CN108039722A - A kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing - Google Patents

A kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing Download PDF

Info

Publication number
CN108039722A
CN108039722A CN201711168605.1A CN201711168605A CN108039722A CN 108039722 A CN108039722 A CN 108039722A CN 201711168605 A CN201711168605 A CN 201711168605A CN 108039722 A CN108039722 A CN 108039722A
Authority
CN
China
Prior art keywords
load
renewable energy
direct current
alternating current
distribution type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711168605.1A
Other languages
Chinese (zh)
Other versions
CN108039722B (en
Inventor
黄磊
舒杰
崔琼
吴志锋
张继元
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Institute of Energy Conversion of CAS
Original Assignee
Guangzhou Institute of Energy Conversion of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Institute of Energy Conversion of CAS filed Critical Guangzhou Institute of Energy Conversion of CAS
Priority to CN201711168605.1A priority Critical patent/CN108039722B/en
Publication of CN108039722A publication Critical patent/CN108039722A/en
Application granted granted Critical
Publication of CN108039722B publication Critical patent/CN108039722B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/382
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing, include the following steps:(1) topological structure of AC/DC network is determined;(2) setting model parameter;(3) each element operation constraints of initialization system;(4) assumed load and its method for operation;(5) running situation is set;(6) system optimization target is selected;(7) single goal or multi-objective Algorithm solving-optimizing allocation plan are used.The present invention solve comprising multiple renewable energy sources, multiple voltage grade, supply of cooling, heating and electrical powers Ac/dc Power Systems complex optimization allocation problem, optimization aim variation, multiple object functions can be selected to optimize system configuration as needed, and the operating condition of system is taken into full account, including synchronizing mode, regenerative resource access constraint, regenerative resource subsidy form, Demand Side Response mode etc., it disclosure satisfy that the configuration needs of different system, there is preferable applicability and feasibility.

Description

A kind of distribution type renewable energy system suitable for alternating current-direct current mixing is distributed rationally Method
Technical field
The present invention relates to distributed energy technical field, and in particular to a kind of distribution suitable for alternating current-direct current mixing can be again Raw energy resource system Optimal Configuration Method.
Background technology
As the broad sense direct current energy equipment ratio using convertible frequency air-conditioner, the load of IT classes and electric automobile as representative quickly increases Long, distribution type renewable energy is fast-developing, and alternating current-direct current unsteady flow link is more in conventional AC distribution, loss is high, flexible with electricity consumption The problems such as property is poor is increasingly protruded.It is to solve the problems, such as these important means to match somebody with somebody multiplexe electric technology using alternating current-direct current mixing.And use and hand over The distribution type renewable energy system of direct current hybrid technology is then the development trend in distributed power generation future.Distributed type renewable energy Distributing rationally for source system is that system is safe and reliable, premise of economical operation, domestic and international scientific research institution from economy, reliability, Feature of environmental protection etc. considers Optimal Configuration Method, and Research on configuration is optimized for the micro-capacitance sensor containing light storage or wind-light storage.This A little Optimal Configuration Methods are generally directed to individual system, and the consideration existed to running situation is insufficient, causes method The problems such as applicability, relatively low feasibility.In addition, for generating electricity containing distribution type renewable energy, the alternating current-direct current of multi-voltage grade Distributing rationally for hybrid system lacks correlative study.
The content of the invention
It is an object of the invention to provide a kind of distribution type renewable energy system optimization suitable for alternating current-direct current mixing to match somebody with somebody Method is put, to meet a variety of workload demands in alternating current-direct current combined hybrid system, improves the reliability, economy, the feature of environmental protection of system operation, Single goal and Multipurpose Optimal Method can be used according to user demand, it is excellent to provide various energy resources complementation for systems organization and dilatation Change allocation plan.
To achieve the above object, the present invention adopts the technical scheme that:
A kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing, includes the following steps:
(1) the topological structure setting of AC/DC network, determines each voltage class and its connection mode;
(2) model parameter is set, including system equipment technical parameter and cost parameter, geographical location, lifetime of system, is passed through Setup parameter forms system element model;
(3) each element operation constraints of initialization system;
(4) assumed load and its method for operation;
(5) setting running situation, including grid-connected reflux type, system running policy, regenerative resource subsidy form, Electricity price scheme, regenerative resource grid-connected voltage level restriction, renewable energy power generation amount accounting and installation constraint based on sites;
(6) select system optimization target, including the chemical conversion of life cycle cost in terms of economy, standard of energy this, it is net existing It is worth, load short of electricity probability, electricity shortage desired value in terms of reliability, and the CO in terms of the feature of environmental protection2Discharge capacity, contain energy Amount;
(7) using single goal or multi-objective Algorithm solving-optimizing configuration object function, configuration scheme is provided.
In step (1), by setting the busbar voltage of alternating current and direct current, select between each busbar voltage and system and electricity The connection relation of net, determines network topology, and plurality of busbar voltage can be connected by multiport electric power electric transformer.
In step (2), system equipment includes power converter apparatus, transformer, storing up electricity and heat accumulation equipment, heat utilization conversion is set It is standby, wherein, power converter apparatus include photovoltaic system, wind-driven generator, solar-thermal generating system, diesel-driven generator, gas turbine, Electric power electric transformer;By set geographical position acquisition whole year by when solar irradiation, wind speed and temperature.
In step (3), each element operation constraints of system includes energy storage discharge and recharge constraint and generator output constrains.
In step (4), load includes cold and hot electric load;Load setting method includes 3 kinds:The first is according to typical load Set, including industrial load, Commercial Load, residential loads, it is special according to load by inputting average load or peak load Property the annual load of generation;Second is that load is configured according to seasonality, and sets certain fluctuation, inputs average load Or annual load is generated after peak load;The third is the annual payload of direct setting;The method of operation of load includes controllable Mode, uncontrollable mode, have Demand Side Response mode, if the Demand Side Response method of operation, then may be set to based on excitation Demand Side Response and Demand Side Response based on electricity price, the Demand Side Response based on excitation is, it is necessary to set user response participation Degree, load constraint and exiting form, the Demand Side Response based on electricity price, it is necessary to set user response participation, load constraint and Electricity price form.
In step (5), system and the operation relation of power grid are determined by setting grid-connected reflux type;Transported by initialization system Each element running priority order in row policy determination system;Regenerative resource subsidy shape is set to accurately reflect the economy of system Formula and electricity price scheme;To improve the feasibility of configuration scheme, it is necessary to set regenerative resource grid-connected voltage level restriction, and It is arranged as required to renewable energy power generation amount accounting and installation constraint based on sites.
In step (6), according to system configuration demand set optimization aim, including economy in terms of life cycle cost, Standard of energy chemical conversion this, net present value (NPV), load short of electricity probability, electricity shortage desired value in terms of reliability, and in terms of the feature of environmental protection CO2Discharge capacity, contain energy.
In step (7), if existing system dilatation, then fixed equipment installed capacity in first setting system is needed;If Planned for new system, then device type and the capacity search range of configuration to be optimized are directly determined according to load;If multiple target Optimization, then solve the optimal forward positions of Pareto of multiple objective function using the genetic algorithm of the non-dominated ranking with elitism strategy, obtain To Pareto optimal solutions, configuration scheme is finally provided.
Compared with prior art, the present invention has the following advantages:
1. the present invention solves the alternating current-direct current mixing comprising multiple renewable energy sources, multiple voltage grade, supply of cooling, heating and electrical powers The complex optimization allocation problem of system.
2. optimization aim variation of the present invention, including the plurality of target such as economy, reliability, feature of environmental protection, can be according to need Multiple object functions are selected to optimize system configuration.
3. the present invention has taken into full account a variety of situations of system operation, including synchronizing mode, grid-connected reflux type, system fortune Row strategy, regenerative resource subsidy form, electricity price scheme, Demand Side Response mode, renewable energy power generation amount accounting and installation Constraint based on sites, disclosure satisfy that the configuration needs of different system, have higher feasibility.
Brief description of the drawings
Fig. 1 is present invention method flow chart;
Fig. 2 is system construction drawing of the embodiment of the present invention;
Fig. 3 is AC load year of embodiment of the present invention change curve;
Fig. 4 is DC load year of embodiment of the present invention change curve.
Embodiment
To make the objects, technical solutions and advantages of the present invention clearer, clear and definite, below in conjunction with the accompanying drawings and specific embodiment party Formula is described in further details present disclosure.It is understood that specific embodiment described herein is used only for Explain the present invention, rather than limitation of the invention.It also should be noted that for the ease of describing, illustrate only in attached drawing Part related to the present invention rather than full content.
It is an object of the invention to provide a kind of distribution type renewable energy system optimization suitable for alternating current-direct current mixing to match somebody with somebody Method is put, this method is suitable for the distribution type renewable energy system of alternating current-direct current mixing, has taken into full account current such system Operating condition and all kinds of optimizing index, to meet the configuration needs of different system, improve the applicability of Optimal Configuration Method.Here Illustrated by taking the low-voltage AC/DC combined hybrid system for living scene of handling official business as an example.
As shown in Figure 1, a kind of distribution type renewable energy system suitable for alternating current-direct current mixing of the embodiment of the present invention is excellent Change collocation method, comprise the following steps:
(1) the topological structure setting of AC/DC network, determines each voltage class and its connection mode;
(2) model parameter is set, including system equipment technical parameter and cost parameter, geographical location, lifetime of system etc., is led to Cross setup parameter and form system element model;
(3) each element operation constraints of initialization system;
(4) assumed load and its method for operation;
(5) setting running situation, including grid-connected reflux type, system running policy, regenerative resource subsidy form, Electricity price scheme, regenerative resource grid-connected voltage level restriction, renewable energy power generation amount accounting and installation constraint based on sites etc.;
(6) select system optimization target, including the chemical conversion of life cycle cost in terms of economy, standard of energy this, it is net existing It is worth, load short of electricity probability, electricity shortage desired value in terms of reliability, and the CO in terms of the feature of environmental protection2Discharge capacity, contain energy Amount;
(7) using single goal or multi-objective Algorithm solving-optimizing configuration object function, configuration scheme is provided.
The specific implementation step of the method for the present invention for convenience of description, above method specific embodiment are as follows:
(1) the topological structure setting of AC/DC network, sets the busbar voltage of alternating current and direct current, selects each busbar voltage Between and system and the connection relation of power grid, determine network topology, as shown in Figure 2.
(2) model parameter is set, and selection system equipment is photovoltaic system, wind-driven generator, solar-thermal generating system, energy storage are electric Pond and its converter, the current transformer for connecting low-voltage AC/DC network, transformer etc., geographical location be arranged to Pearl River Delta area certain City, by the meteorological data of 1991~2010 years by interpolation method obtain system location 1 year 8760 it is small when total solar radiation amount And wind speed.
(3) each element operation constraints of system is set, DEFAULT constraint includes power-balance constraint and power supply units limits, , it is necessary to which the constraints set constrains for energy storage, energy storage constraints has grid-connected alternating current-direct current combined hybrid system for the present embodiment Body is as follows:
SOC charge conditions will meet:
SOC≥SOCmin
Charge-discharge electric power should meet:
Wherein, P+It is respectively the charge-discharge electric power in the unit interval with P-.
(4) assumed load and its method for operation, here account for refrigeration duty directly as electric load, and load classification is such as Shown in table 1.
1 load classification of table
Using second of load set-up mode, load is configured and is set certain according to seasonal and part throttle characteristics Fluctuation, generates annual load, AC load is as shown in figure 3, DC load is as shown in Figure 4 after inputting peak load.Load operation Mode is uncontrollable mode.
(5) initialization system operating condition, initialization system for it is grid-connected, can not adverse current, tou power price price.According to energy storage degree electricity The relation of cost and tou power price, formulating system running policy is:When generation of electricity by new energy amount cannot meet load, electricity price during paddy When directly from power grid power purchase, and for storage battery charge;During peak and usually preferential battery discharging during electricity price, when storage battery SOC drops To the SOC of settingminShi Gaiwei is to power grid power purchase.Charge when generation of electricity by new energy amount overloads for storage battery, when storage battery fills Unnecessary generation of electricity by new energy amount discards after full electricity.Set regenerative resource and subsidize form as electricity price subsidy, renewable energy power generation It is 0%~100% to measure accounting, and regenerative resource grid-connected voltage level restriction is as shown in table 2.
2 regenerative resource grid-connected voltage class requirement of table
Scale of the project Access voltage class
8kW 220V
8-40kW 380V
400-6000kW 10kV
5000-30000kW 35kV
(6) system optimization target is selected, it is optimization aim to choose life cycle cost here, and life cycle cost is by system Initial outlay cost, the present worth summation of the cost of more exchange device and operation expense.Life cycle cost is:
LCC=Cinv+Com×k1+Crep×k2+Cg-Bsub1×k1-Bsub2×k3
Wherein, CinvFor initial outlay cost;ComFor the operation expense of each year;CrepFor storage battery replacement cost; CgThe cost of electricity is bought from power grid for alternating current-direct current combined hybrid system;Bsub1For photovoltaic generation public subsidies;Bsub2Mended for photovoltaic generation provinces and cities Patch;k1For 20 years conversion factors (systems life cycle is arranged to 20 years), the cost of each year is converted to First Year, with discount Rate is related;k2For storage battery replacement cost conversion factor, storage battery replacement cost is converted to First Year, it is related with discount rate;k3 Conversion factor is subsidized for the photovoltaic generation flourishing age, First Year is arrived into subsidy conversion, it is related with subsidy time and discount rate.
(7) object function is solved using single objective genetic algorithm, the present embodiment is planned for new system, determines to treat according to load The capacity for the equipment (photovoltaic generating system, wind generator system, energy-storage system, AC-DC converter, transformer) distributed rationally is searched Rope scope.When not having renewable energy power generation in system, only being powered by power grid, the life cycle cost of system is 3842.6 ten thousand Member, regenerative resource ratio are 0%.
The allocation optimum of system is as shown in table 3 when renewable energy power generation ratio is 0%~100%
The system optimal that 3 regenerative resource ratio of table is 0%~100% configures
Wind turbine/platform 0
Meet photovoltaic cell/kWp of 10kV exchanges 1879
Meet photovoltaic cell/kWp of 380V exchanges 400
Meet photovoltaic cell/kWp of ± 375V direct currents 400
Storage battery/kWh 3227
AC-DC converter capacity/kW 750
Photovoltaic step-up transformer capacity/kVA 1600
Ten thousand yuan of totle drilling cost LCC/ 2289
Generation of electricity by new energy ratio 72.57%
Above-described embodiment is in the art the purpose is to be to allow simply to illustrate that the technical concepts and features of the present invention Those of ordinary skill can understand present disclosure and implement according to this, and it is not intended to limit the scope of the present invention.It is all It is the equivalent change or modification that the essence of content according to the present invention is made, should all covers within the scope of the present invention.

Claims (8)

  1. A kind of 1. distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing, it is characterised in that including Following steps:
    (1) the topological structure setting of AC/DC network, determines each voltage class and its connection mode;
    (2) model parameter is set, including system equipment technical parameter and cost parameter, geographical location, lifetime of system, passes through setting Parameter forms system element model;
    (3) each element operation constraints of initialization system;
    (4) assumed load and its method for operation;
    (5) running situation, including grid-connected reflux type, system running policy, regenerative resource subsidy form, electricity price are set Scheme, regenerative resource grid-connected voltage level restriction, renewable energy power generation amount accounting and installation constraint based on sites;
    (6) select system optimization target, including the chemical conversion of life cycle cost in terms of economy, standard of energy this, net present value (NPV), can By the load short of electricity probability in terms of property, electricity shortage desired value, and the CO in terms of the feature of environmental protection2Discharge capacity, contain energy;
    (7) using single goal or multi-objective Algorithm solving-optimizing configuration object function, configuration scheme is provided.
  2. 2. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (1), by setting the busbar voltage of alternating current and direct current, select between each busbar voltage and system with The connection relation of power grid, determines network topology, and plurality of busbar voltage can be connected by multiport electric power electric transformer.
  3. 3. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (2), system equipment includes power converter apparatus, transformer, storing up electricity and heat accumulation equipment, heat utilization turns Change equipment, wherein, power converter apparatus includes photovoltaic system, wind-driven generator, solar-thermal generating system, diesel-driven generator, combustion gas Turbine, electric power electric transformer;By set geographical position acquisition whole year by when solar irradiation, wind speed and temperature.
  4. 4. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (3), each element operation constraints of system includes energy storage discharge and recharge constraint and generator output about Beam.
  5. 5. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (4), load includes cold and hot electric load;Load setting method includes 3 kinds:The first is according to typical case Load is set, including industrial load, Commercial Load, residential loads, by inputting average load or peak load, according to negative The annual load of lotus characteristic generation;Second is that load is configured according to seasonality, and sets certain fluctuation, and input is average Annual load is generated after load or peak load;The third is the annual payload of direct setting;The method of operation of load includes Controlled manner, uncontrollable mode, have Demand Side Response mode, if the Demand Side Response method of operation, then may be set to be based on The Demand Side Response of excitation and the Demand Side Response based on electricity price, the Demand Side Response based on excitation is, it is necessary to set user response Participation, load constraint and exiting form, the Demand Side Response based on electricity price is, it is necessary to set user response participation, load about Beam and electricity price form.
  6. 6. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (5), system and the operation relation of power grid are determined by setting grid-connected reflux type;It is by setting System operation reserve determines each element running priority order in system;Regenerative resource benefit is set to accurately reflect the economy of system Patch form and electricity price scheme;To improve the feasibility of configuration scheme, regenerative resource grid-connected voltage level restriction is set, can Renewable source of energy generation amount accounting and installation constraint based on sites.
  7. 7. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (6), according to system configuration demand set optimization aim, including economy in terms of life cycle into This, standard of energy chemical conversion this, net present value (NPV), load short of electricity probability, electricity shortage desired value in terms of reliability, and feature of environmental protection side The CO in face2Discharge capacity, contain energy.
  8. 8. the distribution type renewable energy system Optimal Configuration Method according to claim 1 suitable for alternating current-direct current mixing, It is characterized in that:In step (7), if existing system dilatation, then fixed equipment installed capacity in first setting system is needed; Planned if new system, then device type and the capacity search range of configuration to be optimized are directly determined according to load;If more mesh Mark optimization, then solve the optimal forward positions of Pareto of multiple objective function using the genetic algorithm of the non-dominated ranking with elitism strategy, Pareto optimal solutions are obtained, finally provide configuration scheme.
CN201711168605.1A 2017-11-21 2017-11-21 Distributed renewable energy system optimal configuration method suitable for alternating current and direct current mixing Active CN108039722B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711168605.1A CN108039722B (en) 2017-11-21 2017-11-21 Distributed renewable energy system optimal configuration method suitable for alternating current and direct current mixing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711168605.1A CN108039722B (en) 2017-11-21 2017-11-21 Distributed renewable energy system optimal configuration method suitable for alternating current and direct current mixing

Publications (2)

Publication Number Publication Date
CN108039722A true CN108039722A (en) 2018-05-15
CN108039722B CN108039722B (en) 2020-11-10

Family

ID=62092939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711168605.1A Active CN108039722B (en) 2017-11-21 2017-11-21 Distributed renewable energy system optimal configuration method suitable for alternating current and direct current mixing

Country Status (1)

Country Link
CN (1) CN108039722B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108710977A (en) * 2018-06-05 2018-10-26 东南大学 A kind of distributing-supplying-energy system device configuration and running optimizatin design method
CN108959719A (en) * 2018-06-08 2018-12-07 中国科学院电工研究所 The distribution type renewable energy system test scene analogy method of alternating current-direct current mixing
CN109149564A (en) * 2018-08-31 2019-01-04 国网浙江省电力有限公司经济技术研究院 A kind of alternating current-direct current mixing power distribution network distributed generation resource Optimal Configuration Method
CN109659977A (en) * 2018-12-06 2019-04-19 国网江苏省电力有限公司连云港供电分公司 A kind of microgrid power switching control method based on electric power electric transformer
CN109754169A (en) * 2018-12-24 2019-05-14 国网江苏省电力有限公司 Energy resource system analysis method for reliability comprising multiple parallel connected thermoelectric coproduction units
CN110034572A (en) * 2019-04-17 2019-07-19 中国科学院广州能源研究所 The Ac/dc Power Systems energy storage configuration method of the electric power electric transformer containing multiport
CN112713621A (en) * 2020-12-22 2021-04-27 广东电网有限责任公司电力科学研究院 Multi-objective optimization configuration method and system for alternating current-direct current hybrid system
CN112821466A (en) * 2021-01-08 2021-05-18 湖北工业大学 Independent micro-grid capacity configuration method containing photo-thermal power generation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103490410A (en) * 2013-08-30 2014-01-01 江苏省电力设计院 Micro-grid planning and capacity allocation method based on multi-objective optimization
CN103580020A (en) * 2013-03-07 2014-02-12 长沙理工大学 Method for multi-target dynamic optimal dispatching of power system with wind farm based on NSGA-II and Look-ahead
CN105932723A (en) * 2016-06-13 2016-09-07 国网浙江省电力公司电力科学研究院 Optimization planning method for grid structure of alternating current/direct current hybrid microgrid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103580020A (en) * 2013-03-07 2014-02-12 长沙理工大学 Method for multi-target dynamic optimal dispatching of power system with wind farm based on NSGA-II and Look-ahead
CN103490410A (en) * 2013-08-30 2014-01-01 江苏省电力设计院 Micro-grid planning and capacity allocation method based on multi-objective optimization
CN105932723A (en) * 2016-06-13 2016-09-07 国网浙江省电力公司电力科学研究院 Optimization planning method for grid structure of alternating current/direct current hybrid microgrid

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘显茁 等: "采用电力电子变压器的多端口能源路由器", 《电气传动》 *
柯人观: "微电网典型供电模式及微电源优化配置研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
汪湘晋 等: "并网型交直流混合微电网优化配置分析", 《电力系统自动化》 *
赵争鸣 等: "电能路由器的发展及其关键技术", 《中国电机工程学报》 *
郭慧 等: "基于能量路由器的智能型分布式能源网络技术", 《中国电机工程学报》 *
马艺玮: "独立微电网分布式电源优化配置与协调控制", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108710977A (en) * 2018-06-05 2018-10-26 东南大学 A kind of distributing-supplying-energy system device configuration and running optimizatin design method
CN108959719A (en) * 2018-06-08 2018-12-07 中国科学院电工研究所 The distribution type renewable energy system test scene analogy method of alternating current-direct current mixing
CN108959719B (en) * 2018-06-08 2022-04-12 中国科学院电工研究所 AC-DC hybrid distributed renewable energy system test scene simulation method
CN109149564A (en) * 2018-08-31 2019-01-04 国网浙江省电力有限公司经济技术研究院 A kind of alternating current-direct current mixing power distribution network distributed generation resource Optimal Configuration Method
CN109659977A (en) * 2018-12-06 2019-04-19 国网江苏省电力有限公司连云港供电分公司 A kind of microgrid power switching control method based on electric power electric transformer
CN109754169A (en) * 2018-12-24 2019-05-14 国网江苏省电力有限公司 Energy resource system analysis method for reliability comprising multiple parallel connected thermoelectric coproduction units
CN110034572A (en) * 2019-04-17 2019-07-19 中国科学院广州能源研究所 The Ac/dc Power Systems energy storage configuration method of the electric power electric transformer containing multiport
CN112713621A (en) * 2020-12-22 2021-04-27 广东电网有限责任公司电力科学研究院 Multi-objective optimization configuration method and system for alternating current-direct current hybrid system
CN112821466A (en) * 2021-01-08 2021-05-18 湖北工业大学 Independent micro-grid capacity configuration method containing photo-thermal power generation
CN112821466B (en) * 2021-01-08 2023-02-28 湖北工业大学 Independent micro-grid capacity configuration method containing photo-thermal power generation

Also Published As

Publication number Publication date
CN108039722B (en) 2020-11-10

Similar Documents

Publication Publication Date Title
CN108039722A (en) A kind of distribution type renewable energy system Optimal Configuration Method suitable for alternating current-direct current mixing
Saboori et al. Maximizing DISCO profit in active distribution networks by optimal planning of energy storage systems and distributed generators
CN103346562B (en) Multi-time scale microgrid energy control method considering demand response
CN103151797B (en) Multi-objective dispatching model-based microgrid energy control method under grid-connected operation mode
Xie et al. Use of demand response for voltage regulation in power distribution systems with flexible resources
CN112734098B (en) Power distribution network power dispatching method and system based on source-load-network balance
CN105262129B (en) The Multi objective optimization system and method for a kind of micro-capacitance sensor containing composite energy storage
CN105205552B (en) A kind of independent new energy hybrid power system Method for optimized planning
CN109510224A (en) Photovoltaic energy storage and the united capacity configuration of distributed energy and running optimizatin method
Amirthalakshmi et al. A novel approach in hybrid energy storage system for maximizing solar PV energy penetration in microgrid
CN108876000A (en) A kind of photovoltaic charge station light, storage, transformer capacity coordinate and optimize configuration method
CN106779471B (en) Multi-energy interconnected AC/DC hybrid micro-grid system and optimal configuration method
CN106709610A (en) Micro-grid electricity energy storage and ice storage combined optimization scheduling method
CN110417045A (en) A kind of optimization method for alternating current-direct current mixing micro-capacitance sensor capacity configuration
El-Zonkoly Optimal scheduling of observable controlled islands in presence of energy hubs
CN106505558B (en) A kind of the energy conveyance control method and device of DC distribution net
CN115360804B (en) Ordered charging system and ordered charging method
CN106230007A (en) A kind of micro-capacitance sensor energy storage Optimization Scheduling
Astero et al. Improvement of RES hosting capacity using a central energy storage system
KR20130074045A (en) A control method for controlling energy of building based ob microgrid and system for same
CN108039741B (en) Alternating current-direct current hybrid micro-grid optimized operation method considering micro-source residual electricity on-line
Geng et al. Optimal operation of AC–DC distribution network with multi park integrated energy subnetworks considering flexibility
CN108667071B (en) Accurate control calculation method for load of active power distribution network
Mohammad et al. Hydrogen technology supported solar photovoltaic-based microgrid for urban apartment buildings: Techno-economic analysis and optimal design
CN110266059B (en) Novel energy supply system optimal configuration method based on triangular comprehensive evaluation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant