication Date Title
CN103628474A (en) Manufacturing method for connecting hollow prestressed square piles by using bolts
CN105971827B (en) The conversion ring beam and its construction method of pylon are combined with steel cylinder for concrete tube
CN205444475U (en) Prefab and basic connected node
CN106321367A (en) Cable-stayed prestressed steel and concrete combined type fan tower
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN206941858U (en) Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework
CN103590414A (en) Structure for connecting concrete tubular pile with bearing platform
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN203174621U (en) Tower crane foundation
CN212128825U (en) Assembled integrated pier column and bent cap combined structure
CN208844771U (en) The connected support structure of T plate edge joint position
CN212773146U (en) Adopt stud, epoxy mortar and bolted connection's composite beam
CN107246037A (en) A kind of rectifying of leaned building structure and method for stake end sandy soil supporting course
CN210439324U (en) Prefabricated pier plate beam type foundation of lattice type concrete wind power tower
CN115450250B (en) Reinforced cement stabilized macadam retaining wall structure and construction method
CN111719693A (en) Prestress assembly type steel-concrete sleeved beam-column joint
CN208649917U (en) A kind of overhanging component bearing capacity stiffening device
CN113846572B (en) Holding system for bridge capping beam construction and construction method
CN217175201U (en) Assembled concrete column connected node
CN206829147U (en) A kind of combined type shaped steel, slip casting steel pipe bearing diagonal foundation pit enclosure structure
CN216948224U (en) Composite foundation structure of reinforced concrete precast pile
CN103103981A (en) Prestress wedge-shaped pipe pile joint technology and construction method thereof
CN202989911U (en) Post-grouting pile of precast concrete
CN215758594U (en) Widened pier column steel column tie beam device
CN115839102A (en) Wind power tower prestress stiffening type steel concrete high-rise pile cap foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140312