CN103556603A - Plastic sealing construction trolley for concrete faced rockfill dam and construction method - Google Patents

Plastic sealing construction trolley for concrete faced rockfill dam and construction method Download PDF

Info

Publication number
CN103556603A
CN103556603A CN201310555873.4A CN201310555873A CN103556603A CN 103556603 A CN103556603 A CN 103556603A CN 201310555873 A CN201310555873 A CN 201310555873A CN 103556603 A CN103556603 A CN 103556603A
Authority
CN
China
Prior art keywords
construction
plastic sealing
reel
chassis
construction chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310555873.4A
Other languages
Chinese (zh)
Other versions
CN103556603B (en
Inventor
高灵敏
黄远华
赵志忠
王国胜
饶孝国
杨正贵
倪四平
张诗云
河辉煌
贺剑峰
吴金花
吴中甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 1 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 1 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 1 Engineering Co Ltd filed Critical China Gezhouba Group No 1 Engineering Co Ltd
Priority to CN201310555873.4A priority Critical patent/CN103556603B/en
Publication of CN103556603A publication Critical patent/CN103556603A/en
Application granted granted Critical
Publication of CN103556603B publication Critical patent/CN103556603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a plastic sealing construction trolley for a concrete faced rockfill dam. The plastic sealing construction trolley comprises a construction trolley, wherein traveling wheels are arranged at the bottom of the construction trolley; the construction trolley is connected with a main rack winch distributed at the top of a dam through a dragging cable; a seepage-proof cover reel and a neoprene stick reel are arranged on the construction trolley; the neoprene stick reel is located in front of the seepage-proof cover reel; a combined steel mould is arranged between the seepage-proof cover reel and the neoprene stick reel; and a wheel type ladder is hung on the rear part of the construction trolley. A method for performing plastic sealing construction on the concrete faced rockfill dam by adopting the construction trolley comprises a step of putting the loaded materials into a V-shaped slot reserved on a concrete face by the construction trolley according to a construction sequence, thereby realizing the plastic sealing construction for the concrete faced rockfill dam by utilizing the construction trolley. According to the device and the method provided by the invention, the construction difficulty is reduced, the construction process is simplified, the construction schedule is quickened and the construction quality of plastic sealing material filling is ensured.

Description

Rock plastic sealing construction chassis and job practices
Technical field
The present invention relates to the rock plastic sealing construction field in hydraulic engineering, particularly a kind of rock plastic sealing construction chassis and job practices.
Background technology
The job practices of hydraulic engineering Face-Slab of CFRD joint plastic sealing filler, that reserved " V " type groove of counter plate carries out raked joint, brush primer, with plastic filler levelling filleting, place PVC rod again, stack plastic filler, paste antiseepage cover plate and cover plastic filler, press stainless steel band steel, the multiple working procedures such as stainless steel expansion bolt are installed, all these operations are all carried out on the very steep panel inclined-plane of the gradient, the transportation filleting of filler, the topped movement of brush coating of rolling antiseepage cover plate etc., if these operations entirely by manually operating on the very steep panel inclined-plane of the gradient, the one, operator's labour intensity is large, work efficiency is low, the 2nd, many people squeeze that at one, to sew on construction very dangerous, the 3rd, the construction quality of plastic sealing filler can not be guaranteed.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of rock plastic sealing construction chassis and job practices, can improve the construction quality of rock plastic sealing, reduces labour intensity.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of rock plastic sealing construction chassis, comprise construction chassis, construction chassis bottom be provided with road wheel, construction chassis by haulage cable, be connected with the main rack winch that is arranged in dam body top; Construction chassis is provided with antiseepage cover plate reel and neoprene rod reel, before neoprene rod reel is positioned at antiseepage cover plate reel, between antiseepage cover plate reel and neoprene rod reel, is provided with combined steel;
At construction chassis rear portion, pulled stair-climbing wheeled.
The bottom of construction chassis is provided with the inclined-plane consistent with dam body panel gradient.
One group of road wheel at construction chassis the place ahead or rear is provided with steering mechanism.
Described stair-climbing wheeled in, stair-climbing wheeled front end is provided with cat ladder and pulls hanger, cat ladder is pulled hanger and is connected with construction chassis by traction steel wire;
Stair-climbing wheeledly be provided with a plurality of cat ladders and mark time, stair-climbing wheeled bottom is provided with cat ladder wheel.
The structure of described combined steel is:
Hoisting frame and many root posts are slidably connected, and hoisting frame is connected with construction chassis by a plurality of boom hoistings;
Two groups of curved rods are arranged on two row column belows opposite to each other, and the bottom of two row columns is hinged with one end of curved rod respectively, and the other end of curved rod is articulated and connected by straight connecting rod and hoisting frame respectively, and the arc concave side of curved rod is provided with arc formwork.
Arc formwork top after closing up is provided with the breach of 40 ~ 65 °.
Described boom hoisting is assembly pulley, bottle gouard moved by hands or electric block.
The center superposition of seam " V " the shape groove of the reel center of main rack winch and concrete slab.
Above-mentioned construction chassis carries out a method for rock plastic sealing construction, comprises the following steps:
One, will construct chassis rolling at the bottom of dam;
Two, reserved " V " shape groove of first counter plate carries out raked joint brush primer, good with plastic sealing material levelling embedding " V " seam of shape groove;
Three, from neoprene rod reel, neoprene rod is extracted out and put into " V " shape groove;
Four, combined steel is hung to " V " shape groove place, plastic sealing material is put into combined steel;
Five, promote combined steel, operate main rack winch and make the chassis suitable distance of upwards travelling, then from antiseepage cover plate reel, rubber antiseepage cover plate is extracted out, cover on plastic sealing material;
Six, operating personnel stand in stair-climbing wheeled going up, and with stainless steel band steel and stainless steel expansion bolt, rubber antiseepage cover plate and concrete slab are compressed to compacting;
By above-mentioned steps, realize and utilize construction chassis to carry out the construction of rock plastic sealing.
Preferably, in step 4, with bolt, connect curved rod after putting down combined steel, in the indentation, there at arc formwork top, plastic sealing material is beaten closely knit.
A kind of rock plastic sealing construction chassis provided by the invention and job practices, by the construction chassis that arranges and stair-climbing wheeled, can easily plastic sealing material be stored, neoprene rod reel, combined steel, the multiple materials such as antiseepage cover plate reel are all placed on chassis according to processing sequence, the main rack winch traction construction of operation dam crest chassis travels from bottom to top, operating personnel by each operation on construction chassis, counter plate seam is brushed primer, filleting is placed neoprene rod, insert plastic sealing material, paste antiseepage rubber antiseepage cover plate and cover plastic sealing material, press stainless steel band steel, the multiple working procedures such as stainless steel expansion bolt are installed all to carry out on a construction chassis, can solve conventional plastic sealing filler construction labour intensity large, the construction difficult problem that safety is not high.And adopt apparatus and method of the present invention can reduce difficulty of construction, simplify working procedure, accelerating construction progress, guarantees the construction quality that plastic sealing material is filled.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is plastic sealing material interstitital texture sectional schematic diagram.
Fig. 2 is the overall structure schematic diagram of chassis of constructing in the present invention.
Fig. 3 is structural representation stair-climbing wheeled in the present invention.
Fig. 4 is the structure section schematic diagram while stainless steel expansion bolt being installed in the present invention.
Fig. 5 is the schematic diagram that in the present invention, combined steel is filled plastic sealing material.
Fig. 6 is the schematic diagram that in the present invention, combined steel is mentioned die sinking.
Fig. 7 is the schematic side view of combined steel in the present invention.
In figure: mortar bed 1, copper water stop 2, concrete slab 3, stainless steel expansion bolt 4, stainless steel band steel 5, rubber antiseepage cover plate 6, neoprene rod 7, plastic sealing material 8, stair-climbing wheeled 9, cat ladder wheel 10, cat ladder marks time 11, cat ladder is pulled hanger 12, construction chassis 13, steering mechanism 14, working platform 15, antiseepage cover plate reel 16, neoprene rod reel 17, haulage cable 18, main rack winch 19, little chassis rack winch 20, combined steel 21, hoisting frame 22, straight connecting rod 23, bolt 24, curved rod 25, column 26, arc formwork 27, boom hoisting 28.
The specific embodiment
In Fig. 1, concrete slab 3 seams " V " shape groove place, the structure of panel waterstop sealing is comprised of mortar bed 1, copper water stop 2, concrete slab 3, neoprene rod 7, plastic sealing material 8 and rubber antiseepage cover plate 6 successively, is provided with stainless steel band steel 5 and stainless steel expansion bolt 4 rubber antiseepage cover plate 6 is compressed outside rubber antiseepage cover plate 6.
In Fig. 1,2, a kind of rock plastic sealing construction chassis, comprises construction chassis 13, construction chassis 13 bottom be provided with road wheel, preferred, the bottom of construction chassis 13 is provided with the inclined-plane consistent with dam body panel gradient.One group of road wheel at construction chassis 13 the place aheads or rear is provided with steering mechanism 14.
Construction chassis 13 is connected with the main rack winch 19 that is arranged in dam body top by haulage cable 18, the center superposition of seam " V " the shape groove of the reel center of main rack winch 19 and concrete slab 3.; Construction chassis 13 is provided with antiseepage cover plate reel 16 and neoprene rod reel 17, before neoprene rod reel 17 is positioned at antiseepage cover plate reel 16, between antiseepage cover plate reel 16 and neoprene rod reel 17, is provided with combined steel 21; At construction chassis 13 rear portions, pulled stair-climbing wheeled 9.
Structure, is convenient to raw material be placed on construction chassis 13 and be convenient to use according to sequence of construction thus, and the combined steel 21 of setting is also convenient to the moulding of plastic sealing material 8.Before in this example, refer to the upper right side direction in Fig. 2, then refer to the lower left direction in Fig. 2.
In Fig. 2-4, in described stair-climbing wheeled 9, stair-climbing wheeled 9 front end is provided with cat ladder and pulls hanger 12, and cat ladder is pulled hanger 12 and is connected with construction chassis 13 by traction steel wire;
Stair-climbing wheeled 9 are provided with a plurality of cat ladders marks time 11, and stair-climbing wheeled 9 bottom is provided with cat ladder wheel 10.Structure thus, convenient operation personnel carry out the installation of stainless steel band steel 5 and stainless steel expansion bolt 4 on stair-climbing wheeled 9.
In Fig. 2,5 ~ 7, the structure of described combined steel 21 is:
Hoisting frame 22 is slidably connected with many root posts 26, and hoisting frame 22 is connected with construction chassis 13 by a plurality of boom hoistings 28;
Two groups of curved rods 25 are arranged on two row column 26 belows opposite to each other, and the bottom of two row columns 26 is hinged with one end of curved rod 25 respectively, as hinged in the A point place in Fig. 6.The other end of curved rod 25 is articulated and connected by straight connecting rod 23 and hoisting frame 22 respectively, as the B in Fig. 6, D point, the arc concave side of curved rod 25 is provided with arc formwork 27, and as shown in Fig. 5,6, two curved rods 25 in opposite directions connect by bolt 24 at C point place.Structure, is convenient to realize automatic demoulding thus, as shown in Figure 6, unclamps after bolt 24, and when boom hoisting 28 rises, first hoisting frame 22 is raised, and hoisting frame 22 drives curved rod 25 to open, and arc formwork 27 departs from plastic sealing material 8, realizes the demoulding.
Preferred as shown in Fig. 5,6, the arc formwork top after closing up is provided with the breach of 40 ~ 65 °, as the α angle in Fig. 5.Structure, is convenient to manually the plastic sealing material in combined steel 8 be beaten closely knit thus.
Described boom hoisting 28 is assembly pulley, bottle gouard moved by hands or electric block.
Preferably, described column 26 is connected with construction chassis 13 by adjustable mode.Not shown, for ease of improving construction precision, preferably column 26 is to be fixed on construction chassis 13, efficiency when construction is higher like this, and adjustable connected mode, is mainly the gap that can regulate between combined steel 21 and concrete slab 3, the column 26 that optional mode is combined steel 21 front ends is hinged with construction chassis 13, the column of rear end is connected by wire rope between chassis 13 with construction, so can regulate gap, also can regulate angle of inclination.Or the column at combined steel 21 two ends is connected with the sleeve on construction chassis 13, is provided with bolton column on sleeve, and such structure is fixing comparatively firm.Can certainly rely on the deadweight of combined steel 21, column 26 is not connected with construction chassis 13, between combined steel 21 and the chassis 13 of constructing, only by boom hoisting 28, be connected, such structure is comparatively simple.
Above-mentioned construction chassis carries out a method for rock plastic sealing construction, comprises the following steps:
One, main rack winch 19 and little chassis rack winch 20 are arranged in to dam crest, the center superposition of the reel center of main rack winch 19 and slab joint " V " shape groove, construction chassis 13 is connected with main rack winch 19 by haulage cable 18.Operate main rack winch 19 traction chassis 13 approaching dam crests, by antiseepage cover plate reel 16, neoprene rod reel 17, appropriate plastic sealing material 8, stainless steel expansion bolt 4 and stainless steel band steel 5 etc. is placed on the working platform 15 of construction chassis 13.By stair-climbing wheeled 9 rear ends that hang over construction chassis 13, operate 19 reversions of main rack winch, chassis 13 rollings of constructing are at the bottom of dam; Rolling or upwards draw walking process at the bottom of construction chassis 13 is from dam crest to dam, the operating personnel on construction chassis 13, control steering mechanism 14 and make to construct chassis 13 along the downward rolling of slab joint, or upwards traction walking is not offset.
When two, slab joint prepares to carry out the construction of plastic sealing filler, what construction chassis 13 was hung stair-climbing wheeled 9 is placed on concrete slab 3, making stair-climbing wheeled 9 cat ladder pull hanger 12 links together with construction chassis 13, reserved " V " shape groove of first counter plate carries out raked joint brush primer, good with plastic sealing material 8 levelling embeddings " V " seam of shape groove.
Three, from the neoprene rod reel 17 of construction chassis 13 front ends, neoprene rod 7 is extracted out and put into " V " shape groove.
Four, combined steel 21 is hung to " V " shape groove place again, manually plastic sealing material 8 is put into combined steel 21; Preferably, put down combined steel 21 rear with bolt 24 connection curved rods 25, as shown in Figure 5, in the indentation, there at arc formwork 27 tops, plastic sealing material 8 is beaten closely knit.
Five, promote combined steel 21, operate the main rack winch 19He steering mechanism 14 chassis 13 suitable distance of upwards travelling that makes to construct, the one section of distance that is slightly shorter than combined steel 21 length of for example travelling.From the antiseepage cover plate reel 16 of construction chassis 13 rear ends, rubber antiseepage cover plate 6 is extracted out again, covered compacting on plastic sealing material 8.
Six, operating personnel stand on stair-climbing wheeled 9, with stainless steel band steel 5 and stainless steel expansion bolt 4, rubber antiseepage cover plate 6 and concrete slab 3 are compressed to compacting;
By above-mentioned steps, realize and utilize construction chassis to carry out the construction of rock plastic sealing.
Counter plate seam is carried out in plastic sealing packing seal processing procedure, desired plasticity sealing material 8, rubber antiseepage cover plate 6 materials such as grade are by dam crest to the transporting of construction location, and the work of transporting is separately born by small-sized boom truck and the little chassis rack winch 20 of configuration walking steering mechanism.

Claims (10)

1. rock plastic sealing construction chassis, comprise construction chassis (13), construction chassis (13) bottom be provided with road wheel, construction chassis (13) by haulage cable (18), be connected with the main rack winch (19) that is arranged in dam body top; It is characterized in that: construction chassis (13) is provided with antiseepage cover plate reel (16) and neoprene rod reel (17), neoprene rod reel (17) is positioned at antiseepage cover plate reel (16) before, between antiseepage cover plate reel (16) and neoprene rod reel (17), is provided with combined steel (21);
At construction chassis (13) rear portion, stair-climbing wheeled (9) have been pulled.
2. a kind of rock plastic sealing construction chassis according to claim 1, is characterized in that: the bottom of construction chassis (13) is provided with the inclined-plane consistent with dam body panel gradient.
3. a kind of rock plastic sealing construction chassis according to claim 1, is characterized in that: one group of road wheel at construction chassis (13) the place ahead or rear is provided with steering mechanism (14).
4. a kind of rock plastic sealing construction chassis according to claim 1, it is characterized in that: in described stair-climbing wheeled (9), the front end of stair-climbing wheeled (9) is provided with cat ladder and pulls hanger (12), and cat ladder is pulled hanger (12) and is connected with construction chassis (13) by traction steel wire;
Stair-climbing wheeled (9) are provided with a plurality of cat ladders and mark time (11), and the bottom of stair-climbing wheeled (9) is provided with cat ladder wheel (10).
5. a kind of rock plastic sealing construction chassis according to claim 1, is characterized in that: the structure of described combined steel (21) is:
Hoisting frame (22) is slidably connected with many root posts (26), and hoisting frame (22) is connected with construction chassis (13) by a plurality of boom hoistings (28);
Two groups of curved rods (25) are arranged on two row column (26) belows opposite to each other, the bottom of two row columns (26) is hinged with one end of curved rod (25) respectively, the other end of curved rod (25) is articulated and connected by straight connecting rod (23) and hoisting frame (22) respectively, and the arc concave side of curved rod (25) is provided with arc formwork (27).
6. a kind of rock plastic sealing construction chassis according to claim 5, is characterized in that: the arc formwork top after closing up is provided with the breach of 40 ~ 65 °.
7. a kind of rock plastic sealing construction chassis according to claim 5, is characterized in that: described boom hoisting (28) is assembly pulley, bottle gouard moved by hands or electric block.
8. a kind of rock plastic sealing construction chassis according to claim 1, is characterized in that: the center superposition of seam " V " the shape groove of the reel center of main rack winch (19) and concrete slab (3).
9. the method that the construction chassis described in employing claim 1 ~ 8 any one carries out the construction of rock plastic sealing, is characterized in that comprising the following steps:
One, will construct chassis (13) rolling at the bottom of dam;
Two, reserved " V " shape groove of first counter plate carries out raked joint brush primer, good with plastic sealing material (8) levelling embedding " V " seam of shape groove;
Three, from neoprene rod reel (17), neoprene rod (7) is extracted out and put into " V " shape groove;
Four, combined steel (21) is hung to " V " shape groove place, plastic sealing material (8) is put into combined steel (21);
Five, promote combined steel (21), operate main rack winch (19) and make chassis (13) the suitable distance of upwards travelling, then from antiseepage cover plate reel (16), rubber antiseepage cover plate (6) is extracted out, cover on plastic sealing material (8);
Six, operating personnel stand in stair-climbing wheeled (9) above, with stainless steel band steel (5) and stainless steel expansion bolt (4), rubber antiseepage cover plate (6) and concrete slab (3) are compressed to compacting;
By above-mentioned steps, realize and utilize construction chassis to carry out the construction of rock plastic sealing.
10. the method that a kind of rock plastic sealing according to claim 9 is constructed, it is characterized in that: in step 4, after putting down combined steel (21), with bolt (24), connect curved rod (25), in the indentation, there at arc formwork (27) top, plastic sealing material (8) is beaten closely knit.
CN201310555873.4A 2013-11-11 2013-11-11 Rock plastic sealing construction trolley and construction method Active CN103556603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310555873.4A CN103556603B (en) 2013-11-11 2013-11-11 Rock plastic sealing construction trolley and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310555873.4A CN103556603B (en) 2013-11-11 2013-11-11 Rock plastic sealing construction trolley and construction method

Publications (2)

Publication Number Publication Date
CN103556603A true CN103556603A (en) 2014-02-05
CN103556603B CN103556603B (en) 2016-03-30

Family

ID=50010939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310555873.4A Active CN103556603B (en) 2013-11-11 2013-11-11 Rock plastic sealing construction trolley and construction method

Country Status (1)

Country Link
CN (1) CN103556603B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898874A (en) * 2014-04-11 2014-07-02 朱博程 Supporting and pressing type caulking machine for concrete face rockfill dam panels
CN105421293A (en) * 2015-12-26 2016-03-23 中国水电建设集团十五工程局有限公司 Construction method of copper water-stop in seepage-proofing system of concrete face rockfill dam
CN110409381A (en) * 2019-07-04 2019-11-05 中国葛洲坝集团第一工程有限公司 One kind being applied to rock seam crossing antiseepage cover plate compromise joint structure and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1572696A (en) * 1975-11-22 1980-07-30 Vredestein Nv Injection-sealable water-stop and method of installing same
CN101029481A (en) * 2007-04-04 2007-09-05 张明军 Flexible filler embedder and concrete panel seaming method
CN202298564U (en) * 2011-11-01 2012-07-04 中国水电顾问集团华东勘测设计研究院 Anti-seismic and water-stopping structure for concrete face rock-fill dam
CN102808393B (en) * 2012-08-17 2016-05-18 朱博程 Face Slab of Concrete-faced Rockfill flexible filler former
CN103255743B (en) * 2013-04-02 2015-06-03 中国葛洲坝集团股份有限公司 Panel sliding formwork anti-tipping travelling device
CN203583439U (en) * 2013-11-11 2014-05-07 葛洲坝集团第一工程有限公司 Concrete faced rockfill dam plastic water stop construction trolley

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898874A (en) * 2014-04-11 2014-07-02 朱博程 Supporting and pressing type caulking machine for concrete face rockfill dam panels
CN103898874B (en) * 2014-04-11 2019-12-13 朱博程 Concrete face rockfill dam face plate supporting and pressing type caulking machine
CN105421293A (en) * 2015-12-26 2016-03-23 中国水电建设集团十五工程局有限公司 Construction method of copper water-stop in seepage-proofing system of concrete face rockfill dam
CN110409381A (en) * 2019-07-04 2019-11-05 中国葛洲坝集团第一工程有限公司 One kind being applied to rock seam crossing antiseepage cover plate compromise joint structure and construction method

Also Published As

Publication number Publication date
CN103556603B (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN204627625U (en) Automatic walking lining trolley
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN106593469B (en) A kind of trolley for inverted arch construction
CN105298111B (en) Open cut tunnel lining construction template and its constructing device, method
CN207363676U (en) A kind of self-propelled ditch cable trench trolley
CN107100074A (en) A kind of lower bearing arch bridge concrete bridge deck construction method
CN203583439U (en) Concrete faced rockfill dam plastic water stop construction trolley
CN109519197A (en) A kind of sliding formwork just dual-purpose trolley of lining excavation supporting and its application
CN103556603B (en) Rock plastic sealing construction trolley and construction method
CN202991063U (en) Large-section tunnel hydraulic trolley
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN205578009U (en) Two lined steel bones RACK in tunnel equipment of being under construction
CN103982200A (en) Full-face inner sliding rail moving steel mould trolley
CN201770945U (en) Synchronous cradle moving device for continuous rigid frame bridge construction cradle
CN204851287U (en) Big section moving as a whole formula formwork support
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN206600175U (en) A kind of all-hydraulic walking side wall trolley
CN204492846U (en) Movable type with inverted arch lining device crosses car trestle
CN104947674B (en) Construction method for concrete face dam water stop mortar bed construction trolley
CN202250105U (en) Integral hydraulic steel formwork trolley
CN108482519A (en) A kind of reinforced mesh transport trolley
CN102345273A (en) Synchronous cradle moving device for continuous rigid frame bridge construction cradle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant