CN85205055U - Prestressed concrete pile - Google Patents
Prestressed concrete pile Download PDFInfo
- Publication number
- CN85205055U CN85205055U CN 85205055 CN85205055U CN85205055U CN 85205055 U CN85205055 U CN 85205055U CN 85205055 CN85205055 CN 85205055 CN 85205055 U CN85205055 U CN 85205055U CN 85205055 U CN85205055 U CN 85205055U
- Authority
- CN
- China
- Prior art keywords
- pile
- prestressed concrete
- concrete
- foundation pile
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011513 prestressed concrete Substances 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 239000004567 concrete Substances 0.000 claims description 19
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 8
- 238000000034 method Methods 0.000 abstract description 11
- 230000002787 reinforcement Effects 0.000 abstract description 5
- 239000011372 high-strength concrete Substances 0.000 abstract description 4
- 230000003014 reinforcing effect Effects 0.000 abstract description 2
- 238000007493 shaping process Methods 0.000 abstract 1
- 238000012360 testing method Methods 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 6
- 239000000203 mixture Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000005452 bending Methods 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 239000003638 chemical reducing agent Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000003321 amplification Effects 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 239000003112 inhibitor Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model is pre-stretching type prestressed concrete foundation pile. A reinforcing cage shaped before hand is arranged in a steel mold, high-strength concrete is filled; a prestressed concrete pole is formed by stretching steel reinforcement through centrifugal shaping and steam curing stripping process. The pre-stretching type prestressed concrete foundation pile can be used as a foundation pile for mine industry, high-rise building in cities, bridge pier, harbor and the building in coastal area. The connection method of each two piles is simple and reliable, and the length and diameter of the piles are different, so the pre-stretching type prestressed concrete foundation pile is suitable for the need of different engineering.
Description
The utility model is to belong to the pre-tensioned prestressed concrete tubular articles.
At present at industrial and mining enterprises, urban skyscraper, bridge, port and pier, and in the construction work of coastal area,, often adopt pile foundation for satisfying the supporting capacity on basis.Because castinplace pile and driven pile are often adopted in the restriction of conditions such as the requirement of engineering, the difference of basic geology and construction technology level.Castinplace pile is divided into boring, punching and manually digging hole filling pile again.Driven pile has precast concrete square pile, prefabricated concrete pipe pile and piling bar.Piling bar has antirust problem, especially uses to be restricted under the groundwater quality condition of severe.In order to save steel, to reduce construction costs, adopt concrete pile more and more general at present both at home and abroad.In order to improve impact force that concrete pile bears pile driver, to improve the penetrability of stake, even firm stratum also can be passed smoothly running into complicated pile breaking phenomenon does not take place.Engineers both domestic and external is in recent years improving concrete strength, is making number of research projects with prestressed reinforcement manufacturing prestressed concrete pile.For example, No. 79140585 patents of Japan Patent, the inventor is in order to improve concrete intensity, and blending by volume about 1% steel wire and is 7~12% additive of cement weight, concrete compressive strength R in concrete
28=767kg/cm
2, adopting above-mentioned measure, concrete resistance to compression and tensile strength all increase, but have increased construction costs undoubtedly, and manufacturing process is also quite complicated.Again for example, No. 73900 patents of HOII P, the inventor has described a kind of callable prestressing force reinforcement spare, this reinforcement spare is made up of a prestressing force reinforced bar, and import a nut that is fixed on the stake axle by lower bolt end in the hollow hole of foundation pile and screw, and a termination of bearing the impact force of pile driver in the stake in driving in process is arranged.This structure is to save steel, but because stake itself does not contain reinforcing bar, this increases many procedures just for transportation and work progress, and the simultaneously used pile cover and the structure of shoe are also quite complicated.
The purpose of this utility model provides a kind of prestressed concrete pipe pile, is intended to promote the solution of the problems referred to above, realizes a kind of high-strength prestressed concrete pipe pile.
Task of the present utility model is finished as follows, and pile tube comprises that one group is cast in tension reinforcing steel bar in the concrete and one group in order to the fixing anchor rod of pile tube and steel hoop, and anchor rod is evenly distributed on two ends of pile tube.The diameter of pile tube is 300 millimeters to 1500 millimeters, and length is 6 meters to 14 meters, and its concrete crushing strength is 800kg/cm
2To 1000kg/cm
2
Prestressed concrete pipe pile provided by the utility model, because the concrete strength height, the penetrating force of stake is strong, and the method for attachment between stake and the stake is simple and reliable, goes for the foundation pile of different requirement of engineering.
Fig. 1 is the constructional drawing of prestressed concrete pile.(1) prestressed concrete pile among the figure; (2) tension reinforcing steel bar; (3) spiral stirrup; (4) anchor rod; (5) steel hoop; (6) anchor disc of steel hoop.
Fig. 2 (a) is the joint construction figure of stake (1) and steel hoop (5); Fig. 2 (b) is the joint construction figure of steel hoop (5) and anchor rod; Fig. 2 (c) is the amplification constructional drawing of the reservation groove (7) of anchor disc.
Below in conjunction with accompanying drawing the utility model is described in further detail:
The cage of reinforcement of moulding in advance is placed in the punching block, cast is mixed the concrete mixture that forms by the high-strength concrete design mixture proportion, and tension reinforcing steel bar applies prestressing force then, through the centrifuge centrifugal forming, after the stream curing demoulding, prestressed concrete pile has just been made.
The used high-strength concrete design mixture proportion (calculating by the absolute volume method) of the utility model is:
Cement 450-600kg/M
3
Sand coarse aggregate ratio 0.27-0.35
Water/binder ratio 0.28-0.36
Water reducing agent (accounting for cement consumption) 0.5-2.0%
For the technology that simplifies the operation, make things convenient for site operation, this match ratio can be mixed a kind of water reducing agent of powdery.Concrete crushing strength R according to above-mentioned design mixture proportion making
38=800kg/cm
2To 1000kg/cm
2
The utility model adopts the pre-tensioned prestressing method, utilizes the centrifuge centrifugal forming, and its centrifuge speed is 300~1000 rev/mins.Conservation system is divided into: a maintenance, its temperature are 60 ℃-80 ℃, and curing time is 5~9 hours; The secondary maintenance can be adopted steam curing at high pressure, and its curing temperature is 180 ℃~200 ℃, and the time is 5~8 hours, also can adopt curing in water, and temperature is 20 ℃~25 ℃, and the time is 12~16 days.Two kinds of methods can get a desired effect equally, manufacture method according to above-mentioned prestressed concrete pile, can produce the series of products of prestressed concrete pile, the diameter D of pile tube is 300 millimeters to 1500 millimeters, length L is 6 meters to 14 meters, to be applicable to the needs of different engineerings and geological conditions.
Prestressed concrete pile according to manufacturing of the present invention, comprise that one group is cast in tension reinforcing steel bar in the concrete (2) and one group of anchor rod (4) in order to spud pile (1) and steel hoop (5), this anchor rod is evenly distributed on two terminations of stake (1), its length is 40 centimeters, and diameter is 12 millimeters.It is welded together admittedly that the anchor disc (6) of it and steel hoop (4) is that electricity consumption welds, and forms an integral body, and tension reinforcing steel bar (2) adopts the heading tension mode to fix with anchor disc (6).In order to make stake (1) end local cracks not take place bearing under the excessive shaft pressuring load situation, in stake (1) end along L
2In the length range, encrypt spiral stirrup (3), along with tension reinforcing steel bar (2) diameter overstriking, the also corresponding overstriking of the diameter of spiral stirrup (3).According to the prestressed concrete pile of this novel manufacturing, can be suitable for the length of the required stake of different engineerings and geological conditions at the scene with the electric welding splicing.Stake with to be connected be to rely on the position of reservation groove (7) of anchor disc (6) to carry out electric welding, scolder fills up the reservation groove (7) of anchor disc (6), brushes special-purpose inhibitor then, in case on abominable especially stratum or the corrosion of seawater.Weld strength is greater than the intensity of stake itself.The practical experience proof is safe and reliable with this welding method.
In addition, the anti-impact force and the penetration capacity of the prestressed concrete pile of producing for the above-mentioned manufacture method of test basis are done following experiment in test room.With three diameter D=500mm, length L=8m, concrete design compressive strength 800kg/cm
2Prestressed concrete pile, do bending property test.Its result of the test and calculated value compare, and the cracking moment calculated value is according to the TJ10-74 modular formula:
M
f=(σ
hⅡ+γR
S L)W
0
Calculate and get.The ultimate bending moment calculated value is according to the TJ10-74 modular formula:
M
P=〔R
WA (r
1+r
2)/2 +(R
y S+σ′
ya)A
yr
y〕 (stmπα)/(π)
Calculate and get.Experiment value and theoretical value relatively list in table 1.
This shows that the calculated value of ultimate bending moment and test value are very approaching.Because prestressed concrete pile mainly is used as the basis of building and structure, the axial load carrying capacity of stake own is one of its important performance, manufacturing process for the check stake, in test room, utilize three diameter D=500mm equally, length L=3.5 meter, concrete design compressive strength is 800kg/cm
2, do the axial load carrying capacity test of stake, its result of the test rupture load is 800 tons.The supporting capacity calculated value is according to the TJ10-74 modular formula:
N
P=φ (R
aTon A+ σ ' yaAy ')=798.5
As seen, supporting capacity calculated value and test value extremely are close.Prove from domestic and international a large amount of practical experiences.The general service load of the used stake of this test that allows is not more than 160 tons, and the safety factor of this stake that hence one can see that is 5 times.
Table 2 is the design mixture proportion of three kinds of high-strength concretes.Table 3 is the concrete data and the size of tension reinforcing steel bar, spiral stirrup, steel hoop, anchor disc and the reservation groove of three kinds of pile tube diameters.
Table 2
Claims (1)
1, a kind of by centrifugal forming and stream curing and the prestressed concrete pipe pile that constitutes it is characterized in that:
(1) diameter of pile tube is 300 millimeters to 1500 millimeters,
(2) length of pile tube is 6 meters to 14 meters,
(3) concrete crushing strength R
28=800kg/cm
2To 1000kg/cm
2,
(4) pile tube [1] comprises that one group is cast in tension reinforcing steel bar [2] in the concrete and one group in order to fixing pile tube [1] anchor rod [4] with steel hoop,
(5) anchor rod [4] is evenly distributed on two ends of pile tube [1].
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 85205055 CN85205055U (en) | 1985-11-30 | 1985-11-30 | Prestressed concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 85205055 CN85205055U (en) | 1985-11-30 | 1985-11-30 | Prestressed concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN85205055U true CN85205055U (en) | 1987-04-01 |
Family
ID=4800218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 85205055 Expired - Lifetime CN85205055U (en) | 1985-11-30 | 1985-11-30 | Prestressed concrete pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN85205055U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103538145A (en) * | 2013-10-24 | 2014-01-29 | 华煜建设集团有限公司 | Long-tube-section precast concrete pile construction method |
CN115573331A (en) * | 2022-10-25 | 2023-01-06 | 南京交通职业技术学院 | Reinforcement hoop prestress waste mud curing pile-forming method |
-
1985
- 1985-11-30 CN CN 85205055 patent/CN85205055U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103538145A (en) * | 2013-10-24 | 2014-01-29 | 华煜建设集团有限公司 | Long-tube-section precast concrete pile construction method |
CN115573331A (en) * | 2022-10-25 | 2023-01-06 | 南京交通职业技术学院 | Reinforcement hoop prestress waste mud curing pile-forming method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211498444U (en) | Prefabricated assembled reinforced concrete pier | |
CN102383418A (en) | Anti-seismic prefabricated concrete solid square pile and production method thereof | |
CN101831875A (en) | Precast assembly process of prestressed concrete cylindrical hollow pier | |
CN200961263Y (en) | Fixed valve locking type reclaimable rockbolt | |
CN203222809U (en) | Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line | |
CN102912808A (en) | Spiral CFG pile and cement stirring pile combined composite foundation construction method | |
CN114263211A (en) | Retaining wall and construction method thereof | |
CN111441343A (en) | Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application | |
CN102605765B (en) | Prestressed concrete supporting piling wall | |
CN114032943A (en) | Cold region fabricated concrete bearing platform and miniature pile combined foundation | |
CN85108550A (en) | Prestressed concrete foundation pile | |
CN207419509U (en) | Prestressing force assembled Complex retaining wall structure | |
CN109467014B (en) | Wall-attached structure for large-tonnage tower crane super-large load in large wind environment | |
CN85205055U (en) | Prestressed concrete pile | |
CN217378870U (en) | Major diameter prestressed steel pipe concrete friction pile | |
CN115821972A (en) | Assembled rock anchor rod foundation of power transmission line and construction method | |
CN212358032U (en) | Cast-in-place bracket of big cantilever prestressing force bent cap | |
CN205776152U (en) | Prestressed anchor waveform sheet pile retaining structure | |
CN210685594U (en) | Fully prefabricated assembly type enclosure wall based on prestressed concrete hollow square pile technology | |
CN202247861U (en) | Anti-seismic prefabricated concrete solid square pile | |
KR20200002585U (en) | Foundation, pile, pier and its construction equipment | |
CN205557556U (en) | Peripheral mound basis that consolidates | |
CN105714844A (en) | Compound foundation for power transmission tower | |
CN201132956Y (en) | Prestressing force connecting apparatus for rods for reinforcing concrete static pressure piles | |
CN2092560U (en) | Pre-stressed concrete tubular pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
RN01 | Renewal of patent term | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |