CN1035342C - 挤密成桩的方法及其设备 - Google Patents

挤密成桩的方法及其设备 Download PDF

Info

Publication number
CN1035342C
CN1035342C CN93101316A CN93101316A CN1035342C CN 1035342 C CN1035342 C CN 1035342C CN 93101316 A CN93101316 A CN 93101316A CN 93101316 A CN93101316 A CN 93101316A CN 1035342 C CN1035342 C CN 1035342C
Authority
CN
China
Prior art keywords
drilling rod
drill bit
pile
soil
helical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN93101316A
Other languages
English (en)
Other versions
CN1106880A (zh
Inventor
秦晋邦
武振虎
王克文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOUNDATION HANDLING Co CHANGZHI BUILDING ENGRG CORP
Original Assignee
FOUNDATION HANDLING Co CHANGZHI BUILDING ENGRG CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION HANDLING Co CHANGZHI BUILDING ENGRG CORP filed Critical FOUNDATION HANDLING Co CHANGZHI BUILDING ENGRG CORP
Priority to CN93101316A priority Critical patent/CN1035342C/zh
Publication of CN1106880A publication Critical patent/CN1106880A/zh
Application granted granted Critical
Publication of CN1035342C publication Critical patent/CN1035342C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明提供了一种基础工程中就地成桩的方法与设备。将螺旋钻孔机的钻头叶片改为螺旋状,使用时使其正转成孔,反转回填成桩。反转时将所配的材料均匀填入孔中,钻杆随填料慢慢自动上升挤密填料成桩。使用本工法可彻底解决目前难于解决的饱和软粘土的缩颈问题和杂填土的塌孔问题,且整个施工过程中无噪音,无震动,不排污。

Description

挤密成桩的方法及其设备
本发明涉及到基础工程中就地成柱的方法,尤其是不用铸管或其它模板筑桩的方法及其设备。
目前,现场用灰土桩处理软弱地基中,其工法主要有沉管法、双管法、洛阳铲成孔夯填成桩等方法。用沉管法和洛阳铲成孔夯填法难于解决饱和软粘上的缩颈问题和杂填土的塌孔问题;用洛阳铲成孔劳动强度大,效率低,且地下水位高时不易成孔;双管法虽可消除缩颈、塌孔问题,但操作工艺复杂,设备不配套,效率低未能推广应用。另外,以上几种方法都存在着噪声大的缺点。
本发明的目的是为解决上述缩颈和塌孔问题而提出的一种操作简便的挤密成桩的方法及设备。
本发明主要采用的设备是螺旋钻孔机,其工艺方法是:将钻机就位后使其正转成孔,成孔过程中部分土被螺旋提出地面,部分土被挤密至桩间,成孔后视土质情况,如果是粘胶泥,粘住钻头影响下料,就必须迅速提出钻头将粘泥挖掉,再落入孔底,当钻到大于设计深度后,停止下钻让钻土继续旋转将钻杆上的土排出,然后反转,将孔底虚土和钻杆上少量余土压密,再让钻头升至设计深度,继续反转并填入所配好的二灰(生石灰,粉煤灰)或灰土材料。供料速度要求均匀,使钻杆随填料慢慢自动上升挤密填料成桩。
为了使反转时挤密填料,螺旋钻机的钻头叶片为螺旋状,其螺旋角为20~30°,动力头下端装一推力轴承以承受反转时的轴向推力。
经采用上述措施后,在成孔成桩时,由于螺旋叶片一直在孔内,未填料的空孔部分有螺旋叶片支承,阻止了塑状土向孔内走动,较好地解决了缩颈和塌孔问题,反转时用螺旋叶片向下输送灰桩材料,以动力头及钻杆本身的重量挤密压实桩体,省去别的夯实成桩设备,由于反转成桩速度快,减少了高水位时成桩过程放炮带来的成柱困难,本工法在整个施工过程中无噪音、无振动、效率高、不排污,对于临近的建筑物不受影响,特别适用于旧城的改造。
实施例:
位于昔日城墙外护城河上的一工程,该地基80年代初用建筑垃圾、生活垃圾回填,其密实性,力学强度无论在水平方面还是垂直方向上都不均匀,设计要求局布处理。但因水位距处理地面仅1.2~2米,杂填土中含碎砖块多用其它方法难以成孔,用本法顺利完成了该工程,二灰充盈系数达1.5左右,成桩500根,处理深2~4.5米。

Claims (2)

1、一和用于处理软弱地基就地成桩的方法,其步骤包括,将螺旋钻孔机就位后正转成孔,成孔过程中部分土被螺旋提出地面,部分土被挤密至桩间,当钻到大于设计深度0.5米后,停止下钻让钻头继续旋转将钻杆上的土排出,然后反转,将孔底虚土和钻杆上的少量余土压密,再让钻头升至设计深度,继续反转钻头并填入所配好的材料,供料速度要求均匀,使钻杆随填料慢慢自动上升挤密填料成桩。
2.一和用于权利要求1所述方法的螺旋钻孔机,包括机架、动力头、钻杆、钻头、底盘,其特征在于,在动力头下端装一推力轴承。
CN93101316A 1993-02-05 1993-02-05 挤密成桩的方法及其设备 Expired - Fee Related CN1035342C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN93101316A CN1035342C (zh) 1993-02-05 1993-02-05 挤密成桩的方法及其设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN93101316A CN1035342C (zh) 1993-02-05 1993-02-05 挤密成桩的方法及其设备

Publications (2)

Publication Number Publication Date
CN1106880A CN1106880A (zh) 1995-08-16
CN1035342C true CN1035342C (zh) 1997-07-02

Family

ID=4983518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN93101316A Expired - Fee Related CN1035342C (zh) 1993-02-05 1993-02-05 挤密成桩的方法及其设备

Country Status (1)

Country Link
CN (1) CN1035342C (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323584B (zh) * 2021-06-18 2023-11-07 四川振杰岩土工程有限责任公司 一种大型震动长螺旋钻机钻孔方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62242011A (ja) * 1986-04-12 1987-10-22 Hideo Takahashi 浅層地盤改良工法
AU7473587A (en) * 1986-06-27 1988-01-07 Research House Pty. Ltd. Earth compaction means and method
CN2055863U (zh) * 1989-02-21 1990-04-11 宜兴市范道水利工程设备厂 多功能工程钻机
CN1067086A (zh) * 1992-04-17 1992-12-16 山东省寿光县第二建筑工程公司 加固软弱地基的二灰砂桩及制造方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62242011A (ja) * 1986-04-12 1987-10-22 Hideo Takahashi 浅層地盤改良工法
AU7473587A (en) * 1986-06-27 1988-01-07 Research House Pty. Ltd. Earth compaction means and method
CN2055863U (zh) * 1989-02-21 1990-04-11 宜兴市范道水利工程设备厂 多功能工程钻机
CN1067086A (zh) * 1992-04-17 1992-12-16 山东省寿光县第二建筑工程公司 加固软弱地基的二灰砂桩及制造方法

Also Published As

Publication number Publication date
CN1106880A (zh) 1995-08-16

Similar Documents

Publication Publication Date Title
CN111058443B (zh) 一种消除黄土湿陷性的预制桩复合地基施工方法
CN109183790A (zh) 一种螺纹桩及其施工工具和施工方法
CN216275687U (zh) 一种钻孔灌注桩用清淤装置
CN1035342C (zh) 挤密成桩的方法及其设备
CN104141300A (zh) 一种基桩钻孔施工工艺
CN113026716A (zh) 一种湿陷性地基沉管成桩处理方法
CN105926594A (zh) 一种静压沉管载体灌注桩的双管施工方法
US5697734A (en) Method for forming a foundation pile in the ground utilizing a prefabricated pile shaft
JP3476413B2 (ja) 廃棄物処分場の堆積ゴミの処理方法
CN106759296A (zh) 一种可排水异形截面竹节管桩及其根植式施工方法
GB2154630A (en) Construction method for foundation piling
JPH0536565B2 (zh)
GB2132667A (en) Method of installing precast concrete piles
CN108547301A (zh) 一种有负空段的长螺旋钻孔压灌桩施工方法
JP2001182047A (ja) 軟質地盤の静的改良工法及び装置
JPH08199566A (ja) 杭の施工法
JP2743055B2 (ja) 砂地盤の液状化防止工法
CN110172970A (zh) 一种避免浆液倒灌的旋喷桩供浆管线及其喷浆方法
CN209162815U (zh) 一种螺纹桩及其施工工具
CN1089835C (zh) 成桩机
US3707847A (en) Installation of sand drains
CN110438973A (zh) 一种软弱地基的加固方法
CN1062045C (zh) 一种现场灌注桩的施工方法
JPS61254716A (ja) 現場コンクリ−トくいの設置方法
CN2057457U (zh) 一种改进的螺旋钻机

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee