US3266211A - Method of erecting an electrical power transmission tower - Google Patents

Method of erecting an electrical power transmission tower Download PDF

Info

Publication number
US3266211A
US3266211A US302881A US30288163A US3266211A US 3266211 A US3266211 A US 3266211A US 302881 A US302881 A US 302881A US 30288163 A US30288163 A US 30288163A US 3266211 A US3266211 A US 3266211A
Authority
US
United States
Prior art keywords
section
tower
erecting
jacks
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US302881A
Inventor
Hughes Franklin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US302881A priority Critical patent/US3266211A/en
Application granted granted Critical
Publication of US3266211A publication Critical patent/US3266211A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Definitions

  • these towers (sometimes called transmission towers) have been erected from along side of each tower working from the outside of the tower with gin poles, hoists, and other machinery necessary to lift sections of the towers.
  • the towers are always built from the bottom up. Thereafter the hardware, consisting of insulators, cables, braces and the like, was added. This necessitated use of additional cranes and/ or gin poles and the like to secure such items as insulators, in the first place, and the conductor wire attached to said insulators, in the second place.
  • This invention has for its objects the provision of a process and machine and other mechanism for erecting towers of the type concerned from the inside. Additionally, the toweris erected by building the top section first and then lifting it and building the next lower section, then resting the top section on the next lower section and building the third section from the top beneath the second section and so on. When the tower is completed it is then ready for use. Additionally the hardware, including the insulators and line wires are added as the section to which these items are attached is completed. The line wires therefore are elevated from the ground to their position on the top most section and are carried with it as the tower is built.
  • One of the objects .of the invention is to provide a multiple hydraulic or pneumatic jack which can be rested on the ground on especially prepared plates and will serve to elevate the sections as they are assembled to a height so thatthe next section can be assembled and built beneath them.
  • the multiple jack may then be collapsed and moved out from the bottom most section and away from the assembled and erected tower.
  • a second object provides the construction and use of a workmans platform which'is' attached to the multiple jack and can be raised from a lowered position in one section to'araised position in the second next above section so that the workmen can reach all necessary parts of the joints between the towers from the platform.
  • Another object is to provide a means for supporting the multiple jack on the ground and means for collapsing it and transporting it after its work has been done.
  • Still another object of theinvention is to provide a structure'and method for the erection of a transmission line tower from a position which will minimize contact of the erecting machinery with adjacent objects and hazards such as other transmission lines, trees, buildings and other similar objects.
  • a further similar object is to provide means and apparatus for erecting towers of the type described wherein the use of a crane is made unnecessary and tag lines and guy lines are made unnecessary.
  • FIGURE 1 is a plan view of a multiple hoist used in erecting sections of a transmission line tower from a position within the tower;
  • FIGURE 2 is a fragmentary portion of one of the radial supporting base arms with portions shown in section taken substantially on line 2--2 of FIGURE 1;
  • FIGURE 3 is a fragmentary section of the central portion of the multiple jack frame taken substantially on line 33 of FIGURE 1;
  • FIGURE 4 is a side elevational view of the multiple jack with portions of the tower being erected, shown in phantom and with movement of the jack parts shown in dotted lines.
  • the multiple jack indicates a base for the multiple jack generally indicated by numeral 3.
  • the multiple jack consists of a central plate 4 from which four arms 6 extend radially.
  • the base plate 4 is substantially square and each of the base arms 6 eX-. tends outward from each of its four corners. Attachment is made between the base arms'6 and the central plate 2 by bolts 8, 8a 8b, and 8c. The arms can be pivotally moved on these bolts when they are loosened but are held rigid when the nuts of the bolts are tightened.
  • each of the base arms 6 there are loops 10, 10a, 10b, and 100. These loops are sized and disposed so they will each include a cement pier or pile 12. These piers form foundations for the tower and are poured in proper position when the work is laid out in the first place. In the center of each pier there is a stub angle fitting 14. These fittings are included in the cement of each pier when it is cast and are provided with holes 15 for receiving attachment bolts.
  • each of the base arms 6 there are multiple stage hydraulic jacks 18. These, in the form herewith shown, consist of three sections: the bottom cylinder 20, resting on the upper face of each arm, the top section 22 and the mid-section 21 connecting the bottom section to the top section 22.
  • a fitting 23 which connects the top to a horizontal brace member 24 so that the tops of all of the jacks are braced in correct position to fit against the lower member of the tower section being lifted, such as 25 in FIGURE 4.
  • These horizontal connection bars are removably attached by said fittings so that they may be easily removed when the jacks are to be hinged in a horizontal position for transport.
  • Flexible hydraulic tubing 30 is used to connect the lower section of each of the jacks to a hydraulic pressure pump 31 positioned on plate 4.
  • a valve system is used to apply the hydraulic fluid to each of the cylinders as desired and is located in a box 33, also positioned on plate 4. This box also contains electrically driven hydraulic pump (not shown).
  • each of the arms 6 there are casters 35 to be used in moving the multiple jack frame when desired.
  • jacks 37 near the outer ends of each arm.
  • These jacks are provided with comparatively large base plates 38.
  • Similar jacks 39, on base plates 40, are positioned near the inner ends of each of the arms.
  • These jacks are of any type desired and may be screw jacks, as shown, operated by hand or may be small hydraulic jacks connected by flexible tubes to the pump in box 33.
  • top section A of the transmission line tower B is of standard construction or any suitable construction to suit the particular job being erected. For this reason the various parts of the tower are shown in phantom.
  • certain portions of the tower may be prefabricated; that is, held together loosely by bolts when taken from the shop assembly to the place of erection in the field.
  • the side members C of the tower may be assembled with the several corner braces held by bolts. These sections may be erected and held in position by chain hoists D and drawn into position when desired by these hoists. The hoists are then disconnected and bolts are inserted where necessary in order to complete the joints [between the several sections of the tower. As the tower is built from the bottom most section and raised to insert the next lower section, the said next lower section is assembled from the prefabricated parts supplied from the assembly shop.
  • the erecting frame is disposed centrally of the foundation piers, it is to be noted that when prefabricated sections are utilized, it will be necessary to disassemble one corner or the like of all sections other than the topmost, in order that the same may be wrapped around the jacks which are supporting other sections in an elevated position.
  • the jack-s are applied to it and it is raised to make room for the next following section.
  • the lbottom most section when assembled and installed, will have its corner members rest on piers 12, one at each corner.
  • the stub angle pieces 14 will then carry the load of the tower and the conductor wires that are strung on it.
  • the conductor wires -first laid upon the ground along side the tower, will be attached to insulators on the tower at the various positions indicated for them and will be carried up with the tower as the sections are raised by the multiple jack and the new sections built under them.
  • the method of erecting steel towers for high tension electrical transmission lines comprising the steps of erecting substantially equally spaced concrete foundation piers in the earth at the corners of an imaginary geometrical configuration, inserting tower engaging support members in each of the foundation piers, positioning an erecting frame with the main body thereof disposed substantially centrally of the geometrical configuration and extending at least one removably secured support arm from the main body to each of the foundation piers, positioning an adjustable jack on each of the support arms adjacent the foundation piers, interconnecting the tops of each jack by removable members for supporting the lower portion of a tower section which is to be elevated, connecting each jack to a source of fluid pressure disposed on said main body, erecting the top section of a multiple section tower wherein each section is of the same general dimension as said geometrical configuration and includes interconnected vertical and horizontal structural components, positioning the ends of the horizontal structural components on said piers, en-

Description

Aug. 16, 1966 U H 3,266,211
METHOD OF ERECTING AN ELECTRICAL POWER TRANSMISSION TOWER Filed Aug. 19, 1963 2 Sheets-Sheet 1 IN VEN TOR.
Aug. 16, 1966 F. HUGHES 3,266,211
METHOD OF ERECTING AN ELECTRICAL POWER TRANSMISSION TOWER Filed Aug. [9, 1963 2 Sheets-Sheet 2 IN VENTOR.
r' 3,266,211 Patented August 16, 1966 3,266,211 METHOD OF ERECTING AN ELECTRICAL POWER TRANSMISSION TOWER Franklin Hughes, 2050 W. Carnelback Road,
' Phoenix, Ariz. Filed Aug. 19, 1963, Ser. No. 302,881 1 Claim. (Cl. 52-745) This invention concerns apparatus and the process of erecting steel towers used to carry high tension voltage in large conductors.
Heretofore these towers (sometimes called transmission towers) have been erected from along side of each tower working from the outside of the tower with gin poles, hoists, and other machinery necessary to lift sections of the towers. The towers are always built from the bottom up. Thereafter the hardware, consisting of insulators, cables, braces and the like, was added. This necessitated use of additional cranes and/ or gin poles and the like to secure such items as insulators, in the first place, and the conductor wire attached to said insulators, in the second place.
This invention has for its objects the provision of a process and machine and other mechanism for erecting towers of the type concerned from the inside. Additionally, the toweris erected by building the top section first and then lifting it and building the next lower section, then resting the top section on the next lower section and building the third section from the top beneath the second section and so on. When the tower is completed it is then ready for use. Additionally the hardware, including the insulators and line wires are added as the section to which these items are attached is completed. The line wires therefore are elevated from the ground to their position on the top most section and are carried with it as the tower is built.
One of the objects .of the invention is to provide a multiple hydraulic or pneumatic jack which can be rested on the ground on especially prepared plates and will serve to elevate the sections as they are assembled to a height so thatthe next section can be assembled and built beneath them. The multiple jack may then be collapsed and moved out from the bottom most section and away from the assembled and erected tower.
A second object provides the construction and use of a workmans platform which'is' attached to the multiple jack and can be raised from a lowered position in one section to'araised position in the second next above section so that the workmen can reach all necessary parts of the joints between the towers from the platform.
Another object is to provide a means for supporting the multiple jack on the ground and means for collapsing it and transporting it after its work has been done.
Still another object of theinvention is to provide a structure'and method for the erection of a transmission line tower from a position which will minimize contact of the erecting machinery with adjacent objects and hazards such as other transmission lines, trees, buildings and other similar objects.
A further similar object is to provide means and apparatus for erecting towers of the type described wherein the use of a crane is made unnecessary and tag lines and guy lines are made unnecessary.
I attain the foregoing by means of the devices, parts and combinations of parts shown in the accompanying drawings, in which-- FIGURE 1 is a plan view of a multiple hoist used in erecting sections of a transmission line tower from a position within the tower;
FIGURE 2 is a fragmentary portion of one of the radial supporting base arms with portions shown in section taken substantially on line 2--2 of FIGURE 1;
FIGURE 3 is a fragmentary section of the central portion of the multiple jack frame taken substantially on line 33 of FIGURE 1;
FIGURE 4 is a side elevational view of the multiple jack with portions of the tower being erected, shown in phantom and with movement of the jack parts shown in dotted lines.
Similar numerals refer to similar parts in the several views.
In the drawings 2 indicates a base for the multiple jack generally indicated by numeral 3. The multiple jack consists of a central plate 4 from which four arms 6 extend radially. In the form shown the base plate 4 is substantially square and each of the base arms 6 eX-. tends outward from each of its four corners. Attachment is made between the base arms'6 and the central plate 2 by bolts 8, 8a 8b, and 8c. The arms can be pivotally moved on these bolts when they are loosened but are held rigid when the nuts of the bolts are tightened.
At the outer ends of each of the base arms 6 there are loops 10, 10a, 10b, and 100. These loops are sized and disposed so they will each include a cement pier or pile 12. These piers form foundations for the tower and are poured in proper position when the work is laid out in the first place. In the center of each pier there is a stub angle fitting 14. These fittings are included in the cement of each pier when it is cast and are provided with holes 15 for receiving attachment bolts.
Near the outer end of each of the base arms 6 there are multiple stage hydraulic jacks 18. These, in the form herewith shown, consist of three sections: the bottom cylinder 20, resting on the upper face of each arm, the top section 22 and the mid-section 21 connecting the bottom section to the top section 22.
At the top of the top section there is a fitting 23 which connects the top to a horizontal brace member 24 so that the tops of all of the jacks are braced in correct position to fit against the lower member of the tower section being lifted, such as 25 in FIGURE 4. These horizontal connection bars are removably attached by said fittings so that they may be easily removed when the jacks are to be hinged in a horizontal position for transport. Flexible hydraulic tubing 30 is used to connect the lower section of each of the jacks to a hydraulic pressure pump 31 positioned on plate 4. A valve system is used to apply the hydraulic fluid to each of the cylinders as desired and is located in a box 33, also positioned on plate 4. This box also contains electrically driven hydraulic pump (not shown).
On the bottom side of each of the arms 6 there are casters 35 to be used in moving the multiple jack frame when desired. When the jack frame is in use in the erection of a tower, however, the'weight of the jack and the load which it lifts is borne by jacks 37 near the outer ends of each arm. These jacks are provided with comparatively large base plates 38. Similar jacks 39, on base plates 40, are positioned near the inner ends of each of the arms. These jacks are of any type desired and may be screw jacks, as shown, operated by hand or may be small hydraulic jacks connected by flexible tubes to the pump in box 33.
These jacks, being positioned under each radial arm 6, carry the load of the tower as and when it is being erected. They are lowered and removed after the weight of the tower has been transferred to the piers 12. In disconnecting the arms from the piers, it is to be noted that the attaching loops 10 are secured to the ends of the arms 6 by bolts 16. These bolts are removed and the loops 10 removed from the piers 12 after the tower has been assembled and erected.
It is to be understood that the top section A of the transmission line tower B is of standard construction or any suitable construction to suit the particular job being erected. For this reason the various parts of the tower are shown in phantom.
In the process of erection it is to be understood that certain portions of the tower may be prefabricated; that is, held together loosely by bolts when taken from the shop assembly to the place of erection in the field. For example, the side members C of the tower may be assembled with the several corner braces held by bolts. These sections may be erected and held in position by chain hoists D and drawn into position when desired by these hoists. The hoists are then disconnected and bolts are inserted where necessary in order to complete the joints [between the several sections of the tower. As the tower is built from the bottom most section and raised to insert the next lower section, the said next lower section is assembled from the prefabricated parts supplied from the assembly shop. Additionally and due to the fact that the erecting frame is disposed centrally of the foundation piers, it is to be noted that when prefabricated sections are utilized, it will be necessary to disassemble one corner or the like of all sections other than the topmost, in order that the same may be wrapped around the jacks which are supporting other sections in an elevated position.
When, for example, tower section C is completed the jacks are lowered and their lifting pads, together with horizontal connecting members 24 are reapplied to the bottom of the completed section C. Thereafter a new section is erected by applying corner assemblies and bolting them in place, as desired, in the same manner as above indicated.
When this section is completed the jack-s are applied to it and it is raised to make room for the next following section. The lbottom most section, when assembled and installed, will have its corner members rest on piers 12, one at each corner. The stub angle pieces 14 will then carry the load of the tower and the conductor wires that are strung on it. As above stated, the conductor wires,-first laid upon the ground along side the tower, will be attached to insulators on the tower at the various positions indicated for them and will be carried up with the tower as the sections are raised by the multiple jack and the new sections built under them.
Workmen connecting the various parts together are held on a platform P which is operated by a heister G. This heister is on a base H which is hinged to the plate 4. When not in use the heister can be folded over the central portion of the assembly and thus space economized. The men on the platform operate the heister vertically as well as position it laterally. This type of structure is independent of the hydraulic lifting structure and is constructed optionally as best suits the particular installation.
I claim:
The method of erecting steel towers for high tension electrical transmission lines comprising the steps of erecting substantially equally spaced concrete foundation piers in the earth at the corners of an imaginary geometrical configuration, inserting tower engaging support members in each of the foundation piers, positioning an erecting frame with the main body thereof disposed substantially centrally of the geometrical configuration and extending at least one removably secured support arm from the main body to each of the foundation piers, positioning an adjustable jack on each of the support arms adjacent the foundation piers, interconnecting the tops of each jack by removable members for supporting the lower portion of a tower section which is to be elevated, connecting each jack to a source of fluid pressure disposed on said main body, erecting the top section of a multiple section tower wherein each section is of the same general dimension as said geometrical configuration and includes interconnected vertical and horizontal structural components, positioning the ends of the horizontal structural components on said piers, en-
gaging the horizontal structural components with said interconnecting members and raising the said top section of said transmission tower by introducing fluid into each jack, positioning and assembling the next -lower section of said tower beneath said top section with the respective horizontal ends of the next lower portion resting temporarily on said piers, lowering said jacks and said interconnecting members by withdrawing the fluid from said jacks to thereby bring the adjacent surfaces of said top section and said next lower section in proximity to one another, fastening the adjacent surfaces of said top and said next lower sections together, engaging the horizontal structural components of said next lower section with said interconnecting members and elevating the same by reintroducing fluid into the jacks and placing and assembling a third section of said tower beneath said top and said next lower sections with the respective horizontal ends of the third section resting on said piers, withdrawing the reintroduced fluid from said jacks to lower the interconnecting members to thereby bring the adjacent surfaces of said next -lower sections and said third section in proximity to one another, fastening the adjacent surfaces of said third section and said next lower section together and securing the pier engaging ends of the third section to its respective tower engaging support member, and connecting transmission lines and insulators to the top section of said tower.
References Cited by the Examiner UNITED STATES PATENTS 1,299,261 4/1919 Taylor 52745 2,857,994 10/1958 Sheard 5'2-40 2,993,679 7/1961 Morgan 254-89 3,073,573 1/1963 .Haskins 25489 FRANK L. ABBOTT, Primary Examiner.
MILTON S. MEHR, Examiner.
O. SIMPSON, R. S. VERMUT, Assistant Examiners.
US302881A 1963-08-19 1963-08-19 Method of erecting an electrical power transmission tower Expired - Lifetime US3266211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US302881A US3266211A (en) 1963-08-19 1963-08-19 Method of erecting an electrical power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US302881A US3266211A (en) 1963-08-19 1963-08-19 Method of erecting an electrical power transmission tower

Publications (1)

Publication Number Publication Date
US3266211A true US3266211A (en) 1966-08-16

Family

ID=23169611

Family Applications (1)

Application Number Title Priority Date Filing Date
US302881A Expired - Lifetime US3266211A (en) 1963-08-19 1963-08-19 Method of erecting an electrical power transmission tower

Country Status (1)

Country Link
US (1) US3266211A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3638911A (en) * 1970-02-06 1972-02-01 Cmi Corp Asphalt plant erector
US4345671A (en) * 1980-03-12 1982-08-24 Westinghouse Electric Corp. Apparatus and method for installing elevator guide rails
US5509502A (en) * 1994-05-04 1996-04-23 Skyline Displays, Inc. Construction elevator
CN102923600A (en) * 2012-11-15 2013-02-13 河北省送变电公司 Reverse pulley fixing device
CN103618253A (en) * 2013-11-29 2014-03-05 国家电网公司 Steering combination device for iron tower operation
US9556636B2 (en) * 2014-06-27 2017-01-31 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1299261A (en) * 1916-09-06 1919-04-01 Spencer E Huff Construction of towers.
US2857994A (en) * 1954-03-08 1958-10-28 Patent Scaffolding Co Inc Erection frames for sectional towers
US2993679A (en) * 1959-02-20 1961-07-25 Morgan John Sydney Hoisting apparatus for cylindrical tanks
US3073573A (en) * 1960-01-28 1963-01-15 Haskins Roy Tank erection mechanism

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1299261A (en) * 1916-09-06 1919-04-01 Spencer E Huff Construction of towers.
US2857994A (en) * 1954-03-08 1958-10-28 Patent Scaffolding Co Inc Erection frames for sectional towers
US2993679A (en) * 1959-02-20 1961-07-25 Morgan John Sydney Hoisting apparatus for cylindrical tanks
US3073573A (en) * 1960-01-28 1963-01-15 Haskins Roy Tank erection mechanism

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3638911A (en) * 1970-02-06 1972-02-01 Cmi Corp Asphalt plant erector
US4345671A (en) * 1980-03-12 1982-08-24 Westinghouse Electric Corp. Apparatus and method for installing elevator guide rails
US5509502A (en) * 1994-05-04 1996-04-23 Skyline Displays, Inc. Construction elevator
CN102923600A (en) * 2012-11-15 2013-02-13 河北省送变电公司 Reverse pulley fixing device
CN102923600B (en) * 2012-11-15 2014-09-17 河北省送变电公司 Reverse pulley fixing device
CN103618253A (en) * 2013-11-29 2014-03-05 国家电网公司 Steering combination device for iron tower operation
CN103618253B (en) * 2013-11-29 2016-07-06 国网辽宁省电力有限公司朝阳供电公司 Iron tower operation turns to combination unit
US9556636B2 (en) * 2014-06-27 2017-01-31 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
US10577819B2 (en) 2014-06-27 2020-03-03 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders
US10704286B2 (en) * 2014-06-27 2020-07-07 Tindall Corporation Method and apparatus for erecting tower with hydraulic cylinders

Similar Documents

Publication Publication Date Title
US6868646B1 (en) Method and means for erecting a wind energy tower
AU2017225082B2 (en) Utility tower lifting apparatus and method
US2345253A (en) Portable derrick
CA1065575A (en) Modular drill rig erection system
US20150308140A1 (en) Modular monopole tower foundation
US10704286B2 (en) Method and apparatus for erecting tower with hydraulic cylinders
CN107191676A (en) Buried pipeline construction method
US2720694A (en) Method for erecting elevated structures
US3266211A (en) Method of erecting an electrical power transmission tower
CN107816209A (en) The large-scale Roof Truss construction technology of installation is lifted across outer both sides
US4205826A (en) Lifting and supporting apparatus for a tower crane
JP3242775B2 (en) Installation method of vertical container
JPH04161566A (en) Constructing apparatus for large space building
EP1681461A1 (en) Method and means for erecting a wind energy tower
JP4922509B2 (en) How to install a lifting machine
CN212269274U (en) Tower crane supporting system for reconstruction of existing building
JP7158304B2 (en) Transport system and installation method
JP2872886B2 (en) Construction lift equipment
CN210457366U (en) High-rise ALC wallboard corollary equipment
WO2023178638A1 (en) Pile frame
DE102010013512A1 (en) Building system with locally produced large parts
JPH06101348A (en) Method for constructing tower
CA2491949A1 (en) Method and means for erecting a wing energy tower
RU2057866C1 (en) Method for erecting buildings
CN117758715A (en) Method for hoisting low-clearance underground wall-connected reinforcement cage