CN103490410A - Micro-grid planning and capacity allocation method based on multi-objective optimization - Google Patents

Micro-grid planning and capacity allocation method based on multi-objective optimization Download PDF

Info

Publication number
CN103490410A
CN103490410A CN201310393296.3A CN201310393296A CN103490410A CN 103490410 A CN103490410 A CN 103490410A CN 201310393296 A CN201310393296 A CN 201310393296A CN 103490410 A CN103490410 A CN 103490410A
Authority
CN
China
Prior art keywords
micro
electrical network
power
formula
parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310393296.3A
Other languages
Chinese (zh)
Other versions
CN103490410B (en
Inventor
牛涛
窦晓波
钱康
吴在军
赵继超
胡敏强
王作民
刘述军
孙纯军
宗柳
刘代刚
许文超
王震泉
甄宏宁
李桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
Southeast University
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University, Jiangsu Electric Power Design Institute filed Critical Southeast University
Priority to CN201310393296.3A priority Critical patent/CN103490410B/en
Publication of CN103490410A publication Critical patent/CN103490410A/en
Application granted granted Critical
Publication of CN103490410B publication Critical patent/CN103490410B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a micro-grid planning and capacity allocation method based on multi-objective optimization. The method is characterized in that the method comprises the steps of (1) setting the operation mode of a micro-grid, wherein the operation mode of the micro-grid comprises an independent mode and a grid-connected mode; (2) inputting basic data which comprise the system condition, electrovalence parameters, load parameters, photovoltaic parameters, wind electricity parameters and storage battery parameters; (3) pre-processing the basic data; (4) optimizing a distributed power supply and an energy storage system. According to the micro-grid planning and capacity allocation method, distributed power supply capacity and energy storage system capacity in micro-grid planning can be solved jointly, and optimizing allocation can be carried out at the same time.

Description

A kind of micro-Electric Power Network Planning and capacity collocation method based on multiple-objection optimization
Technical field
The present invention relates to a kind of micro-Electric Power Network Planning and capacity collocation method, belong to micro-electric power network technique field.
Background technology
The proposition of micro-electric power network technique and distributed power generation (Distributed Generation, DG) application of technology is closely related with development, with the conventional power source that relies on the remote conveying distribution, compare, distributed generation technology has the energy form variation, efficiency of energy utilization is high and many-sided advantage such as environmental friendliness.Distributed generation system infield characteristics flexible, that disperse have adapted to dispersion electricity needs and resource distribution admirably, delayed the required huge investment that upgrades of defeated, power distribution network, simultaneously, it and large the electrical network standby power supply reliability that also makes each other are improved, and efficiently solve many potential problems of large-scale centralized electrical network.Yet also there are problems in distributed generation system access electrical network, and as high as distributed power source unit cost of access, control is difficult etc.
For coordinating the contradiction of electrical network and distributed power source, solving a large amount of positions disperses, various informative, the simple grid-connected impact that electrical network and user are caused of the different distributed power source of characteristic, reduce its access to the quality of power supply, system protection, the adverse effect that system operation etc. brings, fully excavating distributed power source is value and the benefit that electrical network and user bring, R.H.Lasseter delivered Microgrids mono-literary composition in 2002 on IEEE Power Engineering Society Winter Meeting, the concept of micro-electrical network has been proposed first, and provided the frame structure of micro-electrical network.Micro-electrical network is from systematic point of view, and distributed power source, load, energy storage device and control device etc. are integrated, forms a controlled unit, simultaneously to user's supply of electrical energy and heat energy.Both can with the operation of large grid network, in the time of also can or needing at electric network fault with major network disconnection isolated operation.The contradiction between large electrical network and distributed power source has effectively been coordinated in the proposition of micro-electrical network concept, and fully having excavated distributed energy is value and the benefit that electrical network and user bring.
The diversity of distributed power source and the uncertainty of exerting oneself thereof, make planning and the capacity configuration problem of micro-electrical network very complicated, and the capacity configuration of distributed power source and energy-storage system is subject to the impact of many-sided conditions such as available energy resources (wind energy, solar energy etc.), load importance, power supply reliability, renewable energy utilization rate and economy.Therefore, how to realize in micro-electrical network that it is the problem that need solve in micro-Electric Power Network Planning that the capacity of distributed power source and energy-storage system is distributed rationally.
Retrieval to existing documents and materials and patent description is found, the paper that the people such as Xiao Jun deliver " micro-Study on Power Grid Planning method and software " (the 32nd the 25th phase of volume of Proceedings of the CSEE) has been realized the distributed power source of independent micro-electrical network and the micro-electrical network of grid type and the capacity collocation method of energy-storage system, and has developed a set of micro-Study on Power Grid Planning software; The paper that the people such as Chen Jian deliver " considering the micro-network optimization configuration of self of different control strategies " (Automation of Electric Systems the 37th volume o. 11th) has been set up the micro-network optimization allocation models of self wind-solar-diesel storage based on different control strategies, take power supply economics and the feature of environmental protection as optimization aim, seek the capacity configuration scheme under Optimal Control Strategy; The paper that the people such as Liu Mengxuan deliver " based on the micro-network optimization method for designing of multiobject independence " (the 36th the 17th phase of volume of Automation of Electric Systems) is for the independent micro-electrical network of wind-solar-diesel storage, proposed to consider the multi-objective optimization design of power model of life cycle management net charge, renewable energy utilization rate and pollutant emission level, realized the capacity configuration of distributed power source and energy-storage system under set control strategy; The paper that the people such as Ma Xiyuan deliver " adopt to improve bacterium look for food the wind/light of algorithm/storage mix micro-electric network source and distribute rationally " (the 31st the 25th phase of volume of Proceedings of the CSEE) has proposed to improve bacterium and has looked for food algorithm in the application of the capacity configuration of distributed power source and energy-storage system, has realized the economy configured.
According to the introduction of above-mentioned technical background, existing article stresses respectively different angles and carries out theoretical research, has obtained a series of achievement in research, but still in various degree have a following problem:
(1) existing micro-Electric Power Network Planning and capacity collocation method are often distributed the distributed power source capacity with energy storage system capacity rationally and are distributed rationally as two and independently optimize computational process.
When carrying out the optimization of distributed power source capacity, energy storage system capacity configures as known conditions; When carrying out energy storage system capacity optimization, the distributed power source capacity is as known conditions.Such computational methods, simplified the control strategy of micro-electrical network in the whole year operation simulation process on the impact of distributed power source and energy storage device, economic benefit that the energy storage device peak load shifting brings, energy storage device whole year discharge and recharge number of times, distributed power source is abandoned wind and is abandoned the situations such as light.Therefore, the optimization of distributed power source capacity and energy storage system capacity optimization independently being optimized to computational process as two, may to cause result of calculation be not optimal solution.
(2) existing micro-Electric Power Network Planning and capacity collocation method are mostly for independent micro-electrical network, to the research of the micro-electrical network of grid type seldom, in the document of the micro-electrical network of a few studies grid type, do not consider the receiving ability of outside large electrical network to distributed power source capacity in micro-electrical network yet.
Existing document great majority are planning and capacity configuration problems of the independent micro-electrical network of research, and in this case, micro-electrical network does not have Power Exchange with the interconnection of outside large electrical network, has simplified simulation model.
The planning of the micro-electrical network of existing a few studies grid type and the document of capacity configuration problem, also simplified the receiving ability of outside large electrical network to distributed power source capacity in micro-electrical network.
(3) existing micro-Electric Power Network Planning and capacity collocation method majority stress simple target optimization, and, using other condition as constraint, finally obtain one group of optimal solution.
Existing document majority has stronger specific aim, for micro-electrical network or certain ad hoc hypothesis condition of certain structure, as need calculate other micro-electric network composition or revise assumed condition, needs corresponding adjustment algorithm.Therefore, there is to a certain extent limitation.
(4) existing micro-Electric Power Network Planning and capacity collocation method research lay particular emphasis on algorithm and theoretical research, are difficult to directly apply to engineering reality.
Summary of the invention
Technical problem to be solved by this invention is: the method for proposition, can consider at the same time to be optimized configuration in the distributed power source capacity in micro-Electric Power Network Planning and energy storage system capacity situation, being combined and solve simultaneously; Independent micro-Electric Power Network Planning and capacity configuration problem both can have been solved, also can solve planning and the capacity configuration problem of the micro-electrical network of grid type, and in the planning and capacity collocation method of the micro-electrical network of grid type, the computational methods of the large electrical network of actual engineering design peripheral to the receiving ability of distributed power source capacity in micro-electrical network have been provided in detail, more incorporation engineering reality; Adopt multiple constraint, multiobject algorithm, can obtain the many groups optimal solution under different condition, for designer's reference; Method of the present invention is to propose on the basis of the wind-powered electricity generation through a large amount of, photovoltaic distributed power station and connecting system design thereof, focuses on engineer's design experiences, and incorporation engineering reality, can be used as aid decision-making system and carry out actual engineering design more.
For solving the problems of the technologies described above, the invention provides a kind of micro-Electric Power Network Planning and capacity collocation method based on multiple-objection optimization, it is characterized in that, comprise the following steps:
One) set micro-operation of power networks pattern: the operational mode of micro-electrical network comprises independent micro-electrical network and the micro-electrical network of grid type;
Two) basic data input: the basic data input comprises system condition, electric price parameter, load parameter, photovoltaic parameter, wind-powered electricity generation parameter and accumulator parameter;
Micro-Electric Power Network Planning and capacity collocation method based on multiple-objection optimization according to claim 1, it is characterized in that: described basic data specifically comprises:
(1) system condition input: only for the micro-electrical network of grid type, comprise the grid-connected electric pressure of micro-electrical network, upper level transformer capacity, interconnection wire type and length, PCC point capacity of short circuit;
(2) electric price parameter input: for independent micro-electrical network, the electric price parameter stoichiometric point is arranged on distributed power station outlet side, and the electric price parameter input comprises all kinds distributed power source generating electricity price; For the micro-electrical network of grid type, be divided into two kinds of electricity price metering methods according to micro-power grid operation pattern, being respectively stoichiometric point is arranged on the interconnection that distributed power station outlet side and stoichiometric point be arranged on micro-electrical network and outside large electrical network, electric price parameter is input as purchase electricity price and sale of electricity electricity price, comprises simultaneously and distinguishes time-of-use tariffs and do not distinguish time-of-use tariffs;
(3) load parameter input: the power and the average short trouble time of electrical network that comprise annual load, sensitive load;
(4) photovoltaic parameter input: the electric parameter, cost parameter, capacity limit and the light resources parameter that comprise photovoltaic module;
(5) wind-powered electricity generation parameter input: the electric parameter, cost parameter, capacity limit and the wind-resources parameter that comprise blower fan;
(6) accumulator parameter input: the electric parameter and the cost parameter that comprise storage battery;
(7) other parameter input, comprise maximum Load Probability, minimum renewable energy utilization rate, the standard year interest rate of losing,
Wherein:
Figure BDA0000375157140000051
Three) basic data preliminary treatment:
(1) system restriction condition:
For the micro-electrical network of grid type:
1) interconnection transmission power limit constraint, the grid-connected circuit that interconnection is the outside large electrical network of micro-electrical network access:
P-P lmin<P linemaxformula (1)
In formula, the active power sum that P is various distributed power sources in micro-electrical network, P lminfor load minimum power, P linemaxfor interconnection limit transmission power, wherein, interconnection limit transmission power P linemaxby the interconnection wire type, determined;
2) PCC point short circuit current retrains with the ratio of micro-interconnecting ties maximum normal current:
I k I e &GreaterEqual; 10 Formula (2)
In formula, I kfor system PCC point short circuit current, I erated current sum for various distributed power sources in micro-electrical network; Wherein, PCC point short circuit current is calculated by capacity of short circuit;
3) voltage loss of transmission line constraint:
Figure BDA0000375157140000061
formula (3)
In formula, the voltage loss that Δ U% is transmission line, U is grid-connected voltage, R, X are respectively resistance and the reactance of interconnection,
Figure BDA0000375157140000062
for photovoltaic plant output voltage and current and phase difference, power factor is got the active power sum that 0.98, P is various distributed power sources in micro-electrical network, and l is interconnection length;
4) voltage fluctuation constraint:
U d max % = PR + QX U &times; 100 % &le; U d _ limite % Formula (4)
In formula, U dmax% is the voltage fluctuation that microgrid causes at the PCC point, the active power sum that P is various distributed power sources in micro-electrical network, and the reactive power sum that Q is various distributed power sources in micro-electrical network, R, X are respectively resistance and the reactance of interconnection, and U is grid-connected voltage, U d_limite% is the voltage fluctuation limit value that PCC is ordered;
(2) an operation year photovoltaic power curve, year blower fan power curve of going into operation:
Photovoltaic power curve, the mathematics model of stable state of year blower fan power curve according to light resources, wind-resources situation and photovoltaic, blower fan of going into operation, by wind-power transfer, light-power transfer, calculated, relevant achievement in research is more, belong to prior art, the paper " photovoltaic cell Utility Simulation Model and photovoltaic generating system emulation " (electric power network technique the 34th volume o. 11th) of delivering as people such as Jiao Yang; The paper that the people such as Chen Jie deliver " speed change is determined the full blast speed power of blade wind power generation unit and controlled " (the 32nd the 30th phase of volume of Proceedings of the CSEE);
(3) storage battery preliminary treatment:
1) input electric price parameter and load data;
2) if in the input data, sensitive load power and the numerical value of average short trouble time of electrical network are arranged,, for ensureing the reliable power supply of sensitive load, battery capacity is retrained:
Battery capacity=the sensitive load of guarantee sensitive load * average short trouble time type of electrical network (5)
3) if there are time-of-use tariffs in purchase electricity price or sale of electricity electricity price, storage battery plays the effect of peak load shifting:
Wherein, Л is coefficient of colligation to unit stored energy capacitance peak load shifting economic benefit=unit capacity * (peak electricity price-paddy electricity price) * 365 * Л formula (6);
4) enter distributed power source after the storage battery preliminary treatment and the energy-storage system optimization system is optimized;
Four) distributed power source and energy-storage system optimization: set up Optimized model, by optimized algorithm, solved, Optimized model comprises target function and constraints, and constraints comprises system restriction, storage battery constraint, reliability constraint and the constraint of renewable energy utilization rate
(1) target function:
Selecting micro-electrical network total cost minimum is target function, and its expression formula is:
Minf=min (C c+ C oM-C gs+ C gp) formula (7)
In formula, f is target function, C cfor the initial outlay cost of micro-electrical network, C oMfor operation maintenance and the displacement total cost present worth of system, C gsfor the total revenue present worth of micro-electrical network large electrical network sale of electricity to outside, C gpfor power purchase total cost present worth;
(2) storage battery constraint:
The state-of-charge of storage battery need meet:
S OCmin≤S OC≤S OCmax (8)
In formula, S oCfor state-of-charge, S oCmin, S oCmaxbe respectively lower limit, the upper limit of storage battery charge state,
The charge rate of storage battery, discharge rate constraint need to meet:
r ch &le; r ch max r dch &le; r dch max - - - ( 9 )
In formula, r ch, r dchbe respectively charge rate, the discharge rate of storage battery; r chmax, r dchmaxbe respectively charge rate restriction and discharge rate restriction;
The charging and discharging currents constraint of storage battery needs to meet:
I ch &le; I ch max I dch &le; I dch max - - - ( 10 )
In formula, I ch, I dchbe respectively charging current, the discharging current of storage battery; I chmax, I dchmaxbe respectively charge-current limit and discharging current restriction;
The the discharging and recharging power and need meet of storage battery:
0 &le; P ch &le; P ch max 0 &le; P dch &le; P dch max - - - ( 11 )
In formula, P ch, P dchbe respectively charge power, the discharge power of storage battery; P chmax, P dchmaxbe respectively the charge power upper limit, the discharge power upper limit;
Within a dispatching cycle, the charge and discharge cycles number of times of storage battery meets:
N C≤N Cmax (12)
In formula, N cfor the charge and discharge cycles number of times of storage battery, N cmaxfor the accumulator cell charging and discharging cycle-index upper limit;
(3) system restriction: system restriction refers to the receiving ability of outside large electrical network to micro-electrical network distributed power source, comprise voltage loss constraint and the voltage fluctuation constraint of the constraint of the interconnection transmission power limit, short-circuit current ratio constraint, transmission line, particular content and step 3) in the pretreated system restriction condition of basic data identical, formula (1)~formula (4) has formed system restriction;
(4) reliability constraint: adopt the mistake Load Probability of micro-electrical network as the reliability constraint index, for independent micro-electrical network, when the power supply capacity of distributed power source and energy storage can not meet all workload demands, for ensureing micro-power network safety operation, allow the non-sensitive load of cut-out
f LPSP≤λ max (13)
In formula, f lPSPfor the mistake Load Probability of load, λ maxfor the maximum in initial conditions is lost Load Probability,
F lPSPby following formula, calculated:
f LPSP = &Sigma; i = 1 T [ P LPSP ( t i ) &times; &Delta;t ] &Sigma; i = 1 T [ P L ( t i ) &times; &Delta;t ] - - - ( 14 )
In formula, P lPSP(t i), P l(t i) be respectively t imistake load power constantly and whole load power, Δ t, for calculating step-length, generally gets one hour; T, for optimizing the time of calculating, generally gets 8760 hours 1 year; t ibe i hour, f lPSPless, mean that the power supply reliability of micro-electrical network is higher;
(5) renewable energy utilization rate constraint: the renewable energy utilization rate refers to that renewable energy power generation amount in micro-electrical network accounts for the ratio of the whole power consumptions of load, wherein to deduct and abandon the energy output that wind is abandoned light,
η≥η min (15)
In formula, η is the renewable energy utilization rate, η minfor renewable energy utilization rate limit value in initial conditions,
η is calculated by following formula:
&eta; = 1 - &Sigma; i = 1 T [ P waste ( t i ) &times; &Delta;t ] &Sigma; i = 1 T [ P L ( t i ) &times; &Delta;t ] - - - ( 16 )
In formula, P waste(t i), P l(t i) be respectively t ithe wind of abandoning is constantly abandoned luminous power and whole load power, and η is larger, means that the renewable energy utilization rate of micro-electrical network is higher;
(6) optimize: according to the Optimized model of setting up, adopt genetic algorithm to be optimized.
Beneficial effect that the present invention reaches:
The method that the present invention proposes, can be combined and be solved the distributed power source capacity in micro-Electric Power Network Planning and energy storage system capacity, is optimized configuration simultaneously; Independent micro-Electric Power Network Planning and capacity configuration problem both can have been solved, also can solve planning and the capacity configuration problem of the micro-electrical network of grid type, in the planning and capacity collocation method of the micro-electrical network of grid type, the computational methods of the large electrical network of actual engineering design peripheral to the receiving ability of distributed power source capacity in micro-electrical network have been provided in detail, more incorporation engineering reality; Adopt multiple constraint, multiobject algorithm, can obtain the many groups optimal solution under different condition, for designer's reference; Method of the present invention is to propose on the basis of the wind-powered electricity generation through a large amount of, photovoltaic distributed power station and connecting system design thereof, and incorporation engineering reality, can be used as aid decision-making system and carry out actual engineering design more.
The accompanying drawing explanation
Fig. 1 is micro-Electric Power Network Planning and the capacity configuration flow chart based on multiple-objection optimization;
Fig. 2 is basic data and the input/output relation figure of input;
Fig. 3 is the storage battery pretreatment process.
Embodiment
Micro-Electric Power Network Planning based on multiple-objection optimization and the signal of the flow process of capacity configuration are as shown in Figure 1.Mainly comprise the steps such as scheme of setting micro-operation of power networks pattern, basic data input, basic data preliminary treatment, distributed power source and energy-storage system optimization, the result that is optimized, the comparison of scheme economic technology, obtaining final satisfaction.
Below will introduce in detail the micro-Electric Power Network Planning shown in Fig. 1 and the flow process of capacity configuration.
The first step: set micro-operation of power networks pattern: the operational mode of micro-electrical network is divided into independent micro-electrical network and the large class of the micro-electrical network two of grid type.
Second step: basic data input: the basic data input comprises system condition, electric price parameter, load parameter, photovoltaic parameter, wind-powered electricity generation parameter, accumulator parameter, 7 parts of other parameter, and the basic data of input and the relation between input and output are as shown in Figure 2.
Wherein:
(1) system condition input, only for the micro-electrical network of grid type, comprise the grid-connected electric pressure of micro-electrical network, upper level transformer capacity, interconnection wire type and length, PCC point capacity of short circuit.
(2) electric price parameter input, for independent micro-electrical network, stoichiometric point is arranged on distributed power station outlet side, and input comprises all kinds distributed power source generating electricity price; For the micro-electrical network of grid type, according to micro-power grid operation pattern, be divided into two kinds of electricity price metering methods, being respectively stoichiometric point is arranged on the interconnection that distributed power station outlet side and stoichiometric point be arranged on micro-electrical network and outside large electrical network, be input as purchase electricity price and sale of electricity electricity price, simultaneously can the selective discrimination time-of-use tariffs and do not distinguish time-of-use tariffs.
(3) load parameter input, comprise power and the average short trouble time of electrical network of annual load (minute hour), sensitive load.
(4) photovoltaic parameter is inputted, and comprises electric parameter, cost parameter, capacity limit, the light resources situation of photovoltaic module.
(5) the wind-powered electricity generation parameter is inputted, and comprises electric parameter, cost parameter, capacity limit, the wind-resources situation of blower fan.
(6) accumulator parameter is inputted, and comprises electric parameter and the cost parameter of storage battery.
(7) other parameter input, comprise maximum Load Probability, minimum renewable energy utilization rate, the standard year interest rate of losing.
Wherein:
Figure BDA0000375157140000111
The 3rd step: basic data preliminary treatment:
(1) system restriction condition: for the micro-electrical network of grid type, the present invention has considered the receiving ability of outside large electrical network to micro-electrical network distributed power source first, from the following aspects, has proposed constraint:
1) interconnection (the grid-connected circuit of the outside large electrical network of micro-electrical network access) transmission power limit constraint
P-P Lmin<P linemax (1)
In formula, the active power sum that P is various distributed power sources in micro-electrical network, P lminfor load minimum power, P linemaxfor interconnection limit transmission power.Wherein, interconnection limit transmission power P linemaxby the interconnection wire type, determined.
2) PCC(Point of Conmen Coupling, points of common connection) the ratio constraint of some short circuit current and micro-interconnecting ties maximum normal current
I k I e &GreaterEqual; 10 - - - ( 2 )
In formula, I kfor system PCC point short circuit current, I erated current sum for various distributed power sources in micro-electrical network.Wherein, PCC point short circuit current can be calculated by capacity of short circuit.
3) voltage loss of transmission line constraint
Figure BDA0000375157140000121
In formula, the voltage loss that Δ U% is transmission line, U is grid-connected voltage, R, X are respectively resistance and the reactance of interconnection,
Figure BDA0000375157140000122
for photovoltaic plant output voltage and current and phase difference, power factor is got the active power sum that 0.98, P is various distributed power sources in micro-electrical network, and l is interconnection length.
4) voltage fluctuation constraint
U d max % = PR + QX U &times; 100 % &le; U d _ limite % - - - ( 4 )
In formula, U dmax% is the voltage fluctuation that microgrid causes at the PCC point, the active power sum that P is various distributed power sources in micro-electrical network, and the reactive power sum that Q is various distributed power sources in micro-electrical network, R, X are respectively resistance and the reactance of interconnection, and U is grid-connected voltage, U d_limite% is the voltage fluctuation limit value that PCC is ordered.
(2) an operation year photovoltaic power curve, year blower fan power curve of going into operation
The power curve of photovoltaic, blower fan can be calculated by wind-power transfer, light-power transfer according to the mathematics model of stable state of light resources, wind-resources situation and photovoltaic, blower fan, and relevant achievement in research is more, repeats no more herein.
(3) storage battery preliminary treatment
1) if in the input data, sensitive load power and the numerical value of average short trouble time of electrical network are arranged,, for ensureing the reliable power supply of sensitive load, need be retrained battery capacity:
Battery capacity=the sensitive load of guarantee sensitive load * average short trouble time of electrical network (5)
Wherein, ensure that the battery capacity unit of sensitive load is kilowatt hour (kWh), sensitive load unit is kilowatt (kW), and the average short trouble of electrical network chronomere is hour (h).
2) if there are time-of-use tariffs in purchase electricity price or sale of electricity electricity price, storage battery can play the effect of peak load shifting, has certain economic benefit, unit stored energy capacitance peak load shifting economic benefit:
Unit stored energy capacitance peak load shifting economic benefit=unit capacity * (peak electricity price-paddy electricity price) * 365 * Л (6)
Wherein: stored energy capacitance peak load shifting economic benefit unit of unit is unit/year, unit capacity unit is kilowatt hour (kWh), electricity price unit is unit/kWh, and Л is coefficient of colligation, and this coefficient has considered that efficiency for charge-discharge, charge/discharge capacity of storage battery account for the factors such as percentage of total capacity.
The pretreated flow process of storage battery refers to Fig. 3, enters distributed power source and energy-storage system Optimization Steps after the storage battery preliminary treatment.
The 4th step: distributed power source and energy-storage system optimization
Distributed power source and energy storage system capacity allocation problem, be an optimization problem, can set up Optimized model, by optimized algorithm, solved.Optimized model is comprised of target function and constraints, and the model constrained condition that wherein the present invention proposes comprises system restriction, storage battery constraint, reliability constraint, the constraint of renewable energy utilization rate.
(1) target function: selecting micro-electrical network total cost minimum is target function, and its expression formula is:
minf=min(C c+C OM-C gs+C gp) (7)
In formula, f is target function, C cfor the initial outlay cost of micro-electrical network, C oMfor operation maintenance and the displacement total cost present worth of system, C gsfor the total revenue present worth of micro-electrical network large electrical network sale of electricity to outside, C gpfor power purchase total cost present worth.Wherein, if electricity price is distinguished time-of-use tariffs, in the situation that configured storage battery in micro-electrical network, in the calculating of sale of electricity cost and power purchase cost, should consider the economic benefit of peak load shifting, specifically referring to Fig. 3.
(2) storage battery constraint: for making storage battery safety stable operation, and guarantee its useful life, need in the microgrid planning and designing discharging and recharging of storage battery in the system running made to strict restriction.
The state-of-charge of storage battery (state of charge, SOC) needs to meet:
S OCmin≤S OC≤S OCmax (8)
In formula, S oCfor state-of-charge, S oCmin, S oCmaxbe respectively lower limit, the upper limit of storage battery charge state.
The charge rate of storage battery, discharge rate constraint need to meet:
r ch &le; r ch max r dch &le; r dch max - - - ( 9 )
In formula, r ch, r dchbe respectively charge rate, the discharge rate of storage battery; r chmax, r dchmaxbe respectively charge rate restriction and discharge rate restriction.
The charging and discharging currents constraint of storage battery needs to meet:
I ch &le; I ch max I dch &le; I dch max - - - ( 10 )
In formula, I ch, I dchbe respectively charging current, the discharging current of storage battery; I chmax, I dchmaxbe respectively charge-current limit and discharging current restriction.
The the discharging and recharging power and need meet of storage battery:
0 &le; P ch &le; P ch max 0 &le; P dch &le; P dch max - - - ( 11 )
In formula, P ch, P dchbe respectively charge power, the discharge power of storage battery; P chmax, P dchmaxbe respectively the charge power upper limit, the discharge power upper limit.
Within a dispatching cycle, the charge and discharge cycles number of times of storage battery need meet:
N C≤N Cmax (12)
In formula, N cfor the charge and discharge cycles number of times of storage battery, N cmaxfor the accumulator cell charging and discharging cycle-index upper limit.Formula (8)~formula (12) has formed the storage battery constraint.
(3) system restriction: system restriction refers to the receiving ability of outside large electrical network to micro-electrical network distributed power source, comprises voltage loss constraint and the voltage fluctuation constraint of the constraint of the interconnection transmission power limit, short-circuit current ratio constraint, transmission line.Specifically refer to the 3rd step, the pretreated system restriction condition part of basic data content, formula (1)~formula (4) has formed system restriction.
(4) reliability constraint: adopt the mistake Load Probability of micro-electrical network as the reliability constraint index.For independent micro-electrical network, when the power supply capacity of distributed power source and energy storage can not meet all workload demands, for ensureing micro-power network safety operation, allow the non-sensitive load of cut-out (common load).
f LPSP≤λ max (13)
In formula, f lPSPfor the mistake Load Probability of load, λ maxfor the maximum in initial conditions is lost Load Probability.
F lPSPcan be calculated by following formula:
f LPSP = &Sigma; i = 1 T [ P LPSP ( t i ) &times; &Delta;t ] &Sigma; i = 1 T [ P L ( t i ) &times; &Delta;t ] - - - ( 14 )
In formula, P lPSP(t i), P l(t i) be respectively t imistake load power constantly and whole load power, f lPSPless, mean that the power supply reliability of micro-electrical network is higher.
(5) renewable energy utilization rate constraint: the renewable energy utilization rate refers to that renewable energy power generation amount in micro-electrical network accounts for the ratio of the whole power consumptions of load, wherein will deduct and abandon the energy output that wind is abandoned light.
η≥η min (15)
In formula, η is the renewable energy utilization rate, η minfor renewable energy utilization rate limit value in initial conditions.
η can be calculated by following formula:
&eta; = 1 - &Sigma; i = 1 T [ P waste ( t i ) &times; &Delta;t ] &Sigma; i = 1 T [ P L ( t i ) &times; &Delta;t ] - - - ( 16 )
In formula, P waste(t i), P l(t i) be respectively t ithe wind of abandoning is constantly abandoned luminous power and whole load power, and η is larger, means that the renewable energy utilization rate of micro-electrical network is higher.
(6) optimized algorithm: the Optimized model according to above setting up can adopt intelligent algorithm to be optimized.Optimized algorithm of the present invention adopts the genetic algorithm of current extensive use, and relevant achievement in research is more, repeats no more herein.
The 5th step: optimum results, the optimal solution calculated by optimized algorithm, comprise that installed capacity, the configuration capacity of energy-storage system, rate of return on investment, the reality of distributed power source is lost Load Probability.
Further, can also carry out the scheme economic technology and comprehensively compare, after the result that is optimized, engineers and technicians can be according to the engineering actual conditions, in conjunction with individual design experiences, revise certain (or some) condition, then re-start to optimize and calculate.The condition that can revise has certain distributed power source installed capacity, energy-storage system configuration capacity, maximum Load Probability, the renewable energy utilization rate limit value etc. of losing, and finally can obtain satisfied scheme.
Above demonstration and described basic principle of the present invention and principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and specification, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (2)

1. micro-Electric Power Network Planning and the capacity collocation method based on multiple-objection optimization, is characterized in that, comprises the following steps:
One) set micro-operation of power networks pattern: the operational mode of micro-electrical network comprises independent micro-electrical network and the micro-electrical network of grid type;
Two) basic data input: the basic data input comprises system condition, electric price parameter, load parameter, photovoltaic parameter, wind-powered electricity generation parameter and accumulator parameter;
Three) basic data preliminary treatment:
(1) system restriction condition:
For the micro-electrical network of grid type:
1) interconnection transmission power limit constraint, the grid-connected circuit that interconnection is the outside large electrical network of micro-electrical network access:
P-P lmin<P linemaxformula (1)
In formula, the active power sum that P is various distributed power sources in micro-electrical network, P lminfor load minimum power, P linemaxfor interconnection limit transmission power, wherein, interconnection limit transmission power P linemaxby the interconnection wire type, determined;
2) PCC point short circuit current retrains with the ratio of micro-interconnecting ties maximum normal current:
I k I e &GreaterEqual; 10 Formula (2)
In formula, I kfor system PCC point short circuit current, I erated current sum for various distributed power sources in micro-electrical network; Wherein, PCC point short circuit current is calculated by capacity of short circuit;
3) voltage loss of transmission line constraint:
Figure FDA0000375157130000012
formula (3)
In formula, the voltage loss that Δ U% is transmission line, U is grid-connected voltage, R, X are respectively resistance and the reactance of interconnection,
Figure FDA0000375157130000021
for photovoltaic plant output voltage and current and phase difference, power factor is got the active power sum that 0.98, P is various distributed power sources in micro-electrical network, and l is interconnection length;
4) voltage fluctuation constraint:
U d max % = PR + QX U &times; 100 % &le; U d _ limite % Formula (4)
In formula, U dmax% is the voltage fluctuation that microgrid causes at the PCC point, the active power sum that P is various distributed power sources in micro-electrical network, and the reactive power sum that Q is various distributed power sources in micro-electrical network, R, X are respectively resistance and the reactance of interconnection, and U is grid-connected voltage, U d_limite% is the voltage fluctuation limit value that PCC is ordered;
(2) an operation year photovoltaic power curve, year blower fan power curve of going into operation:
Photovoltaic power curve, year blower fan power curve of going into operation, according to the mathematics model of stable state of light resources, wind-resources situation and photovoltaic, blower fan, are calculated by wind-power transfer, light-power transfer;
(3) storage battery preliminary treatment:
1) input electric price parameter and load data;
2) if in the input data, sensitive load power and the numerical value of average short trouble time of electrical network are arranged,, for ensureing the reliable power supply of sensitive load, battery capacity is retrained:
Battery capacity=the sensitive load of guarantee sensitive load * average short trouble time type of electrical network (5)
3) if there are time-of-use tariffs in purchase electricity price or sale of electricity electricity price, storage battery plays the effect of peak load shifting:
Wherein, Л is coefficient of colligation to unit stored energy capacitance peak load shifting economic benefit=unit capacity * (peak electricity price-paddy electricity price) * 365 * Л formula (6);
4) enter distributed power source after the storage battery preliminary treatment and the energy-storage system optimization system is optimized;
Four) distributed power source and energy-storage system optimization: set up Optimized model, by optimized algorithm, solved, Optimized model comprises target function and constraints, and constraints comprises system restriction, storage battery constraint, reliability constraint and the constraint of renewable energy utilization rate
(1) target function:
Selecting micro-electrical network total cost minimum is target function, and its expression formula is:
Minf=min (C c+ C oM-C gs+ C gp) formula (7)
In formula, f is target function, C cfor the initial outlay cost of micro-electrical network, C oMfor operation maintenance and the displacement total cost present worth of system, C gsfor the total revenue present worth of micro-electrical network large electrical network sale of electricity to outside, C gpfor power purchase total cost present worth;
(2) storage battery constraint:
The state-of-charge of storage battery need meet:
S OCmin≤S OC≤S OCmax (8)
In formula, S oCfor state-of-charge, S oCmin, S oCmaxbe respectively lower limit, the upper limit of storage battery charge state,
The charge rate of storage battery, discharge rate constraint need to meet:
r ch &le; r ch max r dch &le; r dch max - - - ( 9 )
In formula, r ch, r dchbe respectively charge rate, the discharge rate of storage battery; r chmax, r dchmaxbe respectively charge rate restriction and discharge rate restriction;
The charging and discharging currents constraint of storage battery needs to meet:
I ch &le; I ch max I dch &le; I dch max - - - ( 10 )
In formula, I ch, I dchbe respectively charging current, the discharging current of storage battery; I chmax, I dchmaxbe respectively charge-current limit and discharging current restriction;
The the discharging and recharging power and need meet of storage battery:
0 &le; P ch &le; P ch max 0 &le; P dch &le; P dch max - - - ( 11 )
In formula, P ch, P dchbe respectively charge power, the discharge power of storage battery; P chmax, P dchmaxbe respectively the charge power upper limit, the discharge power upper limit;
Within a dispatching cycle, the charge and discharge cycles number of times of storage battery meets:
N C≤N Cmax (12)
In formula, N cfor the charge and discharge cycles number of times of storage battery, N cmaxfor the accumulator cell charging and discharging cycle-index upper limit;
(3) system restriction: system restriction refers to the receiving ability of outside large electrical network to micro-electrical network distributed power source, comprise voltage loss constraint and the voltage fluctuation constraint of the constraint of the interconnection transmission power limit, short-circuit current ratio constraint, transmission line, concrete constraints and step 3) in the pretreated system restriction condition of basic data identical, formula (1)~formula (4) has formed system restriction;
(4) reliability constraint: adopt the mistake Load Probability of micro-electrical network as the reliability constraint index, for independent micro-electrical network, when the power supply capacity of distributed power source and energy storage can not meet all workload demands, for ensureing micro-power network safety operation, allow the non-sensitive load of cut-out
f LPSP≤λ max (13)
In formula, f lPSPfor the mistake Load Probability of load, λ maxfor the maximum in initial conditions is lost Load Probability,
F lPSPby following formula, calculated:
f LPSP = &Sigma; i = 1 T [ P LPSP ( t i ) &times; &Delta;t ] &Sigma; i = 1 T [ P L ( t i ) &times; &Delta;t ] - - - ( 14 )
In formula, P lPSP(t i), P l(t i) be respectively t imistake load power constantly and whole load power, Δ t is for calculating step-length; T is for optimizing the time of calculating; t ibe i hour, f lPSPless, mean that the power supply reliability of micro-electrical network is higher;
(5) renewable energy utilization rate constraint: the renewable energy utilization rate refers to that renewable energy power generation amount in micro-electrical network accounts for the ratio of the whole power consumptions of load, wherein to deduct and abandon the energy output that wind is abandoned light,
η≥η min (15)
In formula, η is the renewable energy utilization rate, η minfor renewable energy utilization rate limit value in initial conditions,
η is calculated by following formula:
&eta; = 1 - &Sigma; i = 1 T [ P waste ( t i ) &times; &Delta;t ] &Sigma; i = 1 T [ P L ( t i ) &times; &Delta;t ] - - - ( 16 )
In formula, P waste(t i), P l(t i) be respectively t ithe wind of abandoning is constantly abandoned luminous power and whole load power, and η is larger, means that the renewable energy utilization rate of micro-electrical network is higher;
(6) optimize: according to the Optimized model of setting up, adopt genetic algorithm to be optimized.
2. micro-Electric Power Network Planning and the capacity collocation method based on multiple-objection optimization according to claim 1, it is characterized in that: described basic data specifically comprises:
(1) system condition input: only for the micro-electrical network of grid type, comprise the grid-connected electric pressure of micro-electrical network, upper level transformer capacity, interconnection wire type and length, PCC point capacity of short circuit;
(2) electric price parameter input: for independent micro-electrical network, the electric price parameter stoichiometric point is arranged on distributed power station outlet side, and the electric price parameter input comprises all kinds distributed power source generating electricity price; For the micro-electrical network of grid type, be divided into two kinds of electricity price metering methods according to micro-power grid operation pattern, being respectively stoichiometric point is arranged on the interconnection that distributed power station outlet side and stoichiometric point be arranged on micro-electrical network and outside large electrical network, electric price parameter is input as purchase electricity price and sale of electricity electricity price, comprises simultaneously and distinguishes time-of-use tariffs and do not distinguish time-of-use tariffs;
(3) load parameter input: the power and the average short trouble time of electrical network that comprise annual load, sensitive load;
(4) photovoltaic parameter input: the electric parameter, cost parameter, capacity limit and the light resources parameter that comprise photovoltaic module;
(5) wind-powered electricity generation parameter input: the electric parameter, cost parameter, capacity limit and the wind-resources parameter that comprise blower fan;
(6) accumulator parameter input: the electric parameter and the cost parameter that comprise storage battery;
(7) other parameter input, comprise maximum Load Probability, minimum renewable energy utilization rate, the standard year interest rate of losing,
Wherein:
Figure FDA0000375157130000061
CN201310393296.3A 2013-08-30 2013-08-30 Micro-grid planning and capacity allocation method based on multi-objective optimization Active CN103490410B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310393296.3A CN103490410B (en) 2013-08-30 2013-08-30 Micro-grid planning and capacity allocation method based on multi-objective optimization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310393296.3A CN103490410B (en) 2013-08-30 2013-08-30 Micro-grid planning and capacity allocation method based on multi-objective optimization

Publications (2)

Publication Number Publication Date
CN103490410A true CN103490410A (en) 2014-01-01
CN103490410B CN103490410B (en) 2014-07-02

Family

ID=49830442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310393296.3A Active CN103490410B (en) 2013-08-30 2013-08-30 Micro-grid planning and capacity allocation method based on multi-objective optimization

Country Status (1)

Country Link
CN (1) CN103490410B (en)

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761586A (en) * 2014-02-11 2014-04-30 东南大学 Microgrid cluster concentrated-distributed type coordinated optimization scheduling method
CN103971173A (en) * 2014-04-28 2014-08-06 广东电网公司电力科学研究院 Method and system for controlling capacity of transformer substations of initiative power distribution network
CN103972915A (en) * 2014-05-23 2014-08-06 中国南方电网有限责任公司调峰调频发电公司 Energy storage system optimum capacity calculating method for peak load shifting
CN104092209A (en) * 2014-06-18 2014-10-08 光一科技股份有限公司 Interactional micro-power-grid energy control processing method based on real-time feedback
CN104361405A (en) * 2014-10-28 2015-02-18 广东电网有限责任公司电力科学研究院 Micro grid energy storage device design method based on capacity limit value constrain
CN104376410A (en) * 2014-11-06 2015-02-25 国家电网公司 Planning method for distributed power source in power distribution network
CN104537435A (en) * 2014-12-18 2015-04-22 国家电网公司 Distributed power source optimizing configuration method based on user-side economic indexes
CN104701871A (en) * 2015-02-13 2015-06-10 国家电网公司 Wind, light and water-containing multi-source complementary micro-grid hybrid energy storage capacity optimal proportion method
CN104795828A (en) * 2015-04-24 2015-07-22 清华大学 Wind storage capacity configuration method based on genetic algorithm
CN104810861A (en) * 2015-04-23 2015-07-29 广西电网有限责任公司电力科学研究院 Optimal locating and constant volume method for distributed power supply in low-voltage distribution network
CN104917203A (en) * 2015-06-26 2015-09-16 国家电网公司 Distributed power supply combined power generation system based on geographical division and coordination control method
CN105098842A (en) * 2015-08-12 2015-11-25 国网山东省电力公司电力科学研究院 Wind farm integration capacity determination method in consideration of voltage constraints
WO2016004651A1 (en) * 2014-07-07 2016-01-14 四川中电启明星信息技术有限公司 Management method for connecting distributed power supplies and micro grid to main power grid
CN105279346A (en) * 2015-11-20 2016-01-27 国网能源研究院 Method for evaluating distributed photovoltaic receiving capability of power distribution network
WO2016061741A1 (en) * 2014-10-21 2016-04-28 Accenture Global Services Limited System, method, and apparatus for capacity determination for micro grid, and tangible computer readable medium
CN105656026A (en) * 2016-01-15 2016-06-08 中国南方电网有限责任公司电网技术研究中心 Equipment construction resource configuration method and system of renewable energy sources
CN105894134A (en) * 2016-05-20 2016-08-24 甘肃省电力公司风电技术中心 New energy power generation right replacement power evaluation method capable of minimizing wind power curtailment and light power curtailment
CN105894108A (en) * 2016-03-25 2016-08-24 中国南方电网有限责任公司电网技术研究中心 Microgrid operation planning method and system
CN106253335A (en) * 2016-06-16 2016-12-21 上海交通大学 A kind of distributed power source capacity and on-position uncertain distribution network planning method
CN106329554A (en) * 2016-09-07 2017-01-11 中国南方电网有限责任公司电网技术研究中心 Method of calculating energy storage rated capacity applied to zone-type microgrid
CN106385053A (en) * 2016-11-21 2017-02-08 南方电网科学研究院有限责任公司 Wind power limit penetration power optimization method and device
CN106786633A (en) * 2017-03-24 2017-05-31 广东电网有限责任公司河源供电局 The collocation method and reactive voltage adjusting means of reactive voltage adjusting means
CN106953315A (en) * 2017-01-17 2017-07-14 无锡协鑫分布式能源开发有限公司 User side grid type light stores up integral system capacity optimization software algorithm
CN107392791A (en) * 2017-07-06 2017-11-24 南方电网科学研究院有限责任公司 The distributed photovoltaic for system of providing multiple forms of energy to complement each other and pneumoelectric mixing capacity method and system for planning
CN107609632A (en) * 2017-09-15 2018-01-19 国家电网公司 Power distribution network reconfiguration Optimal Operation Analysis method and device
CN107706893A (en) * 2017-10-31 2018-02-16 广东电网有限责任公司惠州供电局 A kind of computational methods of DG accesses distribution optimum capacity
CN108039722A (en) * 2017-11-21 2018-05-15 中国科学院广州能源研究所 A kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing
CN108092290A (en) * 2017-08-16 2018-05-29 华东理工大学 A kind of microgrid energy collocation method for combining stored energy capacitance configuration and optimization operation
CN108667071A (en) * 2018-05-16 2018-10-16 国网山东省电力公司泰安供电公司 A kind of active distribution network load is precisely controlled computational methods
CN108988390A (en) * 2018-08-13 2018-12-11 国网江西省电力有限公司电力科学研究院 A kind of distribution network voltage control method based on best abandoning light rate
CN109510241A (en) * 2018-12-20 2019-03-22 中国电建集团河北省电力勘测设计研究院有限公司 The grid-connect mode Optimizing Configuration System and method of the industrial park scene combustion energy storage energy
CN109510224A (en) * 2018-11-16 2019-03-22 上海交通大学 Photovoltaic energy storage and the united capacity configuration of distributed energy and running optimizatin method
CN109711614A (en) * 2018-12-24 2019-05-03 新奥数能科技有限公司 A kind of the dynamic optimization progress control method and system of distributed busbar protection
CN109823223A (en) * 2019-01-23 2019-05-31 国家电网有限公司 A kind of energy accumulation capacity configuration and system of electric automobile charging station
CN110297150A (en) * 2018-03-21 2019-10-01 北京金风科创风电设备有限公司 Wind generating set grid-connected point short circuit capacity detection method and device
CN110515300A (en) * 2019-08-05 2019-11-29 广东电网有限责任公司 A kind of regional internet comprehensive energy multiple-objection optimization configuration method
CN110661284A (en) * 2019-08-20 2020-01-07 四川大学 Capacity optimization configuration method for water-light storage complementary power generation system under multi-target constraint
CN110867883A (en) * 2019-12-16 2020-03-06 贵州电网有限责任公司 Power distribution network operation method suitable for large-scale application of distributed energy storage
CN110979105A (en) * 2019-12-24 2020-04-10 中铁二院工程集团有限责任公司 Design method for external power supply access scheme of through bilateral traction power supply system
CN111753431A (en) * 2020-06-29 2020-10-09 国网山西省电力公司电力科学研究院 Method and device for calculating optimal configuration in integrated energy system
CN111900734A (en) * 2020-08-05 2020-11-06 浙江华云清洁能源有限公司 Distributed energy storage capacity configuration method with transformer capacity expansion reduction as target
CN112039067A (en) * 2020-09-01 2020-12-04 国网河北省电力有限公司邢台供电分公司 Power distribution network new energy power generation utilization rate optimization method and terminal equipment
CN112152257A (en) * 2020-09-04 2020-12-29 摩氢科技有限公司 Distributed energy system and control method thereof
CN112182907A (en) * 2020-10-19 2021-01-05 贵州电网有限责任公司 Reliability constraint-based planning method for energy storage device of electric-gas coupling system
CN113196319A (en) * 2018-11-23 2021-07-30 道达尔太阳能公司 Computer-implemented method for providing technical selection parameters of an energy supply system, computer program product for providing such technical selection parameters, and computer system for providing such an energy supply system
CN113363964A (en) * 2021-05-26 2021-09-07 国网天津市电力公司 Power distribution network distributed energy storage planning method and device considering important load power supply

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094926A (en) * 2013-01-09 2013-05-08 清华大学 Multi-component energy-storing capacity collocation method applied to micro power grid group
CN103166248A (en) * 2013-04-01 2013-06-19 国电联合动力技术有限公司 Engineering configuration method of independent wind-diesel-storage micro grid system capacity

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094926A (en) * 2013-01-09 2013-05-08 清华大学 Multi-component energy-storing capacity collocation method applied to micro power grid group
CN103166248A (en) * 2013-04-01 2013-06-19 国电联合动力技术有限公司 Engineering configuration method of independent wind-diesel-storage micro grid system capacity

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘梦璇等: "基于多目标的独立微电网优化设计方法", 《电力系统自动化》 *

Cited By (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761586A (en) * 2014-02-11 2014-04-30 东南大学 Microgrid cluster concentrated-distributed type coordinated optimization scheduling method
CN103971173B (en) * 2014-04-28 2017-06-16 广东电网公司电力科学研究院 Active distribution network substation capacity control method and system
CN103971173A (en) * 2014-04-28 2014-08-06 广东电网公司电力科学研究院 Method and system for controlling capacity of transformer substations of initiative power distribution network
CN103972915A (en) * 2014-05-23 2014-08-06 中国南方电网有限责任公司调峰调频发电公司 Energy storage system optimum capacity calculating method for peak load shifting
CN103972915B (en) * 2014-05-23 2016-05-25 中国南方电网有限责任公司调峰调频发电公司 A kind of optimum calculation of capacity method of energy-storage system for the peak load shifting of loading
CN104092209A (en) * 2014-06-18 2014-10-08 光一科技股份有限公司 Interactional micro-power-grid energy control processing method based on real-time feedback
WO2016004651A1 (en) * 2014-07-07 2016-01-14 四川中电启明星信息技术有限公司 Management method for connecting distributed power supplies and micro grid to main power grid
WO2016061741A1 (en) * 2014-10-21 2016-04-28 Accenture Global Services Limited System, method, and apparatus for capacity determination for micro grid, and tangible computer readable medium
CN107077704A (en) * 2014-10-21 2017-08-18 埃森哲环球服务有限公司 System, method and device and tangible computer computer-readable recording medium for the capacity determination for micro-capacitance sensor
US10290064B2 (en) 2014-10-21 2019-05-14 Accenture Global Services Limited System, method and apparatus for capacity determination for micro grid and tangible computer readable medium
CN104361405A (en) * 2014-10-28 2015-02-18 广东电网有限责任公司电力科学研究院 Micro grid energy storage device design method based on capacity limit value constrain
CN104376410A (en) * 2014-11-06 2015-02-25 国家电网公司 Planning method for distributed power source in power distribution network
CN104376410B (en) * 2014-11-06 2017-08-08 国家电网公司 A kind of planing method of Distributed Generation in Distribution System
CN104537435A (en) * 2014-12-18 2015-04-22 国家电网公司 Distributed power source optimizing configuration method based on user-side economic indexes
CN104537435B (en) * 2014-12-18 2017-12-15 国家电网公司 Distributed power source Optimal Configuration Method based on user side economic index
CN104701871A (en) * 2015-02-13 2015-06-10 国家电网公司 Wind, light and water-containing multi-source complementary micro-grid hybrid energy storage capacity optimal proportion method
CN104810861A (en) * 2015-04-23 2015-07-29 广西电网有限责任公司电力科学研究院 Optimal locating and constant volume method for distributed power supply in low-voltage distribution network
CN104795828A (en) * 2015-04-24 2015-07-22 清华大学 Wind storage capacity configuration method based on genetic algorithm
CN104917203A (en) * 2015-06-26 2015-09-16 国家电网公司 Distributed power supply combined power generation system based on geographical division and coordination control method
CN104917203B (en) * 2015-06-26 2018-08-03 国家电网公司 Distributed generation resource combined generating system based on geographical zone and control method for coordinating
CN105098842A (en) * 2015-08-12 2015-11-25 国网山东省电力公司电力科学研究院 Wind farm integration capacity determination method in consideration of voltage constraints
CN105279346A (en) * 2015-11-20 2016-01-27 国网能源研究院 Method for evaluating distributed photovoltaic receiving capability of power distribution network
CN105279346B (en) * 2015-11-20 2019-01-08 国网能源研究院 A method of distributed photovoltaic ability is received for assessing power distribution network
CN105656026A (en) * 2016-01-15 2016-06-08 中国南方电网有限责任公司电网技术研究中心 Equipment construction resource configuration method and system of renewable energy sources
CN105894108B (en) * 2016-03-25 2017-04-12 中国南方电网有限责任公司电网技术研究中心 Microgrid operation planning method and system
CN105894108A (en) * 2016-03-25 2016-08-24 中国南方电网有限责任公司电网技术研究中心 Microgrid operation planning method and system
CN105894134A (en) * 2016-05-20 2016-08-24 甘肃省电力公司风电技术中心 New energy power generation right replacement power evaluation method capable of minimizing wind power curtailment and light power curtailment
CN105894134B (en) * 2016-05-20 2020-10-16 甘肃省电力公司风电技术中心 New energy power generation right replacement electric quantity evaluation method for minimizing wind and light abandoning electric quantity
CN106253335A (en) * 2016-06-16 2016-12-21 上海交通大学 A kind of distributed power source capacity and on-position uncertain distribution network planning method
CN106329554B (en) * 2016-09-07 2019-01-25 中国南方电网有限责任公司电网技术研究中心 A kind of calculation method of the energy storage rated capacity suitable for garden type micro-capacitance sensor
CN106329554A (en) * 2016-09-07 2017-01-11 中国南方电网有限责任公司电网技术研究中心 Method of calculating energy storage rated capacity applied to zone-type microgrid
CN106385053A (en) * 2016-11-21 2017-02-08 南方电网科学研究院有限责任公司 Wind power limit penetration power optimization method and device
CN106385053B (en) * 2016-11-21 2019-01-15 南方电网科学研究院有限责任公司 Wind-powered electricity generation critical penetration power optimization method and device
CN106953315A (en) * 2017-01-17 2017-07-14 无锡协鑫分布式能源开发有限公司 User side grid type light stores up integral system capacity optimization software algorithm
CN106786633A (en) * 2017-03-24 2017-05-31 广东电网有限责任公司河源供电局 The collocation method and reactive voltage adjusting means of reactive voltage adjusting means
CN107392791A (en) * 2017-07-06 2017-11-24 南方电网科学研究院有限责任公司 The distributed photovoltaic for system of providing multiple forms of energy to complement each other and pneumoelectric mixing capacity method and system for planning
CN107392791B (en) * 2017-07-06 2020-06-30 南方电网科学研究院有限责任公司 Distributed photovoltaic and gas-electricity hybrid capacity planning method and system for multi-energy complementary system
CN108092290B (en) * 2017-08-16 2021-09-24 华东理工大学 Microgrid energy configuration method combining energy storage capacity configuration and optimized operation
CN108092290A (en) * 2017-08-16 2018-05-29 华东理工大学 A kind of microgrid energy collocation method for combining stored energy capacitance configuration and optimization operation
CN107609632A (en) * 2017-09-15 2018-01-19 国家电网公司 Power distribution network reconfiguration Optimal Operation Analysis method and device
CN107706893A (en) * 2017-10-31 2018-02-16 广东电网有限责任公司惠州供电局 A kind of computational methods of DG accesses distribution optimum capacity
CN107706893B (en) * 2017-10-31 2019-09-10 广东电网有限责任公司惠州供电局 A kind of calculation method of DG access distribution optimum capacity
CN108039722A (en) * 2017-11-21 2018-05-15 中国科学院广州能源研究所 A kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing
US11293402B2 (en) 2018-03-21 2022-04-05 Beijing Goldwind Science & Creation Windpower Equipment Co., Ltd. Method and apparatus for detecting a short-circuit capacity at a grid connection point of a wind turbine
CN110297150A (en) * 2018-03-21 2019-10-01 北京金风科创风电设备有限公司 Wind generating set grid-connected point short circuit capacity detection method and device
CN108667071A (en) * 2018-05-16 2018-10-16 国网山东省电力公司泰安供电公司 A kind of active distribution network load is precisely controlled computational methods
CN108667071B (en) * 2018-05-16 2021-04-27 国网山东省电力公司泰安供电公司 Accurate control calculation method for load of active power distribution network
CN108988390A (en) * 2018-08-13 2018-12-11 国网江西省电力有限公司电力科学研究院 A kind of distribution network voltage control method based on best abandoning light rate
CN109510224A (en) * 2018-11-16 2019-03-22 上海交通大学 Photovoltaic energy storage and the united capacity configuration of distributed energy and running optimizatin method
CN109510224B (en) * 2018-11-16 2021-11-09 上海交通大学 Capacity allocation and operation optimization method combining photovoltaic energy storage and distributed energy
CN113196319A (en) * 2018-11-23 2021-07-30 道达尔太阳能公司 Computer-implemented method for providing technical selection parameters of an energy supply system, computer program product for providing such technical selection parameters, and computer system for providing such an energy supply system
CN113196319B (en) * 2018-11-23 2024-03-22 道达尔太阳能公司 Computer-implemented method, computer-readable storage medium, and computer system for providing technical selection parameters for energy supply systems
CN109510241A (en) * 2018-12-20 2019-03-22 中国电建集团河北省电力勘测设计研究院有限公司 The grid-connect mode Optimizing Configuration System and method of the industrial park scene combustion energy storage energy
CN109711614A (en) * 2018-12-24 2019-05-03 新奥数能科技有限公司 A kind of the dynamic optimization progress control method and system of distributed busbar protection
CN109823223A (en) * 2019-01-23 2019-05-31 国家电网有限公司 A kind of energy accumulation capacity configuration and system of electric automobile charging station
CN109823223B (en) * 2019-01-23 2023-12-08 国家电网有限公司 Energy storage capacity configuration method and system of electric vehicle charging station
CN110515300A (en) * 2019-08-05 2019-11-29 广东电网有限责任公司 A kind of regional internet comprehensive energy multiple-objection optimization configuration method
CN110515300B (en) * 2019-08-05 2022-11-29 广东电网有限责任公司 Multi-objective optimization configuration method for regional interconnection comprehensive energy
CN110661284A (en) * 2019-08-20 2020-01-07 四川大学 Capacity optimization configuration method for water-light storage complementary power generation system under multi-target constraint
CN110867883A (en) * 2019-12-16 2020-03-06 贵州电网有限责任公司 Power distribution network operation method suitable for large-scale application of distributed energy storage
CN110979105A (en) * 2019-12-24 2020-04-10 中铁二院工程集团有限责任公司 Design method for external power supply access scheme of through bilateral traction power supply system
CN110979105B (en) * 2019-12-24 2022-06-14 中铁二院工程集团有限责任公司 Design method for external power supply access scheme of through bilateral traction power supply system
CN111753431B (en) * 2020-06-29 2023-08-18 国网山西省电力公司电力科学研究院 Computing method and computing equipment for optimal configuration in comprehensive energy system
CN111753431A (en) * 2020-06-29 2020-10-09 国网山西省电力公司电力科学研究院 Method and device for calculating optimal configuration in integrated energy system
CN111900734A (en) * 2020-08-05 2020-11-06 浙江华云清洁能源有限公司 Distributed energy storage capacity configuration method with transformer capacity expansion reduction as target
CN111900734B (en) * 2020-08-05 2022-03-11 浙江华云清洁能源有限公司 Distributed energy storage capacity configuration method with transformer capacity expansion reduction as target
CN112039067A (en) * 2020-09-01 2020-12-04 国网河北省电力有限公司邢台供电分公司 Power distribution network new energy power generation utilization rate optimization method and terminal equipment
CN112152257B (en) * 2020-09-04 2022-06-14 摩氢科技有限公司 Distributed energy system and control method thereof
CN112152257A (en) * 2020-09-04 2020-12-29 摩氢科技有限公司 Distributed energy system and control method thereof
CN112182907B (en) * 2020-10-19 2022-12-27 贵州电网有限责任公司 Reliability constraint-based planning method for energy storage device of electric-gas coupling system
CN112182907A (en) * 2020-10-19 2021-01-05 贵州电网有限责任公司 Reliability constraint-based planning method for energy storage device of electric-gas coupling system
CN113363964A (en) * 2021-05-26 2021-09-07 国网天津市电力公司 Power distribution network distributed energy storage planning method and device considering important load power supply

Also Published As

Publication number Publication date
CN103490410B (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103490410B (en) Micro-grid planning and capacity allocation method based on multi-objective optimization
Roslan et al. Scheduling controller for microgrids energy management system using optimization algorithm in achieving cost saving and emission reduction
Sedghi et al. Optimal storage planning in active distribution network considering uncertainty of wind power distributed generation
CN107069814A (en) The Fuzzy Chance Constrained Programming method and system that distribution distributed power source capacity is layouted
Yao et al. Energy storage sizing optimization for large-scale PV power plant
El-Zonkoly Optimal scheduling of observable controlled islands in presence of energy hubs
Nozari et al. Development of dynamic energy storage hub concept: a comprehensive literature review of multi storage systems
CN112132363A (en) Energy storage site selection and volume fixing method for enhancing system operation robustness
Javadi et al. Optimal planning and operation of hybrid energy system supplemented by storage devices
Liu et al. Stochastic optimal operation of flexible distribution networks for security improvement considering active management
Machado et al. Multi-source distributed energy resources management system based on pattern search optimal solution using nonlinearized power flow constraints
Saini et al. Optimum utilization of photovoltaic generation with battery storage in distribution system by utilizing genetic algorithm
Alayi et al. Optimization of Renewable energy consumption in charging electric vehicles using intelligent algorithms
Saini et al. Optimal siting and sizing of battery in varying PV generation by utilizing genetic algorithm in distribution system
Rahmanzadeh et al. Optimal energy management of microgrid based on fcchp in the presence of electric and thermal loads considering energy storage systems
Yi et al. Research on topology of DC distribution network based on power flow optimization
Liu et al. Hierarchical optimal dispatching strategy for microgrid system considering user-side resources
Li et al. The expansion planning of wind-thermal co-generation system based on harmony search algorithm under smart grid
Ramesh et al. Cost Optimization by Integrating PV-System and Battery Energy Storage System into Microgrid using Particle Swarm Optimization
CN111668882A (en) Method and device for optimizing output of micro power supply in intelligent energy ring network
Azami et al. Optimal Smart Home Scheduling with Considering Hybrid Resource Management
Guo et al. Coordinated planning of distributed energy resources and microgrid network
Bayasgalan et al. The Utilization of an Energy Storage Facility in Dispatching Regulation of Power System
Farsadi et al. Economic dispatch problem for distribution network including wind turbines and diesel electric generators
Malekijavan et al. Stochastic Optimal Operation of a Multi carrier Energy System with Electric Vehicles and Combined Heat and Power Units

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP JIANGSU ELECTRIC PO

Free format text: FORMER NAME: JIANGSU ELECTRIC POWER DESIGNING INST.

CP01 Change in the name or title of a patent holder

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Patentee after: Southeast University

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee before: Jiangsu Electric Power Designing Institute

Patentee before: Southeast University