CN107782146A - A kind of method for changing sintering pallet - Google Patents
A kind of method for changing sintering pallet Download PDFInfo
- Publication number
- CN107782146A CN107782146A CN201610788721.2A CN201610788721A CN107782146A CN 107782146 A CN107782146 A CN 107782146A CN 201610788721 A CN201610788721 A CN 201610788721A CN 107782146 A CN107782146 A CN 107782146A
- Authority
- CN
- China
- Prior art keywords
- chassis
- defect
- sintering machine
- sintering
- spare unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B21/00—Open or uncovered sintering apparatus; Other heat-treatment apparatus of like construction
Abstract
A kind of method for changing sintering pallet, it is stand-by to sling standby chassis with 50t cranes;Treat that defect chassis is run to before igniter, gradually reduce mixture ore trough reserves at 1/6 1/3, when defect chassis reaches below mud roller distributing device, reduce the defect chassis bed of material at 1/4 1/2;It is stand-by that spare unit chassis is hoisted to hovering above the position of sintering machine table top tail the 4th bellows reciprocal;Defect chassis stops sintering machine operating when running to tail the 5th bellows reciprocal, and sintering machine has a power failure, and igniter gas flow is controlled in 90m3/h‑120m3/h;Standby chassis is put off on sintering machine table top, is hung out defect chassis and is fallen on sintering machine table top, spare unit chassis is put off on sintering machine track, on the sintering deposit on defect of tumbling chassis to spare unit chassis, progressively recovers sintering machine operating.The time for changing sintering pallet can shorten to 15 minutes by the present invention, effectively reduce sintering production process energy consumption.
Description
Technical field
The present invention relates to the sintering technology in steel and iron industry, more particularly to a kind of method for changing sintering pallet.
Background technology
In sintering machine operation process, sintering pallet can be because of reasons such as mechanical breakdowns, it is necessary to change online.Certain steel mill with
The used time is needed toward sintering pallet is changed 40 minutes or so, and sintering production is stagnated during this, reduces sintering deposit unit-hour output, and is showed
Field other equipment is also running well, and wastes energy consumption.
The content of the invention
It is an object of the invention to provide it is a kind of change sintering pallet method, can will change sintering pallet time
It shorten to 15 minutes, effectively reduces sintering production process energy consumption.
To achieve the above object, the present invention is realized using following technical scheme:
1st, a kind of method for changing sintering pallet, specific method are as follows:
1) spare unit chassis is selected, it is stand-by to sling standby chassis with crane;
2) defect chassis is found, tracks running position, before defect chassis runs to igniter, notifies master control room, by
Step reduce mixture ore trough reserves to the 1/6-1/3 of ore deposit groove controlling level locate, when defect chassis reach mud roller distributing device lower section when,
The defect chassis bed of material is reduced at the 1/4-1/2 of chassis controlling level;
3) spare unit chassis is hoisted to crane the position of sintering machine table top tail the 4th bellows reciprocal, in sintering board
Hovering is stand-by above face;
4) defect chassis stops sintering machine operating, together after igniter when running to tail the 5th bellows reciprocal
When, master control room closes main exhausting door, and sintering machine has a power failure, and igniter gas flow is controlled in 90m3/h-120m3/h;
5) rear of sintering machine rocker is opened in place, loosens sintering pallet gap;
6) standby chassis is put off on sintering machine table top, lifting steel cable decoupling device;
7) another group of lifting steel cable is suspended on defect chassis, lifting steel cable other end is hung on crane;
Above step 5,6,7 is carried out simultaneously;
8) defect chassis is hung out with crane, falls on sintering machine table top, pluck crane hook;Crane is hooked on spare unit chassis to hang
On steel loading rope, spare unit chassis is put off on sintering machine track, takes crane hook;
9) the side trolley wheel of defect chassis is sling with crane, on sintering deposit to the spare unit chassis on defect of tumbling chassis,
Lifting steel cable is hung on defect chassis four wheels, slings defect chassis;
10) mixture ore trough feeding, rear of sintering machine rocker return open main exhausting door, and gas for ignition flow recovers;
Step 9,10 are carried out simultaneously;
11) sintering machine operates, and changes chassis and terminates.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of method for changing sintering pallet, the time that change sintering pallet can be shorten to 15 minutes, effectively
Reduce sintering production process energy consumption.
Embodiment
Embodiments of the present invention are further illustrated with reference to specific embodiment:
1st, a kind of method for changing sintering pallet, it is characterised in that specific method is as follows:
1) spare unit chassis is selected, it is stand-by to sling standby chassis with 50t cranes.
2) defect chassis is found, running position is tracked, treats that defect chassis is run to before igniter, notifies master control room, by
Step reduce mixture ore trough reserves to the 1/6-1/3 of ore deposit groove controlling level locate, when defect chassis reach mud roller distributing device lower section when,
The defect chassis bed of material is reduced at the 1/4-1/2 of chassis controlling level.
The purpose for reducing mixture ore trough reserves is to prevent from changing swollen groove not blanking after chassis.
Reduce the defect chassis bed of material purpose be:First is the lifting weight for mitigating defect chassis, is conveniently replaceable chassis.The
Two can prevent the sintering deposit in chassis from can pollute pallet slideway.3rd when being that defect chassis is sling, and prevents inside chassis
Sintering deposit part is fallen into flue, blocks flue double beat valve.In addition, adjacent two pieces of chassis of defect chassis are also required to suitably reduce
At the bed of material to half.
3) spare unit chassis is hoisted to 50t cranes the position of sintering machine table top tail the 4th bellows reciprocal, in sintering machine
Hovering is stand-by above table top.
4) defect chassis stops sintering machine operating, together after igniter when running to tail the 5th bellows reciprocal
When, master control room closes main exhausting door, and sintering machine has a power failure, and igniter gas flow is controlled in 90m3/h-120m3/h。
5) rear of sintering machine rocker is opened in place, loosens sintering pallet gap.
6) standby chassis is put off on sintering machine table top, lifting steel cable decoupling device.
7) another group of lifting steel cable is suspended on defect chassis, lifting steel cable other end is hung on 50t cranes.
Above step 5,6,7 is carried out simultaneously, amounts to 5 minutes used times.
8) defect chassis is hung out with 50t cranes, falls on sintering machine table top, pluck crane hook;Crane is hooked on spare unit platform
On car lifting steel cable, spare unit chassis is put off on sintering machine track, takes crane hook;The step amounts to 4 minutes used times.
9) the side trolley wheel of defect chassis is sling with 50t cranes, the sintering deposit on defect of tumbling chassis to spare unit chassis
On, lifting steel cable is hung on defect chassis four wheels, slings defect chassis.
10) mixture ore trough feeding, rear of sintering machine rocker return open main exhausting door, and gas for ignition flow recovers.
Step 9,10 are carried out simultaneously, amount to 5 minutes used times.
11) sintering machine operates, and changes chassis and terminates.
Embodiment 1:
By taking certain ㎡ 1# sintering machine of West sintering work area of steel mill 328 as an example.
1) post finds to rock in tail 7# bellows position, 43# chassis the near front wheels, there is the possibility to drop, report master
Control room.
2) production determines to change 43# defect chassis.Spare unit chassis is selected, it is stand-by to sling standby chassis with 50t cranes.
3) 43# chassis running position is tracked, treats that 43# chassis is run to before igniter, progressively controls mixture ore trough material
Position to 30 tons (1/6th positions of ore deposit groove).
4) when 43# chassis is run to mud roller cloth, master control room reduces cloth doses, and it is 180mm to reduce the 43# chassis bed of material
Thickness (bed of material is down to a quarter opening position of chassis controlling level).Adjacent two pieces of chassis of defect chassis also reduce the bed of material extremely
360mm (bed of material is down to the half opening position of chassis controlling level).It is thick for 720mm that other chassis recover normal blanking thickness
Degree.
5) it is stand-by spare unit chassis to be transported to 50t cranes hovering above the sintering pallet of 9# bellows position.
6) when 43# chassis is run to 8# bellows positions, master control room stops sintering machine, closes main exhausting door, gas for ignition flow
100m/h is down to, tail rocker is opened in place, and raw material system stops feeding, and spare unit chassis is put off on sintering machine table top.
7) 43# chassis is sling with 50t cranes, put off on sintering machine table top, sling spare unit chassis and put off in sintering board
On track road, the sintering deposit on 43# chassis is poured on spare unit chassis, tail rocker return.
8) master control room tissue raw material system starts feeding again, and gas for ignition flow returns to 920m/h, main exhausting door by
Step returns to 100%, slings 43# chassis and leaves sintering machine table top.
9) sintering machine reruns, and resumes production.It is 15 minutes to amount to downtime.
Claims (1)
- A kind of 1. method for changing sintering pallet, it is characterised in that specific method is as follows:1) spare unit chassis is selected, it is stand-by to sling standby chassis with crane;2) defect chassis is found, running position is tracked, treats that defect chassis is run to before igniter, master control room is notified, progressively drops Low mixture ore trough reserves, when defect chassis reaches below mud roller distributing device, reduce at the 1/6-1/3 of ore deposit groove controlling level The defect chassis bed of material is at the 1/4-1/2 of chassis controlling level;3) spare unit chassis is hoisted to 50t cranes the position of sintering machine table top tail the 4th bellows reciprocal, in sintering machine table top Top hovering is stand-by;4) defect chassis stops sintering machine operating after igniter when running to tail the 5th bellows reciprocal, meanwhile, it is main Control room and close main exhausting door, sintering machine has a power failure, and igniter gas flow is controlled in 90m3/h-120m3/h;5) rear of sintering machine rocker is opened in place, loosens sintering pallet gap;6) standby chassis is put off on sintering machine table top, lifting steel cable decoupling device;7) another group of lifting steel cable is suspended on defect chassis, lifting steel cable other end is hung on crane;Above step 5,6,7 is carried out simultaneously;8) defect chassis is hung out with crane, falls on sintering machine table top, pluck crane hook;Crane is hooked on spare unit chassis lifting steel On rope, spare unit chassis is put off on sintering machine track, takes crane hook;9) the side trolley wheel of defect chassis is sling with crane, on sintering deposit to the spare unit chassis on defect of tumbling chassis, lifting Steel cable is hung on defect chassis four wheels, slings defect chassis;10) mixture ore trough feeding, rear of sintering machine rocker return open main exhausting door, and gas for ignition flow recovers;Above step 9,10 is carried out simultaneously;11) sintering machine operates, and changes chassis and terminates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610788721.2A CN107782146A (en) | 2016-08-31 | 2016-08-31 | A kind of method for changing sintering pallet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610788721.2A CN107782146A (en) | 2016-08-31 | 2016-08-31 | A kind of method for changing sintering pallet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107782146A true CN107782146A (en) | 2018-03-09 |
Family
ID=61450297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610788721.2A Pending CN107782146A (en) | 2016-08-31 | 2016-08-31 | A kind of method for changing sintering pallet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107782146A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109628732A (en) * | 2019-01-11 | 2019-04-16 | 安阳钢铁股份有限公司 | A kind of operating method prevented sintering machine and shut down knot bulk |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU723345A1 (en) * | 1978-10-04 | 1980-03-25 | Производственное объединение "Уралмаш" | Apparatus for changing carriages of firing and sintering machine |
CN202008297U (en) * | 2011-04-21 | 2011-10-12 | 宝山钢铁股份有限公司 | Automatic positioning and control device for replacement of sintering machine trolleys |
CN103575108A (en) * | 2013-11-01 | 2014-02-12 | 南京钢铁股份有限公司 | Method for rapidly replacing trolleys in sintering machine online |
CN204202392U (en) * | 2014-10-30 | 2015-03-11 | 中冶华天工程技术有限公司 | Sintering machine changing table truck system |
CN105758183A (en) * | 2016-02-29 | 2016-07-13 | 攀钢集团攀枝花钢钒有限公司 | Online quick trolley changing method of sintering machine |
-
2016
- 2016-08-31 CN CN201610788721.2A patent/CN107782146A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU723345A1 (en) * | 1978-10-04 | 1980-03-25 | Производственное объединение "Уралмаш" | Apparatus for changing carriages of firing and sintering machine |
CN202008297U (en) * | 2011-04-21 | 2011-10-12 | 宝山钢铁股份有限公司 | Automatic positioning and control device for replacement of sintering machine trolleys |
CN103575108A (en) * | 2013-11-01 | 2014-02-12 | 南京钢铁股份有限公司 | Method for rapidly replacing trolleys in sintering machine online |
CN204202392U (en) * | 2014-10-30 | 2015-03-11 | 中冶华天工程技术有限公司 | Sintering machine changing table truck system |
CN105758183A (en) * | 2016-02-29 | 2016-07-13 | 攀钢集团攀枝花钢钒有限公司 | Online quick trolley changing method of sintering machine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109628732A (en) * | 2019-01-11 | 2019-04-16 | 安阳钢铁股份有限公司 | A kind of operating method prevented sintering machine and shut down knot bulk |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101907401B (en) | Scrap steel pre-heating conveyor with short process | |
CN107287368A (en) | A kind of converter slag processing unit and method | |
CN101825396A (en) | Device for preheating and conveying scrap steel | |
CN206017503U (en) | Disk brake hydraulic control system | |
EP3647702A1 (en) | In-line aluminum scrap remelting device and process | |
CN107782146A (en) | A kind of method for changing sintering pallet | |
CN204747937U (en) | Mill liners dismouting appurtenance | |
CN203877257U (en) | Rectangular conical metal stock bin unblocking device | |
CN105316444A (en) | Wet method slag quenching processing system and processing method thereof | |
CN203806731U (en) | Bottom-dump tramcar unloading system | |
CN109207173A (en) | The method smoldered is controlled when a kind of dry coke quenching is packed into | |
CN103447789B (en) | The replacing options of vertical grinder grinding roller roller shell | |
CN207723166U (en) | Ladle or hot-metal bottle tear tank dust-extraction unit open | |
CN206680130U (en) | A kind of liftable feed mechanism | |
CN110182610A (en) | A kind of intelligence stacker-reclaimer intelligence pitching Hydraulic system and control method | |
CN205062091U (en) | Braised sediment processing system of heat | |
CN105758183B (en) | The method of sintering machine fast online replacement chassis | |
CN209034422U (en) | A kind of broken screening plant of refinery cinder | |
CN207607916U (en) | A kind of Novel chute device | |
CN106334689A (en) | Improved automatic industrial cleaning device | |
CN207243235U (en) | A kind of plate leveler roller system overturns auxiliary device | |
CN107760816A (en) | Stove method is torn in a kind of 80 tons of converters open | |
CN207004564U (en) | A kind of automatic sprayer | |
CN207432020U (en) | A kind of ball blast tandem shot-blast cleaning machine | |
CN106086311B (en) | A kind of method for reducing KR desulfurization process device mounting heights |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180309 |