CN103544391A - 一种排管敷设电缆群最热电缆的判定方法 - Google Patents
一种排管敷设电缆群最热电缆的判定方法 Download PDFInfo
- Publication number
- CN103544391A CN103544391A CN201310496602.6A CN201310496602A CN103544391A CN 103544391 A CN103544391 A CN 103544391A CN 201310496602 A CN201310496602 A CN 201310496602A CN 103544391 A CN103544391 A CN 103544391A
- Authority
- CN
- China
- Prior art keywords
- cable
- factor
- heated
- centerdot
- comb
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明公开了一种排管敷设电缆群最热电缆的判定方法,包括S1获取排管敷设电缆群中各电缆的基本参数,所述基本参数包括各电缆的埋深及各电缆的相对水平距离;S2利用基本参数,分别计算其它电缆对各电缆的相互热影响因数Fe;S3根据每根电缆的Fe及电缆埋深,得到每根电缆的受热判断因子FFi;S4比较排管敷设电缆群中电缆的受热判断因子FFi,受热判断因子最大值所对应的电缆为最热电缆。本发明克服当前通过主观判断的误差和相关软件模拟的繁杂性,提高排管敷设电缆载流量计算的效率和准确性。
Description
技术领域
本发明涉及电力电缆载流量领域,特别涉及一种排管敷设电缆群最热电缆的判定方法。
背景技术
电力电缆运行中导体的温度是确定其载流量的依据。当导体温度超过绝缘允许最高工作温度,将加速绝缘老化,缩短电缆寿命,甚至造成击穿、接地和闪络等事故大幅度增加;当导体温度低于绝缘允许最高工作温度,虽然可以保证电缆在使用期内安全可靠运行,但会导致电缆截面得不到有效利用,不能充分发挥电缆的传输能力,势必造成投资的浪费。为保证电缆安全运行,对于多回路集群敷设电缆应以发热最厉害的电缆作为确定其载流量的依据。由于影响电缆传热的可变因素很多,特别是多回路集群敷设时需要考虑电缆之间的相互热影响,使得发热最严重的电缆难以确定,从而给多回路电缆载流量的计算带来困难。
空气敷设和电缆沟敷设时,由于空气流动散热性能较好,电缆间的热作用很小。直埋敷设呈水平分离排列,电缆回路数一般不超过6回,可根据电缆水平位置准确确定受热最严重电缆的位置。相较于其他敷设,排管敷设呈现水平分层排列,如常见的3×4排管敷设,可容纳的电缆回路较多。排管敷设电缆之间的相互热作用非常复杂,一般地根据排管敷设电缆的相对位置主观判定最热电缆不够准确,而利用软件(ANSYS等)建立排管敷设电缆模型从而判定最热电缆,此类软件的操作复杂,并不适合工程技术人员使用。
发明内容
为了克服现有技术存在的缺点与不足,本发明提供一种排管敷设电缆群最热电缆的判定方法。
本发明采用如下技术方案:
一种排管敷设电缆群最热电缆的判定方法,包括:
S1获取排管敷设电缆群中各电缆的基本参数,所述基本参数包括各电缆的埋深及各电缆的相对水平距离;
S2利用基本参数,分别计算各电缆的相互热影响因数Fe;
S3根据每根电缆的Fe及电缆埋深,得到每根电缆的受热判断因子FFi;
S4比较排管敷设电缆群中电缆的受热判断因子FFi,受热判断因子最大值所对应的电缆为最热电缆。
如图1所示,所述S2采用镜像法计算其它电缆对各电缆的相互热影响因数Fe,图1中,1、k、p、q均表示为电缆,而且1′、k′、p′、q′分别为上述电缆的镜像位置;2L1、2Lk、2Lp、2Lq则分别为1与1′、k与k′、p与p′、q与q′之间的距离;dpk、d′pk分别为k电缆的中心至p电缆中心的距离、k′(k的镜像)至p中心的距离。
计算公式具体如下:
上式中:dp1,…dpq分别为第1,…,q根电缆中心到第p根电缆中心的距离;d′p1,…d′pq分别为第1,…,q根电缆的镜像到第p根电缆中心的距离,所述p、q均为整数。
所述S3中根据每根电缆的Fe及电缆埋深,得到每根电缆的受热判断因子FFi,具体如下:
受热判断因子FFi的公式如下:
FF=ln(4L·Fe)
其中:L是电缆的埋深,Fe为电缆的相互热影响因数。
所述S4还包括,当两根电缆受热判断因子相同,则根据排管敷设现场实际情况再判定。
本发明的有益效果:
本发明提出排管敷设电缆判断因子,FF概念,通过比较受热判断因子判断排管敷设电缆群中受热最严重的电缆,为排管敷设电缆载流量的准确计算提供基本前提,提高排管敷设电缆载流量的计算精度,克服当前通过主观判断所带来的误差和相关软件(ANSYS等)模拟的繁杂性,提高排管敷设电缆载流量计算的效率和准确性。
附图说明
图1是本发明S2采用的电缆群及相对于地面对称的镜像图;
图2是本发明具体实施例中的排管敷设示意图。
具体实施方式
下面结合实施例及附图,对本发明作进一步地详细说明,但本发明的实施方式不限于此。
实施例
本实施例采用交联聚乙烯钢带铠装三芯电力电缆,型号为YJV22-8.7/15-3×240为例,并分别采用2×3和3×4的排管敷设方式对本发明的判定方法进行验证及说明,其中D1为1080mm,D2为1330mm,D3为1580mm,D表示各个电缆距离地面的高度,电缆间的相互间距d为250mm。
(一)排管敷设2×3六回路电缆载流量试验,选取图2中的A、B、D、E、F、H作为试验电缆,所述试验电缆之间水平距离间隔250mm.
在试验过程首先给电缆加载持续负荷电流,直至稳态时,所述稳态为1h内导体温度变化不超过1℃,当导体温度达到绝缘所允许最高温度(XLPE为90℃)时停止试验,记录下每根试验电缆的导体温度,计算每根电缆受热判断因子,如表1所示,
表1
电缆 | D | B | A |
L/mm | 1080 | 1080 | 1080 |
FF | 17.69631 | 18.81244 | 17.69631 |
导体温度测量值/℃ | 89.4 | 90.5 | 88.6 |
电缆 | H | F | E |
L/mm | 1330 | 1330 | 1330 |
FF | 18.30997 | 19.43258 | 18.30997 |
导体温度测量值/℃ | 86.8 | 91.5 | 88.6 |
由表1可知,F电缆的受热判断因子FF为所有电缆中最大,同时测试结果标明,F电缆所达到的导体温度最高,因此得出,本发明所提出的判定方法能准确判断2×3六回路排管敷设最热电缆。
(二)排管敷设3×4十二回路电缆载流量试验,选取图2中的所有电缆即A、B、C、D、E、F、G、H、I、J、K、L进行加载4恒定电流进行试验,记录每根试验电缆导体温度及每根电缆受热判断因子,如表2所示,
表2
电缆 | C | D | B | A |
L/mm | 1080 | 1080 | 1080 | 1080 |
FF | 25.6703 | 27.9264 | 27.9264 | 25.6703 |
导体温度实侧值/℃ | 83.6 | 85.6 | 86.2 | 83.5 |
电缆 | G | H | F | E |
L/mm | 1330 | 1330 | 1580 | 1580 |
FF | 28.34067 | 30.94552 | 30.94552 | 28.34067 |
导体温度实侧值/℃ | 87.2 | 89.9 | 91.3 | 85.4 |
电缆 | K | L | J | I |
L/mm | 1330 | 1330 | 1580 | 1580 |
FF | 27.87721 | 30.17169 | 30.17169 | 27.87721 |
导体温度实测值/℃ | 81.7 | 83.6 | 88.7 | 78.5 |
由表2可知,F电缆的导体温度最高,其对应的FF值也最大,H电缆次之,
而F、H两根电缆的受热判断因子相等,通过观察试验场周围环境得知,在图2的C、G、K位置侧有一条较大的沟槽,从而导致H电缆的散热较F电缆更好。结果表明,对于出现两根电缆受热判断因子相同的情况,可借助排管敷设现场周围环境最终确定排管敷设最热电缆。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受所述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。
Claims (4)
1.一种排管敷设电缆群最热电缆的判定方法,其特征在于,包括:
S1获取排管敷设电缆群中各电缆的基本参数,所述基本参数包括各电缆的埋深及各电缆的相对水平距离;
S2利用基本参数,分别计算各电缆的相互热影响因数Fe;
S3根据每根电缆的Fe及电缆埋深,得到每根电缆的受热判断因子FFi;
S4比较排管敷设电缆群中电缆的受热判断因子FFi,受热判断因子最大值所对应的电缆为最热电缆。
2.根据权利要求1所述的判定方法,其特征在于,所述S2采用镜像法计算各电缆的相互热影响因数Fe,具体如下:
其中:dp1,…dpq分别为第1,…,q根电缆中心到第p根电缆中心的距离;d′p1,…d′pq分别为第1,…,q根电缆的镜像到第p根电缆中心的距离,所述p、q均为整数。
3.根据权利要求1所述的判定方法,其特征在于,所述S3中根据每根电缆的Fe及电缆埋深,得到每根电缆的受热判断因子FFi,具体如下:
受热判断因子FFi的公式如下:
FF=ln(4L·Fe)
其中:L是电缆的埋深,Fe为电缆的相互热影响因数。
4.根据权利要求1所述的判定方法,其特征在于,所述S4还包括当两根电缆受热判断因子相同,则根据排管敷设现场实际情况再判定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310496602.6A CN103544391A (zh) | 2013-10-21 | 2013-10-21 | 一种排管敷设电缆群最热电缆的判定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310496602.6A CN103544391A (zh) | 2013-10-21 | 2013-10-21 | 一种排管敷设电缆群最热电缆的判定方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103544391A true CN103544391A (zh) | 2014-01-29 |
Family
ID=49967836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310496602.6A Pending CN103544391A (zh) | 2013-10-21 | 2013-10-21 | 一种排管敷设电缆群最热电缆的判定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103544391A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104330659A (zh) * | 2014-10-21 | 2015-02-04 | 国网上海市电力公司 | 一种基于电缆传热模型的准动态增容方法 |
CN107292037A (zh) * | 2017-06-26 | 2017-10-24 | 广东电网有限责任公司珠海供电局 | 一种排管敷设新增电缆最优位置选择方法 |
CN112949012A (zh) * | 2021-03-24 | 2021-06-11 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种降低周围土壤热阻提高电缆输送容量的方法及系统 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103048568A (zh) * | 2012-12-21 | 2013-04-17 | 广东电网公司佛山供电局 | 电缆沟敷设三芯电缆载流量的确定方法和确定系统 |
CN103336023A (zh) * | 2013-06-04 | 2013-10-02 | 华南理工大学 | 一种电力电缆热阻的计算方法 |
-
2013
- 2013-10-21 CN CN201310496602.6A patent/CN103544391A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103048568A (zh) * | 2012-12-21 | 2013-04-17 | 广东电网公司佛山供电局 | 电缆沟敷设三芯电缆载流量的确定方法和确定系统 |
CN103336023A (zh) * | 2013-06-04 | 2013-10-02 | 华南理工大学 | 一种电力电缆热阻的计算方法 |
Non-Patent Citations (3)
Title |
---|
E.TARASIEWICZ 等: "Calculations of temperature distributions within cable trench backfill and the surrounding soil", 《IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS》 * |
周鑫: "单芯电力电缆导体温度计算及试验研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
梁永春 等: "利用模拟热荷法计算地下电缆稳态温度场", 《中国电机工程学报》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104330659A (zh) * | 2014-10-21 | 2015-02-04 | 国网上海市电力公司 | 一种基于电缆传热模型的准动态增容方法 |
CN104330659B (zh) * | 2014-10-21 | 2017-02-15 | 国网上海市电力公司 | 一种基于电缆传热模型的准动态增容方法 |
CN107292037A (zh) * | 2017-06-26 | 2017-10-24 | 广东电网有限责任公司珠海供电局 | 一种排管敷设新增电缆最优位置选择方法 |
CN112949012A (zh) * | 2021-03-24 | 2021-06-11 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种降低周围土壤热阻提高电缆输送容量的方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106655159B (zh) | 一种新能源电站一次调频能力测试系统及其测试方法 | |
CN105337304B (zh) | 一种光伏电站低电压穿越数据获取方法 | |
CN103107535B (zh) | 一种基于熵权法的电网结构安全性综合评估方法 | |
CN102590593B (zh) | 基于稳态热路模型的架空导线允许电流的确定方法与装置 | |
CN101964525B (zh) | 一种支持大规模电流量测的配电网状态估计方法 | |
CN103762579B (zh) | 一种提高电网暂态功角稳定性的直流功率紧急控制性能指标计算方法 | |
CN103954885B (zh) | 基于分布参数的双回线故障单端定位系统及定位方法 | |
CN105425107B (zh) | 一种有源配电网故障诊断与定位的方法及其系统 | |
CN102723726B (zh) | 一种确定交流受端系统最大直流受入量的方法 | |
CN109918762B (zh) | 一种交直流电网混合仿真对比模型构建方法 | |
CN102969692A (zh) | 一种基于电网实时数据的分支系数计算方法 | |
CN106526347B (zh) | 一种基于数模混合仿真的光伏逆变器低电压穿越评估方法 | |
CN103018633B (zh) | 基于不对称阻抗模型短路电流故障特征的含dg配电网故障区间判定方法 | |
CN105071447A (zh) | 一种交直流混联多馈入直流受端电网强度获得方法 | |
CN112924817A (zh) | 一种基于深度神经网络的配电网故障精确定位方法 | |
CN103544391A (zh) | 一种排管敷设电缆群最热电缆的判定方法 | |
CN104849614A (zh) | 小电流单相接地故障选线的判断方法 | |
CN114740303B (zh) | 一种无线无源高压开关柜的故障监测系统 | |
CN106482848B (zh) | 一种基于m-p广义逆的三芯电缆导体温度动态获取方法 | |
CN103412199A (zh) | 一种同塔多回输电线路不平衡度的计算方法 | |
CN111539147A (zh) | 基于有限元仿真的海底脐带缆温度场分析 | |
CN105205202B (zh) | 一种载流量计算方法 | |
CN107944079B (zh) | 基于转移矩阵的排管敷设三相电缆群温升快速获取方法 | |
CN109149566A (zh) | 一种大功率缺失下频率最低点预测的仿真模型的建模方法 | |
Cai et al. | Optimal construction method and demonstration application of multi-in-one station grounding system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140129 |