The non-excavating construction system of ultra-large caliber PE waste pipe
Technical field
The invention belongs to pipelaying techniques field, especially relate to a kind of non-excavating construction system of ultra-large caliber PE waste pipe.
Background technique
Along with China " 12 ". " 13 " firmly the portion's of building planning and Urbanization Construction more and more accelerate, and due to the startup of China's " rain dirt shunting " engineering, solve the planning implementation of " urban waterlogging ", super large caliber pipe network, namely bore is laid more and more more than the tubing of 1600mm, existing pipe laying method roughly has following several: digging laying, non-digging drag are laid, push pipe is laid, immersed tube is laid, liner is laid, public ditch is laid etc., although there is above-mentioned multiple laying method, also can not meet the needs of the current national economic development.Such as some special occasion, the pipe network as the super large caliber more than 2 rice diameters wanted some special buildings such as viaduct, railway, an expressway time be absolutely not passable by excavation construction method.But the pipe network adopting existing trenchless technology to lay super large caliber can not realize, because non-digging drag construction has it specifically to require: i.e. the caliber of hauling construction, largest domestic can only within DN1200mm tubing, this is because tubing complete " S " that will pass by is curved in work progress, first is curved is that tubing enters " construction hole " from ground and behind construction hole, carry out second at 180 ° of opposite directions oppositely curved at once, enters in the hole of having bored and could draw.When DN1200mm tubing hauling construction, that construction hole will have been dug very long very long, otherwise just do not enter in hole when second is curved, the pipeline as laid is bore more than 1600mm and according to said method difficulty of construction is too large to more bigbore PE waste pipe.
In order to solve prior art Problems existing, people have carried out long-term exploration, propose solution miscellaneous.Such as, Chinese patent literature discloses a kind of trombone slide installation method [application number: 200910048811.8] of bypass pipeline, carry out successively as follows: pipe alignment → excavation guide channel → making pipeline → top conduit → connect wire rope → pull catheter and wire rope → help pull a cart and manage → wear engineering pipe and install, it is characterized in that: during the conduit of top, with pressing device by dummy pipe jacking, then jacking rear tube, help pull a cart pipe time, connecting duct and sleeve pipe, pull dummy pipe jacking simultaneously rear sleeve, until when anterior cannula passes in another side guide channel only.
Such scheme to some extent solves the problem of existing pipeline non-excavation laying long construction period, but the program is for laying super large caliber, the body of such as bore more than 1.6 meters also also exists when laying: difficulty of construction is large, body traction difficulties, needs the construction hole of excavation comparatively large, easy slippage time dilatory, body easy-rupturing time dilatory, the problems such as body easily scratches, and body encapsulation is poor, and body docking is insecure.
Summary of the invention
The object of the invention is for the problems referred to above, provide a kind of simple and reasonable, the non-excavating construction system of the ultra-large caliber PE waste pipe of ultra-large caliber PE pipe non-excavation laying can be completed.
For achieving the above object, present invention employs following technical proposal: the non-excavating construction system of this ultra-large caliber PE waste pipe, it is characterized in that, native system comprise for be tilted to down get out slope hole again level get out the no-dig directional driller in straight hole, and dig out and vertically arrange and is communicated with slope hole peace straight hole respectively first construct to cheat and vertically arrange with digging out and be communicated with straight hole second to construct the excavating device of cheating, in the first described construction hole, winch is installed, described second top, construction hole is provided with hanging device for putting into each PE pipe body and each PE pipe body is achieved a butt joint by heat-melting butt-joint device, the tow rope of winch is connected with the drawing head for connecting PE pipe body, on the second construction hole, configuration can to the grouting mechanism of PE pipe body flow coat grouting liquid, native system also comprises when PE pipe body is pulled the electromagnetic shaker shaken PE pipe body in starting stage or each distraction procedure at every turn.
Mechanism of being in the milk in this structure makes grouting liquid form one deck mud at the outer surface of PE pipe body, thus generation buoyancy, reduce the frictional force in PE pipe body and straight hole, PE pipe body is in distraction procedure, PE pipe body tube wall and straight hole which side contacts of inwall, all lubrication can be played, greatly reduce tractive force, after two PE pipe body docking, continue through grouting mechanism to PE pipe body flow coat grouting liquid, make PE pipe body draw difficulty greatly to lower, electromagnetic shaker carries out shock energy to PE pipe body and overcomes the static friction coefficient of grouting liquid to PE pipe body, be conducive to normally carrying out of traction, here grouting liquid comprises the component of following mass fraction: the dry mud of 20-22 part, 10-12 part has the plant slurry of high-lubricity, and the water of 68-70 part, described dry mud, plant slurry and water stir, described plant slurry be any one or multiple pulverizing in shallot, curled mallow, okra, Chinese yam, cactus, taro in the pasty state, as a kind of preferred version, here plant slurry adopts shallot to make, because shallot slurries have the traction that higher lubricity can ensure the PE pipe body of super large caliber, although cost slightly improves, but ensure that the normal traction of ultra-large caliber PE pipe is only key, the grouting that with the addition of shallot slurries in addition can keep not solidifying for three to four days, first by coaxially opposite for two PE pipe bodys during the work of heat-melting butt-joint device, respectively PE pipe body butt end is cleaned, dry up, electric heating melting bellmouth is installed and the contraposition of two PE pipe bodys is closed up, implement electric heat welding, cool after welding.Need before docking to clean respectively the butt joint of PE pipe body, then electricity consumption hot blast drying, guarantees dry tack free, needs cooling 20 minutes after hot melt completes, and treats that jointing reaches some strength and can shake, traction.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, described drawing head comprises can be plugged in PE pipe body end and tubular traction cylindrical shell, outer wall and the described PE pipe inboard wall of tube body of described traction cylindrical shell lean, traction cylindrical shell is provided with the fixed mechanism for traction cylindrical shell and PE pipe body being connected, described pull cylinder end of body is fixed with can by described PE pipe body end-enclosed and tapered traction end cap, and described traction end cap end is provided with draw ring.Adopt this structure can by the fixation of PE pipe body, not easily depart from during traction, PE pipe body not easily produces fracture, and the PE pipe tubular body simultaneously after traction is without the need to cleaning.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, described fixed mechanism comprises some fixed blocks that can radial be located on traction cylindrical shell and PE pipe body, and each fixed block is in a discrete distribution along helix; The projection of each fixed block on traction cylindrical shell cross section is all positioned at circumferentially same and is uniformly distributed in a circumferential direction.Obviously, each fixed block is line distribution setting helically, and make fixed block radial direction and be not axially all positioned on straight line, when ensureing to draw, pulling force disperses, PE pipe body not easy-rupturing during traction, and when making to draw, PE pipe body uniform force, draws more laborsaving.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, described fixed block comprises radial direction and is located in the cylindrical pin with external thread drawn on cylindrical shell and PE pipe body, at the intrinsic welded nut being welded on traction cylinder inboard wall of the end sleeve of cylindrical pin with external thread, be also connected in the end of cylindrical pin with external thread the tightening nut be set up in parallel with welded nut; The thread section length of described cylindrical pin with external thread is 2-3 times of welded nut thickness; The quantity of described fixed block is 4-16.In this structure, welded nut facilitates the installation of cylindrical pin with external thread, and tightening nut makes the fixation of cylindrical pin with external thread, resistance time simultaneously in order to reduce traction, and the outer end of cylindrical pin with external thread flushes with the outer wall of PE pipe body; The length of thread section ensure that the normal mounting of tightening nut, and as a kind of preferred version, the quantity of fixed block is here 8.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, described traction end cap comprises and is fixed on pull cylinder end of body and tapered end cap skeleton, and described end cap skeleton is provided with conically shrouding; Described end cap skeleton comprises some at the equally distributed body of rod of circumferencial direction, the described body of rod comprises the first joint be connected with the inwall of described traction cylindrical shell by welding manner, the first described joint is connected with the rake be obliquely installed, the end of each rake comes together in the medial axis elongation line of traction cylindrical shell and forms the second joint in rake end, and each second joint is parallel to traction cylindrical shell medial axis and arranges and be all connected with draw ring; Described shrouding is provided with protection cylindrical shell away from one end of draw ring, and described protection cylindrical shell one end is connected with described shrouding, and the other end is fitted on PE pipe body; Described protection cylindrical shell comprises tubular straight part, and the diameter of described straight part and the equal diameters of PE pipe body, described straight part upper end is provided with arc choke, and described arc choke is connected with described shrouding by welding manner.In this structure, shrouding ensure that in distraction procedure, and the mud of grouting can not enter in PE pipe body, avoids and pollutes PE pipe tubular body, also do not need to rinse with a large amount of water; In order to avoid draw ring during traction and the second joint depart from, draw ring is here connected with the second joint by welding manner; Indeformable in order to protect cylindrical shell when ensureing traction, be also provided with supporting structure in protection cylindrical shell, be plugged in PE pipe body during installation by traction cylindrical shell local, protection cylinder body is positioned at the periphery that traction cylindrical shell is not plugged on the part of PE pipe body; Here straight part docks with PE pipe body, thus ensures normally carrying out of traction, and make straight part can protect PE pipe body, avoid its surface tear, arc choke can play the effect of full circle to straight hole, and the mill simultaneously reducing hole wall and PE pipe body hinders coefficient; Straight part also can extend on PE pipe body outer side wall.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, also be provided with some respectively along the strut that the diameter that traction cylindrical shell is different distributes in described traction cylindrical shell, the two ends distribution of each strut is connected with the inwall of traction cylindrical shell and each strut is uniformly distributed in a circumferential direction; The end of the first described joint contacts with strut.Improve the structural strength of traction cylindrical shell, prevent from producing distortion in distraction procedure.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, the aperture in described straight hole is greater than the 15-20% of PE pipe outer tube diameter; The length in the second described construction hole is greater than the length of single PE pipe body, and width is greater than the external diameter of single PE pipe body.The pore size in straight hole ensure that the normal traction of PE pipe body, the length in the second construction hole and width ensure that PE pipe body normally can winch to the second construction and cheat bottom, in addition in order to ensure that PE pipe body can normally enter straight hole, the degree of depth in the second construction hole should lower than straight hole.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, the first described bottom, construction hole arranges the first cushion block, and the second described bottom, construction hole arranges the second cushion block, and the second described cushion block is provided with circular arc recess; Construct and cheat the one end be connected and be fixed with the back timber of cross setting and the upper plane of back timber is positioned at straight hole horizontal center line in described straight hole and first, described tow rope is located on back timber and tow rope is positioned on straight centerline hole, and described winch is fixed on the first construction hole by adjusting bolt and by adjusting bolt adjustment tow rope height.In this structure the first cushion block and the second cushion block setting party construct, the second cushion block be provided with circular arc recess ensure that PE pipe body second construction hole in stability, in addition in order to ensure the life safety of operator, should carry out prevent cave in support; It is less that tow rope is positioned at tractive force when straight centerline hole makes to draw.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, the first described construction is provided with an earth anchor ditch in cheating and the cross section of earth anchor ditch is tee T, earth anchor crossbeam is provided with in described earth anchor ditch, described earth anchor crossbeam is I shape and is lined with fixture block respectively in earth anchor crossbeam both sides thus makes earth anchor crossbeam and fixture block surround formation cylinder, described tow rope is connected on earth anchor crossbeam, and the two ends of described earth anchor ditch are respectively equipped with the pile for fixing earth anchor crossbeam.In this structure, earth anchor ditch should to be arranged in the first construction hole and towards direction of traction, timber can prevent earth anchor crossbeam from departing from earth anchor ditch, makes the stability of winch stronger.
In the non-excavating construction system of above-mentioned ultra-large caliber PE waste pipe, described grouting mechanism comprises the grouting pond being located at the second top, construction hole, is provided with the slurry pump be connected with the head that is in the milk in described grouting pond.Grouting head should be placed in the top entering about one meter, straight hole.
Compared with prior art, the advantage of the non-excavating construction system of this ultra-large caliber PE waste pipe is: structure is simple, ultra-large caliber PE pipe body traction difficulty is little, and the construction hole of excavation is little, not easily slippage time dilatory, body not easy-rupturing time dilatory, body not easily scratches, and body encapsulation is strong, without the need to cleaning tubular body, body docking is firm, short construction period.
Accompanying drawing explanation
Fig. 1 is structural representation provided by the invention.
Fig. 2 is the structural representation of drawing head provided by the invention.
In figure, no-dig directional driller 1, slope hole 11, straight hole 12, back timber 121, first construction hole 13, first cushion block 131, second construction hole 14, second cushion block 141, winch 15, tow rope 151, adjusting bolt 152, drawing head 16, electromagnetic shaker 17, grouting mechanism 2, grouting 21, grouting pond 22, slurry pump 23, PE pipe body 3, hanging device 31, earth anchor ditch 4, earth anchor crossbeam 41, fixture block 42, pile 43, traction cylindrical shell 5, traction end cap 6, shrouding 61, the body of rod 62, first joint 621, rake 622, second joint 623, draw ring 7, fixed block 8, cylindrical pin with external thread 81, welded nut 82, tightening nut 83, protection cylindrical shell 9, straight part 91, arc choke 92, strut 9a.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
As shown in Figure 1-2, the non-excavating construction system of this ultra-large caliber PE waste pipe, comprise for be tilted to down get out slope hole 11 again level get out the no-dig directional driller 1 in straight hole 12, and dig out vertically arrange and is communicated with the peaceful straight hole of slope hole 11 12 respectively first construct hole 13 with dig out vertical setting and the be communicated with straight hole 12 second excavating device of constructing hole 14, in first construction hole 13, winch 15 is installed, hanging device 31 for putting into each PE pipe body 3 is provided with and each PE pipe body 3 is achieved a butt joint by heat-melting butt-joint device above second construction hole 14, the tow rope 151 of winch 15 is connected with the drawing head 16 for connecting PE pipe body 3, on the second construction hole 14, configuration can to the grouting mechanism 2 of PE pipe body 3 flow coat grouting liquid, native system also comprises when PE pipe body 3 is pulled the electromagnetic shaker 17 shaken PE pipe body 3 in starting stage or each distraction procedure at every turn, mechanism 2 of being in the milk in this structure makes grouting liquid form one deck mud at the outer surface of PE pipe body 3, thus generation buoyancy, reduce the frictional force in PE pipe body 3 and straight hole 12, PE pipe body 3 is in distraction procedure, PE pipe body 3 tube wall and straight hole 12 which side contacts of inwall, all lubrication can be played, greatly reduce tractive force, after two PE pipe body 3 docking, continue through grouting mechanism 2 to PE pipe body 3 flow coat grouting liquid, make PE pipe body 3 draw difficulty greatly to lower, electromagnetic shaker 17 pairs of PE pipe bodys 3 carry out shock energy and overcome the static friction coefficient of grouting liquid to PE pipe body 3, be conducive to normally carrying out of traction, here grouting liquid comprises the component of following mass fraction: the dry mud of 20-22 part, 10-12 part has the plant slurry of high-lubricity, and the water of 68-70 part, dry mud, plant slurry and water stir, described plant slurry be any one or multiple pulverizing in shallot, curled mallow, okra, Chinese yam, cactus, taro in the pasty state, as a kind of preferred version, here plant slurry adopts shallot to make, because shallot slurries have the traction that higher lubricity can ensure the PE pipe body 3 of super large caliber, although cost slightly improves, but ensure that the normal traction of ultra-large caliber PE pipe is only key, the grouting that with the addition of shallot slurries in addition can keep not solidifying for three to four days, in addition first by coaxially opposite for two PE pipe bodys 3 when heat-melting butt-joint device works, respectively PE pipe body 3 butt end is cleaned, dry up, electric heating melting bellmouth is installed and also the contraposition of two PE pipe bodys 3 is closed up, implement electric heat welding, cool after welding.Need before docking to clean respectively the butt joint of PE pipe body 3, then electricity consumption hot blast drying, guarantees dry tack free, needs cooling 20 minutes after hot melt completes, and treats that jointing reaches some strength and can shake, traction.
As a kind of preferred version, here drawing head 16 comprises can be plugged in PE pipe body 3 end and tubular traction cylindrical shell 5, outer wall and described PE pipe body 3 inwall of traction cylindrical shell 5 lean, traction cylindrical shell 5 is provided with the fixed mechanism for traction cylindrical shell 5 and PE pipe body 3 being connected, traction cylindrical shell 5 end winding support has can by PE pipe body 3 end-enclosed and tapered traction end cap 6, traction end cap 6 end is provided with draw ring 7, this structure can by the fixation of PE pipe body 3, not easily depart from during traction, PE pipe body 3 not easily produces fracture, PE pipe body 3 inside simultaneously after traction is without the need to cleaning.Fixed mechanism comprises some fixed blocks 8 that can radial be located on traction cylindrical shell 5 and PE pipe body 3, and each fixed block 8 is in a discrete distribution along helix; The projection of each fixed block 8 on traction cylindrical shell 5 cross section is all positioned at circumferentially same and is uniformly distributed in a circumferential direction, each fixed block 8 helically line distribution is arranged, make fixed block 8 radial direction and be not axially all positioned on straight line, pulling force dispersion when ensureing to draw, PE pipe body 3 not easy-rupturing during traction, when making to draw, PE pipe body 3 uniform force, draws more laborsaving.Fixed block 8 comprises radial direction and is located in the cylindrical pin with external thread 81 drawn on cylindrical shell 5 and PE pipe body 3, at the intrinsic welded nut 82 being welded on traction cylindrical shell 5 inwall of the end sleeve of cylindrical pin with external thread 81, be also connected in the end of cylindrical pin with external thread 81 tightening nut 83 be set up in parallel with welded nut 82; The thread section length of cylindrical pin with external thread 81 is 2-3 times of welded nut 82 thickness; The quantity of fixed block 8 is 4-16, and welded nut 82 facilitates the installation of cylindrical pin with external thread 81, and tightening nut 83 makes the fixation of cylindrical pin with external thread 81, resistance time simultaneously in order to reduce traction, and the outer end of cylindrical pin with external thread 81 flushes with the outer wall of PE pipe body 3; The length of thread section ensure that the normal mounting of tightening nut 83, and as a kind of preferred version, the quantity of fixed block 8 is here 8.Traction end cap 6 comprises and is fixed on traction cylindrical shell 5 end and tapered end cap skeleton, and end cap skeleton is provided with conically shrouding 61; End cap skeleton comprises some at the equally distributed body of rod 62 of circumferencial direction, the body of rod 62 comprises the first joint 621 be connected with the inwall of described traction cylindrical shell 5 by welding manner, first joint 621 is connected with the rake 622 be obliquely installed, the end of each rake 622 comes together in the medial axis elongation line of traction cylindrical shell 5 and forms the second joint 623 in rake 622 end, and each second joint 623 is parallel to traction cylindrical shell 5 medial axis and arranges and be all connected with draw ring 7; Shrouding 61 is provided with protection cylindrical shell 9 away from one end of draw ring 7, and protection cylindrical shell 9 one end is connected with shrouding 61, and the other end is fitted on PE pipe body 3; Protection cylindrical shell 9 comprises tubular straight part 91, the diameter of straight part 91 and the equal diameters of PE pipe body 3, straight part 91 upper end is provided with arc choke 92, and arc choke 92 is connected with described shrouding 61 by welding manner, shrouding ensure that in distraction procedure, the mud of grouting can not enter in PE pipe body 3, avoids and pollutes PE pipe body 3 inside, also do not need to rinse with a large amount of water; In order to avoid draw ring 7 during traction and the second joint 623 depart from, draw ring 7 is here connected with the second joint 623 by welding manner; Indeformable in order to protect cylindrical shell 9 when ensureing traction, be also provided with supporting structure in protection cylindrical shell 9, be plugged in PE pipe body 3 during installation by traction cylindrical shell 5 local, protection cylindrical shell 9 is positioned at the periphery that traction cylindrical shell 5 is not plugged on the part of PE pipe body 3; Here straight part 91 docks with PE pipe body 3, thus ensure normally carrying out of traction, make straight part 91 can protect PE pipe body 3, avoid its surface tear, arc choke 92 can play the effect of full circle to straight hole 12, the mill simultaneously reducing hole wall and PE pipe body 3 hinders coefficient; Straight part 12 also can extend on PE pipe body 3 outer side wall.Also be provided with some respectively along the strut 9a of the different diameter distribution of traction cylindrical shell 5 in traction cylindrical shell 5, the two ends distribution of each strut 9a to be connected and each strut 9a is uniformly distributed in a circumferential direction with the inwall of traction cylindrical shell 5; The end of the first joint 621 contacts with strut 9a, improves the structural strength of traction cylindrical shell 5, prevents from producing distortion in distraction procedure.
The aperture in straight hole 12 is here greater than the 15-20% of PE pipe body 3 external diameter; The length in the second construction hole 14 is greater than the length of single PE pipe body 3, width is greater than the external diameter of single PE pipe body 3, the pore size in straight hole 12 ensure that the normal traction of PE pipe body 3, length and the width in the second construction hole 14 ensure that PE pipe body 3 normally can winch to the second construction and cheat bottom 14, in addition in order to ensure PE pipe body 3 can normally enter straight hole 12, second construction hole 14 the degree of depth should lower than straight hole 12.Arrange the first cushion block 131, second bottom first construction hole 13 to construct and arrange the second cushion block 141, second cushion block 141 bottom hole 14 and be provided with circular arc recess, construct one end that hole 13 is connected, described straight hole 12 and first is fixed with the back timber 121 of cross setting and the upper plane of back timber 121 is positioned at straight hole 12 horizontal center line, tow rope 151 is located on back timber 121 and tow rope 151 is positioned on the center line of straight hole 12, winch 15 is fixed on the first construction hole 13 by adjusting bolt 152 and adjusts tow rope 151 height by adjusting bolt 152, the setting party of the first cushion block 131 and the second cushion block 141 construct, second cushion block 141 is provided with circular arc recess and ensure that the stability of PE pipe body 3 in the second construction hole, in addition in order to ensure the life safety of operator, the support preventing from caving in should be carried out, it is less that tow rope 151 is positioned at tractive force when straight hole 12 center line makes to draw.An earth anchor ditch 4 is provided with and the cross section of earth anchor ditch 4 is tee T in first construction hole 13, earth anchor crossbeam 41 is provided with in earth anchor ditch 4, earth anchor crossbeam 41 is I shape and is lined with fixture block 42 respectively in earth anchor crossbeam 41 both sides thus makes earth anchor crossbeam 41 and fixture block 42 surround formation cylinder, tow rope 151 is connected on earth anchor crossbeam 41, the two ends of earth anchor ditch 4 are respectively equipped with the pile 43 for fixing earth anchor crossbeam 41, earth anchor ditch 4 should be arranged on first construction hole 13 in and towards direction of traction, timber 43 can prevent earth anchor crossbeam 41 from departing from earth anchor ditch 4, make the stability of winch 15 stronger.Grouting mechanism 2 comprises the grouting pond 22 be located at above the second construction hole 14, slurry pump 23 is provided with in described grouting pond 22, described slurry pump 23 is connected with the grouting 21 being arranged on straight hole 12 upper inside wall, and grouting 21 should be placed in the top entering about 12 1 meters, straight hole.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.
Although more employ no-dig directional driller 1 herein, slope hole 11, straight hole 12, back timber 121, first construction hole 13, first cushion block 131, second construction hole 14, second cushion block 141, winch 15, tow rope 151, adjusting bolt 152, drawing head 16, electromagnetic shaker 17, grouting mechanism 2, grouting 21, grouting pond 22, slurry pump 23, PE pipe body 3, hanging device 31, earth anchor ditch 4, earth anchor crossbeam 41, fixture block 42, pile 43, traction cylindrical shell 5, traction end cap 6, shrouding 61, the body of rod 62, first joint 621, rake 622, second joint 623, draw ring 7, fixed block 8, cylindrical pin with external thread 81, welded nut 82, tightening nut 83, protection cylindrical shell 9, straight part 91, arc choke 92, the terms such as strut 9a, but do not get rid of the possibility using other term.These terms are used to be only used to describe and explain essence of the present invention more easily; The restriction that they are construed to any one additional is all contrary with spirit of the present invention.