CN103558423B - 用于流变二次回路的试验端子 - Google Patents

用于流变二次回路的试验端子 Download PDF

Info

Publication number
CN103558423B
CN103558423B CN201310595360.6A CN201310595360A CN103558423B CN 103558423 B CN103558423 B CN 103558423B CN 201310595360 A CN201310595360 A CN 201310595360A CN 103558423 B CN103558423 B CN 103558423B
Authority
CN
China
Prior art keywords
copper
base
organize
brace
flakes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310595360.6A
Other languages
English (en)
Other versions
CN103558423A (zh
Inventor
马艳
郝韩兵
武新宇
陈贵亮
王世斌
宫建峰
洪磊
赵刚
王庆华
蒋红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310595360.6A priority Critical patent/CN103558423B/zh
Publication of CN103558423A publication Critical patent/CN103558423A/zh
Application granted granted Critical
Publication of CN103558423B publication Critical patent/CN103558423B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明公开了一种用于流变二次回路的试验端子,其包括:多组端子底座以及多组连接片、多个连接螺帽;正常运行中,每组连接片连接在对应一组的端子底座上,当需要短接时,拔出每组连接片的其中一个连片,插入下一组底座的其中一个底座盲孔中,依次类推形成整个流变试验端子的短接,从而完成做到对检修设备和运行设备之间的相关回路做二次安全措施。采用本发明不仅规范操作行为,而且提高工作效率,同时降低了风险发生的可能性。

Description

用于流变二次回路的试验端子
技术领域:
本发明涉及一种用于流变二次回路的试验端子。
背景技术:
电力系统设备的检修是保证用电的基础,继电保护装置作为电力系统中重要的组成部分,其检修的质量攸关供电安全和供电质量。检修人员在做状态检修工作之前,要对检修设备和运行设备之间的相关回路做二次安全措施,而二次安全措施实施的过程中,有涉及到主变与母差保护回路之间的安全措施,如短接母差屏后相关流变试验端子的操作。传统的流变试验端子,采用连片加螺帽的形式,即使用连片进行连接时,使用螺帽在接头处进行固定。存在在使用过程中繁琐的拧紧拧松操作,有时会由于螺帽对口不正确而发生“拧歪”的情况,不仅操作困难,而且费时费力。尤其容易使得螺帽脱落或者连片脱落而造成其他运行间隔流变试验端子的短路现象发生,同时由于连片的金属部分及试验端子的金属部分裸露较大,易造成操作人员触电。
发明内容:
为克服现有技术的缺陷,本发明的目的在于提供一种能根据现场继电保护装置状态检修工作需要,能够方便快捷地进行流变试验端子短接或者恢复的流变试验端子。不仅规范操作行为,而且提高工作效率,同时降低了风险发生的可能性。
本发明解决技术问题采用如下技术方案:
用于流变二次回路的试验端子,其包括:
多组端子底座以及多组连接片、多个连接螺帽;
每组端子底座包括两个并列设置的圆柱状底座,两个底座中部径向之间通过连扳连接,各底座的中心沿轴线设有导电铜柱,铜柱外部为绝缘外壳,所述铜柱的顶端设有盲孔,铜柱底端是与电流二次回路连接的接线端;所述连扳为导电板,连扳中部设有螺孔在两个底座的铜柱之间形成断路;
每组所述连接片包括两个并列设置的连片,各所述连片的中心设有与所述盲孔匹配的柱状铜芯,所述铜芯外部包裹有绝缘塑料,两个所述铜芯之间通过Z字形的铜片连接,在所述铜片上设有绝缘操作把手,两个所述铜芯中,其中一个铜芯的顶部设有中心盲孔;
各所述连接螺帽的中心设有与所述螺孔匹配的铜质螺杆,在所述铜质螺杆的外部设有绝缘旋转把手。
与已有技术相比,本发明的有益效果体现在:
本发明采用可插拔式全绝缘外套设计,端子外部无裸露金属部分,实现操作简单及时化。
端子连片之间的铜片呈阶梯(Z字形)设计,方便互联时接头部分无堆积而造成连片的挤压伤害,接头内部的嵌入式设计,使得内部铜芯之间的连接更加牢固可靠。
连接片和连接螺帽有突出的可操作的绝缘把手设计,使得插拔时的连片及旋转螺帽时受力均匀,方便连片快速准确的进行连接和断开。
正常运行时,连接螺帽安装在两个底座之间的连扳的螺孔内,在两个底座铜柱之间形成通路,不会因为误打开连接片,而造成电流回路开路,提高了安全性。
通过以上的设计,解决检修或运行人员在对流变试验端子进行操作的过程中,由于传统连片通过螺帽紧固,而造成操作时间长、易误碰其它运行中流变试验端子而发生短路及操作人员易触电等缺点。提高了工作人员的操作效率以及速度,加强了安全性,使得整个实施过程更加简单可靠。
附图说明:
图1为本发明的整体示意图;2为试验端子正常运行的俯视图;图3为试验端子检修时的整体示意图;图4为一组底座及连接螺帽的剖视图;图5为一组连接片的剖视图。
图中标号:1底座,2连扳,3铜柱,4绝缘外壳,5盲孔,6接线端,7螺孔,8连片,9铜片,10操作把手,11铜芯,12绝缘塑料,13中心盲孔,14连接螺帽,15螺杆,16旋转把手,17屏柜面板,18螺帽。
以下通过具体实施方式,并结合附图对本发明作进一步说明。
具体实施方式:
实施例:结合图1-5,本实施例用于流变二次回路的试验端子,其包括:
多组端子底座以及多组连接片、多个连接螺帽;
图4所示,每组端子底座包括两个并列设置的圆柱状底座1,两个底座1中部径向之间通过连扳2连接,各底座的中心沿轴线设有导电铜柱3,铜柱外部为绝缘外壳4(塑料外壳),铜柱的顶端设有盲孔5,铜柱底端是与电流二次回路连接的接线端6;其中,连扳2为导电板,连扳中部设有螺孔7在两个底座的铜柱之间形成断路。
图5所示,每组连接片包括两个并列设置的连片8,各连片的中心设有与盲孔5匹配的柱状铜芯11,在铜芯外部包裹有绝缘塑料12,两个铜芯11之间通过Z字形的铜片9连接,在铜片上设有绝缘操作把手10,两个铜芯中,其中一个铜芯的顶部设有中心盲孔13;图4所示,各连接螺帽14的中心设有与螺孔7匹配的铜质螺杆15,在铜质螺杆的外部设有绝缘旋转把手16。
图1、2、4所示,正常状态下,各组底座下端的接线端6穿过屏柜面板17的孔,底座的铜柱用螺帽18固定在屏柜面板17上,接线端6用于电流二次回路接线,连接螺帽14安装在连扳2的螺孔7内,在同组的两个底座的铜柱之间形成通路,每组的底座上连接有一组连接片,连片的铜芯11插入在底座的盲孔5内。图3所示,当检修时,将每组连接片的其中一个连片从底座中拔出,旋转90°插入下一组连接片的带有中心盲孔的连片内,在五组底座及五组连接片中,每组的其中一个底座均与下一组的其中一个底座通过连接片形成短接,可实现流变试验端子之间短接和正常运行快速切换的手动操作。

Claims (1)

1.用于流变二次回路的试验端子,其特征在于包括:
多组端子底座以及多组连接片、多个连接螺帽;
每组端子底座包括两个并列设置的圆柱状的底座(1),两个底座(1)中部径向之间通过连扳(2)连接,各底座的中心沿轴线设有导电的铜柱(3),铜柱外部为绝缘外壳(4),所述铜柱的顶端设有盲孔(5),铜柱底端是与电流二次回路连接的接线端(6);所述连扳(2)为导电板,连扳中部设有螺孔(7)在两个底座的铜柱之间形成断路;
每组所述连接片包括两个并列设置的连片(8),各所述连片的中心设有与所述盲孔(5)匹配的柱状的铜芯(11),所述铜芯外部包裹有绝缘塑料(12),两个所述铜芯(11)之间通过Z字形的铜片(9)连接,在所述铜片上设有绝缘操作把手(10),两个所述铜芯中,其中一个铜芯的顶部设有中心盲孔(13);
各所述连接螺帽(14)的中心设有与所述螺孔(7)匹配的铜质螺杆(15),在所述铜质螺杆的外部设有绝缘旋转把手(16)。
CN201310595360.6A 2013-11-21 2013-11-21 用于流变二次回路的试验端子 Expired - Fee Related CN103558423B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310595360.6A CN103558423B (zh) 2013-11-21 2013-11-21 用于流变二次回路的试验端子

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310595360.6A CN103558423B (zh) 2013-11-21 2013-11-21 用于流变二次回路的试验端子

Publications (2)

Publication Number Publication Date
CN103558423A CN103558423A (zh) 2014-02-05
CN103558423B true CN103558423B (zh) 2015-10-28

Family

ID=50012725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310595360.6A Expired - Fee Related CN103558423B (zh) 2013-11-21 2013-11-21 用于流变二次回路的试验端子

Country Status (1)

Country Link
CN (1) CN103558423B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107919593B (zh) * 2017-07-13 2019-08-06 国网浙江省电力公司湖州供电公司 一种二次设备试验联接端子短接结构
CN107910665A (zh) * 2017-11-02 2018-04-13 国网福建省电力有限公司 一种基于特性试验的端子排快速接线装置及其使用方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1395106A (zh) * 2001-07-07 2003-02-05 余永宽 自动控制电流互感器变比转换的高、低压电能计量装置
CN101587133A (zh) * 2008-05-22 2009-11-25 上海市电力公司 一种电流试验端子
CN201576862U (zh) * 2009-09-18 2010-09-08 北京市电力公司 用于插接电流试验端子的短封件
CN203275458U (zh) * 2013-04-23 2013-11-06 国家电网公司 避雷器带电试验专用端子
CN203606399U (zh) * 2013-11-21 2014-05-21 国家电网公司 用于流变二次回路的试验端子

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3499224B2 (ja) * 2001-05-25 2004-02-23 プロモス テクノロジーズ インコーポレイテッド 弾性接触端子の試験装置及び試験方法
JP5042322B2 (ja) * 2010-01-29 2012-10-03 中国電力株式会社 制御盤の取替工法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1395106A (zh) * 2001-07-07 2003-02-05 余永宽 自动控制电流互感器变比转换的高、低压电能计量装置
CN101587133A (zh) * 2008-05-22 2009-11-25 上海市电力公司 一种电流试验端子
CN201576862U (zh) * 2009-09-18 2010-09-08 北京市电力公司 用于插接电流试验端子的短封件
CN203275458U (zh) * 2013-04-23 2013-11-06 国家电网公司 避雷器带电试验专用端子
CN203606399U (zh) * 2013-11-21 2014-05-21 国家电网公司 用于流变二次回路的试验端子

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
LCWD2-110流变及JCC-110压变二次结线端子板的改进;袁家璞;《华东电力》;19831127;第70-71页 *
防止流变端子短接过程中二次回路两点接地的方法研究;杨明芳;《中国科技信息》;20121101(第21期);第101页 *

Also Published As

Publication number Publication date
CN103558423A (zh) 2014-02-05

Similar Documents

Publication Publication Date Title
CN104241968A (zh) 一种防误操作短路接地装置
CN203491485U (zh) 发电厂、变电站二次回路接线端子排短路插头
CN103558423B (zh) 用于流变二次回路的试验端子
CN203895620U (zh) 一种保护屏带电端子隔离工具
CN104614604A (zh) 一种10kV电缆故障模拟装置及故障模拟方法
CN203606399U (zh) 用于流变二次回路的试验端子
CN202616463U (zh) 用于接线端子的防碰撞工具及防碰撞接线端子
CN204348926U (zh) 导电铜排的接线结构
CN203895633U (zh) 适用于箱变和配电室的短路接地线
CN202454880U (zh) 一种插头可锁式电流短接线
CN107046214B (zh) 一种成套模块化可组合的标准电流端子短接工具
CN203387028U (zh) 用于电流端子短接的短接装置
CN103944094A (zh) 一种10kV手车开关柜母线静触头接地方法及专用接地装置
CN206041016U (zh) 一种户内gis终端实用型接地线
CN104062479A (zh) 计量器具无接线快速安装新装置
CN202651659U (zh) 带负荷更换隔离开关的引流装置
CN203456795U (zh) 用于更换四分裂导线双联耐张绝缘子串导线侧的联板卡具
CN202471945U (zh) 组合式升流箱
CN204179430U (zh) 一种用于现场接线的实用型多功能联接盒
CN204731358U (zh) 一种800mw水轮发电机三相突然短路试验装置
CN104201513A (zh) 一种基于定位杆的防误操作短路接地线
CN204515077U (zh) 一种高压试验接线的固定装置
CN203398737U (zh) 一种低压电缆短接的短接端子
CN210576655U (zh) 一种便于拆装的电脑显示器用电子连接器
CN115116741B (zh) 一种电容器用防护帽

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHUZHOU POWER SUPPLY COMPANY, STATE GRID ANHUI ELE

Effective date: 20140317

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CHUZHOU POWER SUPPLY COMPANY, STATE GRID ANHUI ELECTRIC POWER COMPANY

Effective date: 20140317

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 239000 CHUZHOU, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140317

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: CHUZHOU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Corp.

Address before: 239000 No. 510 Fenghuang Road, Anhui, Chuzhou

Applicant before: CHUZHOU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Corp.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028