CN103532046B - A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional - Google Patents

A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional Download PDF

Info

Publication number
CN103532046B
CN103532046B CN201310485467.5A CN201310485467A CN103532046B CN 103532046 B CN103532046 B CN 103532046B CN 201310485467 A CN201310485467 A CN 201310485467A CN 103532046 B CN103532046 B CN 103532046B
Authority
CN
China
Prior art keywords
wire
arm
pole switch
cross
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310485467.5A
Other languages
Chinese (zh)
Other versions
CN103532046A (en
Inventor
王家峰
梁晓阳
刘诚
段延山
张绍锋
郭勇
周维皓
张�诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Power Supply Co Of State Grid Liaoning Electric Power Co
State Grid Corp of China SGCC
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310485467.5A priority Critical patent/CN103532046B/en
Publication of CN103532046A publication Critical patent/CN103532046A/en
Application granted granted Critical
Publication of CN103532046B publication Critical patent/CN103532046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The present invention relates to 10kV live working of distribution network field, particularly relate to a kind of straight line pole and change operational method and the device that strain section installs on-pole switch additional, it is characterized in that, by having assisted lifting and the decline of wire from hanging insulator crossarm, then complete the in place of on-pole switch by aerial lift device with insulated arm, turn on-load whole installing additional in the work flow of on-pole switch without the need to equipment.Compared with prior art, the invention has the beneficial effects as follows: 1) adopt live line working technology, do not affect the electricity consumption of circuit lower end enterprise, directly can throw after on-pole switch installation and use use, without the need to end load under reduction process point, decrease the number participating in operating personnel, shorten overall operation duration; 2) to be sling on-pole switch by the insulation arm of aerial lift device with insulated arm, and complete the installation of on-pole switch, reducing the labour intensity of operating personnel in insulation bucket; Decrease the participation of lifting vehicle, significantly reduce task difficulty.

Description

A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional
Technical field
The present invention relates to 10kV live working of distribution network field, particularly relate to a kind of straight line pole and change operational method and the device that strain section installs on-pole switch additional.
Background technology
At present, the live line working of power distribution network is the main direction of studying of power distribution network operation technique, and hot line maintenance is the Main Means solving power distribution network uninterrupted operation.Such as changing strain section at straight line pole installs additional in the operation of on-pole switch, mainly utilizes equipment to turn on-load to reach the object of uninterrupted operation, but due to operation participant many, also need truck crane compounding practice, therefore length consuming time, difficulty is large, labour intensity is large, is unfavorable for promoting the use of.
Summary of the invention
The object of this invention is to provide a kind of straight line pole and change operational method and the device that strain section installs on-pole switch additional, utilize simply from hanging insulator crossarm device, realize on-load operation, reduce task difficulty and labour intensity, shorten consuming time, reach that few people carries out, the object of uninterrupted operation.
To achieve these goals, the present invention is by the following technical solutions:
A kind of straight line pole changes the operational method that strain section installs on-pole switch additional, by having assisted lifting and the decline of wire from hanging insulator crossarm, then the in place of on-pole switch is completed by aerial lift device with insulated arm, turn on-load whole installing additional in the work flow of on-pole switch without the need to equipment, its concrete operation step is as follows:
1) two operating personnels respectively use an aerial lift device with insulated arm respectively in the both sides of electric pole, to gold utensil on the wire in job area and bar simultaneously, synchronously carry out insulation and cover, during operation according to by near to far, the order of earth electrode sets gradually insulation masking material from the bottom to top, after ecto-entad, first electrified body;
2) will be installed to the head of the mast as far as possible from hanging insulator crossarm, hoisting depth when ensureing traction wire meets job requirements, confirms firm and reliable connection after installation;
3) the insulation suspension hook on hanging insulator crossarm is connected with wire, untie the binding wire of fixing cord and single cross-arm, promote insulating hanging hook block and play wire, wire and single cross-arm are departed from, remove the single cross-arm on electric pole, two operating personnels cooperatively interact and embrace cross-arm by first group and be arranged on the position of single cross-arm, then embrace on cross-arm in this group and arrange insulation masking material;
Operating personnel is installed to electric pole by embracing cross-arm for second group of fixing on-pole switch, and two groups of spacings of embracing cross-arm should meet the job requirements that on-pole switch is installed, and the lead-in wire of on-pole switch both sides should complete installation on the ground;
4) to be sling by on-pole switch with the insulation arm of aerial lift device with insulated arm and deliver to second group and embrace on cross-arm, two operating personnels cooperatively interact and on-pole switch is fixed to second group embraces on cross-arm; Wire is fallen by the insulation suspension hook of operating personnel's operation on hanging insulator crossarm; Operating personnel adopts insulation wire grip stringing lead, and utilize insulation tension wire clamp that electric pole both sides wire is fixed on first group and embrace on cross-arm, wire is removed from hanging insulator crossarm after all fixing;
5) operating personnel carries out on-pole switch and connects lead-in wire, should determine that on-pole switch is in out position, be connected respectively by the lead-in wire of on-pole switch both sides with wire before connecing lead-in wire; After lead-in wire connects, close on-pole switch, tests stream to on-pole switch both sides lead-in wire, confirm through-flow normal after, cutting off wire apart from both sides insulation tension wire clamp central spot;
6) remove insulation to cover, according to from far near, from top to bottom, from inside to outside, first ground connection after this order of electrified body carry out successively;
7) operating personnel returns to ground, the end of job.
Use in said method from hanging insulator crossarm, comprise cross-arm main body, metal holder, tension soft ribbons and insulation suspension hook, curved metal upwarps holder two ends the top being located at cross-arm main body, one end of tension soft ribbons is connected the one end of holding in the palm with metal, metal is provided with the other end of holder and tightens up handle, and metal is provided with metal stabilizing bracket holder; Be provided with 1 ~ 3 insulation suspension hook below described cross-arm main body, the lower end of insulating cord is located at by insulation suspension hook, and the upper end of insulating cord is wrapped on the self-locking bearing pin be located in cross-arm main body, is provided with location jump ring between one end of self-locking bearing pin and cross-arm main body.
Described cross-arm main body is isolation material, and its length is 1700 ~ 1800mm.
Compared with prior art, the invention has the beneficial effects as follows:
1) adopt live line working technology, do not affect the electricity consumption of circuit lower end enterprise, directly can throw after on-pole switch installation and use use, without the need to end load under reduction process point, decrease the number participating in operating personnel, shorten overall operation duration;
2) to be sling on-pole switch by the insulation arm of aerial lift device with insulated arm, and complete the installation of on-pole switch, reducing the labour intensity of operating personnel in insulation bucket; Decrease the participation of lifting vehicle, significantly reduce task difficulty.
Accompanying drawing explanation
Fig. 1 is that the present invention is from hanging insulator crossarm example structure schematic diagram;
Fig. 2 is operating principle figure of the present invention;
Fig. 3 is work flow schematic block diagram of the present invention.
In figure: 1-cross-arm main body 2-metal tightens up handle 6-metal stabilizing bracket 7-insulating cord 8-self-locking bearing pin 9-holder 3-tension soft ribbons 4-insulation suspension hook 5-and locates jump ring
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described further:
See Fig. 1, that the present invention is from hanging insulator crossarm example structure schematic diagram, comprise cross-arm main body 1, metal holder 2, tension soft ribbons 3 and insulation suspension hook 4, curved metal upwarps holder 2 two ends the top being located at cross-arm main body 1, one end of tension soft ribbons 3 is connected one end of holder 2 with metal, metal is provided with the other end of holder 2 and tightens up handle 5, and metal is provided with criss-cross metal stabilizing bracket 6 holder 2; 3 insulation suspension hooks 4 are provided with below cross-arm main body 1, the lower end of insulating cord 7 is located at by insulation suspension hook 4, the upper end of insulating cord 7 is wrapped on the self-locking bearing pin 8 be located in cross-arm main body, be provided with between one end of self-locking bearing pin and cross-arm main body and locate jump ring 9, the long 500mm of insulating cord 7, self-locking bearing pin 8 has draw-in groove, location jump ring 9 is stuck in draw-in groove and can prevents self-locking bearing pin from rotating, when putting down insulation suspension hook 4, as long as jump ring 9 is located in pull-out from draw-in groove, self-locking bearing pin 8 can rotated down insulation suspension hook.Cross-arm main body 1 is isolation material, and its length is 1780mm.
Operating personnel is when installing from hanging insulator crossarm, only tension soft ribbons need be pierced into and tighten up handle, then operation is tightened up handle and is tightened up tension soft ribbons, make to link together from hanging insulator crossarm and electric pole, the method is time saving and energy saving, significantly can reduce the labour intensity of operating personnel when installing insulating cross-arm, this from hanging insulator crossarm be easy to install, simple to operate, be applicable to distribution network live line work.
A kind of straight line pole of the present invention changes the operational method that strain section installs on-pole switch additional, exactly by having assisted lifting and the decline of wire from hanging insulator crossarm, then the in place of on-pole switch is completed by aerial lift device with insulated arm, turn on-load whole installing additional in the work flow of on-pole switch without the need to equipment, its concrete operation step is as follows:
1) two operating personnels respectively use an aerial lift device with insulated arm respectively in the both sides of electric pole, to gold utensil on the wire in job area and bar simultaneously, synchronously carry out insulation and cover, action should as far as possible lightly be carried out, during operation according to by near to far, the order of earth electrode sets gradually insulation masking material from the bottom to top, after ecto-entad, first electrified body;
2) head of the mast will be installed to as far as possible from hanging insulator crossarm, to ensure that hoisting depth when drawing wire meets job requirements, after installation, confirm firm and reliable connection;
3) the insulation suspension hook on hanging insulator crossarm is connected with wire, untie the binding wire of fixing cord and single cross-arm, promote insulating hanging hook block and play wire, wire and single cross-arm are departed from, remove the single cross-arm on electric pole, two operating personnels cooperatively interact and embrace cross-arm by first group and be arranged on the position of single cross-arm, then embrace on cross-arm in this group and arrange insulation masking material;
Operating personnel embraces cross-arm by second of fixing on-pole switch group and is installed on electric pole, and two groups of spacings of embracing cross-arm should meet the job requirements that on-pole switch is installed, and the lead-in wire of on-pole switch both sides should complete installation on the ground;
4) to be sling by on-pole switch with the insulation arm of aerial lift device with insulated arm and deliver to second group and embrace on cross-arm, two operating personnels cooperatively interact and on-pole switch is fixed to second group embraces on cross-arm; Wire is fallen by the insulation suspension hook of operating personnel's operation on hanging insulator crossarm; Operating personnel adopts insulation wire grip stringing lead, and utilize insulation tension wire clamp that electric pole both sides wire is fixed on first group and embrace on cross-arm, wire is removed from hanging insulator crossarm after all fixing;
5) operating personnel carries out on-pole switch and connects lead-in wire, should determine that on-pole switch is in out position, be connected respectively by the lead-in wire of on-pole switch both sides with wire before connecing lead-in wire; After lead-in wire connects, close on-pole switch, tests stream to on-pole switch both sides lead-in wire, confirm through-flow normal after, cutting off wire apart from both sides insulation tension wire clamp central spot;
6) remove insulation to cover, action should as far as possible lightly be carried out, according to from far near, from top to bottom, from inside to outside, first ground connection after this order of electrified body carry out successively;
7) operating personnel returns to ground, the end of job.

Claims (1)

1. a straight line pole changes the operational method that strain section installs on-pole switch additional, it is characterized in that, by having assisted lifting and the decline of wire from hanging insulator crossarm, then complete the in place of on-pole switch by aerial lift device with insulated arm, turn on-load whole installing additional in the work flow of on-pole switch without the need to equipment; Described from hanging insulator crossarm, comprise cross-arm main body, metal holder, tension soft ribbons and insulation suspension hook, curved metal upwarps holder two ends the top being located at cross-arm main body, one end of tension soft ribbons is connected the one end of holding in the palm with metal, metal is provided with the other end of holder and tightens up handle, and metal is provided with metal stabilizing bracket holder; Be provided with 1 ~ 3 insulation suspension hook below described cross-arm main body, the lower end of insulating cord is located at by insulation suspension hook, and the upper end of insulating cord is wrapped on the self-locking bearing pin be located in cross-arm main body, is provided with location jump ring between one end of self-locking bearing pin and cross-arm main body;
Described straight line pole changes the operational method that strain section installs on-pole switch additional, and its concrete operation step is as follows:
1) two operating personnels respectively use an aerial lift device with insulated arm respectively in the both sides of electric pole, to gold utensil on the wire in job area and bar simultaneously, synchronously carry out insulation and cover, during operation according to by near to far, the order of earth electrode sets gradually insulation masking material from the bottom to top, after ecto-entad, first electrified body;
2) will be installed to the head of the mast as far as possible from hanging insulator crossarm, hoisting depth when ensureing traction wire meets job requirements, confirms firm and reliable connection after installation;
3) the insulation suspension hook on hanging insulator crossarm is connected with wire, untie the binding wire of fixing cord and single cross-arm, promote insulating hanging hook block and play wire, wire and single cross-arm are departed from, remove the single cross-arm on electric pole, two operating personnels cooperatively interact and embrace cross-arm by first group and be arranged on the position of single cross-arm, then embrace on cross-arm in this group and arrange insulation masking material;
Operating personnel is installed to electric pole by embracing cross-arm for second group of fixing on-pole switch, and two groups of spacings of embracing cross-arm should meet the job requirements that on-pole switch is installed, and the lead-in wire of on-pole switch both sides should complete installation on the ground;
4) to be sling by on-pole switch with the insulation arm of aerial lift device with insulated arm and deliver to second group and embrace on cross-arm, two operating personnels cooperatively interact and on-pole switch is fixed to second group embraces on cross-arm; Wire is fallen by the insulation suspension hook of operating personnel's operation on hanging insulator crossarm; Operating personnel adopts insulation wire grip stringing lead, and utilize insulation tension wire clamp that electric pole both sides wire is fixed on first group and embrace on cross-arm, wire is removed from hanging insulator crossarm after all fixing;
5) operating personnel carries out on-pole switch and connects lead-in wire, should determine that on-pole switch is in out position, be connected respectively by the lead-in wire of on-pole switch both sides with wire before connecing lead-in wire; After lead-in wire connects, close on-pole switch, tests stream to on-pole switch both sides lead-in wire, confirm through-flow normal after, cutting off wire apart from both sides insulation tension wire clamp central spot;
6) remove insulation to cover, according to from far near, from top to bottom, from inside to outside, first ground connection after this order of electrified body carry out successively;
7) operating personnel returns to ground, the end of job.
CN201310485467.5A 2013-10-16 2013-10-16 A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional Active CN103532046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310485467.5A CN103532046B (en) 2013-10-16 2013-10-16 A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310485467.5A CN103532046B (en) 2013-10-16 2013-10-16 A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional

Publications (2)

Publication Number Publication Date
CN103532046A CN103532046A (en) 2014-01-22
CN103532046B true CN103532046B (en) 2016-01-13

Family

ID=49933846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310485467.5A Active CN103532046B (en) 2013-10-16 2013-10-16 A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional

Country Status (1)

Country Link
CN (1) CN103532046B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114374170A (en) * 2021-11-29 2022-04-19 国网浙江省电力有限公司金华供电公司 Method for changing straight pole into strain pole and additionally installing switch on 10kV overhead line

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203481749U (en) * 2013-10-16 2014-03-12 国家电网公司 Self-lifting type insulation cross arm

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203481749U (en) * 2013-10-16 2014-03-12 国家电网公司 Self-lifting type insulation cross arm

Also Published As

Publication number Publication date
CN103532046A (en) 2014-01-22

Similar Documents

Publication Publication Date Title
CN102420401B (en) Triangular insulating hanging fulcrum bar
CN104143782B (en) The electrification replacing tool of one ± 800kV line tension insulator chain and method
CN105514877B (en) Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture
CN102611035B (en) Special tool and method for charged replacement of middle-phase tension insulator
CN204885990U (en) Transmission line yoke plate hoisting device
CN102403674B (en) A kind of live-wire work insulating cross arm
CN104078881B (en) Phase strain insulator specific purpose tool in charged for replacement
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN203787855U (en) Power transmission line linear charged wire lifting device
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
CN103532046B (en) A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional
CN203278097U (en) Electric pole cross arm erecting device
CN204809744U (en) Wire end broadsword type load support fixture and insulator chain change device
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN202353100U (en) Triangular insulation lifting strut
CN201408937Y (en) Wire lifting device for crane
CN105119203A (en) Lifting tool for comprehensive live overhaul of distribution network
CN201821045U (en) Double hook lifting insulating support rod
CN204927967U (en) Bypass operation drainage line fixing device
CN202353095U (en) Wire lifting arrangement structure for 8-bundled conductors on straight-path tower
CN202424016U (en) Pulley device for electric power circuit maintenance
CN202308978U (en) Live working insulated cross arm
CN205335800U (en) Wire insulated supporting plate device
CN105449612A (en) A conductive wire insulation support plate apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Anshan Power Supply Company of State Grid Liaoning Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: ANSHAN POWER SUPPLY COMPANY, LIAONING ELECTRIC POWER Co.,Ltd.

CP03 Change of name, title or address

Address after: 114002 Anshan South Road, Tiedong District, Liaoning, Shengli Road, No. 52

Patentee after: Anshan Power Supply Company of State Grid Liaoning Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: Anshan Power Supply Company of State Grid Liaoning Electric Power Company