CN103485819A - Method for inverted step bag type filling of large dip angle coal seam gob - Google Patents

Method for inverted step bag type filling of large dip angle coal seam gob Download PDF

Info

Publication number
CN103485819A
CN103485819A CN201310434474.2A CN201310434474A CN103485819A CN 103485819 A CN103485819 A CN 103485819A CN 201310434474 A CN201310434474 A CN 201310434474A CN 103485819 A CN103485819 A CN 103485819A
Authority
CN
China
Prior art keywords
filling
segmentation
coal
goaf
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310434474.2A
Other languages
Chinese (zh)
Other versions
CN103485819B (en
Inventor
贾凯军
冯光明
李乃梁
滑怀田
任海兵
李�杰
张兆威
张德成
王清亚
王帅
刘永清
李少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310434474.2A priority Critical patent/CN103485819B/en
Publication of CN103485819A publication Critical patent/CN103485819A/en
Application granted granted Critical
Publication of CN103485819B publication Critical patent/CN103485819B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A method for inverted step bag type filling of a large dip angle coal seam gob comprises the steps of starting to incline a working surface from an open-off cut, adopting pseudo-inclined mining, performing gob bag type filling method filling on the gob, enabling one more filling body to be sequentially filled in a next subsection than in a front subsection, and enabling the filling bodies to be in an inverted step mode; performing propulsion along the trend along with the pseudo-inclined working surface, and filling the gob sequentially until filling work of the whole gob is finished. The large dip angle working surface is arranged in a pseudo-inclined mode, the dip angle of the working surface is reduced, the lower filling bodies serve as carriers for the upper filling bodies in the gob, the filling bodies can not only support a top plate and effectively control movement of overlying strata, but also form a whole, and the stability is good. The method is particularly suitable for large dip angle working surface gob filling propelled according to the trend, a filling process is simple, construction is simple, investment at an initial stage is less, and filling efficiency and filling density are high.

Description

A kind of large-inclination-angle coal bed goaf rank pocket type placement method of falling from power
Technical field
The present invention relates to a kind of large-inclination-angle coal bed goaf rank pocket type placement method of falling from power, be particularly useful for large-inclination-angle coal bed work plane and move towards the goaf filling advanced.
Background technology
For a long time, on " three times " pressure coal and water body, after coal mining, often cause the gross distortion on goaf overlying rock and earth's surface, cause that above ground structure can't be used because of distortion, lithic drainage is also destroyed.By filling is carried out in goaf, can address these problems.
At present, the pocket type placement method that goaf filling adopts, by the direct roof supporting of obturation, can reduce and crush and control surface movement, but it is only applicable to the goaf filling of moving towards propelling or facing upward oblique exploitation work plane that seam inclination is less, when seam inclination is greater than 25 °, when work plane moves towards to advance, filling bag will be in the packing job process and filling complete after slurry produce downslide because of Action of Gravity Field before solidifying, not only reduce pack completeness but also affected the stability of obturation, thereby limited the propagation and employment of pocket type placement method.
Summary of the invention
Technical problem: the objective of the invention is to overcome the deficiency of existing goaf pocket type filling technique, a kind of goaf bag-type packing method that high inclination-angle moves towards work plane that adapts to is provided.
Technical scheme: the large-inclination-angle coal bed goaf of the present invention rank pocket type placement method of falling from power comprises the steps:
A, from the open-off cut lower end, start the oblique adjusting coal-face, from the bottom up, take the flexible filling bag length as unit along the seam inclination direction to coal-face segmentation exploited, at first, along open-off cut, the first segmentation bottom advances equate with the flexible filling bag width section dark, and hang flexible filling bag in the goaf at its rear, flexible filling bag is carried out to filling; Then, in the first segmentation, advance again one to cut deeply, in the second segmentation, advance one to cut deeply simultaneously, and complete hanging bag and filling work in the goaf at its rear; Carry out in proper order, in the first segmentation, the second segmentation, advance again one to cut dark, in the 3rd segmentation, advance one to cut dark simultaneously, and complete hanging bag and filling operation in the goaf at its rear, constantly push ahead, until the oblique adjusting bashing stage, last segmentation of open-off cut upper end advances one to cut dark, and complete hanging bag and filling operation in the goaf at its rear, make coal-face (2) and track lane form angle α;
B, complete the oblique adjusting operation after, along the pseudo-tiltedly exploitation of moving towards of coal-face, one of the every propelling of coal-face cuts dark, hangs successively from the bottom up flexible filling bag in each segmentation of the goaf at its rear, and carries out filling;
C, with coal-face, constantly advance, when terminal that the coal-face exploitation by transportation lane one side closes on, start the coal-face of oblique adjusting is aligned, complete successively from the bottom up the filling operation of each segmentation, until go up a segmentation goaf most while completing the filling operation of last obturation, whole stowing operation finishes.
Described obturation is the rank arranged in form of falling from power in goaf; The angle α in described coal-face and track lane is 75 °~85 °.
Beneficial effect: owing to having adopted technique scheme, work plane moves towards to advance pseudo-tiltedly exploitation, and angle reduces, and length increases, and the back production work efficiency improves; Obturation is arranged with stepped form, the top obturation using to have condensed in bottom and the obturation that possesses some strength as support, having avoided slurry to solidify the cause deadweight glides, strengthened the self-stability of obturation, and under the high inclination-angle condition, each obturation relies on extruding mutually, forms an integral body, and the top board that goaf is exposed is supported.The present invention can solve " three times " and press coal low, the complex process of filling mining mode pack completeness and the larger problem of investment in the past, is applicable to the goaf filling that large-inclination-angle coal bed work plane move towards propelling.The optional scope of filler is wide, and filling process is simple, the initial stage less investment, and easily construction, pack effectiveness and pack densification are high, have practicality widely.
The accompanying drawing explanation
Fig. 1 is filling floor map in oblique adjusting process of the present invention;
Fig. 2 is the present invention's filling floor map while completing oblique adjusting;
Filling floor map when Fig. 3 is the normal filling of the present invention;
Fig. 4 is the present invention's filling floor map while starting to align;
Fig. 5 is filling floor map in levelling process of the present invention;
Fig. 6 is filling floor map after sand off of the present invention.
In figure: the 1-open-off cut; The 2-coal-face; The 3-goaf; 4-track lane; 5-transports lane; The 6-obturation.
The specific embodiment
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
Shown in Fig. 1, take and arrange that along coal-face 2 five filling bag are example.After open-off cut 1 has tunneled, coal-face 2 is carried out to oblique adjusting, from the bottom up, the flexible filling bag length of take is divided into coal-face 2 as unit along the seam inclination direction five segmentations, at first, cutting that edge the first one of segmentation propelling bottom equates with the flexible filling bag width is dark, and hangs flexible filling bag in the goaf 3 at its rear, and flexible filling bag is carried out to filling; Then, in the first segmentation, advance again one to cut deeply, in the second segmentation, advance one to cut deeply simultaneously, and complete hanging bag and filling work in the goaf 3 at its rear; Carry out in proper order, in the first segmentation, the second segmentation, advance again one to cut dark, in the 3rd segmentation, advance one to cut dark simultaneously, and complete hanging bag and filling operation in the goaf 3 at its rear, constantly push ahead, until complete the oblique adjusting bashing stage, shown in Fig. 2, the 5th segmentation topmost advance first section dark, and the goaf 3 at its rear completes hanging bag and filling operation, makes coal-face 2 and track lane 4 form the angle α of 75 °~85 °.
Shown in Fig. 3, after completing the oblique adjusting operation, the pseudo-tiltedly exploitation of moving towards along coal-face 2, one of the every propelling of coal-face 2 cuts dark, hangs successively from the bottom up flexible filling bag in 3 each segmentations of the goaf at its rear, and carries out filling, until coal-face 2 first segmentations complete last section dark, arrival stops adopting line, and the goaf 3 at its rear completes corresponding hanging bag and filling operation, shown in Fig. 4.
Shown in Fig. 5, with coal-face 2, constantly advance, start the coal-face 2 of oblique adjusting is aligned, the second segmentation, the 3rd segmentation, the 4th segmentation and the 5th segmentation respectively advance one to cut dark, complete its packing job of hanging bag in its goaf, rear 3, now the second segmentation also reaches and stops adopting line, stop exploitation, carry out in proper order, the 3rd segmentation, the 4th segmentation reaches successively and stops adopting line, until the 5th segmentation topmost advance last section dark, reach and stop adopting line, and while in the goaf 3 at its rear, completing the filling operation of last obturation 6, whole stowing operation finishes, shown in Fig. 6.
According to the situation of goaf 3 overlying rocks, in case of necessity, in work plane track lane 4, transportation constructs fire dam in lane 5, obturation 6 and the service aisle that stops adopting between line are carried out to flood irrigation, until be full of.
Selected filler in above-mentioned example, possess certain mobility, is filled with filling bag and can solidifies after a period of time and form the induration with some strength, controls the activity of overlying rock.Such as high water filling material, paste filling material, paste-like backfill material etc.

Claims (3)

1. the large-inclination-angle coal bed goaf rank pocket type placement method of falling from power, is characterized in that, comprises the steps:
A, from open-off cut (1) lower end, start oblique adjusting coal-face (2), from the bottom up, take the flexible filling bag length as unit along the seam inclination direction to coal-face (2) segmentation exploited, at first, along open-off cut (1), the first segmentation bottom advances equate with the flexible filling bag width section dark, and hang flexible filling bag in the goaf (3) at its rear, flexible filling bag is carried out to filling; Then, in the first segmentation, advance again one to cut deeply, in the second segmentation, advance one to cut deeply simultaneously, and complete hanging bag and filling work in the goaf (3) at its rear; Carry out in proper order, in the first segmentation, the second segmentation, advance again one to cut dark, in the 3rd segmentation, advance one to cut dark simultaneously, and complete hanging bag and filling operation in the goaf (3) at its rear, constantly push ahead, until the oblique adjusting bashing stage, last segmentation of open-off cut (1) upper end advances one to cut dark, and complete hanging bag and filling operation in the goaf (3) at its rear, make coal-face (2) and track lane (4) form angle α;
B, complete the oblique adjusting operation after, along the pseudo-tiltedly exploitation of moving towards of coal-face (2), one of the every propelling of coal-face (2) cuts dark, hangs successively from the bottom up flexible filling bag in each segmentation of goaf (3) at its rear, and carries out filling;
C, with coal-face (2), constantly advance, when terminal that coal-face (2) exploitation by transportation lane (5) one sides closes on, the coal-face (2) started oblique adjusting is aligned, complete successively from the bottom up the filling operation of each segmentation, until go up a segmentation goaf (3) most while completing the filling operation of last obturation (6), whole stowing operation finishes.
2. the large-inclination-angle coal bed goaf according to claim 1 rank pocket type placement method of falling from power, it is characterized in that: described obturation (6) is the rank arranged in form of falling from power in goaf (3).
3. the large-inclination-angle coal bed goaf according to claim 1 rank pocket type placement method of falling from power, it is characterized in that: described coal-face (2) is 75 °~85 ° with the angle α in track lane (4).
CN201310434474.2A 2013-09-23 2013-09-23 Fall from power rank pocket type placement method in a kind of large-inclination-angle coal bed goaf Expired - Fee Related CN103485819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310434474.2A CN103485819B (en) 2013-09-23 2013-09-23 Fall from power rank pocket type placement method in a kind of large-inclination-angle coal bed goaf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310434474.2A CN103485819B (en) 2013-09-23 2013-09-23 Fall from power rank pocket type placement method in a kind of large-inclination-angle coal bed goaf

Publications (2)

Publication Number Publication Date
CN103485819A true CN103485819A (en) 2014-01-01
CN103485819B CN103485819B (en) 2015-11-04

Family

ID=49826364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310434474.2A Expired - Fee Related CN103485819B (en) 2013-09-23 2013-09-23 Fall from power rank pocket type placement method in a kind of large-inclination-angle coal bed goaf

Country Status (1)

Country Link
CN (1) CN103485819B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924944A (en) * 2019-11-29 2020-03-27 北京科技大学 Coal mine main roadway down-pressing coal segmented circulating filling mining method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1474032A (en) * 2003-08-08 2004-02-11 中南大学 Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN101806226A (en) * 2010-03-19 2010-08-18 中国矿业大学 Mined out space dam-type filling method
CN102230396A (en) * 2011-05-31 2011-11-02 大连大学 Filling method capable of exploring while filling coal mine goaf
CN102536238A (en) * 2012-01-09 2012-07-04 中国矿业大学 Mining method for large-inclined angle laminar non-coal solid mineral deposit
CN103161498A (en) * 2013-03-20 2013-06-19 中国矿业大学 Method for filling coal pillar beside roadway in steep coal seam section
CN103306720A (en) * 2013-05-20 2013-09-18 中国矿业大学 Inclined layered solid filling coal mining method for ultra-thick coal seam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1474032A (en) * 2003-08-08 2004-02-11 中南大学 Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN101806226A (en) * 2010-03-19 2010-08-18 中国矿业大学 Mined out space dam-type filling method
CN102230396A (en) * 2011-05-31 2011-11-02 大连大学 Filling method capable of exploring while filling coal mine goaf
CN102536238A (en) * 2012-01-09 2012-07-04 中国矿业大学 Mining method for large-inclined angle laminar non-coal solid mineral deposit
CN103161498A (en) * 2013-03-20 2013-06-19 中国矿业大学 Method for filling coal pillar beside roadway in steep coal seam section
CN103306720A (en) * 2013-05-20 2013-09-18 中国矿业大学 Inclined layered solid filling coal mining method for ultra-thick coal seam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯光明等: "超高水材料袋式充填开采研究", 《采矿与安全工程学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924944A (en) * 2019-11-29 2020-03-27 北京科技大学 Coal mine main roadway down-pressing coal segmented circulating filling mining method

Also Published As

Publication number Publication date
CN103485819B (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent's spoil
CN103696771B (en) Skip-mining type wangeviry stope branch roadway filling and coal mining method
CN101806226B (en) Mined out space dam-type filling method
CN106869933A (en) A kind of block fills and stops adopting the method for coal pillar width with reference to reduction super high seam
CN104088662B (en) A kind of construction method of solid filling coal mining gob-side entry retaining support body of wall
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN102337892B (en) Upward access filling method
CN104806247B (en) Longitudinal combination bridge transportation resources is built in the middle of open-pit mine stope
CN205638519U (en) Girdle solid filling support
CN101876253A (en) Working surface layout method for mining steeply dipping coal seam
CN106968671A (en) The filling of underground coal mine coal-face return channel withdraws method
CN103046929A (en) Method for stripping rock layer of end slope
CN108035714A (en) Spoil zero-emission short face is without coal pillar mining method
CN111255456B (en) Mine advancing type filling roadway mining method
CN108397195B (en) Steep-inclined thick coal seam mechanical coal mining system and coal-mining method
CN204299617U (en) One is anti-breaks type gob side entry retaining filling air bag
CN113047839A (en) Method for planning dump of strip mine in ultra-thick inclined coal seam and efficiently recovering end slope resources
CN104265291A (en) Comprehensive mechanized coal mining method of steeply inclined and extremely thick coal seam planing conveyor
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN203962014U (en) Combine and adopt the dual-purpose working surface hydraulic support of filling
CN103161498A (en) Method for filling coal pillar beside roadway in steep coal seam section
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN105221185A (en) A kind of coal winning technology
CN101881179A (en) Coal mine up-dip working face slant range paste-like filling method
CN103485819A (en) Method for inverted step bag type filling of large dip angle coal seam gob

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151104

Termination date: 20160923