Prior art keywords
voltage
adjusting means
reactive
voltage adjusting
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710183243.7A
Other languages
Chinese (zh)
Other versions
CN106786633B (en
Inventor
陶飞达
蔡广林
殷栢辉
李桂昌
曾振达
杨夏
孟婉婕
游景方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Electrical Technology Co ltd
Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Electrical Technology Co ltd, Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangzhou Power Electrical Technology Co ltd
Priority to CN201710183243.7A priority Critical patent/CN106786633B/en
Publication of CN106786633A publication Critical patent/CN106786633A/en
Application granted granted Critical
Publication of CN106786633B publication Critical patent/CN106786633B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

The present invention relates to the collocation method and reactive voltage adjusting means of a kind of reactive voltage adjusting means.The collocation method of above-mentioned reactive voltage adjusting means, comprises the following steps:Obtain maximum load current of the low-voltage circuit where reactive voltage adjusting means mount point in the first setting time section;Obtain the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;The configuration capacity of reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and capacity configuration formula;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases of erecting bed area low-voltage circuit, AQTo promote to increase coefficient, K is nargin coefficient, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where mount point;The capacity of voltage regulator module in the reactive voltage adjusting means is configured according to the configuration capacity;It makes the configuration of above-mentioned reactive voltage adjusting means more accurate, effectively increases the allocative effect of reactive voltage adjusting means.

Description

The collocation method and reactive voltage adjusting means of reactive voltage adjusting means
Technical field
The present invention relates to technical field of electric power, the collocation method of more particularly to a kind of reactive voltage adjusting means and idle Voltage regulating device.
Background technology
As household electrical appliance are in the popularization of every family, the need for electricity more and more higher of all types of user, due to rural area etc. The power load development of non-Urban Areas is underestimated, and non-Urban Areas power distribution network generally existing capacity of distribution transform it is not enough and The problems such as wire diameter is meticulous, voltage is seriously relatively low when causing peak times of power consumption.Additionally, non-Urban Areas living standard is gradually carried Height, build a house everywhere increase and lack planning property, it is understood that there may be former stand from being changed into the situation away from load center in load center, Aggravation power distribution network terminal temperature difference low voltage problem.
In the case of power distribution network terminal voltage is seriously relatively low, most of electrical equipment can not be normally-open, now distribution transformer The maximum load when maximum load for detecting is part electric operation, that is to say, that be because low-voltage causes user many Equipment " pseudo- data " obtained from peak period cannot open.After reactive voltage adjusting means puts into operation, user's voltage Recover normal, the high-power electric appliance of user can be with normally-open, and the peak oppressive for a long time because of low-voltage problem is born before causing Lotus is released, and maximum load now will exceed well over long-term measurement in the past and the data for counting.Reactive voltage regulation dress The correct configuration for putting capacity has decisive role to reactive voltage adjustment work, however, traditional reactive voltage adjusting means Configuration typically with the maximum load surveyed to determine the configuration capacity of reactive voltage adjustment equipment, allocative effect is poor.
The content of the invention
Based on this, it is necessary to for traditional scheme to the technical problem of the allocative effect difference of reactive voltage adjusting means, carry For the collocation method and reactive voltage adjusting means of a kind of reactive voltage adjusting means.
A kind of collocation method of reactive voltage adjusting means, comprises the following steps:
Obtain peak load electricity of the low-voltage circuit where reactive voltage adjusting means mount point in the first setting time section Stream;
Obtain the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
The configuration of reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and capacity configuration formula Capacity;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases, AQTo promote to increase coefficient, K is nargin system Number, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where device mount point;
The capacity of voltage regulator module in the reactive voltage adjusting means is configured according to the configuration capacity.
The collocation method of above-mentioned reactive voltage adjusting means, can obtain low pressure where reactive voltage adjusting means mount point Maximum load current of the circuit in the first setting time section, and erecting bed area low pressure where above-mentioned reactive voltage adjusting means The phase voltage of circuit, the configuration capacity of reactive voltage adjusting means is calculated with this, configures described idle according to above-mentioned configuration capacity Voltage regulator module in voltage regulating device, makes the configuration of above-mentioned reactive voltage adjusting means more accurate, effectively increases nothing The allocative effect of work(voltage regulating device.
A kind of reactive voltage adjusting means, including voltage regulator module and reactive compensation module;The two of the voltage regulator module Secondary side includes bucking coil, and the reactive compensation module includes multiple unit capacitor;One end of the voltage regulator module primary side connects Signal input part is connect, the other end of voltage regulator module primary side connects zero line side, the bucking coil of voltage regulator module secondary side First end connects signal input part, and the second end of bucking coil connects one end of reactive compensation module, the 3rd end of bucking coil Connect the other end of reactive compensation module, one end connection signal output part of the reactive compensation module, the reactive-load compensation mould The other end connection zero line side of block;
Before reactive voltage regulation, low-voltage circuit is when first sets where acquisition reactive voltage adjusting means mount point Between maximum load current in section;
Obtain the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
The configuration of reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and capacity configuration formula Capacity;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases of erecting bed area low-voltage circuit, AQFor Promote to increase coefficient, K is nargin coefficient, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where device mount point;
The capacity of the voltage regulator module is configured according to the configuration capacity.
Above-mentioned reactive voltage adjusting means, has carried out accurately connecting respectively to voltage regulator module therein and reactive compensation module Connect, identified voltage regulator module capacity has accuracy higher, be conducive to improving the idle electricity of reactive voltage adjusting means Pressure regulating effect.
Brief description of the drawings
Fig. 1 is the collocation method flow chart of the reactive voltage adjusting means of one embodiment;
Fig. 2 is the reactive voltage adjusting means structural representation of one embodiment;
Fig. 3 is the conspectus of the distribute-electricity transformer district of one embodiment;
Fig. 4 is the reactive voltage adjusting means structural representation of one embodiment.
Specific embodiment
Collocation method below in conjunction with the accompanying drawings to reactive voltage adjusting means of the invention and reactive voltage adjusting means Specific embodiment is described in detail.
With reference to Fig. 1, Fig. 1 show the collocation method flow chart of the reactive voltage adjusting means of one embodiment, including such as Lower step:
S51, obtains maximum of the low-voltage circuit where reactive voltage adjusting means mount point in the first setting time section and bears Charged current;
The structural representation of above-mentioned reactive voltage adjusting means can be with as shown in Fig. 2 including the first A.C. contactor 27, Two A.C. contactors 29, the 3rd A.C. contactor 28, voltage regulator module 10, reactive compensation module 21, compensating switch 22, electric capacity 31st, controller 26 and communication module 36.The secondary side of above-mentioned voltage regulator module 10 includes bucking coil 11, reactive compensation module 21 include multiple unit capacitor, and the second A.C. contactor 29 is connected between input and output end, voltage regulator module 10 and idle The output end of compensating module 21 is in parallel, and input passes sequentially through compensating switch 22 and electric capacity 31 is grounded, above-mentioned first ac contactor Device 27 is connected between input and bucking coil 11, the 3rd A.C. contactor 28 be connected to bucking coil 11 and output end it Between, controller noted above 26 connects voltage regulator module 10 and reactive compensation module 21 respectively, to above-mentioned voltage regulator module 10 and idle Compensating module 21 is configured accordingly, and controller noted above 26 also (is such as serviced by communication module 36 with the control device of outside Stand or a distant place control main website etc.) it is communicatively coupled.Above-mentioned voltage regulator module 10 is to connect with the low-voltage circuit in erecting bed area Relation, and reactive compensation module 21 is parallel relationship with the low-voltage circuit in erecting bed area.The erecting bed of reactive voltage adjusting means Area can determine that in above-mentioned erecting bed area the specific position of installation reactive voltage adjusting means according to distribution network line with electrical feature It is set to the mount point of reactive voltage adjusting means.
Reactive voltage adjusting means according to the physical circuit feature of corresponding distribution network line end, with corresponding erecting bed Area, according to above-mentioned erecting bed area and can answer the corresponding feature of distribution network line end to enter above-mentioned reactive voltage adjusting means Row configuration, to ensure the allocative effect to reactive voltage adjusting means.Above-mentioned first setting time section can be according to distribution netting twine The power utilization environment feature of road end is configured, and could be arranged to be currently configured the time period such as nearest 1 year of time.
S52, obtains the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
Usually, the line voltage of above-mentioned low-voltage circuit can be 0.4kV (kilovolt), and corresponding phase voltage can be 0.22kV.The collocation method of above-mentioned reactive voltage adjusting means is applied to the low pressure level of 0.4kV.
In one embodiment, distribution network line end mesolow line where the above-mentioned acquisition reactive voltage adjusting means The process of the phase voltage on road can include:
Measure the line voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
The phase voltage of low-voltage circuit is calculated according to the line voltage and phase voltage calculation formula;Wherein, the phase voltage meter Calculating formula is:UIRepresent line voltage, UNRepresent phase voltage.
The present embodiment determines the phase voltage of low-voltage circuit according to the line voltage that measurement is obtained, and has identified phase voltage Accuracy higher.
S53, reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and capacity configuration formula Configuration capacity;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases of erecting bed area low-voltage circuit, AQTo promote to increase coefficient, K is nargin coefficient, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where mount point;
Above-mentioned number of phases α can determine according to the phase attributes feature of circuit where reactive voltage adjusting means, promote to increase coefficient AQInterval can be [1.8,2.0], above-mentioned symbol [] represents closed interval, and its implication is to be installed additional in 0.4kV low-voltage circuits After reactive voltage adjusting means, user side voltage is improved, now because the workload demand that low-voltage problem suppresses can be manifested Come, cause workload demand to increase, therefore recruit depressor module capacity when to consider load promote increase phenomenon.If the first setting time section To be currently configured nearest 1 year of the time, then ILmaxIt is the reactive voltage adjusting means mount point peak load of nearest year electricity Stream.
In one embodiment, the interval that above-mentioned rush increases coefficient can be [1.8,2.0];Above-mentioned nargin coefficient takes It is [1.3,1.5] that value is interval;
It is above-mentioned that reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and capacity configuration formula Before the process of configuration capacity, can also include:
If the reactive voltage adjusting means is arranged in three-phase circuit, α is set to 3;If the reactive voltage is adjusted Regulating device is arranged in single-phase circuit, then α is set into 1.
If the reactive voltage adjusting means is arranged in three-phase circuit, phase coefficient is set to 3;Now, capacity Allocation formula is:SQS=3AQKUNILmax;If the reactive voltage adjusting means is arranged in single-phase circuit, by phase coefficient It is set to 1;Now, capacity configuration formula is:SQD=AQKUNILmax
S54, the capacity of voltage regulator module in the reactive voltage adjusting means is configured according to the configuration capacity.
Configuration capacity configuration includes voltage regulator module and reactive compensation module parallel with one another, and above-mentioned steps can be accurately real Now to the configuration of capacity needed for voltage regulator module.
The collocation method of the reactive voltage adjusting means that the present invention is provided, can obtain reactive voltage adjusting means mount point Maximum load current of the place low-voltage circuit in the first setting time section, and installed where above-mentioned reactive voltage adjusting means The phase voltage of platform area low-voltage circuit, the configuration capacity of reactive voltage adjusting means is calculated with this, is configured according to above-mentioned configuration capacity Voltage regulator module in the reactive voltage adjusting means, makes the configuration of above-mentioned reactive voltage adjusting means more accurate, effectively Improve the allocative effect of reactive voltage adjusting means.
In one embodiment, the collocation method of above-mentioned reactive voltage adjusting means, can also include:
Setting ratio according to the configuration capacity determines that the reactive compensation module switching to the reactive voltage is adjusted The capacity of device;Wherein, the reactive compensation module is connected in parallel on the output end of the voltage regulator module;The reactive compensation module Including multiple unit capacitor.
Above-mentioned reactive compensation module can include multiple unit capacitor, and reactive compensation module can be by controlling to access idle electricity Press the capacitor bank numerical control switching of adjusting means to the volume controlled of the reactive voltage adjusting means.
Used as one embodiment, the scope of above-mentioned setting ratio is [25%, 35%].
Specifically, during the actual disposition of reactive voltage adjusting means, the group forming criterion of capacitor can be to solve Certainly based on low-voltage circuit low voltage problem, solve the problems, such as that three-phase imbalance is pair, therefore the capacitor of reactive compensation module can To be divided to two groups, one group of realization is compensated altogether, and another set realizes that the ratio between a point benefit compensation, both capacity could be arranged to 2:1.
The present embodiment determines reactive compensation module switching to described idle according to [25%, 35%] of voltage regulator module capacity The capacity of voltage regulating device, the effectively perfect configuration process of reactive voltage adjusting means.
In one embodiment, the collocation method of above-mentioned reactive voltage adjusting means, can also include:
Output signal to the reactive voltage adjusting means carries out n times sampling, obtains the corresponding N number of sampling of output signal Voltage;
The voltage wave in reactive voltage adjusting means erecting bed area is calculated according to the sampled voltage and stability bandwidth computing formula Dynamic rate;Wherein, the stability bandwidth computing formula is:
In formula, VB% is voltage fluctuation rate, ViBe ith sample voltage, i.e. the electricity of ith sample moment final mount point Pressure, VNIt is low-voltage circuit rated voltage, i is the integer more than or equal to 1 and less than or equal to N;
During gear regulation, the gear number and span of voltage regulator module are determined according to the voltage fluctuation rate.
Above-mentioned N can be determined according to the specific features of corresponding distribution network line end, such as be defined as 1000 equivalent.
It is above-mentioned that the gear number of voltage regulator module and the mistake of span are determined according to the voltage fluctuation rate as one embodiment Journey can include:
Detect the erecting bed area in the second setting time section with the presence or absence of distributed power source;
If the erecting bed area has distributed power source in the second setting time section, formula is adjusted according to the first gear Determine the gear number and span during the regulation of voltage regulator module gear;
If the erecting bed area does not exist distributed power source in the second setting time section, adjust public according to the second gear Formula determines the gear number and span during the regulation of voltage regulator module gear.
Used as one embodiment, above-mentioned first gear regulation formula includes:
VBDuring % > 1, D=± 2m, J=2.5%;
0≤VBDuring %≤1, D=± m, J=5.0%;
The second gear regulation formula includes:
VBDuring % > 1, D=-2m, J=2.5%;
0≤VBDuring %≤1, D=-m, J=5.0%;
In formula, D represents gear number, and m represents gear threshold value, and J represents span.
Above-mentioned second setting time section can be defined as a following time period more long, such as this time of the five-year Section.If the erecting bed area the second setting time section in there is distributed power source, can by the gear of voltage regulator module to Raise (take+number) or to lowering (take-number).Under normal circumstances, if the output voltage of reactive voltage adjusting means is less than reference Magnitude of voltage, then by the gear of voltage regulator module to downward, if the output voltage of reactive voltage adjusting means is more than reference voltage level, Then by the gear of voltage regulator module to rise, above-mentioned reference voltage level can determine according to the concrete model of voltage regulator module.If The erecting bed area does not exist distributed power source in the second setting time section, then only need to be downward by the gear of voltage regulator module Adjust, be effectively simplified the gear regulation process of voltage regulator module.
In actual application process, above-mentioned reactive voltage adjusting means may be mounted in 0.4kV low-voltage circuits.It is idle Mount point of the voltage regulating device in 0.4kV low-voltage circuits chooses process can be included:Respectively match somebody with somebody in acquisition 0.4kV low-voltage circuits The transformer capacity in Bian Tai areas, low-voltage customer complain situation and low voltage terminal voltage condition;To meet low-voltage judgment principle Platform area as adjuster erecting bed area;According to institute's channel selection area transformer capacity, the low-voltage origin cause of formation, pre-selection mount point and circuit The voltage and three-phrase burden balance situation of terminal temperature difference determine final mount point.
It is determined that after mount point, maximum load current of the final mount point in nearly 1 year can be obtained, using adjuster Capacity method for optimizing obtains its configuration capacity;Its pressure regulator gear and electric capacity for being related to is determined according to adjuster stepping group technology Device group number.
The configuration of above-mentioned reactive voltage adjusting means is referred to as low-voltage reactive power voltage integrated adjuster (low- Voltage reactive power voltage regulator, LRVR), refer to a kind of low-voltage reactive power voltage adjuster, Mainly it is made up of voltage regulator module, reactive compensation module, coordinating control module (controller) and communication module, structural representation May be referred to shown in Fig. 2, be mainly used to solve the problems, such as low-voltage circuit low-voltage and three-phase load unbalance.
The operation principle of above-mentioned LRVR can include:Voltage regulator module coil is connected in the line, electric when input is detected When pressing through low, voltage regulator module automatic is boosted step by step according to the numerical value for actually entering voltage, output voltage is met load Normal work, and reactive-load compensation capacitor puts into the reactive-load compensation of respective numbers, to the inductive reactive power on compensated line, drop Low line loss and pressure drop caused by reactive current.When input voltage is detected higher than setting value (upper voltage limit), pressure regulation Device module makes output voltage control in target zone then according to the numerical value step pressure reducing of voltage is actually entered.
In the configuration process of reactive voltage adjusting means, low-voltage judgment principle can be used, above-mentioned low-voltage judges Principle refers to that distribute-electricity transformer district low-voltage circuit three-phase voltage occurred less than the qualified lower limit V of voltage in 1 yearSlimNumber of days add up More than Tlim, or single-phase voltage is less than the qualified lower limit V of voltageDlimNumber of days it is accumulative more than Tlim.Preferably, TlimValue Interval is [30,40], and unit is day, and interval " [] " containing bracket all thinks to obtain two end points in the present invention Value, such as TlimSpan be, more than or equal to 30 days, and to be less than or equal to 40 days.For 0.4kV low-voltage circuits, VSlimTake 354.3V, VDlimTake 198V.
Can be according to the voltage of institute's channel selection area transformer capacity, the low-voltage origin cause of formation, pre-selection mount point and line end user And three-phrase burden balance situation determines final mount point, specific determination process includes:Understand the basic condition in this area, with Determine whether transformer capacity meets actual load demand, if seriously overload can first change transformer for distribution transforming;If there is three-phase Voltage is seriously uneven, can first carry out phase modulation.Final mount point should be in low-voltage user front end and near the electricity of user side On bar.Terminal voltage caused by radius of electricity supply is long is relatively low, in peak of power consumption (such as daily 11:00-12:00,17:00- 20:00) when household electrical appliance cannot be used normally, the mount point place of user's voltage between 170V-200V in peak of power consumption For optimal.The distribution of the configuration and low-voltage user at scene is understood, to determine to use single-phase equipment or three-phase equipment.Peace Decorate the region that can be selected easily transport and install equipment.
By taking the 10kV circuits of certain rural area as an example, transformer capacity, the low pressure of each distribute-electricity transformer district in circuit can be obtained Customer complaint situation and low voltage terminal voltage condition:Circuit trunk line length 13.8km, total length is 18.2km, wherein backbone It is LGJ-95 to use wire type, and branch line includes LGJ-70 and LGJ-50 using wire type;Attaching has distribution to become to circuit altogether Depressor 36, total capacity is 4860kVA;Obtain there are problems that the platform area of low-voltage in circuit according to low-voltage judgment principle;Choosing Take as a example by certain distribution transforming that there are problems that low-voltage, the line parameter circuit value of the distribute-electricity transformer district is as shown in figure 3, according to institute's channel selection area transformation The voltage and three-phrase burden balance situation of device capacity, the low-voltage origin cause of formation, pre-selection mount point and line end user determine final Mount point can be for C points in Fig. 3 at, select three-phase low-voltage Reactive Voltage Comprehensive Adjustment device, its pressure regulator being related to is unidirectional;Obtain Take maximum load current I of the final mount point in nearly 1 yearLmax, it is 1.5 to set nargin coefficient, promotees to increase coefficient AQIt is 2.0, utilizes The collocation method of reactive voltage adjusting means obtains its configuration capacity:ILmax=60A, SQS=118.47kVA, then pressure regulator is optional The capacity model of 120kVA (kilovolt-ampere) is taken, capacitor can choose 30kvar (kilovar);It is true according to adjuster stepping group technology The fixed pressure regulator gear and capacitor bank number that it is related to, wherein, it can be seen from the adjuster mount point historical data of nearest a year Its voltage fluctuation rate VB% is 1.24, therefore corresponding pressure regulator gear may be configured as:Gear number D=± 8, span J= 1.25%;Capacitor is divided to two groups, and one group of realization is compensated altogether, and capacity is 20kvar, and another set realizes a point benefit compensation, and capacity is 10kvar。
The collocation method of the reactive voltage adjusting means that the present invention is provided is history data with reference to low-voltage circuit, low The voltage origin cause of formation and the actual conditions at scene, and consider promote increase phenomenon propose low-voltage reactive power voltage regulator capacity it is preferably square Method, relatively conventional collocation method has more reasonability;According to the situation of voltage fluctuation rate, pressure regulator stepping method, regulation effect are proposed Fruit more refines, and is suitable for the larger platform area demand of load fluctuation.
With reference to shown in Fig. 4, Fig. 4 is the reactive voltage adjusting means structural representation of one embodiment, including pressure regulator mould Block 60 and reactive compensation module 71;The secondary side of the voltage regulator module 60 includes bucking coil 61, the reactive compensation module 71 include multiple unit capacitor;One end connection signal input part of the primary side of the voltage regulator module 60, voltage regulator module 60 is once The other end connection zero line side of side, the first end connection signal input part of the bucking coil 61 of the secondary side of voltage regulator module 60, mends The second end for repaying coil 61 connects one end of reactive compensation module 71, the three-terminal link reactive compensation module 71 of bucking coil 61 The other end, one end connection signal output part of the reactive compensation module 61, the other end of the reactive compensation module 71 connects Connecting to neutral line end;Specifically, voltage regulator module 60 and the low-voltage circuit in reactive voltage adjusting means erecting bed area are series relationship, nothing Work(compensating module 71 is parallel relationship with the low-voltage circuit in erecting bed area, and reactive compensation module 71 can be connected in parallel on voltage regulator module 60 output end;
Before reactive voltage regulation, (such as low pressure trunk of low-voltage circuit where reactive voltage adjusting means mount point is obtained Circuit) the first setting time section in maximum load current;
Obtain the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
The configuration of reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and capacity configuration formula Capacity;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases of erecting bed area low-voltage circuit, AQFor Promote to increase coefficient, K is nargin coefficient, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where mount point;
The capacity of the voltage regulator module 60 is configured according to the configuration capacity;After the completion of voltage regulator module capacity configuration Reactive voltage regulation is carried out to distribution network line end.
The reactive voltage adjusting means that the present embodiment is provided, to 71 points of voltage regulator module therein 60 and reactive compensation module Accurate connection has not been carried out, identified voltage regulator module capacity has accuracy higher, be conducive to improving reactive voltage tune The reactive voltage regulating effect of regulating device.
In one embodiment, after the capacity for configuring the voltage regulator module, can be according to the configuration capacity Setting ratio determines the capacity of the reactive compensation module switching to the reactive voltage adjusting means.
Specifically, the scope of above-mentioned setting ratio is [25%, 35%].In the actual disposition mistake of reactive voltage adjusting means Cheng Zhong, the group forming criterion of capacitor can be to solve the problems, such as based on low-voltage circuit low voltage, to solve the problems, such as three-phase imbalance It is pair, therefore the capacitor of reactive compensation module can be divided to two groups, one group of realization is compensated altogether, and another set realizes a point benefit Repay, the ratio between both capacity could be arranged to 2:1.
In one embodiment, distribution network line end mesolow line where the reactive voltage adjusting means can be measured The line voltage on road;
The phase voltage of low-voltage circuit is calculated according to the line voltage and phase voltage calculation formula;Wherein, the phase voltage meter Calculating formula is:UIRepresent line voltage, UNRepresent phase voltage.
Usually, the phase voltage of above-mentioned low-voltage circuit can be 0.4kV (kilovolt).Above-mentioned reactive voltage adjusting means is applicable In the low pressure level of 0.4kV, it can choose erecting bed area in 0.4kV low pressure levels, it is determined that corresponding mount point, is configured Adjusted with reactive voltage.
The present embodiment determines the phase voltage of low-voltage circuit according to the line voltage that measurement is obtained, and has identified phase voltage Accuracy higher.
In one embodiment, the interval that above-mentioned rush increases coefficient can be [1.8,2.0];Above-mentioned nargin coefficient takes It is [1.3,1.5] that value is interval;
If the reactive voltage adjusting means is arranged in three-phase circuit, α can be set to 3;Can be with the idle electricity Pressure adjusting means is arranged in single-phase circuit, then α is set into 1.
In one embodiment, after the capacity for configuring the voltage regulator module, can also include:
Output signal to the reactive voltage adjusting means carries out n times sampling, obtains the corresponding N number of sampling of output signal Voltage;
The voltage wave in reactive voltage adjusting means erecting bed area is calculated according to the sampled voltage and stability bandwidth computing formula Dynamic rate;Wherein, the stability bandwidth computing formula is:
In formula, VB% is voltage fluctuation rate, ViBe ith sample voltage, i.e. the electricity of ith sample moment final mount point Pressure, VNIt is low-voltage circuit rated voltage, i is the integer more than or equal to 1 and less than or equal to N;
During gear regulation, the gear number and span of voltage regulator module are determined according to the voltage fluctuation rate.
Above-mentioned N can be determined according to the specific features of corresponding distribution network line end, such as be defined as 1000 equivalent.
It is above-mentioned that the gear number of voltage regulator module and the mistake of span are determined according to the voltage fluctuation rate as one embodiment Journey can include:
Detect the erecting bed area in the second setting time section with the presence or absence of distributed power source;
If the erecting bed area has distributed power source in the second setting time section, formula is adjusted according to the first gear Determine the gear number and span during the regulation of voltage regulator module gear;
If the erecting bed area does not exist distributed power source in the second setting time section, adjust public according to the second gear Formula determines the gear number and span during the regulation of voltage regulator module gear.
Used as one embodiment, above-mentioned first gear regulation formula includes:
VBDuring % > 1, D=± 2m, J=2.5%;
0≤VBDuring %≤1, D=± m, J=5.0%;
The second gear regulation formula includes:
VBDuring % > 1, D=-2m, J=2.5%;
0≤VBDuring %≤1, D=-m, J=5.0%;
In formula, D represents gear number, and m represents gear threshold value, and J represents span.
Above-mentioned second setting time section can be defined as a following time period more long, such as this time of the five-year Section.If the erecting bed area the second setting time section in there is distributed power source, can by the gear of voltage regulator module to Raise (take+number) or to lowering (take-number).Under normal circumstances, if the output voltage of reactive voltage adjusting means is less than reference Magnitude of voltage, then by the gear of voltage regulator module to downward, if the output voltage of reactive voltage adjusting means is more than reference voltage level, Then by the gear of voltage regulator module to rise, above-mentioned reference voltage level can determine according to the concrete model of voltage regulator module.If The erecting bed area does not exist distributed power source in the second setting time section, then only need to be downward by the gear of voltage regulator module Adjust, be effectively simplified the gear regulation process of voltage regulator module.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the invention, and its description is more specific and detailed, but simultaneously Can not therefore be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of collocation method of reactive voltage adjusting means, it is characterised in that comprise the following steps:
Obtain maximum load current of the low-voltage circuit where reactive voltage adjusting means mount point in the first setting time section;
Obtain the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
Held according to the configuration that the maximum load current, phase voltage and capacity configuration formula calculate reactive voltage adjusting means Amount;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases of erecting bed area low-voltage circuit, AQTo promote Increase coefficient, K is nargin coefficient, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where mount point;
The capacity of voltage regulator module in the reactive voltage adjusting means is configured according to the configuration capacity.
2. the collocation method of reactive voltage adjusting means according to claim 1, it is characterised in that also include:
Setting ratio according to the configuration capacity determines the reactive compensation module switching to the reactive voltage adjusting means Capacity;Wherein, the reactive compensation module is connected in parallel on the output end of the voltage regulator module;The reactive compensation module includes Multiple unit capacitor.
3. the collocation method of reactive voltage adjusting means according to claim 2, it is characterised in that the setting ratio Scope is [25%, 35%].
4. the collocation method of reactive voltage adjusting means according to claim 1, it is characterised in that also include:
Output signal to the reactive voltage adjusting means carries out n times sampling, obtains the corresponding N number of sampling electricity of output signal Pressure;
The voltage fluctuation rate in reactive voltage adjusting means erecting bed area is calculated according to the sampled voltage and stability bandwidth computing formula; Wherein, the stability bandwidth computing formula is:
V B % = Σ i = 2 N ( V i - V i - 1 ) 2 N - 1 V N ;
In formula, VB% is voltage fluctuation rate, ViIt is ith sample voltage, VNIt is low-voltage circuit rated voltage, i is more than or equal to 1 And the integer less than or equal to N;
During gear regulation, the gear number and span of voltage regulator module are determined according to the voltage fluctuation rate.
5. the collocation method of reactive voltage adjusting means according to claim 4, it is characterised in that described according to the electricity Pressure stability bandwidth determines that the gear number of voltage regulator module and the process of span include:
Detect the erecting bed area in the second setting time section with the presence or absence of distributed power source;
If the erecting bed area has distributed power source in the second setting time section, formula is adjusted according to the first gear and is determined Gear number and span during the regulation of voltage regulator module gear;
If the erecting bed area does not exist distributed power source in the second setting time section, formula is adjusted according to the second gear true Determine the gear number and span during the regulation of voltage regulator module gear.
6. the collocation method of reactive voltage adjusting means according to claim 5, it is characterised in that first gear is adjusted Section formula includes:
VBDuring % > 1, D=± 2m, J=2.5%;
0≤VBDuring %≤1, D=± m, J=5.0%;
The second gear regulation formula includes:
VBDuring % > 1, D=-2m, J=2.5%;
0≤VBDuring %≤1, D=-m, J=5.0%;
In formula, D represents gear number, and m represents gear threshold value, and J represents span.
7. the collocation method of the reactive voltage adjusting means according to any one of claim 1 to 6, it is characterised in that described The interval for promoting to increase coefficient is [1.8,2.0];The interval of the nargin coefficient is [1.3,1.5];
It is described that reactive voltage adjusting means is calculated according to the maximum load current, phase voltage and default capacity configuration formula Configuration capacity process before, also include:
If the reactive voltage adjusting means is arranged in three-phase circuit, α is set to 3;If the reactive voltage adjusting means In single-phase circuit, then α is set to 1.
8. the collocation method of the reactive voltage adjusting means according to any one of claim 1 to 6, it is characterised in that described The process for obtaining the phase voltage of distribution network line end mid & low-voltage line where the reactive voltage adjusting means includes:
Measure the line voltage in erecting bed area where the reactive voltage adjusting means;
The phase voltage of low-voltage circuit is calculated according to the line voltage and phase voltage calculation formula;Wherein, the phase voltage calculation is public Formula is:UIRepresent line voltage, UNRepresent phase voltage.
9. a kind of reactive voltage adjusting means, it is characterised in that including voltage regulator module and reactive compensation module;The pressure regulator The secondary side of module includes bucking coil, and the reactive compensation module includes multiple unit capacitor;The voltage regulator module primary side One end connection signal input part, voltage regulator module primary side the other end connection zero line side, the benefit of voltage regulator module secondary side The first end connection signal input part of coil is repaid, the second end of bucking coil connects one end of reactive compensation module, bucking coil Three-terminal link reactive compensation module the other end, the reactive compensation module one end connection signal output part, the nothing The other end connection zero line side of work(compensating module;
Before reactive voltage regulation, low-voltage circuit where reactive voltage adjusting means mount point is obtained in the first setting time section Interior maximum load current;
Obtain the phase voltage of erecting bed area low-voltage circuit where the reactive voltage adjusting means;
Held according to the configuration that the maximum load current, phase voltage and capacity configuration formula calculate reactive voltage adjusting means Amount;Wherein, the capacity configuration formula is:S=α AQKUNILmax;In formula, α is the number of phases of erecting bed area low-voltage circuit, AQTo promote Increase coefficient, K is nargin coefficient, UNIt is phase voltage, ILmaxThe maximum load current of low-voltage circuit where device mount point;
The capacity of the voltage regulator module is configured according to the configuration capacity.
10. the collocation method of reactive voltage adjusting means according to claim 9, it is characterised in that configuring the tune After the capacity of depressor module, the setting ratio according to the configuration capacity determines the reactive compensation module switching to the nothing The capacity of work(voltage regulating device.
CN201710183243.7A 2017-03-24 2017-03-24 The collocation method and reactive voltage adjusting means of reactive voltage adjusting means Active CN106786633B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710183243.7A CN106786633B (en) 2017-03-24 2017-03-24 The collocation method and reactive voltage adjusting means of reactive voltage adjusting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710183243.7A CN106786633B (en) 2017-03-24 2017-03-24 The collocation method and reactive voltage adjusting means of reactive voltage adjusting means

Publications (2)

Publication Number Publication Date
CN106786633A true CN106786633A (en) 2017-05-31
CN106786633B CN106786633B (en) 2018-02-06

Family

ID=58966425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710183243.7A Active CN106786633B (en) 2017-03-24 2017-03-24 The collocation method and reactive voltage adjusting means of reactive voltage adjusting means

Country Status (1)

Country Link
CN (1) CN106786633B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108599105A (en) * 2018-05-30 2018-09-28 南京南瑞继保电气有限公司 A kind of method of capacity nonlinear adjustment during series transformer longitudinal difference protection calculates
CN108599106A (en) * 2018-05-30 2018-09-28 南京南瑞继保电气有限公司 A kind of method that capacity adjusts during series transformer longitudinal difference protection calculates
CN110429592A (en) * 2019-08-06 2019-11-08 国网四川省电力公司电力科学研究院 A kind of 10kV route pressure regulator installation site and Capacity Selection method
CN110620384A (en) * 2019-10-22 2019-12-27 国网湖南省电力有限公司 User low voltage management method based on plug-and-play mobile SVC
US11881700B2 (en) 2018-05-30 2024-01-23 Nr Electric Co., Ltd. Longitudinal differential protection method of transformer

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5134356A (en) * 1990-06-22 1992-07-28 Board Of Regents Of The University Of Washington Reactive power compensator
CN103441510A (en) * 2013-08-05 2013-12-11 南方电网科学研究院有限责任公司 Regional power grid reactive power optimization method relating to flexible HVDC system
CN103490410A (en) * 2013-08-30 2014-01-01 江苏省电力设计院 Micro-grid planning and capacity allocation method based on multi-objective optimization
CN105098777A (en) * 2015-09-10 2015-11-25 国家电网公司 Low-voltage assistant decision method for rural distribution network
CN105762792A (en) * 2016-03-16 2016-07-13 国家电网公司 Household average distribution transform capacity configuration method based on user behaviors
CN106208110A (en) * 2016-08-31 2016-12-07 中国电力科学研究院 A kind of screening technique of distribution network var compensation optimal allocation strategy

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5134356A (en) * 1990-06-22 1992-07-28 Board Of Regents Of The University Of Washington Reactive power compensator
CN103441510A (en) * 2013-08-05 2013-12-11 南方电网科学研究院有限责任公司 Regional power grid reactive power optimization method relating to flexible HVDC system
CN103490410A (en) * 2013-08-30 2014-01-01 江苏省电力设计院 Micro-grid planning and capacity allocation method based on multi-objective optimization
CN105098777A (en) * 2015-09-10 2015-11-25 国家电网公司 Low-voltage assistant decision method for rural distribution network
CN105762792A (en) * 2016-03-16 2016-07-13 国家电网公司 Household average distribution transform capacity configuration method based on user behaviors
CN106208110A (en) * 2016-08-31 2016-12-07 中国电力科学研究院 A kind of screening technique of distribution network var compensation optimal allocation strategy

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108599105A (en) * 2018-05-30 2018-09-28 南京南瑞继保电气有限公司 A kind of method of capacity nonlinear adjustment during series transformer longitudinal difference protection calculates
CN108599106A (en) * 2018-05-30 2018-09-28 南京南瑞继保电气有限公司 A kind of method that capacity adjusts during series transformer longitudinal difference protection calculates
CN108599105B (en) * 2018-05-30 2020-03-20 南京南瑞继保电气有限公司 Method for nonlinear capacity adjustment in longitudinal differential protection calculation of series transformer
US11881700B2 (en) 2018-05-30 2024-01-23 Nr Electric Co., Ltd. Longitudinal differential protection method of transformer
CN110429592A (en) * 2019-08-06 2019-11-08 国网四川省电力公司电力科学研究院 A kind of 10kV route pressure regulator installation site and Capacity Selection method
CN110429592B (en) * 2019-08-06 2022-11-08 国网四川省电力公司电力科学研究院 10kV line voltage regulator installation position and capacity selection method
CN110620384A (en) * 2019-10-22 2019-12-27 国网湖南省电力有限公司 User low voltage management method based on plug-and-play mobile SVC

Also Published As

Publication number Publication date
CN106786633B (en) 2018-02-06

Similar Documents

Publication Publication Date Title
CN106786633B (en) The collocation method and reactive voltage adjusting means of reactive voltage adjusting means
CN103606932B (en) The low voltage dynamic reactive-power compensation capacitor autocontrol method that load is relevant
CN103199549B (en) A kind of method that Receiving-end power grid dynamic reactive power compensation equipment configuration position is selected
CN106022973B (en) A kind of scheduling strategy of the real-time distribution distribution three-phrase burden balance based on greedy algorithm
CN103326348B (en) A kind of system improving the analysis of area power grid power supply capacity and overall process on-line monitoring
CN104635080B (en) A kind of method for predicting grid line loss rate
CN103499731B (en) A kind of comprehensive analysis method of supply voltage qualification rate
CN105406482B (en) Voltage powerless control method based on reactive power compensator and its system
CN102315667B (en) Method and apparatus for controlling battery and specification determining method of battery
CN108573330B (en) Loss reduction method and device for power distribution network
CN101609989B (en) System for calculating power supply abundance of urban power network
CN111009906B (en) Reactive compensation balancing method for full cable net rack
CN105337318A (en) Phase modulation operation capability test method and system for wind turbine generators
CN107834549A (en) A kind of regional distribution network drop damage potential evaluation method
CN105703374A (en) New-type urbanization-based low voltage treatment measures optimization method
CN104993481B (en) The key element diagnosis of low-voltage platform area six and analysis method and system
CN101764404A (en) Method for judging coordination running state between provincial and local regions in coordination voltage control between provincial and local regions
CN104092215B (en) Distribution transformer capacity control method and system
CN111027886A (en) Evaluation method of low-voltage treatment scheme considering unit cost effectiveness
CN100470996C (en) Static hybrid automatic voltage control method
CN104362641B (en) A kind of distribution reactive comprehensive control strategy and optimum capacity collocation method
CN108365611B (en) Reactive compensation control method for distributed photovoltaic power station
CN104734163A (en) Power factor compensation device in light-load operating of transformer, connecting system and compensation method thereof
CN106300383B (en) Consider the comprehensive reactive configuration method of the 10kV distribution line of equipment response speed
Oue et al. Verification of the autonomous voltage control for SVR based on the advanced voltage-estimation corresponding to the voltage drop phenomenon

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200302

Address after: Guangzhou Yuexiu District City, Guangdong province 510060 Dongfeng Road No. 757

Co-patentee after: HEYUAN POWER SUPPLY BUREAU, GUANGDONG POWER GRID CO., LTD.

Patentee after: GUANGDONG STATE GRID CO., LTD.

Address before: 517000 No. 19, Heyuan Avenue, Heyuan, Guangdong

Co-patentee before: Guangzhou City Benliu Electric Power Science & Technology Co., Ltd.

Patentee before: HEYUAN POWER SUPPLY BUREAU, GUANGDONG POWER GRID CO., LTD.

TR01 Transfer of patent right