CN103542174A - 一种煤矿塌陷区管道敷设方法 - Google Patents

一种煤矿塌陷区管道敷设方法 Download PDF

Info

Publication number
CN103542174A
CN103542174A CN201310542097.4A CN201310542097A CN103542174A CN 103542174 A CN103542174 A CN 103542174A CN 201310542097 A CN201310542097 A CN 201310542097A CN 103542174 A CN103542174 A CN 103542174A
Authority
CN
China
Prior art keywords
pipe
subsidence
laying method
pipe trench
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310542097.4A
Other languages
English (en)
Other versions
CN103542174B (zh
Inventor
盛平
王东权
于广云
杨洋
张彦丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310542097.4A priority Critical patent/CN103542174B/zh
Publication of CN103542174A publication Critical patent/CN103542174A/zh
Application granted granted Critical
Publication of CN103542174B publication Critical patent/CN103542174B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/032Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being continuous
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/11Accessories therefor, e.g. anchors for the detection or protection of pipes in the ground

Abstract

一种抗煤矿塌陷区管道敷设方法,管道穿越煤矿塌陷区区域,采用柔度较好的高密度聚乙烯管,将管道放置盖板管沟中,管沟顶板距离地面约为0.5m,管沟宽度比管道外径宽约1m。管道呈弯曲蛇形状敷设在管沟中,两侧用黄沙、锯末等缓冲材料回填,管道底部每隔30m~50m设置高度为20cm左右的橡胶支座。该方法能使管道抵抗采动区不均匀沉降、屈曲变形等地表大变形的影响,保证在地表下沉过程中管道能够正常工作,可以有效的避免地表沉降造成的附加内力对管道的破坏,大大节约了改线的土地资源,其结构简单,实施方便,投资较少,效果好,具有广泛的实用性。

Description

一种煤矿塌陷区管道敷设方法
技术领域
本发明涉及煤矿塌陷区管道敷设方法,适用于预防和治理不均沉降地区地表大变形的新建管道工程。
背景技术
为了满足社会经济的发展,人们加大了对地下资源的开发和利用,煤炭、石油、天然气、地下水等资源被源源不断的从地下采出,这不可避免的会破坏地下岩体、土体的原始应力平衡状态,引起岩土体内的应力重分布,岩层产生移动、变形和破坏。当地下开采面积达到一定的范围后,起始于采场附近的移动将扩展到地表,形成一个地表变形区,无论是减轻地表沉陷的开采技术,包括房柱式开采、部分开采、充填法开采和分层间隙开采等,还是普通开采方法,都会引起地表的大面积沉陷。随着城市建设的发展,各种供水管道、燃气管道工程日益增加,在矿区的这些管道工程不可避免的会穿越煤矿塌陷区。传统的直埋式敷设方法,将管道直接埋入地下,然后进行回填。当地表由于地下采煤活动,发生大幅度地表变形的时候,地下管道将承受巨大的附加内力作用,一旦管道承受的荷载超过其本身许用强度,就会发生破裂甚至是断裂事故,进而影响管道的正常使用。因此,如何保证穿越煤矿塌陷区的各种管道工程能够有效抵抗地表大幅度变形的影响,保证管道使用安全,成为一个亟待解决的课题。
发明内容
鉴于已有技术存在的不足,本发明的目的是提供一种无需改道,抵抗变形量大,效果好的抗煤矿塌陷区管道敷设方法。
本发明的煤矿塌陷区管道敷设方法包括:
a、在煤矿塌陷区域内开挖沟槽,并对沟槽用砖块砌筑横断面呈U的管沟,管沟顶板距离地面约为0.5m,管沟宽度比管道外径宽约为1m;
b、在管沟的底部间隔距离设置厚度约为20cm的橡胶支座;
c、在管沟中安放聚乙烯管,将其连接成弯曲蛇形状的管道;
d、然后用柔性缓冲材料对管沟进行回填,埋住管道后,在上面设置盖板。
所述管沟底部设置橡胶支座的间隔距离为30m~50m;所述的聚乙烯管为高密度聚乙烯管;所述的柔性缓冲材料为黄沙与锯末混合物,其重量比为3:1。
有益效果:最适用于穿越地表变形较大区域的管道工程。将管道放置在管沟中,一部分地表变形由管沟承担,地表土体的移动不是直接施加在管道上;采用柔性复合材料的管材,能满足塌陷区不均匀沉降、屈曲变形等地表大变形造成的管道附加变形影响;管道呈弯曲状敷设在管沟中,可以利用管道的富余长度来补偿由于地表水平移动造成的管道拉伸或者压缩;底部放置一定厚度的橡胶支座,可以利用支座的旋转,来调解地表不均匀沉降造成的管道转角。该方法可以有效降低管道因地表大幅度变形产生的附加应力,保护管道不发生破坏,在采煤塌陷下沉过程中,能保证管道正常运营,满足地表沉陷后管道功能完好。大大节约了改线后耕地资源或重建管道的费用,具有广泛的实用性。
附图说明
图1是本发明管道敷设横断面示意图。
图2是本发明管道敷设平面示意图。
图中:1—盖板,2—管沟,3—管道,4—柔性缓冲材料,5—橡胶支座
具体实施方式
下面将结合附图对本发明的一个实施例作进一步的描述:
如附图1所示,为了避免地表变形直接作用于管道结构上,在煤矿塌陷区内设置盖板管沟,管沟宽度大于所敷设管道的外经约1m,管沟顶部加盖厚度约5cm的钢筋混凝土盖板;施工时,先在塌陷区开挖出一条管沟2,管沟2上设置有盖板1,管沟2顶面距离地面约为0.5m,在管沟2中每隔30m~50m设置一块橡胶支座5,厚度约为20cm,然后将管道3放置于管沟2中,在周围用柔性缓冲材料4回填。为了补偿地表水平变形对管道3造成的拉伸或者压缩作用,管道3呈弯曲蛇形状放置在管沟2中,如图2所示。具体的弯曲曲率视地表水平变形而定。管道材质采用柔性复合材料管材;柔性复合材料管材可以是高密度聚乙烯管,即HDPE管;所述柔性缓冲材料可以是黄沙与锯末按重量比3:1的混合物。

Claims (4)

1.一种煤矿塌陷区管道敷设方法,其特征在于包括如下步骤:
a、在煤矿塌陷区域内开挖沟槽,并对沟槽用砖块砌筑横断面呈U的管沟(2),管沟(2)顶板距离地面约为0.5m,管沟(2)宽度比管道外径宽约为1m;
b、在管沟(2)的底部间隔距离设置厚度约为20cm的橡胶支座(5);
c、在管沟(2)中安放聚乙烯管,将其连接成弯曲蛇形状的管道(3);
d、然后用柔性缓冲材料(4)对管沟(2)进行回填,埋住管道(3)后,在上面设置盖板(1)。
2.根据权利要求1所述的煤矿塌陷区管道敷设方法,其特征在于:所述管沟(2)底部设置橡胶支座(5)的间隔距离为30m~50m。
3.根据权利要求1所述的煤矿塌陷区管道敷设方法,其特征在于:所述的聚乙烯管为高密度聚乙烯管。
4.根据权利要求1所述的煤矿塌陷区管道敷设方法,其特征在于:所述的柔性缓冲材料(4)为黄沙与锯末混合物,其重量比为3:1。
CN201310542097.4A 2013-11-05 2013-11-05 一种煤矿塌陷区管道敷设方法 Expired - Fee Related CN103542174B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310542097.4A CN103542174B (zh) 2013-11-05 2013-11-05 一种煤矿塌陷区管道敷设方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310542097.4A CN103542174B (zh) 2013-11-05 2013-11-05 一种煤矿塌陷区管道敷设方法

Publications (2)

Publication Number Publication Date
CN103542174A true CN103542174A (zh) 2014-01-29
CN103542174B CN103542174B (zh) 2015-11-18

Family

ID=49965911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310542097.4A Expired - Fee Related CN103542174B (zh) 2013-11-05 2013-11-05 一种煤矿塌陷区管道敷设方法

Country Status (1)

Country Link
CN (1) CN103542174B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939948A (zh) * 2017-04-12 2017-07-11 河南理工大学 一种煤矿开采沉陷区埋地油气管道保护装置及铺设方法
CN108426093A (zh) * 2018-02-01 2018-08-21 中国十七冶集团有限公司 一种小区道路过路管加固方法
CN114382948A (zh) * 2020-10-20 2022-04-22 中国石油天然气集团有限公司 一种崩塌区油气管道抗冲击敷设方法
CN114440002A (zh) * 2020-11-02 2022-05-06 中国石油天然气集团有限公司 一种缓解走滑断层作用下油气管道应变的敷设结构及方法
CN114382948B (zh) * 2020-10-20 2024-04-30 中国石油天然气集团有限公司 一种崩塌区油气管道抗冲击敷设方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5326982A (en) * 1976-08-25 1978-03-13 Hitachi Cable Ltd Cable line
JPH0634076A (ja) * 1992-07-14 1994-02-08 Kubota Corp 土木シートによる埋設管路の沈下防止方法
JPH10204857A (ja) * 1997-01-21 1998-08-04 Nkk Corp パイプラインの埋戻し工法
CN101886684A (zh) * 2010-06-18 2010-11-17 大连理工大学 沉陷区埋地管线结构的减震控制装置
JP2011219996A (ja) * 2010-04-09 2011-11-04 Sekisui House Ltd 地盤沈下対策配管構造及び地盤沈下対策配管方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5326982A (en) * 1976-08-25 1978-03-13 Hitachi Cable Ltd Cable line
JPH0634076A (ja) * 1992-07-14 1994-02-08 Kubota Corp 土木シートによる埋設管路の沈下防止方法
JPH10204857A (ja) * 1997-01-21 1998-08-04 Nkk Corp パイプラインの埋戻し工法
JP2011219996A (ja) * 2010-04-09 2011-11-04 Sekisui House Ltd 地盤沈下対策配管構造及び地盤沈下対策配管方法
CN101886684A (zh) * 2010-06-18 2010-11-17 大连理工大学 沉陷区埋地管线结构的减震控制装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
冯伟: "采空塌陷区管道成灾机理分析及工程防治措施", 《水文地质工程地质》, vol. 37, no. 3, 30 May 2010 (2010-05-30) *
张浩: "临涣输水管道穿越任楼煤矿塌陷区管材与铺设方案的选择", 《科技推广与应用》, 30 October 2006 (2006-10-30) *
殷成奇: "煤矿塌陷区直埋供热管道可靠性分析", 《区域供热》, no. 2, 28 February 2009 (2009-02-28) *
管军,王敏: "西气东输二线管道在罐罐岭地震断裂带的敷设", 《天然气工业》, 30 May 2010 (2010-05-30) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939948A (zh) * 2017-04-12 2017-07-11 河南理工大学 一种煤矿开采沉陷区埋地油气管道保护装置及铺设方法
CN106939948B (zh) * 2017-04-12 2022-06-28 河南理工大学 一种煤矿开采沉陷区埋地油气管道保护装置及铺设方法
CN108426093A (zh) * 2018-02-01 2018-08-21 中国十七冶集团有限公司 一种小区道路过路管加固方法
CN114382948A (zh) * 2020-10-20 2022-04-22 中国石油天然气集团有限公司 一种崩塌区油气管道抗冲击敷设方法
CN114382948B (zh) * 2020-10-20 2024-04-30 中国石油天然气集团有限公司 一种崩塌区油气管道抗冲击敷设方法
CN114440002A (zh) * 2020-11-02 2022-05-06 中国石油天然气集团有限公司 一种缓解走滑断层作用下油气管道应变的敷设结构及方法

Also Published As

Publication number Publication date
CN103542174B (zh) 2015-11-18

Similar Documents

Publication Publication Date Title
CN204645075U (zh) 一种城市道路软土地基地下管道加固装置
CN103498696B (zh) 一种从顶板巷道注浆充填压实采空区充填体的方法
CN104234056B (zh) 用于防止高水位液化地区地下综合管廊变形的施工方法
CN106703692A (zh) 一种地面定向顺层钻孔注浆加固薄层灰岩的方法
Chen et al. Recent advances in high slope reinforcement in China: Case studies
CN104612696B (zh) 大断面暗挖地铁车站在粉细砂层中穿越高架桥柱洞法施工方法
CN111608688B (zh) 一种盾构下穿建筑物地面的加固方法
Li et al. Trial of small gateroad pillar in top coal caving longwall mining of large mining height
Yao et al. Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings
CN102425155A (zh) 一种采空区上覆岩体浅层加固方法
CN1804239A (zh) 塌陷区抗变形建筑物基础施工方法
CN103542174B (zh) 一种煤矿塌陷区管道敷设方法
CN102102518A (zh) 一种水库坝体下厚煤层放顶煤协调开采方法
CN104895121A (zh) 一种减小地下结构建设中地表沉降及建构筑物变形的横向隔断法
CN204402554U (zh) 一种在施工现场铺设的避险逃生管道
US20230030467A1 (en) Method for slope geological disaster treatment and mineral resource recovery
CN104863176A (zh) 一种用于天然气管道工程的挡土墙及其施工方法
CN106149631B (zh) 高山窄谷拱坝崩塌型边坡处理方法
CN213088018U (zh) 一种盾构下穿建筑物防沉降控制的支护结构
CN204163734U (zh) 公路隧道结构
CN108798589B (zh) 一种含水层改性方法
CN110617077B (zh) 一种隧底仰拱防底臌施工方法
Xu et al. Numerical study on karst treatment technology of Wuhan Metro Line 6
CN109441478B (zh) 隧洞ⅳ类、ⅴ类围岩超前杆系拱减震加固法
CN105298523A (zh) 一种回采巷道顶板层次控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20201105

CF01 Termination of patent right due to non-payment of annual fee