CN103544023A - Modern industrial logistics simulation method and modern industrial logistics simulation system - Google Patents

Modern industrial logistics simulation method and modern industrial logistics simulation system Download PDF

Info

Publication number
CN103544023A
CN103544023A CN201310557999.5A CN201310557999A CN103544023A CN 103544023 A CN103544023 A CN 103544023A CN 201310557999 A CN201310557999 A CN 201310557999A CN 103544023 A CN103544023 A CN 103544023A
Authority
CN
China
Prior art keywords
logistics
simulation
rdc
finished product
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310557999.5A
Other languages
Chinese (zh)
Inventor
林杰
毛清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Liugong Luchuang Manufacturing Technology Co Ltd
Original Assignee
Guangxi Liugong Luchuang Manufacturing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Liugong Luchuang Manufacturing Technology Co Ltd filed Critical Guangxi Liugong Luchuang Manufacturing Technology Co Ltd
Priority to CN201310557999.5A priority Critical patent/CN103544023A/en
Publication of CN103544023A publication Critical patent/CN103544023A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a modern industrial logistics simulation method and a modern industrial logistics simulation system. The modern industrial logistics simulation system comprises a simulation base, simulation parts and a simulation information platform, wherein the simulation parts are used for representing suppliers and RDCs. The modern industrial logistics simulation system is characterized in that the suppliers and the RDCs are connected through logistics transport rails, the RDCS are connected with a production line through the logistics transport rails, a manufacturing dispatching center and a finished product warehouse are arranged on the sides of the production line respectively, wherein the manufacturing dispatching center is used for controlling whole production, the finished product warehouse is connected with a delivery center, and the delivery center is connected with dealers through the logistics transport rails; car models are arranged on the logistics transport rails, RFID modules and wireless receiving control modules are arranged on the car models, and a car dispatching controller controls the car models to operate; the simulation information platform comprises an electronic map and a logistics project management system, the logistics project management system controls whole logistics and production, and all material condition changes in the car models, the production line and the finished product warehouse are represented through the electronic map.

Description

Modern industry logistics analogy method and simulation system thereof
Technical field
The present invention relates to a kind of stimulating and training system, specifically, relate to a kind of modern industry logistics analogy method and simulation system thereof.
Background technology
Logistics Industry refers to the aspects such as transportation, storage, handling, processing, arrangement, dispensing, information is organically combined, and forms complete supply chain, and acceleration starting material, finished product flow, for user provides industry multi-functional, integrated synthesis sex service.
Advancing by leaps and bounds of informationization technology, for the development of Logistics Industry brings huge impetus.In promoting several pacing itemss of material flow industry accelerated development, ecommerce is most important factor.The rise of shopping online, credit system perfect, makes the demand for services amount of corresponding kinds of goods dispensing increasing.Expert's prophesy, the logistics of 21 century is the key point of holding market with dispensing.
At present in enterprise and school, shop floor worker is carried out to the training of logistics, the mode adopting, is all to adopt Practice in Mechanical Technology, the mode that enters enterprise with student is carried out entity training, yet, because real training student is not very skilled for operating process and mode, easily cause the damage of workpiece and product, also easily there is security incident, in addition, the training of logistics not overnight just can realize, and it needs long-term logistics training just can realize.Therefore, this just needs a kind of reliability strong, easy to operate, is convenient to product that logistics real training uses or method to address the above problem.
Summary of the invention
The present invention is directed to existing logistics system and use weak effect in practical work, the problem of real training staff training inconvenience, provides a kind of modern industry logistics analogy method and simulation system thereof to address the above problem.
Logistics analogy method in the present invention is achieved in that a kind of modern industry logistics analogy method, comprises the following steps:
Step 1, sets up logistics simulation system: on simulation pedestal, adopt simulating piece to represent and comprise supplier, RDC, production line, manufacture dispatching center, warehouse for finished product and dealer, wherein adopt the logistics transportation track of simulation use that above-mentioned simulating piece is connected; On logistics transportation track, place the car mould that is provided with RFID module and wireless receiving control module, by vehicle scheduling controller, control the operation of car mould;
Step 2, set up analog information platform: set up the electronic chart consistent with each other with logistics simulation system model, and set up logistics plan management system, change system and comprise material storage interface, material feeding interface and material form ordering system, in supplier, RDC, the simulating piece that production line and warehouse for finished product are corresponding is provided with the electronic board for showing that its material changes;
Step 3, carry out logistics simulation: by the production schedule and MRP are set in logistics plan management system, according to plan, start between Che Mo supplier, RDC, production line, manufacture dispatching center, warehouse for finished product and dealer and transport simulation material, and the information of Che Mo and logistics operation is fed back in electronic chart.
The present invention program's know-why is: by various piece carry out analogies streaming system by simulating piece on a simulation pedestal in, and simulate their operational process, thereby reach the effect that allows start-up obtain logistics training.For example, can adopt wooden simulation room to be used for representing supplier, RDC, manufacture dispatching center and warehouse for finished product etc.And logistics transportation track can be built by wooden track, and the logistics material of simulation can replace using by timber model.In addition, when building simulating piece, also need to build analog information platform, comprise the logistics plan management system of controlling logistics and production, it is used for dispatching the management of whole logistics Major program and logistics schedule, and electronic chart can be by the form of electronic chart, the travel situations of car mould in reactant flow field simulation system, and the situation of material on production line and in warehouse for finished product.And on the logistics plan management system stated can programme by existing programing system, and electronic chart can, by after the computer programming formation electronic chart corresponding with logistics simulation system, react to electronic chart by the RFID module on car mould and the reaction module on transported material.Be noted that in addition RDC is area distribution center (Regional Distribution Center is called for short RDC), refers to that logistics company specifically carries out distribution, the home-delivery center of business running.
The solution of the present invention is that the logistics simulation system forming is as follows: comprise simulation pedestal, and the simulating piece, the analog information platform that are used for representing supplier and RDC, between described supplier and RDC, by logistics transportation track, be connected, described RDC is connected with production line by logistics transportation track, described production line side is respectively arranged with for controlling manufacture dispatching center and the warehouse for finished product of integral production, described warehouse for finished product is connected with shipping center, and described shipping center is connected with dealer by logistics transportation track; Described logistics transportation track is provided with car mould, and described car mould is provided with RFID module and wireless receiving control module, and vehicle scheduling controller is controlled the operation of car mould; The logistics plan management system that analog information platform comprises electronic chart and controls whole logistics and production, the material situation variation in described car mould, production line and warehouse for finished product all adopts electronic chart represented.Logistics plan management system comprises material storage interface, material feeding interface and material form ordering system.This logistics plan management system is as a kind of management system of simulating logistics, by designing various material storages interface, material feeding interface and material form ordering system, coordinate simulation logistics, it is mainly the understanding to a kind of logistics management of trainee by various operation interfaces, and above-mentioned design can realize its function by computer programming.
In the present invention, as further improvement, also comprise Bill of Material (BOM) BOM generating apparatus, described Bill of Material (BOM) BOM generating apparatus records and generates unique code to the material of production line and finished product, and stores.Bill of Material (BOM) BOM realizes the information such as material, finished product that system is related to product to be described and unified management by a kind of product structure data file that can be identified by computing machine.This Bill of Material (BOM) BOM generating apparatus can carry out Programming according to the sign on simulation material.
In the present invention, as further improvement, described supplier, RDC, production line and warehouse for finished product correspondence are provided with the electronic board for showing that its material changes, and electronic board can be used for display material stream situation of change, and can be connected with logistics plan management system and/or electronic chart also reading out data.
In the present invention, as further improvement, described RDC comprises for the large RDC of a large amount of parts of Analogue Storage with for accepting to simulate the little RDC of great RDCHuo Tong city supplier's part.RDC by simulation different situations can more be conducive to allow the present logistics analog case of the clearer understanding of real training personnel.
In the present invention, as further improvement, described logistics transportation track is made by wooden track, and the track cost of manufacture of being made by wood is low, is convenient to make.
The invention has the beneficial effects as follows:
1. the present invention designs ingeniously, rationally, can effectively utilize simulation mould to student, and workman carries out modern logistics training, plays and neither hinders production line, avoids again the advantageous effect of damage of product.And its analogy method is convenient to teaching use especially.
2. theory of the present invention is advanced, by various moulds are set, coordinates simulation information platform, the overall process that simulates modern logistics that can be complete.。
3. the present invention is simple in structure, by existing equipment and software, all can implement by this programme, is convenient to the industry and promotes the use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the part-structure schematic diagram at logistics plan management system interface in the present invention;
Fig. 3 is the structural representation of electronic board of the present invention
Parts title and sequence number in figure:
Large supplier 1 ,Tong city supplier 2, large RDC 3, little RDC 4, manufacture dispatching center 5, production line 6, warehouse for finished product 7, shipping center 8, dealer 9;
Track a.
Embodiment
Below in conjunction with drawings and Examples, describe the present invention, following examples explain with invention optimal effectiveness.
Embodiment 1:
As shown in Figure 1, it is modern industry logistics simulation system of the present invention, comprise simulation pedestal, on simulation pedestal, with simulating piece, form large supplier 1 ,Tong city supplier 2, large RDC 3, little RDC 4, simulating piece can be wooden grid etc., and ,Liang Ge great supplier 1 is connected with large ROC3 by track a as shown in the figure, and large RDC3 is connected with little RDC4, little RDC4 sidepiece is connected with Tong Cheng supplier 2 by track a.In addition, little RDC4 is also connected with production line 6 by track, production line 6 sides are respectively arranged with for controlling manufacture dispatching center 5 and the warehouse for finished product 7 of integral production, and manufacture dispatching center 5, production line 6, warehouse for finished product 7, warehouse for finished product 7 is connected with shipping center 8, shipping center 8 is connected with dealer 9 by track a, same, above-mentioned manufacture dispatching center 5, production line 6, warehouse for finished product 7 etc. can adopt model-composing, and track a is provided with car mould, car mould is provided with RFID module and wireless receiving control module, and vehicle scheduling controller is controlled the operation of car mould.
In addition, this modern industry logistics simulation system, also be provided with the analog information platform for analogies streaming system, the logistics plan management system that this analog information platform comprises electronic chart and controls whole logistics and production, the material situation variation in car mould, production line and warehouse for finished product all adopts electronic chart represented.This electronic chart is arranged in terminal; it is formed by general computer software editor; its image demonstrating at terminal is consistent with the simulating piece in Fig. 1; in addition; it is by the RFID module on car mould; and the feedback module on transported material, on electronic chart, feed back the ruuning situation of car mould or material.Thereby can by electronic form, recognize intuitively the ruuning situation of whole modern logistics.
And logistics plan management system is as the management system of simulation modern logistics, as shown in Figure 2, it is by the various material storage of design interface, material feeding interface and material form ordering system, coordinate simulation logistics, it is mainly the understanding to a kind of logistics management of trainee by various operation interfaces, above-mentioned design can realize its function by computer programming, during real training, the situation that start-up can operate by logistics plan management system is first set simulating piece again allows real training personnel understand the operation of its modern logistics.
In addition, when logistics material enters into production line 6, Bill of Material (BOM) BOM generating apparatus records and generates unique code to the material of production line 6 and finished product, and store, this Bill of Material (BOM) BOM generating apparatus can carry out Programming according to the sign on simulation material, or adopts existing BOM machine also can realize.
In addition, large supplier 1 ,Tong city supplier 2, large RDC 3, little RDC 4, production line 6 and warehouse for finished product 7 correspondences are provided with the electronic board for showing that its material changes, this electronic board structure as shown in Figure 3, it is marked with for expressing each simulating piece flow situation, this electronic board can be connected with the chip of logistics plan management system or electronic board, thereby realize synchronous variation, or be only to adopt the situation of model to carry out situation expression.
Track a in the present embodiment is made by wood, can reduce greatly model cost like this.
Product of the present invention is mainly used in educating real training use, and its mode of operation is as follows:
First the employing simulating piece according to the present embodiment builds modern industry logistics simulation system, and in track a placement vehicle mould.Then in logistics plan management system, set the production schedule and MRP, for example, it is 5 mechanical arms that the production schedule can be set, and in logistics plan, comprises the part of 5 mechanical arms, and it can replace by the simulating piece of 5 casees logistics.Start subsequently car mould, by vehicle scheduling controller car hauler mould, move, simulation logistics progress, dispatch buses and in Cong Liangge great supplier 1,4 logistics materials are transported to large RDC 3, and will in 1 logistics Cong Tong city supplier 2, be transported to little RDC 4, in little RDC4, material is transported in production line 6 subsequently, finally in production line 6, simulate assembling, be transported to shipping center 8, operation completes, and whole logistics progress can be observed by electronics situation in electronic chart.
Embodiment 2:
The present embodiment difference from Example 1 is, simulates the simulating pieces such as the large supplier 1 ,Tong city supplier 2 on pedestal, large RDC 3, little RDC 4 and can adopt the simulation workpiece of irony to make, and other principle of work are identical with embodiment 1.
Finally it should be noted that: obviously, above-described embodiment is only used to clearly illustrate example of the present invention, and not to the restriction of implementing.For the those of ordinary skill in described field, can also make other changes in different forms on the basis of the above description.Here without also cannot be to all embodiment with exhaustive.And the apparent variation of being amplified out thus or change are still among protection scope of the present invention.

Claims (6)

1. a modern industry logistics analogy method, is characterized in that:
Step 1, sets up logistics simulation system: on simulation pedestal, adopt simulating piece to represent and comprise supplier, RDC, production line, manufacture dispatching center, warehouse for finished product and dealer, wherein adopt the logistics transportation track of simulation use that above-mentioned simulating piece is connected; On logistics transportation track, place the car mould that is provided with RFID module and wireless receiving control module, by vehicle scheduling controller, control the operation of car mould;
Step 2, set up analog information platform: set up the electronic chart consistent with each other with logistics simulation system model, and set up logistics plan management system, this system comprises material storage interface, material feeding interface and material form ordering system, in supplier, RDC, the simulating piece that production line and warehouse for finished product are corresponding is provided with the electronic board for showing that its material changes;
Step 3, carry out logistics simulation: by the production schedule and MRP are set in logistics plan management system, according to plan, start between Che Mo supplier, RDC, production line, manufacture dispatching center, warehouse for finished product and dealer and transport simulation material, and the information of Che Mo and logistics operation is fed back in electronic chart.
2. the simulation system that modern industry logistics analogy method according to claim 1 forms, comprise simulation pedestal, and the simulating piece, the analog information platform that are used for representing supplier and RDC, it is characterized in that: between described supplier and RDC, by logistics transportation track, be connected, described RDC is connected with production line by logistics transportation track, described production line side is respectively arranged with for controlling manufacture dispatching center and the warehouse for finished product of integral production, described warehouse for finished product is connected with shipping center, and described shipping center is connected with dealer by logistics transportation track; Described logistics transportation track is provided with car mould, and described car mould is provided with RFID module and wireless receiving control module, and vehicle scheduling controller is controlled the operation of car mould; The logistics plan management system that analog information platform comprises electronic chart and controls whole logistics and production, material situation variation in described car mould, production line and warehouse for finished product all adopts electronic chart to show, described logistics plan management system comprises material storage interface, material feeding interface and material form ordering system.
3. the system that modern industry logistics analogy method according to claim 2 forms, it is characterized in that: also comprise Bill of Material (BOM) BOM generating apparatus, described Bill of Material (BOM) BOM generating apparatus records and generates unique code to the material of production line and finished product, and stores.
4. the system that modern industry logistics analogy method according to claim 2 forms, is characterized in that: described supplier, and RDC, production line and warehouse for finished product correspondence are provided with the electronic board for showing that its material changes.
5. the system that modern industry logistics analogy method according to claim 2 forms, is characterized in that: described RDC comprises for the large RDC of a large amount of parts of Analogue Storage with for accepting to simulate the little RDC of great RDCHuo Tong city supplier's part.
6. the system that modern industry logistics analogy method according to claim 2 forms, is characterized in that: described logistics transportation track is made by wooden track.
CN201310557999.5A 2013-11-10 2013-11-10 Modern industrial logistics simulation method and modern industrial logistics simulation system Pending CN103544023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310557999.5A CN103544023A (en) 2013-11-10 2013-11-10 Modern industrial logistics simulation method and modern industrial logistics simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310557999.5A CN103544023A (en) 2013-11-10 2013-11-10 Modern industrial logistics simulation method and modern industrial logistics simulation system

Publications (1)

Publication Number Publication Date
CN103544023A true CN103544023A (en) 2014-01-29

Family

ID=49967504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310557999.5A Pending CN103544023A (en) 2013-11-10 2013-11-10 Modern industrial logistics simulation method and modern industrial logistics simulation system

Country Status (1)

Country Link
CN (1) CN103544023A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103577958A (en) * 2013-11-10 2014-02-12 广西柳工路创制造科技有限公司 Modern industry logistics simulation system
CN112424754A (en) * 2018-06-13 2021-02-26 伯曼集团股份公司 Method for designing and testing logistics and material processing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10134112A1 (en) * 2001-07-13 2003-01-23 Volkswagen Ag Simulating manufacture of product in real existing software environment of real production site, involves acquiring required materials and semi-finished products in parts list in environment
US20040010428A1 (en) * 2002-07-10 2004-01-15 Chun-Zhi Lee System and method for controlling logistics
CN101025805A (en) * 2007-01-24 2007-08-29 上海理工大学 Product-based bill of material generating method
CN101944300A (en) * 2010-09-03 2011-01-12 北京物资学院 Practice teaching system and method for logistics information technology
CN202332056U (en) * 2011-10-13 2012-07-11 桂林易创精益信息技术有限公司 Analog training platform of manufacturing enterprise information system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10134112A1 (en) * 2001-07-13 2003-01-23 Volkswagen Ag Simulating manufacture of product in real existing software environment of real production site, involves acquiring required materials and semi-finished products in parts list in environment
US20040010428A1 (en) * 2002-07-10 2004-01-15 Chun-Zhi Lee System and method for controlling logistics
CN101025805A (en) * 2007-01-24 2007-08-29 上海理工大学 Product-based bill of material generating method
CN101944300A (en) * 2010-09-03 2011-01-12 北京物资学院 Practice teaching system and method for logistics information technology
CN202332056U (en) * 2011-10-13 2012-07-11 桂林易创精益信息技术有限公司 Analog training platform of manufacturing enterprise information system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
追魂剑君: "物流沙盘模拟介绍", 《HTTP://WENKU.BAIDU.COM.VIEW/D3EB97DBA58DA0116C1749C0.HTML》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103577958A (en) * 2013-11-10 2014-02-12 广西柳工路创制造科技有限公司 Modern industry logistics simulation system
CN112424754A (en) * 2018-06-13 2021-02-26 伯曼集团股份公司 Method for designing and testing logistics and material processing system

Similar Documents

Publication Publication Date Title
Monizza et al. Parametric and Generative Design techniques in mass-production environments as effective enablers of Industry 4.0 approaches in the Building Industry
CN108510866B (en) Comprehensive practice teaching system of intelligent manufacturing technology
CN105096083B (en) Information system for warehouse
CN112435571B (en) Industrial Internet + intelligent manufacturing technology fusion production and comprehensive training system
CN104463521B (en) Material allocation method
CN101369291A (en) Storage simulator
CN105205638A (en) Manufacturing industry logistics management system adopting two-dimension code scanning technology
Lyons et al. Customer-driven supply chains: From glass pipelines to open innovation networks
CN112488654A (en) Integrated intelligent cooperation method and device for electric power material design
CN102930378A (en) Automatic printing and managing system for bar code
CN105518725A (en) Production system simulation device, production system simulation method, and production system simulation program
CN103544023A (en) Modern industrial logistics simulation method and modern industrial logistics simulation system
Brenner et al. A seamless convergence of the digital and physical factory aiming in personalized Product Emergence Process (PPEP) for smart products within ESB Logistics Learning Factory at Reutlingen University
CN108960707B (en) Automobile part packaging management system
CN103577958A (en) Modern industry logistics simulation system
Ezema et al. Industrial design and simulation of a JIT material handling system
CN108038526A (en) A kind of cigarette auxiliary material group disk storage method and system
CN111709805A (en) Integrated order management method and device based on bar code management and control
CN104021448A (en) Cloud-manufacturing-oriented service process and synergetic transaction control method
Conrad et al. Turbo Flow: Using plan for every part (PFEP) to Turbo charge your supply chain
Lee et al. Dynamic impact analysis method using use-case and UML models on object-oriented analysis
CN107993043A (en) Intelligent warehouse management system
Harris et al. Capitalizing on lean production systems to win new business: creating a lean and profitable new product portfolio
CN201686102U (en) Tobacco product container with RFID electronic tag
Tee A historical perspective on industrial production and outlook

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140129