CN108035714A - Spoil zero-emission short face is without coal pillar mining method - Google Patents
Spoil zero-emission short face is without coal pillar mining method Download PDFInfo
- Publication number
- CN108035714A CN108035714A CN201711290733.3A CN201711290733A CN108035714A CN 108035714 A CN108035714 A CN 108035714A CN 201711290733 A CN201711290733 A CN 201711290733A CN 108035714 A CN108035714 A CN 108035714A
- Authority
- CN
- China
- Prior art keywords
- shortwall
- spoil
- zero
- tunnel
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005065 mining Methods 0.000 title claims abstract description 29
- 239000003245 coal Substances 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000000725 suspension Substances 0.000 claims description 6
- 230000005641 tunneling Effects 0.000 claims 1
- 208000028659 discharge Diseases 0.000 abstract description 4
- 239000011435 rock Substances 0.000 abstract description 2
- 239000002699 waste material Substances 0.000 abstract 1
- 101100008048 Caenorhabditis elegans cut-4 gene Proteins 0.000 description 2
- 238000002485 combustion reaction Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000001473 noxious effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000002910 solid waste Substances 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The present invention discloses a kind of spoil zero-emission short face without coal pillar mining method, suitable for being used during mine spoil zero discharge treatment.According to actual condition of mines, in pitshaft arrangement short section working face in a region selected around, using adopt entirely fill entirely by the way of short section working face is exploited, the waste filling that produces in mine other exploitation working faces is entered into shortwall, shortwall carries out staying lane along filling face edge and the supporting of entity coal side anchor pole, utilizes the exploitation for staying lane to carry out Adjacent Working Face.The present invention mainly replaces coal body by spoil, realizes the maximization of the utilization of resources, at the same again can complete controlroof, realize that lossless melt of rock stratum is adopted, application value is high.
Description
Technical field
The present invention relates to a kind of spoil zero-emission short face without coal pillar mining method, mine spoil zero discharge treatment is particularly suitable for
When use.
Background technology
China's coal-mine produces more than one hundred million tons of spoil per annual meeting, and the major way of the spoil of colliery processing now is exactly outdoor heap
Put, so that substantial amounts of soil can be taken, not only pile things on or destroy original landforms vegetation, and air storage can be easy to from
Combustion, noxious material can all cause serious harm to environment for human survival and mining area ecological environment caused by spontaneous combustion.
China has explored the mode of a variety of processing spoils, but is all that colliery first emits spoil mostly, then
It is utilized, although therefrom having handled part spoil, while a large amount of dust is also produced in discharge and processing procedure, to environment
Secondary pollution is caused, is currently badly in need of a kind of coal-mining method of downhole gangue zero-emission.
The content of the invention
Technical problem:The purpose of the present invention is overcome the shortcomings of in prior art, there is provided a kind of method is simple, realizes effect
Good and sound spoil zero-emission short face is without coal pillar mining method.
Technical solution:A kind of spoil zero-emission short face is without coal pillar mining method, it is characterised in that step is as follows:
A. according to actual condition of mines, shortwall is being set near mine shaft station, shortwall exploitation
Exploited apart from shaft station 500m~1000m, shortwall to the direction away from shaft station initial position;
B. by mine, other are exploited the spoil produced in working faces and all transport to shortwall, and shortwall is used and is adopted entirely
The mode filled entirely is exploited, using spoil to shortwall filling mining, while during exploitation to back and
Side wall carries out suspension roof support, and suspension roof support includes filling the supporting of face edge and in entity coal side supporting along shortwall, and
Formed after supporting on the outside of shortwall and stay lane, while the digging laneway on the outside of the adjacent shortwall of current shortwall;
C. after tunnelling is complete, open-off cut is tunneled from tunnel to current shortwall, using staying lane and adjacent driving
The filling mining working face that tunnel forms adjacent shortwall is continued to be exploited in a manner of Quan Caiquan fills and is returned using spoil
Fill out, while shift adjacent tunnel and open-off cut that heading equipment tunnels next shortwall, opened for ensuing shortwall
Adopt and prepare;
E. repeat step b and c, so as to fulfill the continuous exploitation of the shortwall of mine processing spoil, until handling completion
All spoils of lower generation, realize the zero-emission of ground spoil.
The shortwall is used for underground storage spoil, and shortwall width is 30~50m, is highly coal seam height,
Length is 1000m~3000m.The lanewidth degree that stays is 3~6m.The shortwall mining sequence is protrusive with retreating
Alternately, tunnelling order is protrusive always to formula.
Beneficial effect:By adopting the above-described technical solution, the present invention has the following advantages that compared with prior art:
(1) solid waste such as all spoils produced in progress of coal mining are by backfilling directly in down-hole treatment, nothing
Ground need to be discharged into again, realize the target of spoil zero-emission, avoid spoil discharge and caused by environmental pollution, while significantly
Degree reduces the cost of floor treatment spoil.
(2) shortwall exploitation only needs the filling hydraulic support of small-sized coalcutter and ten framves or so, avoids mine
The input of high cost, and overcome that production efficiency caused by current filling technique is low, delays the problem of normal production.
(3) shortwall filling mining Hou Liu lanes, reduce tunnelling, reduce the cost of tunnelling.
(4) coal body is replaced by spoil, while eliminates coal column, realize the maximization of the utilization of resources, shortwall is complete
Adopt it is complete fill again can complete controlroof, realize that lossless melt of rock stratum is adopted, application value height.
Brief description of the drawings
Fig. 1 is short face advance mining of the spoil zero-emission short face without coal pillar mining method of the present invention;
Fig. 2 is that short face of the spoil zero-emission short face of the present invention without coal pillar mining method is retreated.
In figure:1- shortwalls;2- stays lane;3- tunnels;4- open-off cuts;The adjacent shortwalls of 5-;The adjacent tunnels of 6-.
Embodiment
One embodiment of the present of invention is further described below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, spoil zero-emission short face of the invention is without coal pillar mining method, it is characterised in that step is as follows:
A. according to actual condition of mines, shortwall 1, the shortwall are being set near mine shaft station
1 is used for underground storage spoil, and shortwall width is 30~50m, is highly coal seam height, length is 1000m~3000m, short
Opened apart from shaft station 500m~1000m, shortwall 1 to the direction away from shaft station the initial position of working face mining
Adopt, sequentially for protrusive and retrusive alternately, the shortwall 1 tunnels 1 working face mining of shortwall
Order is protrusive always;
B. by mine, other are exploited the spoil produced in working faces and all transport to shortwall 1, to shortwall 1 using complete
Adopt the mode filled entirely to be exploited, using spoil to 1 filling mining of shortwall, while to back during exploitation
Suspension roof support is carried out with side wall, suspension roof support includes filling the supporting of face edge and in entity coal side supporting along shortwall 1, and
Being formed after supporting in the outside of shortwall 1 and stay lane 2,2 width of lane that stays is 3~6m, while in current shortwall 1
Adjacent 5 outside digging laneway 3 of shortwall;
C. after having been tunneled after tunnel 3, open-off cut 4 is tunneled from tunnel 3 to current shortwall 1, using staying lane 2 and adjacent pick
Into tunnel 3 form the filling mining working face of adjacent shortwall 5 and continue in a manner of Quan Caiquan fills to be exploited and utilized
Gangue refill, while adjacent tunnel 6 and open-off cut 4 that heading equipment tunnels next shortwall are shifted, it is ensuing short
Working face mining is prepared;
E. repeat step b and c, so as to fulfill the continuous exploitation of the shortwall 1 of mine processing spoil, until handling completion
All spoils of lower generation, realize the zero-emission of downhole gangue.
Claims (4)
1. a kind of spoil zero-emission short face is without coal pillar mining method, it is characterised in that step is as follows:
A. according to actual condition of mines, shortwall is being set near mine shaft station(1), of shortwall exploitation
Beginning positional distance shaft station 500m ~ 1000m, shortwall(1)Exploited to the direction away from shaft station;
B. by mine, other are exploited the spoil produced in working faces and all transport to shortwall(1), to shortwall(1)Using complete
Adopt the mode filled entirely to be exploited, using spoil to shortwall(1)Filling mining, while to tunnel during exploitation
(3)Top plate and side wall carry out suspension roof support, suspension roof support is included along shortwall(1)Filling face edge supporting and in entity
The collateral shield of coal, and in shortwall after supporting(1)Outside forms and stays lane(2), while in current shortwall(1)It is adjacent short
Working face(5)Outside digging laneway(3);
C. tunnel is treated(3)After having tunneled, from tunnel(3)To current shortwall(1)Tunnel open-off cut(4), using staying lane(2)And
The tunnel of adjacent driving(3)Form adjacent shortwall(5)Filling mining working face continue carried out in a manner of Quan Caiquan fills
Exploit and utilize gangue refill, while shift the adjacent tunnel that heading equipment tunnels next shortwall(6)And open-off cut
(4), prepare for the exploitation of ensuing shortwall;
E. repeat step b and c, so as to fulfill the shortwall of mine processing spoil(1)Continuous exploitation, until handling under completion
All spoils produced, realize the zero-emission of downhole gangue.
2. spoil zero-emission short face according to claim 1 is without coal pillar mining method, it is characterized in that:The shortwall
(1)Spoil is stored for underground, shortwall width is 30 ~ 50m, is highly coal seam height, length is 1000m ~ 3000m.
3. spoil zero-emission short face according to claim 1 is without coal pillar mining method, it is characterized in that:Described stays lane(2)It is wide
Spend for 3 ~ 6m.
4. spoil zero-emission short face according to claim 1 is without coal pillar mining method, it is characterized in that:The shortwall
(1)Mining sequence for protrusive and retrusive alternately, the tunnel(3)Tunneling sequence is protrusive always.
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711290733.3A CN108035714A (en) | 2017-12-08 | 2017-12-08 | Spoil zero-emission short face is without coal pillar mining method |
PCT/CN2018/087977 WO2019109602A1 (en) | 2017-12-08 | 2018-05-23 | Short-face coal-pillar-free mining method having zero gangue discharge |
AU2018308953A AU2018308953A1 (en) | 2017-12-08 | 2018-05-23 | Zero-gangue-discharge short-wall face pillar-free mining method |
JP2018555277A JP6684922B2 (en) | 2017-12-08 | 2018-05-23 | Zero-discharging short-faced pillarless coal mining method |
US16/319,033 US20210310356A1 (en) | 2017-12-08 | 2018-05-23 | Zero-gangue-discharge short-wall face pillar-free mining method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711290733.3A CN108035714A (en) | 2017-12-08 | 2017-12-08 | Spoil zero-emission short face is without coal pillar mining method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108035714A true CN108035714A (en) | 2018-05-15 |
Family
ID=62096112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711290733.3A Pending CN108035714A (en) | 2017-12-08 | 2017-12-08 | Spoil zero-emission short face is without coal pillar mining method |
Country Status (5)
Country | Link |
---|---|
US (1) | US20210310356A1 (en) |
JP (1) | JP6684922B2 (en) |
CN (1) | CN108035714A (en) |
AU (1) | AU2018308953A1 (en) |
WO (1) | WO2019109602A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019109602A1 (en) * | 2017-12-08 | 2019-06-13 | 中国矿业大学 | Short-face coal-pillar-free mining method having zero gangue discharge |
CN110424966A (en) * | 2019-07-25 | 2019-11-08 | 中国矿业大学 | A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method |
CN111156000A (en) * | 2020-04-07 | 2020-05-15 | 北京中矿创新联盟能源环境科学研究院 | Low seam coal-pillar-free retreating type coal mining method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110130899B (en) * | 2019-07-09 | 2019-11-05 | 北京中矿创新联盟能源环境科学研究院 | Coal mining method without coal pillar, roadway and tunneling in whole mining area |
CN116084945A (en) * | 2022-11-30 | 2023-05-09 | 天地(榆林)开采工程技术有限公司 | Fully-separated filling method for short-wall fully-mechanized coal mining face mining |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1936271A (en) * | 2006-08-21 | 2007-03-28 | 山东盛泉矿业有限公司 | Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock |
CN102261247A (en) * | 2011-08-02 | 2011-11-30 | 中国矿业大学 | Secondary coal-mining method for reversely filling paste in stripes |
CN103410515A (en) * | 2013-08-23 | 2013-11-27 | 山东科技大学 | Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method |
CN106522948A (en) * | 2016-11-25 | 2017-03-22 | 山东科技大学 | Short-wall waste rock gluing continuous mining and continuous filling mining method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3852967A (en) * | 1970-11-04 | 1974-12-10 | Dow Chemical Co | Method of filling subterranean voids with a particulate material |
CN1483921A (en) * | 2002-09-18 | 2004-03-24 | 杨新兴 | Cavern filling type coal mining method |
JP4459966B2 (en) * | 2007-01-05 | 2010-04-28 | 栄一 鈴木 | Stone mining method |
CN105089668A (en) * | 2014-05-19 | 2015-11-25 | 梁捷 | Longwall working face coal-pillar-free mining method |
CN108035714A (en) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | Spoil zero-emission short face is without coal pillar mining method |
-
2017
- 2017-12-08 CN CN201711290733.3A patent/CN108035714A/en active Pending
-
2018
- 2018-05-23 JP JP2018555277A patent/JP6684922B2/en active Active
- 2018-05-23 AU AU2018308953A patent/AU2018308953A1/en not_active Abandoned
- 2018-05-23 WO PCT/CN2018/087977 patent/WO2019109602A1/en active Application Filing
- 2018-05-23 US US16/319,033 patent/US20210310356A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1936271A (en) * | 2006-08-21 | 2007-03-28 | 山东盛泉矿业有限公司 | Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock |
CN102261247A (en) * | 2011-08-02 | 2011-11-30 | 中国矿业大学 | Secondary coal-mining method for reversely filling paste in stripes |
CN103410515A (en) * | 2013-08-23 | 2013-11-27 | 山东科技大学 | Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method |
CN106522948A (en) * | 2016-11-25 | 2017-03-22 | 山东科技大学 | Short-wall waste rock gluing continuous mining and continuous filling mining method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019109602A1 (en) * | 2017-12-08 | 2019-06-13 | 中国矿业大学 | Short-face coal-pillar-free mining method having zero gangue discharge |
CN110424966A (en) * | 2019-07-25 | 2019-11-08 | 中国矿业大学 | A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method |
CN111156000A (en) * | 2020-04-07 | 2020-05-15 | 北京中矿创新联盟能源环境科学研究院 | Low seam coal-pillar-free retreating type coal mining method |
Also Published As
Publication number | Publication date |
---|---|
JP2020504253A (en) | 2020-02-06 |
US20210310356A1 (en) | 2021-10-07 |
WO2019109602A1 (en) | 2019-06-13 |
AU2018308953A1 (en) | 2019-06-27 |
JP6684922B2 (en) | 2020-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108035714A (en) | Spoil zero-emission short face is without coal pillar mining method | |
AU2013358812B2 (en) | Solid-filling coal mining method with two pre-excavated tunnels for advancing | |
CN106223958B (en) | The slant middle thick orebody subregion rock drilling stage falls ore deposit afterwards filling collaboration mining codes | |
CN104405437A (en) | Mining method employing solid filling and fully-mechanized coal mining hybrid working face | |
CN111364998B (en) | Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing | |
CN102392642A (en) | Method for arranging roadways on coal-pillar-free stope | |
CN111691885B (en) | Efficient filling mining method for ultra-thick coal seam | |
CN109681206A (en) | A method of filling control ground settlement of mining | |
CN104564137B (en) | Handling method and device for double-medium stacked supporting and hard top plate type mined-out area | |
CN107524443B (en) | Special big thick ore body strides continuous block caving mining method built on the sand | |
CN109882239B (en) | Open-pit end slope coal-pressing radial filling mining method | |
CN103993881A (en) | Long-wall roadway type cemented filling mining method | |
CN108756875B (en) | The continuous quarrying apparatus of row's open coal mine medium-thickness seam and method in a kind of | |
CN100590294C (en) | Waste filling thin coal seam tunnelling method | |
CN106837335A (en) | Truck cooperates with ore removal sill pillars sublevel caving method | |
CN109630112A (en) | A kind of N00 mining codes for cutting top filling | |
CN116163730A (en) | Method for mining and sealing carbon dioxide by bidirectional forward filling of thin coal layer drilling machine | |
CN110644993B (en) | Z-shaped strip working face mining method | |
CN105971607A (en) | Method for gob-side entry retaining of medium-thickness coal seam | |
CN102287211A (en) | Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof | |
CN111828005B (en) | Face mining method | |
CN208456613U (en) | A kind of Mechanized roadway layout structure | |
CN112647947A (en) | Non-coal-pillar mining method for mining area | |
CN114183140B (en) | Mining and filling method for advanced replacement section coal pillar | |
CN203570313U (en) | Double-alley chain type stoping and filling arrangement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180515 |
|
RJ01 | Rejection of invention patent application after publication |