CN103618253A - 铁塔作业转向组合装置 - Google Patents

铁塔作业转向组合装置 Download PDF

Info

Publication number
CN103618253A
CN103618253A CN201310619156.3A CN201310619156A CN103618253A CN 103618253 A CN103618253 A CN 103618253A CN 201310619156 A CN201310619156 A CN 201310619156A CN 103618253 A CN103618253 A CN 103618253A
Authority
CN
China
Prior art keywords
tower
turns
hole
plate
combination unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310619156.3A
Other languages
English (en)
Other versions
CN103618253B (zh
Inventor
郑国永
柏春宇
付长春
姜立功
石祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chaoyang Sanbei Protection Forest System Construction Management Station
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310619156.3A priority Critical patent/CN103618253B/zh
Publication of CN103618253A publication Critical patent/CN103618253A/zh
Application granted granted Critical
Publication of CN103618253B publication Critical patent/CN103618253B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种铁塔作业转向组合装置,其特殊之处是:由用于固定在塔材上的塔材保护卡具和用于连接所述塔材保护卡具的转向板组成。由于塔材保护卡具夹紧固定在塔材上,塔材保护卡具再利用作业绳索与转向板连接,则将作业用铁塔的各向塔材连接固定为一体,再通过转向板上转向作业孔连接作业绳索及相关转向工器具,达到转向目的,结构简单,且保证了施工和检修质量,显著提高了塔上作业施工及检修进度。

Description

铁塔作业转向组合装置
技术领域
    本发明涉及铁塔组立用工具,特别是一种铁塔作业转向组合装置。
背景技术
    随着近几年经济不断发展,电力线路在不断的建设,随之而来的铁塔组建作业不断增多,在作业过程中,建塔用各种工器具与塔材及金具之间缺少直接使用并规范的连接装置,给现场施工及日常检修带来很大的麻烦和不便。
发明内容
本发明的目的是为了提供一种保证施工和检修质量、提高塔上作业施工及检修进度的铁塔作业转向组合装置。
本发明的技术方案是:
一种铁塔作业转向组合装置,其特殊之处是:由用于固定在塔材上的塔材保护卡具和用于连接所述塔材保护卡具的转向板组成。
上述的铁塔作业转向组合装置,所述塔材保护卡具具有利用螺栓连接的双层夹板,所述双层夹板由直角状外板和直角状内板组成,所述直角状内板折角处设有一对间隔分布的连接筋,所述连接筋之间设有连接板,所述连接板上设有用于连接作业绳索的连接孔。
上述的铁塔作业转向组合装置,所述连接孔处设有用于连接作业绳索的连接扣,以达到方便连接的目的,且防止作业绳索过度磨损。
上述的铁塔作业转向组合装置,所述转向板上设有多个用于连接所述塔材保护卡具的固定孔以及转向作业孔,所述固定孔和转向作业孔以所述转向板中心线为对称中心均匀分布在所述转向板上。
上述的铁塔作业转向组合装置,所述固定孔和转向作业孔间隔分布。
上述的铁塔作业转向组合装置,所述固定孔和转向作业孔上设有用于连接作业绳索的连接扣,以达到方便连接的目的,且防止作业绳索过度磨损。
本发明的有益效果是:
由于塔材保护卡具夹紧固定在塔材上,塔材保护卡具再利用作业绳索与转向板连接,则将作业用铁塔的各向塔材连接固定为一体,再通过转向板上转向作业孔连接作业绳索及相关转向工器具,达到转向目的,结构简单,且保证了施工和检修质量,显著提高了塔上作业施工及检修进度。
附图说明
图1是本发明的使用状态示意图;
图2是图1中塔材保护卡具的结构示意图;
图3是图2中A向视图;
图4是图1中转向板的结构示意图。
图中:塔材保护卡具1、直角状外板101、直角状内板102、连接筋103、连接板104、连接孔105、螺栓106、转向板2、固定孔201、转向作业孔202、连接扣3、作业绳索4、作业绳索5、铁塔主材6。
具体实施方式
如图所示,该铁塔作业转向组合装置,由塔材保护卡具1和转向板2组成。其中,所述塔材保护卡具1用于保护塔材并连接固定转向板2,其具有利用螺栓106连接的双层夹板,所述双层夹板由直角状外板101和直角状内板102组成,所述直角状内板102折角处设有一对间隔分布的连接筋103,所述连接筋103之间设有连接板104,所述连接板104上设有用于连接作业绳索4的连接孔105,所述连接孔105处设有用于连接作业绳索4的连接扣3。所述转向板2上设有多个用于连接所述塔材保护卡具1的固定孔201以及转向作业孔202,用于与塔材保护卡具1固定,并利用转向作业孔202使作业时作业绳索5改变受力方向,所述固定孔201和转向作业孔202以所述转向板2中心线为对称中心均匀分布在所述转向板2上,所述固定孔201和转向作业孔202间隔分布。所述固定孔201和转向作业孔201上设有用于连接作业绳索4、5的连接扣3。
在铁塔组立过程中,首先采用四个塔材保护卡具1分别固定于铁塔四角主材上,即将塔材保护卡具1双层夹板夹设于铁塔主材6根部并利用螺栓106夹紧固定,再利用作业绳索4将四个塔材保护卡具1与设于铁塔中部的转向板2连接固定,最后根据现场实际情况对转向板2上各个角度预先连接的作业绳索5改变力的方向,达到转向目的。

Claims (6)

1.一种铁塔作业转向组合装置,其特征在于:由用于固定在塔材上的塔材保护卡具和用于连接所述塔材保护卡具的转向板组成。
2.根据权利要求1所述的铁塔作业转向组合装置,其特征在于:所述塔材保护卡具具有利用螺栓连接的双层夹板,所述双层夹板由直角状外板和直角状内板组成,所述直角状内板折角处设有一对间隔分布的连接筋,所述连接筋之间设有连接板,所述连接板上设有用于连接作业绳索的连接孔。
3.根据权利要求2所述的铁塔作业转向组合装置,其特征在于:所述连接孔处设有用于连接作业绳索的连接扣。
4.根据权利要求1所述的铁塔作业转向组合装置,其特征在于:所述转向板上设有多个用于连接所述塔材保护卡具的固定孔以及转向作业孔,所述固定孔和转向作业孔以所述转向板中心线为对称中心均匀分布在所述转向板上。
5.根据权利要求4所述的铁塔作业转向组合装置,其特征在于:所述固定孔和转向作业孔间隔分布。
6.根据权利要求4所述的铁塔作业转向组合装置,其特征在于:所述固定孔和转向作业孔上设有用于连接作业绳索的连接扣。
CN201310619156.3A 2013-11-29 2013-11-29 铁塔作业转向组合装置 Active CN103618253B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310619156.3A CN103618253B (zh) 2013-11-29 2013-11-29 铁塔作业转向组合装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310619156.3A CN103618253B (zh) 2013-11-29 2013-11-29 铁塔作业转向组合装置

Publications (2)

Publication Number Publication Date
CN103618253A true CN103618253A (zh) 2014-03-05
CN103618253B CN103618253B (zh) 2016-07-06

Family

ID=50168956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310619156.3A Active CN103618253B (zh) 2013-11-29 2013-11-29 铁塔作业转向组合装置

Country Status (1)

Country Link
CN (1) CN103618253B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104708A (zh) * 2017-12-29 2018-06-01 国网河北省电力有限公司衡水供电分公司 平梯末端固定组合工具
CN113550644A (zh) * 2021-07-26 2021-10-26 广东欲丰电器制造有限公司 一种铁塔作业转向组合装置

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3266211A (en) * 1963-08-19 1966-08-16 Hughes Franklin Method of erecting an electrical power transmission tower
JPH02114814A (ja) * 1988-10-24 1990-04-26 Chubu Electric Power Co Inc 架設装置及びそれを使用する高効率送電線路
JP2000129958A (ja) * 1998-10-26 2000-05-09 Mitsubishi Heavy Ind Ltd 塔状構造体
CN201635476U (zh) * 2010-03-26 2010-11-17 四川电力送变电建设公司 铁塔组立施工夹具
CN202194429U (zh) * 2011-09-01 2012-04-18 北京市电力公司 转向平衡装置
CN102923600A (zh) * 2012-11-15 2013-02-13 河北省送变电公司 反向滑车固定装置
CN202967898U (zh) * 2012-11-12 2013-06-05 湖北省送变电工程公司 转向二联板
CN203674616U (zh) * 2013-11-29 2014-06-25 国家电网公司 铁塔作业转向组合装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU887794A1 (ru) * 1979-06-14 1981-12-07 Центральный Научно-Исследовательский И Проектный Институт По Планировке И Застройке Сельских Населенных Мест И Жилищно-Гражданскому Строительству На Селе Способ монтажа конструкций

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3266211A (en) * 1963-08-19 1966-08-16 Hughes Franklin Method of erecting an electrical power transmission tower
JPH02114814A (ja) * 1988-10-24 1990-04-26 Chubu Electric Power Co Inc 架設装置及びそれを使用する高効率送電線路
JP2000129958A (ja) * 1998-10-26 2000-05-09 Mitsubishi Heavy Ind Ltd 塔状構造体
CN201635476U (zh) * 2010-03-26 2010-11-17 四川电力送变电建设公司 铁塔组立施工夹具
CN202194429U (zh) * 2011-09-01 2012-04-18 北京市电力公司 转向平衡装置
CN202967898U (zh) * 2012-11-12 2013-06-05 湖北省送变电工程公司 转向二联板
CN102923600A (zh) * 2012-11-15 2013-02-13 河北省送变电公司 反向滑车固定装置
CN203674616U (zh) * 2013-11-29 2014-06-25 国家电网公司 铁塔作业转向组合装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104708A (zh) * 2017-12-29 2018-06-01 国网河北省电力有限公司衡水供电分公司 平梯末端固定组合工具
CN113550644A (zh) * 2021-07-26 2021-10-26 广东欲丰电器制造有限公司 一种铁塔作业转向组合装置

Also Published As

Publication number Publication date
CN103618253B (zh) 2016-07-06

Similar Documents

Publication Publication Date Title
CN204430668U (zh) 箱形梁焊接用辅助工具
CN103618253A (zh) 铁塔作业转向组合装置
MX2017013374A (es) Dispositivo de union de un tramo metalico con un tramo de hormigon en una torre hueca hibrida.
CN203946776U (zh) 钢塔承压板翻身吊装夹具
MX2015002630A (es) Procedimiento para la fabricacion de cilindros de molino de gran tamaño.
CN203674616U (zh) 铁塔作业转向组合装置
CN204126062U (zh) 一种圆柱形刚性系杆封板连接节点结构
CN203700940U (zh) 一种体外预应力索的便捷安装装置
CN105800466B (zh) 一种导电架
CN204715858U (zh) 一种铁塔组立保护工具
CN203760929U (zh) 一种输电线路杆塔施工中耐张塔紧线转向滑车
CN204492327U (zh) 一种组合式安全围栏
CN103850279B (zh) 一种骨架式斗杆及挖掘机
CN203559314U (zh) 浓密机轨道固定装置
CN203077185U (zh) 一种快卸式紧绳装置
CN203008479U (zh) 一种组立铁塔时临时站立平台
CN204935421U (zh) 简易c型夹具
CN104167650A (zh) 一种砼杆地线的连接结构及其使用方法
CN104708258A (zh) 圆形钢筋对焊夹具
CN205578900U (zh) 电缆托架支吊架的生根装置
CN204079317U (zh) 一种带有防脱装置的顶升横梁
CN205764676U (zh) 一种可调式管道滚动支撑架
CN203830975U (zh) 工字型钢结构起重机横梁焊接支撑装置
CN205011242U (zh) 一种声屏障单元板吊装用夹具
CN203770447U (zh) 一种联轴器对轮压盖

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xuan Guoli

Inventor after: Liu Fengyu

Inventor after: Zhang Xiaoping

Inventor after: Si Yadong

Inventor after: Sun Bin

Inventor after: Liu Fengzhen

Inventor after: Lu Junhai

Inventor after: Zheng Guoyong

Inventor after: Zhang Hongyu

Inventor after: Cong Peixian

Inventor after: Ma Conggan

Inventor after: Cang Rui

Inventor after: Yang Hongwei

Inventor after: Zhao Lihua

Inventor before: Zheng Guoyong

Inventor before: Bai Chunyu

Inventor before: Fu Changchun

Inventor before: Jiang Ligong

Inventor before: Shi Xiang

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160606

Address after: 122000 Chaoyang City Chaoyang District, Twin Towers, Liaoning, No. three, No. 13

Applicant after: Chaoyang Power Supply Company, State Grid Liaoning Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: State Grid Beijing Electric Power Company

Applicant after: CHAOYANG SANBEI PROTECTION FOREST SYSTEM CONSTRUCTION MANAGEMENT STATION

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Chaoyang Power Supply Company, State Grid Liaoning Electric Power Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant