CN103607721B - A kind of method and apparatus of base station construction - Google Patents
A kind of method and apparatus of base station construction Download PDFInfo
- Publication number
- CN103607721B CN103607721B CN201310632731.3A CN201310632731A CN103607721B CN 103607721 B CN103607721 B CN 103607721B CN 201310632731 A CN201310632731 A CN 201310632731A CN 103607721 B CN103607721 B CN 103607721B
- Authority
- CN
- China
- Prior art keywords
- reference value
- lte
- value
- community
- fei
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 163
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000012545 processing Methods 0.000 claims description 12
- 241000208340 Araliaceae Species 0.000 claims description 5
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims description 5
- 235000003140 Panax quinquefolius Nutrition 0.000 claims description 5
- 235000008434 ginseng Nutrition 0.000 claims description 5
- 230000006855 networking Effects 0.000 abstract description 11
- 230000007774 longterm Effects 0.000 abstract description 6
- 238000004891 communication Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Abstract
The embodiment of the present invention provides the method and apparatus of a kind of base station construction, relate to the communications field, the construction area of LTE base station can be accurately determined, improve the efficiency of networking, the method includes: base station construction equipment obtains telephone traffic and the traffic information of non-Long Term Evolution LTE community, determine the scene information of Gai Fei LTE community, and obtained the construction priority value of Gai Fei LTE community by this telephone traffic and this traffic information according to this scene information, and determine LTE base station correspondence Fei LTE community to be built according to this construction priority value.The embodiment of the present invention is used for base station construction.
Description
Technical field
The present invention relates to the communications field, the method and apparatus particularly relating to a kind of base station construction.
Background technology
Along with the development of mobile communication technology, in order to meet user's demand to wireless communication,
The planning of wireless network is the most important, at present, based on existing WCDMA(Wideband Code
Division Multiple Access Wireless, WCDMA) network carrying out LTE
During (Long Term Evolution, Long Term Evolution) networking, the most smart
Really, the region always networking department being suitable for LTE base station construction is reasonably selected to face
A difficult problem.
In prior art, mainly the telephone traffic by obtaining each community of WCDMA network determines
(it is the covering after having built of this LTE base station wait the construction area of the LTE base station built
Region), it is contemplated that the construction cost of LTE base station, it is therefore desirable to it is accurately determined LTE
The construction area of base station, but, the construction area obtained by telephone traffic is perhaps without carrying out
The construction of LTE base station, such as, be not required to set up LTE base station for the rural area that telephone traffic is high,
If therefore determine the construction area of LTE base station according to telephone traffic, the cost of networking can be increased,
Reduce the efficiency of networking.
Summary of the invention
The present invention provides the method and apparatus of a kind of base station construction, it is possible to be accurately determined LTE base
The construction area stood.
For reaching above-mentioned purpose, the present invention adopts the following technical scheme that
A kind of method of base station construction, including:
Obtain telephone traffic and the traffic information of non-Long Term Evolution LTE community;
Determine the scene information of described non-LTE community;
Obtain described non-according to described scene information by described telephone traffic and described traffic information
The construction priority value of LTE community;
LTE base station correspondence Fei LTE community to be built is determined according to described construction priority value.
A kind of base station construction equipment, it is characterised in that including:
Acquiring unit, for obtaining telephone traffic and the traffic information of non-LTE community;
Processing unit, for determining the scene information of described non-LTE community, according to described scene
Described telephone traffic and described traffic information that information is obtained by described acquiring unit obtain described
The construction priority value of non-LTE community, and determine to be built according to described construction priority value
LTE base station correspondence Fei LTE community.
By using such scheme, base station construction equipment is according to the traffic obtaining Fei LTE community
Measure and traffic information, and the scene information of Gai Fei LTE community obtains Gai Fei LTE community
Build priority value, thus determine that LTE base station to be built is corresponding according to this construction priority value
Fei LTE community.So, base station construction equipment is by the essence to telephone traffic and traffic information
Really analyze, reasonably select the preferential community building LTE base station, to meet high bandwidth high-quality
Data traffic demand, thus reduce the cost of networking, improve the efficiency of networking.
Accompanying drawing explanation
The schematic flow sheet of a kind of base station construction method that Fig. 1 provides for the embodiment of the present invention;
The structural representation of a kind of base station construction equipment that Fig. 2 is inner offer of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, to the technical side in the embodiment of the present invention
Case is clearly and completely described, it is clear that described embodiment is only the present invention one
Divide embodiment rather than whole embodiments.Based on the embodiment in the present invention, this area is general
The every other embodiment that logical technical staff is obtained under not making creative work premise,
Broadly fall into the scope of protection of the invention.
In following example of the present invention, can be based on WCDMA(Wideband Code
Division Multiple Access Wireless, WCDMA) network carries out LTE
The construction of base station, it is also possible to be network based on other construction that carries out LTE base station, such as,
Can also is that based on CDMA(Code Division Multiple Access, CDMA)
Network or TDMA(Time Division Multiple Access, time division multiple acess) network enters
Row LTE(Long Term Evolution, Long Term Evolution) construction of base station, the present invention is to this
It is not construed as limiting.
The embodiment of the present invention provides a kind of method of base station construction, as it is shown in figure 1, the method
Executive agent is base station construction equipment, and the method includes:
S101, base station construction equipment obtain telephone traffic and the traffic information of non-LTE community.
Specifically, base station construction equipment can (can in the embodiment of the present invention by non-LTE network
To be WCDMA network) in SGSN(Serving GPRS Support Node, GPRS clothes
Node is supported in business) and GGSN(Gateway GPRS Support Node, GPRS gateway is supported
Node) between gn interface obtain this telephone traffic and traffic information.
S102, base station construction equipment obtain the scene information of Gai Fei LTE community.
Specifically, base station construction equipment can be by the RNC(Radio in non-LTE network
Network Controller, radio network controller) and SGSN between Iu-PS interface obtain
Taking this scene information, wherein, this scene information can be school, business district, shopping centre, residence
The areas such as people district or villages and towns in rural areas.
S103, base station construction equipment are believed by this telephone traffic and this portfolio according to this scene information
Breath obtains the construction priority value of Gai Fei LTE community.
Further, during base station construction equipment obtains non-LTE network, Ge Fei LTE community is first
In this first unit interval in the first average traffic amount in unit interval section and this non-LTE network
Total traffic in Duan, and according to this total traffic and Fei LTE community in this non-LTE network
The ratio of quantity be worth to the first value, and first be worth in this first unit interval section according to this
The second interior average traffic amount, and according to this first average traffic amount and this second average traffic amount
Ratio be worth to the first reference value.
Specifically, base station construction equipment obtains each non-LTE community in the first preset time period
Telephone traffic, and be worth to each non-LTE according to this telephone traffic with the ratio of this first preset time period
The community the first average traffic amount in the first unit interval section, this base station construction equipment obtains should
Total traffic in the second preset time period in non-LTE network, and according to this total traffic with
In this non-LTE network, the ratio of the quantity of Fei LTE community is worth to the first value, and according to this
It is second flat that one value and the ratio of this second preset time period are worth in this first unit interval section
All telephone traffics, and be worth to according to the ratio of this first average traffic amount with this second average traffic amount
First reference value.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, and base station construction equipment obtains every
Ge Fei LTE community telephone traffic in 24 hours (the i.e. first preset time period), and by these words
Business amount is divided by 24 telephone traffics (the i.e. first average traffic amount) obtaining the most each hour, base station
Construction machines obtains total in 24 hours (the i.e. second preset time period) of 5 Ge Fei LTE communities
Telephone traffic (will 5 Ge Fei LTE communities each comfortable 24 hours interior telephone traffic be added), and will
This total traffic, divided by the quantity (i.e. 5) of Fei LTE community in this non-LTE network, obtains
One value (this value i.e. represents that each non-LTE community was 24 hours interior telephone traffics), by this first
Value divided by 24 telephone traffics (the i.e. second average traffic amount) obtaining each hour, and according to this
One average traffic amount is worth to the first reference value, in the present invention with the ratio of this second average traffic amount
In embodiment, the first preset time period and the second preset time period are identical (i.e. 24 hours),
This is not construed as limiting by the present invention, it is also possible to be the different time periods.
It addition, this base station construction equipment is according in this non-LTE network the first of Ge Fei LTE community
Average traffic measures maximum average traffic amount, puts down with this maximum according to this first average traffic amount
All ratios of telephone traffic are worth to the second reference value, and according to this first reference value, this second reference
Value and this traffic information obtain the construction priority value of Gai Fei LTE community.
Wherein, this maximum average traffic amount is that the first of this Ge Fei LTE community obtained averagely is talked about
Maximum telephone traffic in business amount.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, and base station construction equipment obtains every
Ge Fei LTE community is in the first average traffic amount in the first unit interval section, and from 5 obtained
Individual first average traffic amount chooses the telephone traffic of maximum as maximum draw telephone traffic, by first
Average traffic amount measures the second reference value divided by this maximum average traffic, and according to this first ginseng
Examine value, this second reference value and this traffic information and obtain the construction priority of Gai Fei LTE community
Value.
Further, this traffic information includes preset flow number of users, then this base station construction sets
In standby the first preset flow number of users obtained in this Ge Fei LTE community and this non-LTE network
Total preset flow number of users, and according in this total preset flow number of users and this non-LTE network
The ratio of the quantity of non-LTE community is worth to the second value, and according to this second be worth to this second
The second preset flow number of users in unit interval section, and according to this first preset flow number of users
It is worth to the 3rd reference value, then this base station construction equipment with the ratio of this second preset flow number of users
Gai Fei LTE community is obtained according to this first reference value, this second reference value and the 3rd reference value
Construction priority value.
Wherein, this preset flow number of users is the service traffics used in the second unit interval section
More than or equal to the quantity of the user of predetermined threshold value, e.g., this preset flow number of users can be
The quantity of the service traffics user more than 1MB is used in one hour;Illustratively, this base station
Construction machines can obtain the service traffics used in the first preset time period and be more than or equal to
The quantity of the user of predetermined threshold value, and be worth according to the ratio of this quantity with this first preset time period
To preset flow number of users.
Further, this traffic information also includes the service traffics of pre-set business, and base station is built
If equipment obtains this Ge Fei LTE community first industry of this pre-set business in the 3rd unit interval section
Business flow, obtains in this non-LTE network the total of in the 3rd unit interval section this pre-set business
Service traffics, and according to these total service traffics and the number of Fei LTE community in this non-LTE network
The ratio of amount is worth to the 3rd value, and is worth in the 3rd unit interval section according to the 3rd
Second service traffics, are worth to according to the ratio of these first service traffics with these the second service traffics
Four reference values, then this base station construction equipment according to this first reference value, this second reference value, should
3rd reference value and the 4th reference value obtain the construction priority value of Gai Fei LTE community.
Wherein, this pre-set business can be video, FTP(File Transfer Protocol,
FTP) download and the contour band width service of mail, due to the bandwidth of these business demands
Relatively big, therefore it is more suitable for carrying in the lte networks.
It should be noted that this pre-set business can be stored in base station with the form of pre-set business table
In construction machines, base station construction equipment determines the business of needs acquisition according to this pre-set business table
Service traffics.
Specifically, base station construction equipment obtains each non-LTE community in the first preset time period
The service traffics of pre-set business, and first preset with this according to the service traffics of this pre-set business
The ratio of time period is worth to each non-LTE community pre-set business in the 3rd unit interval section
First service traffics, this base station construction equipment obtains in this non-LTE network at the second Preset Time
Total service traffics of the pre-set business in Duan, and according to these total service traffics and this non-LTE network
The ratio of the quantity of middle Fei LTE community is worth to the 3rd value, and according to the 3rd value with this second
The ratio of preset time period is worth to the second business of the pre-set business in the 3rd unit interval section
Flow, this base station construction equipment is according to the ratio of these first service traffics Yu these the second service traffics
Obtain the 4th reference value, then this base station construction equipment is according to this first reference value, this second reference
Value, the 3rd reference value and the 4th reference value obtain the construction priority value of Gai Fei LTE community.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, and base station construction equipment obtains every
The service traffics of Ge Fei LTE community pre-set business in 24 hours (the first preset time period),
And by the service traffics of this pre-set business divided by 24(the first preset time period) obtain each non-LTE
Community is in the first service traffics of each hour interior pre-set business, and this base station construction equipment obtains
Total business of the pre-set business in 24 hours (the second preset time period) in this non-LTE network
Flow, and by these total service traffics divided by the quantity of Fei LTE community in this non-LTE network (i.e.
5) the 3rd value is obtained, and by the 3rd value divided by 24(the second preset time period) obtain the least
Second service traffics of the pre-set business time in, this base station construction equipment is according to this first Business Stream
Measure and be worth to the 4th reference value with the ratio of these the second service traffics, then this base station construction equipment according to
This first reference value, this second reference value, the 3rd reference value and the 4th reference value are somebody's turn to do
The construction priority value of non-LTE community.
Alternatively, base station construction equipment obtains this Ge Fei LTE community in the 4th unit interval section
The corresponding first terminal quantity presetting terminal type, obtains in this non-LTE network single the 4th
To presetting total terminal quantity of terminal type in bit time section, and according to this total terminal quantity
It is worth to the 4th value with the ratio of the quantity of Fei LTE community in this non-LTE network, and according to this
4th is worth to the second terminal quantity in the 4th unit interval section, according to this first terminal
Quantity is worth to the 5th reference value, then this base station construction equipment root with the ratio of this second terminal quantity
And it is somebody's turn to do by this first reference value, this second reference value, the 3rd reference value according to this scene information
4th reference value and the 5th reference value obtain the construction priority value of Gai Fei LTE community.
Wherein, this terminal type can be that the brand of terminal or model are (if market price is 3000
The terminal that unit is above), base station construction equipment can be by obtaining terminal according to default terminal type
Identification information obtain brand or the model of this terminal, it should be noted that this default terminal
Type can be stored in this base station construction equipment with the form of default terminal type table, this base station
Construction machines determines the quantity of the terminal needing acquisition according to this default terminal type table.
It should be noted that after the terminal of user's use powers on (such as mobile phone power-on), terminal
The identification information of this terminal can be sent to base station construction equipment, then this base station construction equipment according to
The identification information of this terminal obtains brand or the model of this terminal, it addition, when user is by being somebody's turn to do
When terminal Fei LTE community uses service traffics, this base station construction equipment also can get this end
The brand of end or model, therefore, base station construction equipment is by obtaining in preset time period
The quantity presetting terminal type obtains the 5th reference value.
Specifically, base station construction equipment acquisition Ge Fei LTE community is right in the first preset time period
The terminal quantity of terminal type should be preset, and according to this terminal quantity and this first preset time period
Ratio be worth to first terminal quantity, base station construction equipment obtains in this non-LTE network second
To presetting total terminal quantity of terminal type in preset time period, and according to this total number of terminals
Amount and the ratio of the quantity of Fei LTE community in this non-LTE network are worth to the 4th value, and according to
The ratio of the 4th value and this second preset time period is worth to the second terminal quantity, and according to this
One terminal quantity and this second terminal quantity obtain the 5th reference value, then this base station construction equipment root
And it is somebody's turn to do by this first reference value, this second reference value, the 3rd reference value according to this scene information
4th reference value and the 5th reference value obtain the construction priority value of Gai Fei LTE community.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, and base station construction equipment obtains each
Non-LTE community is the corresponding terminal presetting terminal type in 24 hours (the first preset time period)
Quantity, and this terminal quantity is obtained first terminal quantity divided by 24, base station construction equipment obtains
To presetting terminal type in 24 hours (the second preset time period) in this non-LTE network
Total terminal quantity, and by this total terminal quantity divided by Fei LTE community in this non-LTE network
The ratio of quantity (i.e. 5) be worth to the 4th value, and the 4th value is preset divided by 24(second
Time period) obtain the second terminal quantity, and by this first terminal quantity divided by the second terminal quantity
Obtain the 5th reference value, then this base station construction equipment according to this scene information by this first reference
Value, this second reference value, the 3rd reference value and the 4th reference value and the 5th reference value
Obtain the construction priority value of Gai Fei LTE community.
In a kind of possible implementation of the present invention, obtaining the first reference value, the second reference
After value, the 3rd reference value and the 4th reference value and the 5th reference value, base station construction equipment according to
Scene information determines that the first preset weights corresponding to this first reference value, this second reference value are corresponding
The second preset weights, the 3rd preset weights corresponding to the 3rd reference value and the 4th reference value
The 4th corresponding preset weights and the 5th preset weights corresponding to the 5th reference value.
Base station construction equipment is according to formula:
L=aY1+bY2+cY3+dY4+eY5
Obtain the construction priority value of Gai Fei LTE community;Wherein, L is building of Gai Fei LTE community
Setting priority value;A is this first preset weights;Y1It it is the first reference value;B be this second preset
Weights;Y2For this second reference value;C is the 3rd preset weights;Y3It it is the 3rd reference value;d
For the 4th preset weights;Y4It it is the 4th reference value;E is the 5th preset weights;Y5It is the 5th
Reference value.
Such as, following table provides preset weights and the corresponding relation of reference value under a kind of different scene,
It is merely illustrative, is not construed as limiting, as shown in the table:
Scene weights | a | b | c | d | e |
Campus | 30 | 30 | 15 | 15 | 10 |
Business district | 25 | 25 | 15 | 15 | 20 |
Shopping centre | 20 | 20 | 30 | 15 | 15 |
Residential block | 30 | 30 | 15 | 20 | 10 |
Villages and towns in rural areas | 30 | 30 | 15 | 15 | 10 |
So, the construction of non-LTE community can be calculated according to above table and formula preferential
Level value.
S104, base station construction equipment determine LTE base station to be built according to this construction priority value
Corresponding Fei LTE community.
Specifically, after the construction priority value obtaining Ge Fei LTE community, base station construction equipment
Corresponding non-of LTE base station to be built is determined according to this construction priority value order from high to low
LTE community, and built should the LTE base station of non-LTE community by base station construction personnel.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, obtains respectively according to above-mentioned formula
The construction priority of non-LTE community is respectively L1, L2, L3, L4 and L5, and L1 > L2 > L3 > L4 > L5,
The most preferentially build the LTE base station of community corresponding for L1.
It should be noted that the LTE building corresponding non-LTE community mentioned in the embodiment of the present invention
Base station, specifically refers to, and the coverage of the LTE base station of construction includes Gai Fei LTE community.
So, by the method using above-mentioned executive agent to be base station construction equipment, base station construction
Equipment, by the Accurate Analysis to telephone traffic and traffic information, reasonably selects preferentially to build LTE
The community of base station, to meet high bandwidth high-quality data traffic demand, thus reduces networking
Cost, improves the efficiency of networking.
The embodiment of the present invention provides a kind of base station construction equipment 20, as in figure 2 it is shown, this base station is built
If equipment 20 includes:
Acquiring unit 21, for obtaining telephone traffic and the traffic information of non-LTE community.
Specifically, base station construction equipment can (can in the embodiment of the present invention by non-LTE network
To be WCDMA network) in SGSN and GGSN between gn interface obtain this telephone traffic and industry
Business amount information, and obtained by the Iu-PS interface between RNC and SGSN in non-LTE network
This scene information, wherein, this scene information can be school, business district, shopping centre, resident
The area such as district or villages and towns in rural areas.
Processing unit 22, for determining the scene information of Gai Fei LTE community, believes according to this scene
It is little that this telephone traffic that breath is obtained by this acquiring unit 21 and this traffic information obtain this non-LTE
The construction priority value in district, and determine LTE base station pair to be built according to this construction priority value
Answer Fei LTE community.
Further, this acquiring unit 21 specifically for, obtain each non-LTE in non-LTE network
The community the first average traffic amount in the first unit interval section, and obtain in this non-LTE network
Total traffic in this first unit interval section.
This processing unit 22 specifically for, according to non-with this non-LTE network of this total traffic
The ratio of the quantity of LTE community is worth to the first value, and first is worth in this first unit according to this
The second average traffic amount in time period, second averagely talks about with this according to this first average traffic amount
The ratio of business amount is worth to the first reference value, according in this non-LTE network the of Ge Fei LTE community
One average traffic measures maximum average traffic amount, and according to this first average traffic amount with this
The ratio of big average traffic amount is worth to the second reference value, and according to this first reference value, this second
Reference value and this traffic information obtain the construction priority value of Gai Fei LTE community.
Wherein, this maximum average traffic amount is that the first of this Ge Fei LTE community obtained averagely is talked about
Maximum telephone traffic in business amount.
Specifically, base station construction equipment obtains each non-LTE community in the first preset time period
Telephone traffic, and be worth to each non-LTE according to this telephone traffic with the ratio of this first preset time period
The community the first average traffic amount in the first unit interval section, this base station construction equipment obtains should
Total traffic in the second preset time period in non-LTE network, and according to this total traffic with
In this non-LTE network, the ratio of the quantity of Fei LTE community is worth to the first value, and according to this
It is second flat that one value and the ratio of this second preset time period are worth in this first unit interval section
All telephone traffics, and be worth to according to the ratio of this first average traffic amount with this second average traffic amount
First reference value.
Further, this traffic information includes preset flow number of users, this preset flow user
Number is more than or equal to the use of predetermined threshold value for the service traffics used in the second unit interval section
The quantity at family;This acquiring unit specifically for, obtain first in this Ge Fei LTE community preset
Flow number of users, obtains the total preset flow number of users in this non-LTE network;
This processing unit 22 specifically for, according to this total preset flow number of users and this non-LTE net
In network, the ratio of the quantity of Fei LTE community is worth to the second value, and second is worth to according to this
The second preset flow number of users in this second unit interval section, uses according to this first preset flow
The ratio of amount and this second preset flow number of users is worth to the 3rd reference value, and according to this first
The construction that reference value, this second reference value and the 3rd reference value obtain Gai Fei LTE community is preferential
Level value.
Wherein, this preset flow number of users is the service traffics used in the second unit interval section
More than or equal to the quantity of the user of predetermined threshold value, e.g., this preset flow number of users can be
The quantity of the service traffics user more than 1MB is used in one hour;Illustratively, this base station
Construction machines can obtain the service traffics used in the first preset time period and be more than or equal to
The quantity of the user of predetermined threshold value, and be worth according to the ratio of this quantity with this first preset time period
To preset flow number of users.
Further, this traffic information also includes the service traffics of pre-set business;This acquisition
Unit specifically for, obtain this Ge Fei LTE community this pre-set business in the 3rd unit interval section
The first service traffics, obtain in this non-LTE network in the 3rd unit interval section that this is preset
Total service traffics of business, and according to these total service traffics and the non-LTE in this non-LTE network
The ratio of the quantity of community is worth to the 3rd value, and is worth to when three units according to the 3rd
Between the second service traffics in section, according to the ratio of these first service traffics with these the second service traffics
It is worth to the 4th reference value, and according to this first reference value, this second reference value, the 3rd ginseng
Examine value and the 4th reference value obtains the construction priority value of Gai Fei LTE community.
Wherein, this pre-set business can be video, FTP download and the contour band width service of mail, by
Relatively big in the bandwidth of these business demands, therefore it is more suitable for carrying in the lte networks.
It should be noted that this pre-set business can be stored in base station with the form of pre-set business table
In construction machines, base station construction equipment determines the business of needs acquisition according to this pre-set business table
Service traffics.
Specifically, base station construction equipment obtains each non-LTE community in the first preset time period
The service traffics of pre-set business, and first preset with this according to the service traffics of this pre-set business
The ratio of time period is worth to each non-LTE community pre-set business in the 3rd unit interval section
First service traffics, this base station construction equipment obtains in this non-LTE network at the second Preset Time
Total service traffics of the pre-set business in Duan, and according to these total service traffics and this non-LTE network
The ratio of the quantity of middle Fei LTE community is worth to the 3rd value, and according to the 3rd value with this second
The ratio of preset time period is worth to the second business of the pre-set business in the 3rd unit interval section
Flow, this base station construction equipment is according to the ratio of these first service traffics Yu these the second service traffics
Obtain the 4th reference value, then this base station construction equipment is according to this first reference value, this second reference
Value, the 3rd reference value and the 4th reference value obtain the construction priority value of Gai Fei LTE community.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, and base station construction equipment obtains every
The service traffics of Ge Fei LTE community pre-set business in 24 hours (the first preset time period),
And by the service traffics of this pre-set business divided by 24(the first preset time period) obtain each non-LTE
Community is in the first service traffics of each hour interior pre-set business, and this base station construction equipment obtains
Total business of the pre-set business in 24 hours (the second preset time period) in this non-LTE network
Flow, and by these total service traffics divided by the quantity of Fei LTE community in this non-LTE network (i.e.
5) the 3rd value is obtained, and by the 3rd value divided by 24(the second preset time period) obtain the least
Second service traffics of the pre-set business time in, this base station construction equipment is according to this first Business Stream
Measure and be worth to the 4th reference value with the ratio of these the second service traffics, then this base station construction equipment according to
This first reference value, this second reference value, the 3rd reference value and the 4th reference value are somebody's turn to do
The construction priority value of non-LTE community.
Alternatively, this acquiring unit 21 is additionally operable to, and reason unit 22 is according to this first ginseng in this place
Examining value, this second reference value, the 3rd reference value and the 4th reference value, to obtain this non-LTE little
Before the construction priority value in district, obtain this Ge Fei LTE community corresponding in the 4th unit interval section
Preset the first terminal quantity of terminal type, and obtain in this non-LTE network in the 4th unit
To presetting total terminal quantity of terminal type in time period, and according to this total terminal quantity with
In this non-LTE network, the ratio of the quantity of Fei LTE community is worth to the 4th value, and according to this
Four are worth to the second terminal quantity in the 4th unit interval section.
This processing unit 22 is additionally operable to, according to this first terminal quantity and this second terminal quantity
Than being worth to the 5th reference value, and according to this scene information by this first reference value, this second
Reference value, the 3rd reference value and the 4th reference value and the 5th reference value obtain this non-LTE
The construction priority value of community.
Wherein, this terminal type can be that the brand of terminal or model are (if market price is 3000
The terminal that unit is above), base station construction equipment can be by obtaining terminal according to default terminal type
Identification information obtain brand or the model of this terminal, illustratively, this default terminal type can
Being stored in this base station construction equipment with the form with default terminal type table, this base station construction sets
The standby quantity determining the terminal needing acquisition according to this default terminal type table.
It should be noted that after the terminal of user's use powers on (such as mobile phone power-on), terminal
The identification information of this terminal can be sent to base station construction equipment, then this base station construction equipment according to
The identification information of this terminal obtains brand or the model of this terminal, it addition, when user is by being somebody's turn to do
When terminal Fei LTE community uses service traffics, this base station construction equipment also can get this end
The brand of end or model, therefore, base station construction equipment is by obtaining in preset time period
The quantity presetting terminal type obtains the 5th reference value.
Specifically, base station construction equipment acquisition Ge Fei LTE community is right in the first preset time period
The terminal quantity of terminal type should be preset, and according to this terminal quantity and this first preset time period
Ratio be worth to first terminal quantity, base station construction equipment obtains in this non-LTE network second
To presetting total terminal quantity of terminal type in preset time period, and according to this total number of terminals
Amount and the ratio of the quantity of Fei LTE community in this non-LTE network are worth to the 4th value, and according to
The ratio of the 4th value and this second preset time period is worth to the second terminal quantity, and according to this
One terminal quantity and this second terminal quantity obtain the 5th reference value, then this base station construction equipment root
And it is somebody's turn to do by this first reference value, this second reference value, the 3rd reference value according to this scene information
4th reference value and the 5th reference value obtain the construction priority value of Gai Fei LTE community.
Such as, this non-LTE network includes 5 Ge Fei LTE communities, and base station construction equipment obtains each
Non-LTE community is the corresponding terminal presetting terminal type in 24 hours (the first preset time period)
Quantity, and this terminal quantity is obtained first terminal quantity divided by 24, base station construction equipment obtains
To presetting terminal type in 24 hours (the second preset time period) in this non-LTE network
Total terminal quantity, and by this total terminal quantity divided by Fei LTE community in this non-LTE network
The ratio of quantity (i.e. 5) be worth to the 4th value, and the 4th value is preset divided by 24(second
Time period) obtain the second terminal quantity, and by this first terminal quantity divided by the second terminal quantity
Obtain the 5th reference value, then this base station construction equipment according to this scene information by this first reference
Value, this second reference value, the 3rd reference value and the 4th reference value and the 5th reference value
Obtain the construction priority value of Gai Fei LTE community.
Further, this processing unit 22 specifically for, according to this scene information determine this first
Second preset weights corresponding to the first preset weights corresponding to reference value, this second reference value, should
The 4th preset weights that 3rd preset weights corresponding to the 3rd reference value is corresponding with the 4th reference value
And the 5th the 5th preset weights corresponding to reference value;
According to formula:
L=aY1+bY2+cY3+dY4+eY5
Obtain the construction priority value of Gai Fei LTE community;Wherein, L is building of Gai Fei LTE community
Setting priority value;A is this first preset weights;Y1It it is the first reference value;B be this second preset
Weights;Y2For this second reference value;C is the 3rd preset weights;Y3It it is the 3rd reference value;d
For the 4th preset weights;Y4It it is the 4th reference value;E is the 5th preset weights;Y5It is the 5th
Reference value, and determine LTE base to be built according to this construction priority value order from high to low
Correspondence of standing Fei LTE community.
Affiliated those skilled in the art is it can be understood that arrive, for convenience and simplicity of description,
The specific works process of the base station construction equipment of foregoing description and description, be referred to preceding method
Corresponding process in embodiment, does not repeats them here.
By using above-mentioned base station construction equipment, this base station construction equipment is by telephone traffic and industry
The Accurate Analysis of business amount information, reasonably selects the preferential community building LTE base station, to meet
High bandwidth high-quality data traffic demand, thus reduce the cost of networking, improve the effect of networking
Rate.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is also
Being not limited to this, any those familiar with the art is at the technology model that the invention discloses
In enclosing, change can be readily occurred in or replace, all should contain within protection scope of the present invention.
Therefore, protection scope of the present invention should described be as the criterion with scope of the claims.
Claims (10)
1. the method for a base station construction, it is characterised in that including:
Obtain first in the first unit interval section of Ge Fei LTE community in non-LTE network averagely to talk about
Business amount;
Obtain the total traffic in described first unit interval section in described non-LTE network;
Obtain the traffic information of described non-LTE community;
Determine the scene information of described non-LTE community;According to described total traffic and described non-LTE
In network, the ratio of the quantity of Fei LTE community is worth to the first value, and is worth to according to described first
The second average traffic amount in described first unit interval section;
Ratio according to described first average traffic amount with described second average traffic amount is worth to the first ginseng
Examine value;
Measure maximum according to the first average traffic of Ge Fei LTE community in described non-LTE network to put down
All telephone traffics, wherein, described maximum average traffic amount is the of the described Ge Fei LTE community that obtains
Maximum telephone traffic in one average traffic amount;
Ratio according to described first average traffic amount with described maximum average traffic amount is worth to the second ginseng
Examine value;
Obtain described according to described first reference value, described second reference value and described traffic information
The construction priority value of non-LTE community;
Determine that LTE base station to be built is corresponding according to described construction priority value order from high to low
Fei LTE community.
Method the most according to claim 1, it is characterised in that described traffic information includes
Preset flow number of users, described preset flow number of users is the industry used in the second unit interval section
Business flow is more than or equal to the quantity of the user of predetermined threshold value;The described non-LTE community of described acquisition
Traffic information include:
Obtain the first preset flow number of users in described Ge Fei LTE community;
Obtain the total preset flow number of users in described non-LTE network;
Described obtain according to described first reference value, described second reference value and described traffic information
The construction priority value of described non-LTE community includes:
According to described total preset flow number of users and the number of Fei LTE community in described non-LTE network
The ratio of amount is worth to the second value, and is worth in described second unit interval section according to described second
The second preset flow number of users;
Ratio according to described first preset flow number of users with described second preset flow number of users is worth
To the 3rd reference value;
Obtain described according to described first reference value, described second reference value and described 3rd reference value
The construction priority value of non-LTE community.
Method the most according to claim 2, it is characterised in that described traffic information also wraps
Include the service traffics of pre-set business;The traffic information of the described non-LTE community of described acquisition also includes:
Obtain described Ge Fei LTE community first industry of described pre-set business in the 3rd unit interval section
Business flow;
Obtain in described non-LTE network the total of in described 3rd unit interval section described pre-set business
Service traffics;
Described obtain according to described first reference value, described second reference value and described 3rd reference value
The construction priority value of described non-LTE community also includes:
According to described total service traffics and the ratio of the quantity of Fei LTE community in described non-LTE network
It is worth to the 3rd value, and second be worth in described 3rd unit interval section according to the described 3rd
Service traffics;
Ratio according to described first service traffics with described second service traffics is worth to the 4th reference
Value;
According to described first reference value, described second reference value, described 3rd reference value and described
Four reference values obtain the construction priority value of described non-LTE community.
Method the most according to claim 3, it is characterised in that described according to described first
Reference value, described second reference value, described 3rd reference value and described 4th reference value obtain described
Before the construction priority value of non-LTE community, described method also includes:
Obtain that described Ge Fei LTE community is corresponding in the 4th unit interval section presets the of terminal type
One terminal quantity;
Obtain in described non-LTE network corresponding described default terminal in described 4th unit interval section
Total terminal quantity of type, and according to described total terminal quantity and the non-LTE in described non-LTE network
The ratio of the quantity of community is worth to the 4th value, and is worth in described 4th unit according to the described 4th
The second terminal quantity in time period;
Ratio according to described first terminal quantity with described second terminal quantity is worth to the 5th reference
Value;
Described according to described first reference value, described second reference value, described 3rd reference value and institute
State the 4th reference value to obtain the construction priority value of described non-LTE community and include:
According to described scene information by described first reference value, described second reference value, described
Three reference values and described 4th reference value and described 5th reference value obtain described non-LTE community
Build priority value.
Method the most according to claim 4, it is characterised in that described believe according to described scene
Breath is by described first reference value, described second reference value, described 3rd reference value and the described 4th
Reference value and described 5th reference value obtain the construction priority value of described non-LTE community and include:
The first preset weights corresponding to described first reference value, described is determined according to described scene information
The 3rd preset weights that second preset weights corresponding to the second reference value, described 3rd reference value are corresponding
Fourth preset weights corresponding with described 4th reference value and described 5th reference value corresponding the 5th
Preset weights;
According to formula:
L=aY1+bY2+cY3+dY4+eY5
Obtain the construction priority value of described non-LTE community;Wherein, L is described non-LTE community
Build priority value;A is described first preset weights;Y1It it is the first reference value;B is described second
Preset weights;Y2For described second reference value;C is described 3rd preset weights;Y3It it is the 3rd reference
Value;D is described 4th preset weights;Y4It it is the 4th reference value;E is described 5th preset weights;
Y5It it is the 5th reference value.
6. a base station construction equipment, it is characterised in that including:
Acquiring unit, is used for obtaining in non-LTE network Ge Fei LTE community in the first unit interval section
In the first average traffic amount, obtain in described non-LTE network in described first unit interval section
Total traffic, and obtain the traffic information of described non-LTE community;
Processing unit, for determining the scene information of described non-LTE community, according to described total traffic
Amount and the ratio of the quantity of Fei LTE community in described non-LTE network are worth to the first value, and according to
Described first is worth to the second average traffic amount in described first unit interval section, according to described
First average traffic amount is worth to the first reference value, according to institute with the ratio of described second average traffic amount
State the first average traffic of Ge Fei LTE community in non-LTE network and measure maximum average traffic amount,
And it is worth to the second reference according to the ratio of described first average traffic amount with described maximum average traffic amount
Value, and obtain institute according to described first reference value, described second reference value and described traffic information
The construction priority value of Shu Fei LTE community, and according to described construction priority value from high to low suitable
Sequence determines LTE base station correspondence Fei LTE community to be built, wherein, described maximum average traffic
Amount is the maximum telephone traffic in the first average traffic amount of the described Ge Fei LTE community obtained.
Equipment the most according to claim 6, it is characterised in that described traffic information includes
Preset flow number of users, described preset flow number of users is the industry used in the second unit interval section
Business flow is more than or equal to the quantity of the user of predetermined threshold value;Described acquiring unit specifically for,
Obtain the first preset flow number of users in described Ge Fei LTE community, obtain described non-LTE network
In total preset flow number of users;
Described processing unit specifically for, according to described total preset flow number of users and described non-LTE
In network, the ratio of the quantity of Fei LTE community is worth to the second value, and is worth to according to described second
The second preset flow number of users in described second unit interval section, presets stream according to described first
Amount number of users is worth to the 3rd reference value with the ratio of described second preset flow number of users, and according to institute
State the first reference value, described second reference value and described 3rd reference value and obtain described non-LTE community
Construction priority value.
Equipment the most according to claim 7, it is characterised in that described traffic information also wraps
Include the service traffics of pre-set business;Described acquiring unit specifically for, obtain described each non-LTE little
District is the first service traffics of described pre-set business in the 3rd unit interval section, obtain described non-LTE
Total service traffics of described pre-set business, described process in described 3rd unit interval section in network
Unit is specifically for according to described total service traffics and Fei LTE community in described non-LTE network
The ratio of quantity is worth to the 3rd value, and is worth in described 3rd unit interval section according to the described 3rd
The second interior service traffics, according to the ratio of described first service traffics Yu described second service traffics
Obtain the 4th reference value, and according to described first reference value, described second reference value, the described 3rd
Reference value and described 4th reference value obtain the construction priority value of described non-LTE community.
Equipment the most according to claim 8, it is characterised in that described acquiring unit is additionally operable to,
At described processing unit according to described first reference value, described second reference value, described 3rd reference
Before value and described 4th reference value obtain the construction priority value of described non-LTE community, obtain described
Ge Fei LTE community is the corresponding first terminal quantity presetting terminal type in the 4th unit interval section,
And obtain in described non-LTE network corresponding described default terminal class in described 4th unit interval section
Total terminal quantity of type, described processing unit is specifically for non-with described according to described total terminal quantity
In LTE network, the ratio of the quantity of Fei LTE community is worth to the 4th value, and is worth according to the described 4th
To the second terminal quantity in described 4th unit interval section;
Described processing unit is additionally operable to, according to described first terminal quantity and described second terminal quantity
Ratio be worth to the 5th reference value, and according to described scene information by described first reference value, institute
State the second reference value, described 3rd reference value and described 4th reference value and described 5th reference value
Obtain the construction priority value of described non-LTE community.
Equipment the most according to claim 9, it is characterised in that described processing unit is concrete
For, determine the first preset weights corresponding to described first reference value, institute according to described scene information
State the second preset weights corresponding to the second reference value, described 3rd reference value corresponding the 3rd preset power
Be worth fourth preset weights corresponding with described 4th reference value and described 5th reference value corresponding the
Five preset weights;
According to formula:
L=aY1+bY2+cY3+dY4+eY5
Obtain the construction priority value of described non-LTE community;Wherein, L is described non-LTE community
Build priority value;A is described first preset weights;Y1It it is the first reference value;B is described second
Preset weights;Y2For described second reference value;C is described 3rd preset weights;Y3It it is the 3rd reference
Value;D is described 4th preset weights;Y4It it is the 4th reference value;E is described 5th preset weights;
Y5It is the 5th reference value, and determines according to described construction priority value order from high to low and wait to build
LTE base station correspondence Fei LTE community.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310632731.3A CN103607721B (en) | 2013-12-02 | 2013-12-02 | A kind of method and apparatus of base station construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310632731.3A CN103607721B (en) | 2013-12-02 | 2013-12-02 | A kind of method and apparatus of base station construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103607721A CN103607721A (en) | 2014-02-26 |
CN103607721B true CN103607721B (en) | 2016-08-17 |
Family
ID=50125917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310632731.3A Active CN103607721B (en) | 2013-12-02 | 2013-12-02 | A kind of method and apparatus of base station construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103607721B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104486769B (en) * | 2014-12-03 | 2018-04-10 | 中国联合网络通信集团有限公司 | A kind of choosing method and device for being worth cell |
CN104486770B (en) * | 2014-12-04 | 2018-10-19 | 中国联合网络通信集团有限公司 | A kind of selection method and device of long-term evolving network cell to be disposed |
CN104581744B (en) * | 2015-01-27 | 2019-04-12 | 中国联合网络通信集团有限公司 | A kind of method and device for realizing the network planning |
CN105554798B (en) * | 2015-12-07 | 2018-12-28 | 中国联合网络通信集团有限公司 | A kind of base station priorities determine method and priority determining device |
CN105978714B (en) * | 2016-05-09 | 2019-04-09 | 中国联合网络通信集团有限公司 | The expansion planning method and expansion planning system of Internet data center |
CN108200599A (en) * | 2018-03-29 | 2018-06-22 | 中国联合网络通信集团有限公司 | The efficiency evaluation method, apparatus and network system of a kind of base station |
CN109041070B (en) * | 2018-07-26 | 2021-08-24 | 南京华苏科技有限公司 | Communication network planning method and device based on web crawler |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1913694A (en) * | 2005-08-10 | 2007-02-14 | 中兴通讯股份有限公司 | Network planning method for supporting high speed downlink packet access service in WCDMA system |
CN101150836A (en) * | 2007-11-06 | 2008-03-26 | 中国移动通信集团江苏有限公司 | Radio precise planning analog and testing system and method |
CN103347261A (en) * | 2013-07-01 | 2013-10-09 | 广东省电信规划设计院有限公司 | Networking method and device for determining deployment of LTE network based on CDMA network data |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1938636B1 (en) * | 2005-09-30 | 2014-07-30 | Telecom Italia S.p.A. | Method for planning a cellular mobile telecommunications network |
-
2013
- 2013-12-02 CN CN201310632731.3A patent/CN103607721B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1913694A (en) * | 2005-08-10 | 2007-02-14 | 中兴通讯股份有限公司 | Network planning method for supporting high speed downlink packet access service in WCDMA system |
CN101150836A (en) * | 2007-11-06 | 2008-03-26 | 中国移动通信集团江苏有限公司 | Radio precise planning analog and testing system and method |
CN103347261A (en) * | 2013-07-01 | 2013-10-09 | 广东省电信规划设计院有限公司 | Networking method and device for determining deployment of LTE network based on CDMA network data |
Non-Patent Citations (2)
Title |
---|
LTE技术演进及网络部署浅析;仪鲁男等;《电信网技术》;20110715(第7期);全文 * |
Traffic Allocation Scheme with Cooperation of Multiple RANs in Universal Wireless Environments;Lv Zhaobiao et al.;《中国通信》;20120415;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN103607721A (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103607721B (en) | A kind of method and apparatus of base station construction | |
Clarke | Expanding mobile wireless capacity: The challenges presented by technology and economics | |
CN101951685B (en) | Method and device for providing differentiated service for UE (User Equipment) | |
Checko et al. | Optimizing small cell deployment by the use of C-RANs | |
CN103814596B (en) | Transmit the methods, devices and systems of data | |
CN104811919B (en) | A kind of network parameter acquisition methods, device and equipment | |
CN104883242B (en) | The sending method and system of a kind of access point, website, beacon frame | |
CN106877993A (en) | A kind of collocation method and device | |
CN101558606A (en) | Method and apparatus of prioritizing services of wireless local area network | |
CN104581743B (en) | A kind of method and device for realizing WLAN deployment | |
CN103249112A (en) | User access control method and device, and route | |
CN104902431A (en) | Cross-cell D2D communication spectrum distributing method in LTE network | |
CN101753234A (en) | Method for allocating frequency spectrum resources based on honest cooperation in composite cognitive radio network | |
CN104244331B (en) | Data distribution processing method and processing device | |
CN110769469B (en) | Resource allocation method and base station | |
CN105530650B (en) | A kind of method and device of network resource planning | |
EP2482600A1 (en) | Method and device for allocating channels, method for allocating base station available resources | |
CN105517002B (en) | A kind of AF panel and energy-efficient Cellular Networks relay station dispositions method | |
CN105517000B (en) | A kind of method and device of cell splitting | |
CN104581744B (en) | A kind of method and device for realizing the network planning | |
CN112738813B (en) | Network construction evaluation method and device | |
CN103582005B (en) | A kind of method and apparatus carrying out traffic assignments between network | |
CN102271410B (en) | Method and device for providing differentiated services for UE (User Equipment) | |
CN103079275A (en) | Multiple knapsack problem-based aggregated spectrum allocation method | |
CN106535222A (en) | Method and apparatus for automatically generating regulation schemes for base station baseband processing board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |