CN103817791A - Machining method for pre-stress concrete solid cylindrical pile - Google Patents

Machining method for pre-stress concrete solid cylindrical pile Download PDF

Info

Publication number
CN103817791A
CN103817791A CN201410072499.7A CN201410072499A CN103817791A CN 103817791 A CN103817791 A CN 103817791A CN 201410072499 A CN201410072499 A CN 201410072499A CN 103817791 A CN103817791 A CN 103817791A
Authority
CN
China
Prior art keywords
main muscle
stretching force
prestressing force
concrete
force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410072499.7A
Other languages
Chinese (zh)
Inventor
邓亚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410072499.7A priority Critical patent/CN103817791A/en
Publication of CN103817791A publication Critical patent/CN103817791A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • B28B21/62Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements circumferential laterally tensioned
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/14Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means vibrating, e.g. the surface of the material
    • B28B21/16Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means vibrating, e.g. the surface of the material one or more mould elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a machining method for a pre-stress concrete solid cylindrical pile. The machining method comprises the specific manufacturing steps in sequence: manufacturing a steel reinforcement cage; assembling; tensioning; pouring; finishing; finally, machining to obtain the pre-stress concrete solid cylindrical pile; carrying out surface treatment on the prepared pre-stress concrete solid cylindrical pile. The machining method has the advantages of simple machining process, cost saving, strong bearing capability, long service life and the like; the quality can be guaranteed and the pre-stress concrete solid cylindrical pile can be rapidly machined, so that the pre-stress concrete solid cylindrical pile can be produced and popularized in a large scale.

Description

The processing method of prestressed concrete filled circles stake
Technical field
The present invention relates to building field, the processing method of a kind of prestressed concrete filled circles stake is provided especially.
Background technology
At present, China's precast concrete pile manufacture field, mainly contains two kinds of concrete-piles: a kind of is that the vibrate cross section of moulding is polygonal post, and another kind is the stake of cast circle or the cast polygonal pile of centrifugal forming.The method of the cast circle stake traditional fabrication concrete-pile of centrifugal forming is: penetration concrete material in female die, and then the upper mold section that closes applies prestressing force, cause quality and the steel bar quality of concrete-pile to be affected, and all there is complex forming technology in the stake of the cast of above-mentioned centrifugal forming circle, production efficiency is low, the problems such as cost of manufacture is high, and bearing capacity of pile is low.
Therefore, how the processing method of concrete-pile is improved, become people's problem demanding prompt solution.
summary of the invention
Given this, the object of the present invention is to provide the processing method of a kind of prestressed concrete filled circles stake, at least to solve the complex forming technology existing in concrete-pile processing method in the past, the problem such as production efficiency is low, and cost of manufacture is high, and bearing capacity of pile is low.
The processing method that the invention provides the stake of a kind of prestressed concrete filled circles, is characterized in that, concrete making step is as follows:
---fabrication of reinforcing cage: by the some main muscle of isometric prestressing force and spiral bar colligation or be welded into cylindrical reinforcing steel cage;
---assembling: above-mentioned cylindrical reinforcing steel cage mounted is fitted in lower mold half, anchoring locking is carried out in the two ends of the main muscle of prestressing force in cylindrical reinforcing steel cage, again upper mold half be fastened on to the top of lower mold half and upper and lower half mold is fixed to connection, and being provided with sprue gate in described upper mold half;
---stretch-draw: the main muscle of prestressing force in the die assembly assembling is applied to stretching force, and stretch-draw, to 60% ~ 80% of the main muscle tensile strength of prestressing force, is carried out anchoring;
---a cast: toward mould inside cast concrete, carry out maintenance at the sprue gate place of upper mold half after being poured, put after concrete solidifies and the demoulding;
---finishing: the prestressed concrete filled circles stake making is carried out to surface treatment and late maintaining.
Preferably, in described stretch-draw step stretching force for applying stage by stage.
Further preferably, the described detailed process that applies stage by stage stretching force is:
---apply stretching force to 10% ~ 20% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 5 ~ 10 seconds;
---apply again stretching force to 40% ~ 50% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 5 ~ 10 seconds;
---apply again stretching force to 60% ~ 80% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 10 ~ 20 seconds.
Further preferably, in described cast step, in concrete placement, unitary mould assembly inner concrete is shaken and smash, be convenient to accelerate poring rate and air-free concrete.
Further preferably, the main muscle of described prestressing force is steel bar for prestressed concrete.
The processing method of prestressed concrete filled circles provided by the invention stake, mainly contain following improvement: 1, steel reinforcement cage is assembled in lower mold half, after upper mold half and lower mold half are fastened, carry out again concrete unified cast, thereby can avoid female die cast time, the concrete material that occurs exceeding female die in matched moulds process falls down and enters two phenomenons in the joint close between half module, has also avoided the quality problems of the original intrinsic stakes such as the spillage that causes thus.2, before cast concrete, carry out the stretch-draw of the main muscle of prestressing force, can effectively avoid carrying out again the spiral bar generation displacement phenomenon that stretch-draw causes being imbedded in reinforcement in concrete cage after cast, and then guarantee that its position fixes, improve concrete solid pile service life.
The processing method of prestressed concrete filled circles provided by the invention stake, there is processing technology simple, cost-saving, bearing capacity is high, the advantages such as long service life, can fast and ensure the quality of products and process the stake of prestressed concrete filled circles, be conducive to the stake of prestressed concrete filled circles and realize large-scale production and popularization.
Accompanying drawing explanation
Fig. 1 is the structural representation of steel reinforcement cage;
Fig. 2 is the structural representation of upper and lower half mold.
The specific embodiment
It should be noted that, in the situation that not conflicting, the feature in embodiment and embodiment in the application can combine mutually.Describe the present invention in detail below in conjunction with embodiment.
Processing method according to the stake of prestressed concrete filled circles is carried out the processing of concrete-pile, its whole process-cycle is: steel reinforcement cage processing 10 ~ 30 minutes, steel reinforcement cage, die assembly assembling 5 ~ 20 minutes, stretch-draw 3 ~ 10 minutes, pour into a mould 5 ~ 30 minutes, first maintenance 3 ~ 7 hours, puts a demoulding 5 ~ 20 minutes, finishing, later stage autoclave curing 5 ~ 12 hours, concrete steps are as follows:
First, as shown in Figure 1, by the some main muscle 1 of isometric prestressing force and spiral bar 2 colligations or be welded into cylindrical reinforcing steel cage; Again above-mentioned cylindrical reinforcing steel cage mounted is fitted in lower mold half 3, anchoring locking is carried out in the two ends of the main muscle of prestressing force in cylindrical reinforcing steel cage, again upper mold half 4 is fastened on to the top of lower mold half 3 and upper and lower half mold is fixed to connection, and in described upper mold half 4, be provided with sprue gate 41, the concrete structure of upper and lower half mold as shown in Figure 2; Then the main muscle of prestressing force in the die assembly assembling is applied to stretching force, stretch-draw, to 60% ~ 80% of the main muscle tensile strength of prestressing force, is carried out anchoring; Again by concrete from the sprue gate of upper mold half toward mould inside cast concrete, after being poured, carry out maintenance, after concrete is cured to sufficient intensity, put and the demoulding; Finally, the prestressed concrete filled circles stake making is carried out to surface treatment and late maintaining, make finished product.
Wherein, the main muscle tensile strength of prestressing force refers to the intensity level that the main muscle material of this prestressing force of national regulation should reach.
In order to improve stretch-draw effect, as the improvement of technical scheme, in stretch-draw step, stretching force, for applying stage by stage, is specially:
---apply stretching force to 10% ~ 20% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 5 ~ 10 seconds;
---apply again stretching force to 40% ~ 50% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 5 ~ 10 seconds;
---apply again stretching force to 60% ~ 80% of the main muscle tensile strength of prestressing force, stablize that stretching force is constant to be continued for 10 ~ 20 seconds and lock anchoring piece again.
By the above-mentioned tension force that applies stage by stage, can reduce to greatest extent loss of prestress.
In order to make concrete-pile quality everywhere even, in concrete placement, can unitary mould assembly inner concrete be shaken and be smash, smash and make the concrete of cast more closely knit by shake, improve the quality of concrete-pile.
Wherein, the main muscle of prestressing force can be selected steel bar for prestressed concrete, and this rod iron material is 30MnSi, and intensity is to be more than or equal to 1420MPa, far above common iron.
PHC500A100 prestressed concrete pipe pile prepared by the A type prestressed concrete filled circles stake that is 500mm by the diameter that uses method provided by the invention to be made and conventional method carries out multiple comparison test and obtains following data, in table 1.Wherein the method for test is carried out according to GB13476-2009.
Table 1 performance comparison data
Stake type The present invention (500A) Prestressed concrete pipe pile (PHC500A100) GB requirement
Cracking resistance moment of flexure (kN.m) 140~170 120~150 103
Ultimate bending moment (kN.m) 220~250 190~220 155
Cracking Shear Force (kN) 390~410 250~260 239
Bearing capacity (kN) ≥4934 ≥3158 ——
Construction breakage rate (%) 0~0.2 0.3~1 ——

Claims (5)

1. a processing method for prestressed concrete filled circles stake, is characterized in that, concrete making step is as follows:
---fabrication of reinforcing cage: by the some main muscle of isometric prestressing force and spiral bar colligation or be welded into cylindrical reinforcing steel cage;
---assembling: above-mentioned cylindrical reinforcing steel cage mounted is fitted in lower mold half, anchoring locking is carried out in the two ends of the main muscle of prestressing force in cylindrical reinforcing steel cage, again upper mold half be fastened on to the top of lower mold half and upper and lower half mold is fixed to connection, and being provided with sprue gate in described upper mold half;
---stretch-draw: the main muscle of prestressing force in the die assembly assembling is applied to stretching force, and stretch-draw, to 60% ~ 80% of the main muscle tensile strength of prestressing force, is carried out anchoring;
---cast: toward mould inside cast concrete, carry out maintenance at the sprue gate place of upper mold half after being poured, put after the complete solidifying and setting of concrete and the demoulding;
---finishing: the prestressed concrete filled circles stake making is carried out to surface treatment and late maintaining.
2. according to the processing method of prestressed concrete filled circles stake described in claim 1, it is characterized in that: in described stretch-draw step, stretching force is for applying stage by stage.
3. according to the processing method of prestressed concrete filled circles stake described in claim 2, it is characterized in that, the described detailed process that applies stage by stage stretching force is:
---apply stretching force to 10% ~ 20% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 5 ~ 10 seconds;
---apply again stretching force to 40% ~ 50% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 5 ~ 10 seconds;
---apply again stretching force to 60% ~ 80% of the main muscle tensile strength of prestressing force, stablize stretching force constant continue 10 ~ 20 seconds.
4. according to the processing method of prestressed concrete filled circles stake described in claim 1, it is characterized in that: in described cast step, in concrete placement, unitary mould assembly inner concrete is shaken and smash.
5. according to the processing method of prestressed concrete filled circles stake described in claim 1, it is characterized in that: the main muscle of described prestressing force is steel bar for prestressed concrete.
CN201410072499.7A 2014-02-28 2014-02-28 Machining method for pre-stress concrete solid cylindrical pile Pending CN103817791A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410072499.7A CN103817791A (en) 2014-02-28 2014-02-28 Machining method for pre-stress concrete solid cylindrical pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410072499.7A CN103817791A (en) 2014-02-28 2014-02-28 Machining method for pre-stress concrete solid cylindrical pile

Publications (1)

Publication Number Publication Date
CN103817791A true CN103817791A (en) 2014-05-28

Family

ID=50753211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410072499.7A Pending CN103817791A (en) 2014-02-28 2014-02-28 Machining method for pre-stress concrete solid cylindrical pile

Country Status (1)

Country Link
CN (1) CN103817791A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105058572A (en) * 2015-08-31 2015-11-18 刘浩然 Flue machine
CN113119296A (en) * 2021-04-13 2021-07-16 内蒙古利元管涵工程有限责任公司 Preparation method and system of partially prestressed concrete pile foundation for power transmission line tower

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0598638A (en) * 1991-10-09 1993-04-20 Times Eng:Kk Ultra-high-bending tenacity pc pile
CN102373702A (en) * 2011-08-26 2012-03-14 江苏固丰管桩集团有限公司 Concrete circular pile and processing method thereof
CN102392441A (en) * 2011-07-26 2012-03-28 杭州固华复合材料科技有限公司 Composite crack control prestressed concrete big tube pile and manufacturing method thereof
CN202492836U (en) * 2012-02-06 2012-10-17 天津建城基业集团有限公司 Soil-retaining duplex-type reinforced tube pile
JP2013067024A (en) * 2011-09-20 2013-04-18 Taisei Corp Formwork formation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0598638A (en) * 1991-10-09 1993-04-20 Times Eng:Kk Ultra-high-bending tenacity pc pile
CN102392441A (en) * 2011-07-26 2012-03-28 杭州固华复合材料科技有限公司 Composite crack control prestressed concrete big tube pile and manufacturing method thereof
CN102373702A (en) * 2011-08-26 2012-03-14 江苏固丰管桩集团有限公司 Concrete circular pile and processing method thereof
JP2013067024A (en) * 2011-09-20 2013-04-18 Taisei Corp Formwork formation
CN202492836U (en) * 2012-02-06 2012-10-17 天津建城基业集团有限公司 Soil-retaining duplex-type reinforced tube pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105058572A (en) * 2015-08-31 2015-11-18 刘浩然 Flue machine
CN105058572B (en) * 2015-08-31 2017-03-08 刘浩然 A kind of smoke flue machine
CN113119296A (en) * 2021-04-13 2021-07-16 内蒙古利元管涵工程有限责任公司 Preparation method and system of partially prestressed concrete pile foundation for power transmission line tower

Similar Documents

Publication Publication Date Title
CN101642932B (en) Production process of short tubular piles
CN101302758B (en) Method for processing prestress square pile
CN104416675A (en) Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN101718153A (en) Partially prestressed concrete electric pole and preparation method thereof
CN105855434B (en) Plate-girder steel reinforcement cage global formation sizing mould bases and construction method
CN102211353A (en) Process for manufacturing centrifugal concrete pile
CN105365040A (en) Production technology of short tubular pile
CN104972550A (en) Multilateral mould of site precast concrete pile and manufacturing method of precast concrete pile
CN103817791A (en) Machining method for pre-stress concrete solid cylindrical pile
CN102852139B (en) Special-shaped high bearing capacity concrete pile and production method thereof
CN206800800U (en) Horizontal reinforcement distance piece
CN201660886U (en) Pretensioning prestressed concrete quadrangular pile
CN112873527A (en) Manufacturing mold and method for supporting pile
CN111086195B (en) FRP strip-shaped spiral stirrup and preparation method thereof
CN205244648U (en) Novel prestressing force steel cylinder concrete jack pipe
CN207656905U (en) A kind of molding die of prefabricated high-strength concrete bridge pier
CN201645621U (en) Prestressed concrete polygon solid or hollow pile molding stretching die
CN105781016A (en) Cement-based composite and steel pipe combined compound column and manufacturing method thereof
JP4640686B1 (en) Upper mold for molding concrete blocks for construction.
CN205677280U (en) A kind of strenthening member of impaired armored concrete vertical member
CN102975282A (en) Method for forming unnonuniformly reinforcement-arranged precast pile
CN110042832B (en) High-performance tubular pile with damping device and preparation method thereof
CN108516859B (en) Fiber lightweight aggregate prefabricated hollow concrete column
CN105729622A (en) Production process of concrete hollow square pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140528