CN103538145A - Long-tube-section precast concrete pile construction method - Google Patents

Long-tube-section precast concrete pile construction method Download PDF

Info

Publication number
CN103538145A
CN103538145A CN201310504306.6A CN201310504306A CN103538145A CN 103538145 A CN103538145 A CN 103538145A CN 201310504306 A CN201310504306 A CN 201310504306A CN 103538145 A CN103538145 A CN 103538145A
Authority
CN
China
Prior art keywords
mold
construction method
pile
tube
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310504306.6A
Other languages
Chinese (zh)
Inventor
沈黎兴
罗史嵘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAYU CONSTRUCTION GROUP CO Ltd
Original Assignee
HUAYU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAYU CONSTRUCTION GROUP CO Ltd filed Critical HUAYU CONSTRUCTION GROUP CO Ltd
Priority to CN201310504306.6A priority Critical patent/CN103538145A/en
Publication of CN103538145A publication Critical patent/CN103538145A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/68Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts and applying centrifugal forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a long-tube-section precast concrete pile construction method. The method is characterized by including coating concrete release agent on the mold inner wall and the mold end cover torus; placing a reinforcement cage required by pile production into a mold cavity, and then closing the upper mold and the lower mold; conveying configured concrete to the mold cavity, and straightening a preset hole mandrel; tensioning the reinforcement cage in the mold, and applying pre-stressing; hanging the mold to a centrifuge to centrifuge and form, and then performing high-pressure steam curing; pulling out the preset hole mandrel of the cured and formed tube section, and disassembling the mold. The invention further provides a construction method of the long-tube-section precast concrete pile, production process is simple, since the mole is closed at first, the upper mold and the lower mold are closed tightly, the problem of precast concrete pile commissure leakage is solved, the pile quality is guaranteed, the produced precast pile is higher in ensile strength and flexural capacity, and beat resistant capacity of the long-tube-section precast concrete pile is improved greatly.

Description

A kind of construction method of long joint concrete precast pile
Technical field
the present invention relates to a kind of construction method of long joint concrete precast pile.
Background technology
long joint concrete precast pile is widely used in the great foundation engineerings such as road, bridge, water conservancy, electric power and metallurgy of China's Coastal Areas.Along with the development of engineering, more and more higher to the requirement of long joint concrete large-diameter tubular pile, its demand is also increasing.The bending resistance of the concrete-pile adopting at present and resistance to tension and effective compressive pre-stress value are less than normal, and concrete configuration is the deciding factor that determines concrete tubular pile performance.
Summary of the invention
technical problem to be solved by this invention is just to provide a kind of construction method of long joint concrete precast pile, can greatly improve the intensity of concrete precast pile.
for solving the problems of the technologies described above, technical scheme of the present invention is: a kind of construction method of long joint concrete precast pile, and its construction procedure is as follows:
(1) at mould inner wall and die end bezel ring, face brushing concrete parting agent;
(2) by producing the required steel reinforcement cage of pile tube, pack dies cavity into, then close up upper and lower mould;
(3) by the concrete conveyance configuring to dies cavity, straightening preformed hole plug;
(4) steel reinforcement cage in mould is carried out to stretch-draw, apply prestressing force;
(5) by mold hoisting to centrifugal forming on centrifuge, then carry out autoclave curing;
(6) the moulding tube coupling after maintenance is extracted to preformed hole plug, and remove mould.
as preferably, the concrete described in step (3) is formed by following material configuration: 500 parts of portland cements, its strength grade is not less than 42.5 grades, 700 parts, fine aggregate river sand, 1000 parts of rubbles, 140 parts, water, 6 parts of high efficiency water reducing agents.
as preferably, its stretch-draw intensity of the stretch-draw described in step (4) is 0.7 times of steel reinforcement cage overall strength, and the stretch-draw time is 10-60 second.
as preferably, autoclave curing described in step (5), its pressure is that 10 atmospheric pressure, temperature are 180 degree.
beneficial effect of the present invention: the construction method that the invention provides a kind of long joint concrete precast pile, production technology is simple, owing to adopting first matched moulds, make upper and lower mould close closelyr, solved the problem of concrete precast pile joint close spillage, guaranteed pile tube quality, prefabricated pile tensile strength and the bending resistance produced are stronger, have greatly improved the anti-strike ability of long joint concrete precast pile.
The specific embodiment
the following stated is only better embodiment of the present invention, and the equivalence of doing according to structure, feature and principle described in patent claim of the present invention therefore all changes or modifies, and is included in patent claim of the present invention.
embodiment: a kind of construction method of long joint concrete precast pile, its construction procedure is as follows:
(1) at mould inner wall and die end bezel ring, face brushing concrete parting agent.
(2) by producing the required steel reinforcement cage of pile tube, pack dies cavity into, then close up upper and lower mould, the method that adopts first matched moulds to be in the milk again, can avoid because concrete particle drops, being difficult to close tightly when matched moulds, causes upper and lower mould joint close compared with causing greatly spillage.
(3) by the concrete conveyance configuring to dies cavity, straightening preformed hole plug.Its concrete is formed by following material configuration: 500 parts of portland cements, its strength grade is not less than 42.5 grades, 700 parts, fine aggregate river sand, 1000 parts of rubbles, 140 parts, water, 6 parts of high efficiency water reducing agents.
(4) steel reinforcement cage in mould is carried out to stretch-draw, apply prestressing force, its stretch-draw intensity is 0.7 times of steel reinforcement cage overall strength, and the stretch-draw time is 10-60 second.
(5) by mold hoisting to centrifugal forming on centrifuge, then carry out autoclave curing, its pressure is that 10 atmospheric pressure, temperature are 180 degree.
(6) the moulding tube coupling after maintenance is extracted to preformed hole plug, and remove mould.
the invention provides a kind of construction method of long joint concrete precast pile, production technology is simple, owing to adopting first matched moulds, make upper and lower mould close closelyr, solved the problem of concrete precast pile joint close spillage, guaranteed pile tube quality, prefabricated pile tensile strength and the bending resistance produced are stronger, have greatly improved the anti-strike ability of long joint concrete precast pile.

Claims (4)

1. a construction method for long joint concrete precast pile, is characterized in that construction procedure is as follows:
(1) at mould inner wall and die end bezel ring, face brushing concrete parting agent;
(2) by producing the required steel reinforcement cage of pile tube, pack dies cavity into, then close up upper and lower mould;
(3) by the concrete conveyance configuring to dies cavity, straightening preformed hole plug;
(4) steel reinforcement cage in mould is carried out to stretch-draw, apply prestressing force;
(5) by mold hoisting to centrifugal forming on centrifuge, then carry out autoclave curing;
(6) the moulding tube coupling after maintenance is extracted to preformed hole plug, and remove mould.
2. the construction method of a kind of long joint concrete precast pile according to claim 1, it is characterized in that: the concrete described in step (3) is formed by following material configuration: 500 parts of portland cements, its strength grade is not less than 42.5 grades, 700 parts, fine aggregate river sand, 1000 parts of rubbles, 140 parts, water, 6 parts of high efficiency water reducing agents.
3. the construction method of a kind of long joint concrete precast pile according to claim 1, is characterized in that: its stretch-draw intensity of the stretch-draw described in step (4) is 0.7 times of steel reinforcement cage overall strength, and the stretch-draw time is 10-60 second.
4. the construction method of a kind of long joint concrete precast pile according to claim 1, is characterized in that: autoclave curing described in step (5), its pressure is that 10 atmospheric pressure, temperature are 180 degree.
CN201310504306.6A 2013-10-24 2013-10-24 Long-tube-section precast concrete pile construction method Pending CN103538145A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310504306.6A CN103538145A (en) 2013-10-24 2013-10-24 Long-tube-section precast concrete pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310504306.6A CN103538145A (en) 2013-10-24 2013-10-24 Long-tube-section precast concrete pile construction method

Publications (1)

Publication Number Publication Date
CN103538145A true CN103538145A (en) 2014-01-29

Family

ID=49962186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310504306.6A Pending CN103538145A (en) 2013-10-24 2013-10-24 Long-tube-section precast concrete pile construction method

Country Status (1)

Country Link
CN (1) CN103538145A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85205055U (en) * 1985-11-30 1987-04-01 北京电力设备总厂 Prestressed concrete pile
CN85108550A (en) * 1985-11-30 1987-06-03 清华大学 Prestressed concrete foundation pile
CN1133771A (en) * 1995-10-13 1996-10-23 广州羊城管桩有限公司 Technique for mfg. prestressed high-strength concrete pipe pile by blending grinding fine building sand
JP2005154213A (en) * 2003-11-27 2005-06-16 Fuji Ps Corp Binder composition in high durable concrete, product of high durable concrete and method of manufacturing the same
CN2782763Y (en) * 2005-04-08 2006-05-24 王伟明 Pretensioned type steel strand prestressed concrete pipe pile
CN102490263A (en) * 2011-11-18 2012-06-13 宁波海港工程有限公司 Pipe joint production method for concrete pipe piles with long pipe joints

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85205055U (en) * 1985-11-30 1987-04-01 北京电力设备总厂 Prestressed concrete pile
CN85108550A (en) * 1985-11-30 1987-06-03 清华大学 Prestressed concrete foundation pile
CN1133771A (en) * 1995-10-13 1996-10-23 广州羊城管桩有限公司 Technique for mfg. prestressed high-strength concrete pipe pile by blending grinding fine building sand
JP2005154213A (en) * 2003-11-27 2005-06-16 Fuji Ps Corp Binder composition in high durable concrete, product of high durable concrete and method of manufacturing the same
CN2782763Y (en) * 2005-04-08 2006-05-24 王伟明 Pretensioned type steel strand prestressed concrete pipe pile
CN102490263A (en) * 2011-11-18 2012-06-13 宁波海港工程有限公司 Pipe joint production method for concrete pipe piles with long pipe joints

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张俊娟等: "长管节大管桩的管节生产工艺", 《土工基础》 *

Similar Documents

Publication Publication Date Title
CN101619781B (en) Carbon fiber concrete pipe and manufacture method thereof
CN201858441U (en) Lined reinforced concrete anticorrosive composite pipeline
CN101303095B (en) Reinforced concrete and glass fiber reinforced plastic sand inclusion composite pipes and molding process thereof
CN101435250A (en) Prefabricated common concrete pipe restricted type regeneration concrete core composite column and manufacturing method thereof
CN103770214A (en) Production method for telegraph pole based on self-compacting concrete
CN107269295A (en) A kind of PVA ECC set lining structures and construction method
CN108797893A (en) A kind of carbon fiber mesh enhancing concrete exempts to tear column mould and preparation method thereof open
CN108049318A (en) Composite entity assembling overlapping box culvert and construction method
CN201981780U (en) Mold for manufacturing of cylindrical structures
CN103568109A (en) Hole forming method of precast concrete hollow component
CN108797892A (en) A kind of fiberglass gridding enhancing concrete exempts to tear column mould and preparation method thereof open
CN104908157A (en) Super-high performance concrete compound pipeline preparation method
CN103538145A (en) Long-tube-section precast concrete pile construction method
CN102303094A (en) Manufacturing method for foundry port couple runner
CN202850017U (en) Modified type prestress high-strength concrete hollow square pile
CN105736851B (en) The socket cracking structure and its manufacture method of a kind of Prestressed concrete cylinder pipe
CN202639230U (en) No-box casting system for bimetallic casting
CN108756065A (en) A kind of basalt fibre grid enhancing concrete exempts to tear column mould and preparation method thereof open
CN102975282A (en) Method for forming unnonuniformly reinforcement-arranged precast pile
CN104476667A (en) Novel production process of electric pole
CN213173823U (en) Improved concrete pouring vertical shaft mould inner barrel
CN112873515A (en) Concrete pole pouring system and method
CN102490263B (en) Pipe joint production method for concrete pipe piles with long pipe joints
CN103817791A (en) Machining method for pre-stress concrete solid cylindrical pile
CN104942977A (en) Core pulling pipe of prefabricated member and manufacturing method of prefabricated member

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140129