CN103526659A - Crossroad single-layer all-round overpass bridge - Google Patents

Crossroad single-layer all-round overpass bridge Download PDF

Info

Publication number
CN103526659A
CN103526659A CN201310490072.4A CN201310490072A CN103526659A CN 103526659 A CN103526659 A CN 103526659A CN 201310490072 A CN201310490072 A CN 201310490072A CN 103526659 A CN103526659 A CN 103526659A
Authority
CN
China
Prior art keywords
bridge
track
road
turning
turn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310490072.4A
Other languages
Chinese (zh)
Inventor
周智昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310490072.4A priority Critical patent/CN103526659A/en
Publication of CN103526659A publication Critical patent/CN103526659A/en
Priority to PCT/CN2014/088893 priority patent/WO2015055152A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a crossroad single-layer all-round overpass bridge. The crossroad single-layer all-round overpass bridge can be constructed on a one-way road having more than three lanes in a busy downtown. Upper bridge parts and lower bridge parts of the crossroad single-layer all-round overpass bridge are constructed on roads at the four directions of a crossroad in a long and short elevated combination manner; each long high level bridge slantwise changes in lanes on high so as to fall over a forward lane; the long high level bridges of two opposite roads are used for the right turning entering and direct running and entering or left turning exiting and direct running and exiting of vehicles; the long high level bridges of the other two opposite roads are used for the right turning entering or left turning exiting of the vehicles; and vehicles going straight run on ground. By adopting the crossroad single-layer all-round overpass bridge, all running modes on all roads do not need traffic lights, and bypassing is not needed.

Description

The all-round overpass bridge of crossroad single-deck
 
Technical field
The present invention relates to a kind of can allow all running modes all without traffic lights, without the crossroad single-deck overpass bridge simple in structure detouring.
Background technology
At present in the world also without any crossroad single-deck overpass bridge simple in structure, can reach any running mode of allowing on all roads all without traffic lights, without the effect detouring.
Summary of the invention
The object of the invention is can be in the crossroad of unidirectional three tracks, busy urban district and above road thereof, builds without traffic lights, and driving is without the all-round overpass bridge of the individual layer simple in structure detouring.
Technical scheme of the present invention be all can overpass bridge by the individual layer of building crossroad in upper and lower bridge portion in the long and short overhead mode combining, build on the road of crossroad four direction, and every is grown tall and builds bridge all oblique lane change aloft to drop on forward track; Wherein two road centres that are relative direction are direct lane, the right of direct lane is for turning right into track, the left side of direct lane is the track of turning left out, turning right into the right in track is the track of turning right out, turn left the left side in track out for turning left into track, and growing tall of this road built bridge for the vehicle of turning right into and keeping straight on into or turning left out and keep straight on out; Another two roads that are relative direction are middle for turning right into and turning left out track, right-hand rotation carry is in the right of turning left out, turn right into the right for turning right out and keep straight on out track, the position of turning right out and keeping straight on out is interchangeable, the left side of turning left out is for turning left into and keeping straight on into track, turn left into and keep straight on into position interchangeable, growing tall of this road built bridge for the vehicle of turning right into or turning left out, through vehicles passes through on ground.
The growing tall of two subtend roads build bridge for turn right into and keep straight on into vehicle pass-through time, its keep straight on out and the vehicle that turns left out need build bridge from growing tall through and upper short viaduct, or, its grow tall build bridge for keep straight on out and turn left out vehicle pass-through time, turn right into and keep straight on into vehicle need from short overhead bridge and by growing tall, build bridge under by enter forward track; The growing tall of another two subtend roads build bridge for turn right into vehicle pass-through time, its vehicle turning left out need be through also upper short viaduct from the bridge formation that grows tall, or, its grow tall build bridge for turn left out vehicle pass-through time, turn right into vehicle need from short overhead bridge and by growing tall, build bridge under by enter forward track.
On every road for turn right into grow tall to build bridge and all with on its right road for the short viaduct turning left out, be connected, or, for turn left out grow tall bridge formation all with on its left side road, supply to turn right into short viaduct be connected.
On one road for keep straight on into grow tall and build bridge and for the short viaduct of keeping straight on out, be connected on its subtend road, otherwise, for growing tall of keeping straight on out build bridge with on its subtend road, supply to keep straight on into short viaduct be connected; The craspedodrome on the ground of another road goes out track and enters track with its subtend road craspedodrome on the ground and be connected.
On every road for the short viaduct of turning right out all with the confession of its right road turn left into short overhead being connected, ground, crossing only needs to build one in order to pass the underground pedestrian passageway of ground direct lane; Every road is upper right produce and turn left into vehicle also can pass through in track, ground, do not build for turn right out and turn left into short viaduct, but four roads all need to build walkway.
Accompanying drawing explanation:
Fig. 1: the stereogram that crossroad single-deck all can overpass bridge: R is underground pedestrian passageway.
Fig. 2: the plan view that crossroad single-deck all can overpass bridge: wherein two subtend roads the direct lane on ground be positioned at turn right out and turn left into track outside, the growing tall vehicle of building bridge as driving into uses.
Fig. 3: the plan view of the all-round overpass bridge of crossroad single-deck: R is underground pedestrian passageway, and right-turn lane is on ground.
Fig. 4: the plan view that crossroad single-deck all can overpass bridge: wherein the direct lane of two subtend roads on ground be positioned at turn right out and turn left into track.
Fig. 5: the plan view that crossroad single-deck all can overpass bridge: the growing tall vehicle of building bridge as rolling away from uses.
The specific embodiment:
The all-round overpass bridge of crossroad single-deck is simple in structure, can build the crossroad of unidirectional three tracks, busy urban district and above road thereof in, and ground direct lane can be located on the more busy road of through vehicles.Short viaduct on outgoing vehicles, drives into the bridge formation that grows tall on vehicle and can more be conducive to driving.
Crossroad single-deck all can overpass bridge can meet the driving requirement of all roads; As Fig. 2: the craspedodrome in A road goes out vehicle ground 10 roads to C road of keeping straight on from ground 6 roads, the short viaduct 5 on vehicle of turning right out is turned right into the short viaduct 7 in B road, the vehicle that turns left out turns left and builds bridge 4 to growing tall of D road from 12 roads, ground through short viaduct 11 bridge formation 1 that grows tall, and from ground, 12 roads enter 13 roads, ground through the bridge formation 1 that grows tall to the vehicle that turns around.The craspedodrome in B road goes out vehicle and keeps straight on to the bridge formation 4 that grows tall in D road from 14 roads, ground through short viaduct 7 bridge formation 2 that grows tall, the short viaduct 8 on vehicle of turning right out is turned right into the short viaduct 9 in C road, the vehicle that turns left out turns left and builds bridge 1 to growing tall of A road from 15 roads, ground through short viaduct 7 bridge formation 2 that grows tall, and from ground, 15 roads enter 16 roads, ground through the bridge formation 2 that grows tall to the vehicle that turns around.
All can putting into practice of overpass bridge can greatly save time and the fuel oil of driving, reduce the generation of blocking up with traffic accident, and will reduce greatly air pollution.

Claims (5)

1. the all-round overpass bridge of crossroad single-deck, it is characterized in that: the upper and lower bridge portion that individual layer all can overpass bridge is built on the road of crossroad four direction in the long and short overhead mode combining, and every is grown tall and builds bridge all oblique lane change aloft to drop on forward track; Wherein two road centres that are relative direction are direct lane, the right of direct lane is for turning right into track, the left side of direct lane is the track of turning left out, turning right into the right in track is the track of turning right out, turn left the left side in track out for turning left into track, and growing tall of this road built bridge for the vehicle of turning right into and keeping straight on into or turning left out and keep straight on out; Another two roads that are relative direction are middle for turning right into and turning left out track, right-hand rotation carry is in the right of turning left out, turn right into the right for turning right out and keep straight on out track, turn right out and keep straight on out the position in track is interchangeable, the left side of turning left out is for turning left into and keeping straight on into track, turn left into and keep straight on interchangeablely into the position in track, growing tall of this road built bridge for the vehicle of turning right into or turning left out, and through vehicles passes through on ground.
2. the all-round overpass bridge of crossroad single-deck as claimed in claim 1, it is characterized in that: the growing tall of two subtend roads build bridge for turn right into and keep straight on into vehicle pass-through time, its keep straight on out and the vehicle that turns left out need build bridge from growing tall through and upper short viaduct, or, its grow tall build bridge for keep straight on out and turn left out vehicle pass-through time, turn right into and keep straight on into vehicle need from short overhead bridge and by growing tall, build bridge under by enter forward track; The growing tall of another two subtend roads build bridge for turn right into vehicle pass-through time, its vehicle turning left out need be through also upper short viaduct from the bridge formation that grows tall, or, its grow tall build bridge for turn left out vehicle pass-through time, turn right into vehicle need from short overhead bridge and by growing tall, build bridge under by enter forward track.
3. the all-round overpass bridge of crossroad single-deck as claimed in claim 1, it is characterized in that: on every road for turn right into the short viaduct all turning left out with confession on its right road of building bridge of growing tall be connected, or, for growing tall of turning left out build bridge all with confession on its left side road turn right into short viaduct be connected.
4. the all-round overpass bridge of crossroad single-deck as claimed in claim 1, it is characterized in that: on a road for keep straight on into grow tall and build bridge and for the short viaduct of keeping straight on out, be connected on its subtend road, otherwise, for growing tall of keeping straight on out build bridge with on its subtend road for keep straight on into short viaduct be connected; The craspedodrome on the ground of another road goes out track and enters track with its subtend road craspedodrome on the ground and be connected.
5. the all-round overpass bridge of crossroad single-deck as claimed in claim 1, it is characterized in that: on every road for the short viaduct of turning right out all with the confession of its right road turn left into short overhead being connected, ground, crossing only needs to build one in order to pass the underground pedestrian passageway of ground direct lane; Every road is upper right produce and turn left into vehicle also can pass through in track, ground, do not build for turn right out and turn left into short viaduct, but four roads all need to build walkway.
CN201310490072.4A 2013-10-18 2013-10-18 Crossroad single-layer all-round overpass bridge Pending CN103526659A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310490072.4A CN103526659A (en) 2013-10-18 2013-10-18 Crossroad single-layer all-round overpass bridge
PCT/CN2014/088893 WO2015055152A1 (en) 2013-10-18 2014-10-20 Single-level versatile overpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310490072.4A CN103526659A (en) 2013-10-18 2013-10-18 Crossroad single-layer all-round overpass bridge

Publications (1)

Publication Number Publication Date
CN103526659A true CN103526659A (en) 2014-01-22

Family

ID=49928980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310490072.4A Pending CN103526659A (en) 2013-10-18 2013-10-18 Crossroad single-layer all-round overpass bridge

Country Status (1)

Country Link
CN (1) CN103526659A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032636A (en) * 2014-06-05 2014-09-10 覃章应 Overpass for urban traffic diversion
WO2015055152A1 (en) * 2013-10-18 2015-04-23 周智昂 Single-level versatile overpass
CN105019324A (en) * 2014-09-19 2015-11-04 欧煜新 Crossroad tunnel system and running method thereof
CN107034754A (en) * 2017-05-23 2017-08-11 大连交通大学 A kind of interchange viaduct
CN108316074A (en) * 2018-03-23 2018-07-24 广东工业大学 A kind of anti-collision crossroad
CN109537384A (en) * 2018-11-20 2019-03-29 定远县中林机械技术有限公司 It is a kind of unimpeded without stop viaduct

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015055152A1 (en) * 2013-10-18 2015-04-23 周智昂 Single-level versatile overpass
CN104032636A (en) * 2014-06-05 2014-09-10 覃章应 Overpass for urban traffic diversion
CN105019324A (en) * 2014-09-19 2015-11-04 欧煜新 Crossroad tunnel system and running method thereof
CN107034754A (en) * 2017-05-23 2017-08-11 大连交通大学 A kind of interchange viaduct
CN108316074A (en) * 2018-03-23 2018-07-24 广东工业大学 A kind of anti-collision crossroad
CN109537384A (en) * 2018-11-20 2019-03-29 定远县中林机械技术有限公司 It is a kind of unimpeded without stop viaduct

Similar Documents

Publication Publication Date Title
CN103526659A (en) Crossroad single-layer all-round overpass bridge
CN103161108B (en) A kind of intersection bridge
CN105155374A (en) Multifunctional cross-shaped overpass
CN203200625U (en) Bridge on junction of three roads
CN103572677A (en) Left-turn-free flyover
CN103526661A (en) Triple path single-layer all-round overpass bridge
CN107988866B (en) Simple overpass
CN102383350A (en) U-shaped combined passageway for crossroad
CN204803696U (en) Prevent stifled crossroad unit
CN103541285B (en) Conflict-free stereoscopic composite bridge
CN102041758A (en) Left-turn flyover
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN201873916U (en) Simple three-branch road interchange overpass
CN102943422A (en) Turning traveling road and method for effectively using same
CN202181491U (en) U-shaped combined passage of crossroad
CN204185741U (en) The full interchange viaduct of crossroad two aspect
CN203383113U (en) Cross road and T road all-directional no-parking flyover
CN202577084U (en) Interchange bridge
CN202390738U (en) Novel flyover
CN204803700U (en) Quick cross overpass
CN105002796A (en) Single-layer overpass without traffic lights on crossroads
CN204982578U (en) Crossroad does not have red light individual layer overpass
CN105178123A (en) Cross overpass
CN204803699U (en) Economical cross overpass
CN204875403U (en) Multi -functional cross overpass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140122