CN103575108A - Method for rapidly replacing trolleys in sintering machine online - Google Patents

Method for rapidly replacing trolleys in sintering machine online Download PDF

Info

Publication number
CN103575108A
CN103575108A CN201310530806.7A CN201310530806A CN103575108A CN 103575108 A CN103575108 A CN 103575108A CN 201310530806 A CN201310530806 A CN 201310530806A CN 103575108 A CN103575108 A CN 103575108A
Authority
CN
China
Prior art keywords
chassis
sintering machine
bellows
need
trolleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310530806.7A
Other languages
Chinese (zh)
Other versions
CN103575108B (en
Inventor
张立强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN201310530806.7A priority Critical patent/CN103575108B/en
Publication of CN103575108A publication Critical patent/CN103575108A/en
Application granted granted Critical
Publication of CN103575108B publication Critical patent/CN103575108B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a method for rapidly replacing trolleys in a sintering machine online. The method comprises the steps as follows: step one, determining that the number of the to-be-replaced trolleys is 1 to 3, and controlling a mixture in a mixture bin within 10%-20% of a bin space; step two, intermittently starting and stopping a discharge device until the thickness of cloth in the to-be-replaced trolleys is in a range of 180-210mm; step three, when the to-be-replaced trolleys move to be right above a fourth bellow from the tail of the sintering machine, adjusting the opening of an air door of a main exhaust fan to be in a range of 15%-20%; step four, enabling the to-be-replaced trolleys to break away from a running track of the sintering machine through manual operation, and placing standby trolleys in positions of the to-be-replaced trolleys; and step five, adjusting the temperature in a hearth of an ignition device to be at 1100-1250 DEG C, and recovering the normal production of the sintering machine when both temperatures in the second and third bellows from the tail of the sintering machine reach above 280 DEG C. According to the method, the rapid and online replacement of the trolleys in the sintering machine is realized, and the production efficiency is improved.

Description

A kind of method of sintering machine fast online replacement chassis
Technical field
The present invention relates to the raw material sintering art in metallurgical ironmaking, relate in particular to a kind of method of sintering machine fast online replacement chassis.
Background technology
Sintering pallet is used in the raw material sintering system of iron industry, and a sintering machine is joined end to end and formed chain by the identical chassis of a lot of platforms, does the oval-shaped circular flow of closing on sintering pallet orbit.Sintering pallet moves to tail along top orbit from sintering device handpiece loads sintering raw mix igniting by platform, sintering raw mix carries out forward the sintering of raw material in running at chassis, sintering pallet is tumbled along the circumference of orbit after tail, successively by the sintering finished equipment that is poured into subsequent processing, having toppled over sintering finished empty chassis continues to turn back to successively sintering device handpiece along bottom orbit, circumference along head orbit is turned to head top orbit, the empty chassis returning after the orbit of top carries out the loading of raw materials for sintering again by platform, uninterruptedly loop successively the SINTERING PRODUCTION of iron-smelting raw material.Under the production status that sintering pallet moves continuously in high temperature, high load capacity, the batch turning of tumbling etc. for a long time, often can cause chassis to damage and fault, at this moment just need to use standby chassis to change.
Domestic present main flow is produced sintering deposit method and is completed by sintering machine; the main part of sintering machine is sintering pallet; because sintering pallet has many consumable accessorys; such as sintering machine fire bars, thermal insulation barriers and chassis wheel hub etc.; changing under normal circumstances chassis needs the slow material of sintering to shut down, could change sintering pallet, and through understanding analysis and adding up, current domestic SINTERING PRODUCTION factory changes the time substantially about about 30 minutes; the replacing time is long, to production, brings massive losses.
Summary of the invention
Technical problem to be solved by this invention is the shortcoming that overcomes prior art, a kind of method of sintering machine fast online replacement chassis is provided, and the method has realized the online replacing to chassis in sintering machine fast, simple, fast, whole Renewal process only needs complete for 6 minutes.
In order to solve the problems of the technologies described above, the invention provides a kind of method of sintering machine fast online replacement chassis, this sintering machine is that level is installed, sintering machine is provided with orbit, orbit is provided with the chassis of continuous installation, sintering machine below is provided with bellows, bellows are connected with main exhauster by large flue, top, sintering device handpiece one end is provided with feed opening, sintering machine feed opening is provided with igniter along sintering machine traffic direction, in igniter, be provided with burner hearth, feed opening top is provided with discharging device, discharging device is connected with blending bunker, the method is specifically carried out according to the following steps:
Step 1: first determine that needing the quantity of replacing chassis is 1-3 platform, and must be adjacent chassis, control the 10%-20% that the compound in blending bunker is position in storehouse;
Step 2: when need replacing chassis is 10-20cm apart from feed opening horizontal range, being interrupted start and stop discharging device, being start-up time and interval time 10-20 second, is 180-210mm until need the thickness of cloth in replacing chassis;
Step 3: when need are changed trolley movement to directly over the bellows of fourth from the last from rear of sintering machine time, main exhauster throttle opening is adjusted to 15%-20%, standby chassis is winched to rear of sintering machine and play position between a fourth from the last bellows and the 5th bellows reciprocal, when need, change when trolley movement rises between second and the 3rd bellows to rear of sintering machine and stop sintering machine, by the empty coal of point of adjustment fire gas than the temperature in reduction igniter burner hearth to 600-700 ℃;
Step 4: it is separated with orbit that manual operation need be changed chassis, hang out and need replacing chassis to be placed in by standby chassis, and standby chassis is put into the former chassis position that needs to change, the cloth that need are changed in chassis is discharged on described standby chassis, and need replacing chassis is hung to standby place to be repaired;
Step 5: the temperature in the burner hearth having than raising igniter by the empty coal of point of adjustment fire gas is to 1100-1250 ℃, starting sintering machine and controlling the chassis speed of service is 1.5-1.75m/min, main exhauster throttle opening is adjusted to 70%-90%, when the temperature in rear of sintering machine plays penultimate and the 3rd bellows all reaches more than 280 ℃, the chassis speed of service is adjusted to 1.75-2.15m/min, thereby returns to normal production fast.
The present invention compared with prior art tool has the following advantages:
The technical program is simple to operate, and in changing chassis, whole process completed in 6 minutes, higher than existing method efficiency, faster, greatly shortened the replacing time, reduced cost, improved production efficiency, stability is better, and security is higher, increases the competitiveness of enterprise.
The specific embodiment
Below the present invention is described in further detail:
embodiment 1
The method of a kind of sintering machine fast online replacement chassis that the present embodiment provides, this sintering machine is that level is installed, sintering machine is provided with orbit, orbit is provided with the chassis of continuous installation, sintering machine below is provided with bellows, bellows are connected with main exhauster by large flue, top, sintering device handpiece one end is provided with feed opening, sintering machine feed opening is provided with igniter along sintering machine traffic direction, in igniter, be provided with burner hearth, feed opening top is provided with discharging device, and discharging device is connected with blending bunker, and the method is specifically carried out according to the following steps:
Step 1: the quantity of first determine to need changing chassis is 1, to control compound in blending bunker be position in storehouse 20%.
Step 2: when need replacing chassis is 20cm apart from feed opening horizontal range, discharging device stops after blowing 10s, starting discharging device 12s, is stopping discharging device 10s, is 180mm until need the thickness of cloth in replacing chassis.
Step 3: when need are changed trolley movement to directly over the bellows of fourth from the last from rear of sintering machine time, main exhauster throttle opening is adjusted to 20%, standby chassis is winched to rear of sintering machine and play position between a fourth from the last bellows and the 5th bellows reciprocal, when rising between second and the 3rd bellows to rear of sintering machine, need replacing trolley movement stops sintering machine, by the empty coal of point of adjustment fire gas, than the temperature to 700 ℃ reducing in igniter burner hearth, avoid excess Temperature to damage chassis.
Step 4: it is separated with guide rail that manual operation need be changed chassis, hang out and need replacing chassis to be placed in by standby chassis, and standby chassis is put into the former chassis position that needs to change, the cloth that need are changed in chassis is discharged on standby chassis, and need replacing chassis is hung to standby place to be repaired.
Step 5: the temperature to 1100 ℃ in the burner hearth having than raising igniter by the empty coal of point of adjustment fire gas, starting sintering machine and controlling the chassis speed of service is 1.5m/min, main exhauster throttle opening is adjusted to 70%, when the temperature in rear of sintering machine plays penultimate and the 3rd bellows all reaches more than 280 ℃, the chassis speed of service is adjusted to 1.75m/min, thereby return to normal production fast, 4 minutes whole Renewal process used times.
embodiment 2
The method of a kind of sintering machine fast online replacement chassis that the present embodiment provides, this sintering machine is that level is installed, sintering machine is provided with orbit, orbit is provided with the chassis of continuous installation, sintering machine below is provided with bellows, bellows are connected with main exhauster by large flue, top, sintering device handpiece one end is provided with feed opening, sintering machine feed opening is provided with igniter along sintering machine traffic direction, in igniter, be provided with burner hearth, feed opening top is provided with discharging device, and discharging device is connected with blending bunker, and the method is specifically carried out according to the following steps:
Step 1: the quantity of first determine to need changing chassis is 2, and need to change 2 that chassis is continuous adjacent, to control compound in blending bunker be position in storehouse 15%.
Step 2: when need replacing chassis is 15cm apart from feed opening horizontal range, discharging device stops after blowing 15s, starting discharging device 15s, is stopping discharging device 15s, until the thickness of cloth is 200mm in two chassis that need to change.
Step 3: when need are changed trolley movement to directly over the bellows of fourth from the last from rear of sintering machine time, main exhauster throttle opening is adjusted to 15%, standby chassis is winched to rear of sintering machine and play position between a fourth from the last bellows and the 5th bellows reciprocal, when rising between second and the 3rd bellows to rear of sintering machine, need replacing trolley movement stops sintering machine, by the empty coal of point of adjustment fire gas, than the temperature to 650 ℃ reducing in igniter burner hearth, avoid excess Temperature to damage chassis.
Step 4: it is separated with guide rail that manual operation need be changed chassis, hang out and need replacing chassis to be placed in by standby chassis, and standby chassis is put into the former chassis position that needs to change successively, the cloth that need are changed in chassis is discharged on standby chassis, and need replacing chassis is hung to standby place to be repaired.
Step 5: the temperature to 1180 ℃ in the burner hearth having than raising igniter by the empty coal of point of adjustment fire gas, starting sintering machine and controlling the chassis speed of service is 1.65m/min, main exhauster throttle opening is adjusted to 80%, when the temperature in rear of sintering machine plays penultimate and the 3rd bellows all reaches more than 280 ℃, the chassis speed of service is adjusted to 1.85m/min, thereby return to normal production fast, 5 minutes whole Renewal process used times.
embodiment 3
The method of a kind of sintering machine fast online replacement chassis that the present embodiment provides, this sintering machine is that level is installed, sintering machine is provided with orbit, orbit is provided with the chassis of continuous installation, sintering machine below is provided with bellows, bellows are connected with main exhauster by large flue, top, sintering device handpiece one end is provided with feed opening, sintering machine feed opening is provided with igniter along sintering machine traffic direction, in igniter, be provided with burner hearth, feed opening top is provided with discharging device, and discharging device is connected with blending bunker, and the method is specifically carried out according to the following steps:
Step 1: the quantity of first determine to need changing chassis is 3, and need to change 3 that chassis is continuous adjacent, to control compound in blending bunker be position in storehouse 10%.
Step 2: when need replacing chassis is 10cm apart from feed opening horizontal range, discharging device stops after blowing 10s, starting discharging device 20s, is stopping discharging device 10s, starting discharging device 15s, until the thickness of cloth is 210mm in three chassis that need to change.
Step 3: when need are changed trolley movement to directly over the bellows of fourth from the last from rear of sintering machine time, main exhauster throttle opening is adjusted to 18%, standby chassis is winched to rear of sintering machine and play position between a fourth from the last bellows and the 5th bellows reciprocal, when rising between second and the 3rd bellows to rear of sintering machine, need replacing trolley movement stops sintering machine, by the empty coal of point of adjustment fire gas, than the temperature to 600 ℃ reducing in igniter burner hearth, avoid excess Temperature to damage chassis.
Step 4: it is separated with guide rail that manual operation need be changed chassis, hang out and need replacing chassis to be placed in by standby chassis, and standby chassis is put into the former chassis position that needs to change successively, the cloth that need are changed in chassis is discharged on standby chassis, and need replacing chassis is hung to standby place to be repaired.
Step 5: the temperature to 1200 ℃ in the burner hearth having than raising igniter by the empty coal of point of adjustment fire gas, starting sintering machine and controlling the chassis speed of service is 1.75m/min, main exhauster throttle opening is adjusted to 75%, when the temperature in rear of sintering machine plays penultimate and the 3rd bellows all reaches more than 280 ℃, the chassis speed of service is adjusted to 2.05m/min, thereby return to normal production fast, 6 minutes whole Renewal process used times
Like this, avoided changing in production process the time waste of chassis, whole process operation is simple, in changing chassis, whole process completed in 6 minutes, higher, faster than existing method efficiency, greatly shortened the replacing time, reduced cost, improved production efficiency, stability is better, security is higher, increases the competitiveness of enterprise.
Above embodiment only, for explanation technological thought of the present invention, can not limit protection scope of the present invention with this, every technological thought proposing according to the present invention, and any change of doing on technical scheme basis, within all falling into protection domain of the present invention.

Claims (1)

1. the method for a sintering machine fast online replacement chassis, this sintering machine is that level is installed, described sintering machine is provided with orbit, described orbit is provided with the chassis of continuous installation, described sintering machine below is provided with bellows, described bellows are connected with main exhauster by large flue, top, described sintering device handpiece one end is provided with feed opening, described sintering machine feed opening is provided with igniter along sintering machine traffic direction, in described igniter, be provided with burner hearth, described feed opening top is provided with discharging device, described discharging device is connected with blending bunker, it is characterized in that: the method is specifically carried out according to the following steps:
Step 1: first determine that needing the quantity of replacing chassis is 1-3 platform, and must be adjacent chassis, control the 10%-20% that the compound in blending bunker is position in storehouse;
Step 2: when need changing chassis and being 10-20cm apart from feed opening horizontal range, being interrupted start and stop discharging device when described, being start-up time and interval time 10-20 second, is 180-210mm until need to change the thickness of cloth in chassis;
Step 3: when the described trolley movement of need changing is to directly over the bellows of fourth from the last from rear of sintering machine time, main exhauster throttle opening is adjusted to 15%-20%, standby chassis is winched to rear of sintering machine and play position between a fourth from the last bellows and the 5th bellows reciprocal, when need, change when trolley movement rises between second and the 3rd bellows to rear of sintering machine and stop sintering machine, by the empty coal of point of adjustment fire gas than the temperature in reduction igniter burner hearth to 600-700 ℃;
Step 4: it is separated with orbit that manual operation need be changed chassis, hang out and need replacing chassis to be placed in by standby chassis, and standby chassis is put into the former chassis position that needs to change, the cloth that need are changed in chassis is discharged on described standby chassis, and need replacing chassis is hung to standby place to be repaired;
Step 5: the temperature in the burner hearth having than raising igniter by the empty coal of point of adjustment fire gas is to 1100-1250 ℃, starting sintering machine and controlling the chassis speed of service is 1.5-1.75m/min, main exhauster throttle opening is adjusted to 70%-90%, when the temperature in rear of sintering machine plays penultimate and the 3rd bellows all reaches more than 280 ℃, the chassis speed of service is adjusted to 1.75-2.15m/min, thereby returns to normal production fast.
CN201310530806.7A 2013-11-01 2013-11-01 Method for rapidly replacing trolleys in sintering machine online Active CN103575108B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310530806.7A CN103575108B (en) 2013-11-01 2013-11-01 Method for rapidly replacing trolleys in sintering machine online

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310530806.7A CN103575108B (en) 2013-11-01 2013-11-01 Method for rapidly replacing trolleys in sintering machine online

Publications (2)

Publication Number Publication Date
CN103575108A true CN103575108A (en) 2014-02-12
CN103575108B CN103575108B (en) 2015-05-27

Family

ID=50047418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310530806.7A Active CN103575108B (en) 2013-11-01 2013-11-01 Method for rapidly replacing trolleys in sintering machine online

Country Status (1)

Country Link
CN (1) CN103575108B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105344420A (en) * 2015-11-20 2016-02-24 莱芜钢铁集团有限公司 Sintering machine and single-roll grid plate replacement assisting device thereof
CN105758183A (en) * 2016-02-29 2016-07-13 攀钢集团攀枝花钢钒有限公司 Online quick trolley changing method of sintering machine
CN106091694A (en) * 2016-06-22 2016-11-09 首钢京唐钢铁联合有限责任公司 A kind of device and method changing burning machine chassis
CN107782146A (en) * 2016-08-31 2018-03-09 鞍钢股份有限公司 A kind of method for changing sintering pallet
CN108870977A (en) * 2018-06-15 2018-11-23 首钢水城钢铁(集团)有限责任公司 A kind of trolley limiting device in metallurgy sintered technique

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2325358Y (en) * 1998-04-09 1999-06-23 唐小丽 Sintering machine bogie changing apparatus
JP2001323326A (en) * 2000-05-15 2001-11-22 Kobe Steel Ltd Sintering machine operating method
CN202008297U (en) * 2011-04-21 2011-10-12 宝山钢铁股份有限公司 Automatic positioning and control device for replacement of sintering machine trolleys
KR101142484B1 (en) * 2004-12-28 2012-05-07 주식회사 포스코 Sintering process device and method thereof
CN102706152A (en) * 2012-06-28 2012-10-03 中冶华天工程技术有限公司 Trolley replacing device of sintering machine in material carrying sate of trolley
CN103017545A (en) * 2012-12-24 2013-04-03 攀枝花钢城集团有限公司 Method for rapidly correcting deformation of annular cooling machine trolley

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2325358Y (en) * 1998-04-09 1999-06-23 唐小丽 Sintering machine bogie changing apparatus
JP2001323326A (en) * 2000-05-15 2001-11-22 Kobe Steel Ltd Sintering machine operating method
KR101142484B1 (en) * 2004-12-28 2012-05-07 주식회사 포스코 Sintering process device and method thereof
CN202008297U (en) * 2011-04-21 2011-10-12 宝山钢铁股份有限公司 Automatic positioning and control device for replacement of sintering machine trolleys
CN102706152A (en) * 2012-06-28 2012-10-03 中冶华天工程技术有限公司 Trolley replacing device of sintering machine in material carrying sate of trolley
CN103017545A (en) * 2012-12-24 2013-04-03 攀枝花钢城集团有限公司 Method for rapidly correcting deformation of annular cooling machine trolley

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105344420A (en) * 2015-11-20 2016-02-24 莱芜钢铁集团有限公司 Sintering machine and single-roll grid plate replacement assisting device thereof
CN105758183A (en) * 2016-02-29 2016-07-13 攀钢集团攀枝花钢钒有限公司 Online quick trolley changing method of sintering machine
CN105758183B (en) * 2016-02-29 2018-01-26 攀钢集团攀枝花钢钒有限公司 The method of sintering machine fast online replacement chassis
CN106091694A (en) * 2016-06-22 2016-11-09 首钢京唐钢铁联合有限责任公司 A kind of device and method changing burning machine chassis
CN106091694B (en) * 2016-06-22 2018-12-14 首钢京唐钢铁联合有限责任公司 A kind of device and method of replacement roasting machine trolley
CN107782146A (en) * 2016-08-31 2018-03-09 鞍钢股份有限公司 A kind of method for changing sintering pallet
CN108870977A (en) * 2018-06-15 2018-11-23 首钢水城钢铁(集团)有限责任公司 A kind of trolley limiting device in metallurgy sintered technique

Also Published As

Publication number Publication date
CN103575108B (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN103575108B (en) Method for rapidly replacing trolleys in sintering machine online
CN102146510B (en) Roasting method for controlling ring formation of rotary kiln
CN102121786A (en) Hot air system of grate-rotary kiln-circular cooler
CN103484587B (en) Method for replacing cooling wall of blast furnace with material
CN102935547A (en) System for removing slab burrs
CN201926303U (en) Sintering machine with sintered clinker crushing device
CN202717313U (en) Automatic cooling system for high-temperature conveying belt
CN104388626B (en) The control method of the injection flow rate of vapotron in converter extracting vanadium dry-dedusting system
CN203054544U (en) Electrical control system of glass tempering furnace
CN104651603A (en) Plane circulating belt type roasting machine
CN103805727B (en) A kind of method adopting bucket machine hot charging direct-reduced iron
CN105014174B (en) A kind of Full automatic feed electronic component seperator
CN103320150A (en) Coaling method for a coke oven vehicle
CN103776271A (en) Calcium carbide sensible heat recovery equipment for calcium carbide furnace
CN104289155A (en) Chain belt type granulator for rapid one-step molding of high temperature liquid calcium carbide
CN209065942U (en) A kind of converter scrap steel preheating conveying system
CN204255050U (en) A kind of control system of drying kiln
CN102134620A (en) Blast furnace shaft upper part rapid hot wet method for producing lining
CN103526025A (en) Iron alloy furnace burden production system
JP2017009163A (en) Particulate matter heat treatment device and heat treatment method for waste gypsum
CN1213636C (en) Electromagnetic induction rivet heater
CN201284353Y (en) Quenching launching mechanism for producing efficient precise steel pipe kiln
CN105252103A (en) Flame cutting device and method for track beam
CN203613242U (en) Iron alloy furnace burden production system
CN210142985U (en) Soft start system of mining conveyor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant