CN108035714A - Spoil zero-emission short face is without coal pillar mining method - Google Patents

Spoil zero-emission short face is without coal pillar mining method Download PDF

Info

Publication number
CN108035714A
CN108035714A CN201711290733.3A CN201711290733A CN108035714A CN 108035714 A CN108035714 A CN 108035714A CN 201711290733 A CN201711290733 A CN 201711290733A CN 108035714 A CN108035714 A CN 108035714A
Authority
CN
China
Prior art keywords
shortwall
spoil
zero
tunnel
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711290733.3A
Other languages
Chinese (zh)
Inventor
张农
魏群
谢正正
周俊瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201711290733.3A priority Critical patent/CN108035714A/en
Publication of CN108035714A publication Critical patent/CN108035714A/en
Priority to PCT/CN2018/087977 priority patent/WO2019109602A1/en
Priority to AU2018308953A priority patent/AU2018308953A1/en
Priority to JP2018555277A priority patent/JP6684922B2/en
Priority to US16/319,033 priority patent/US20210310356A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention discloses a kind of spoil zero-emission short face without coal pillar mining method, suitable for being used during mine spoil zero discharge treatment.According to actual condition of mines, in pitshaft arrangement short section working face in a region selected around, using adopt entirely fill entirely by the way of short section working face is exploited, the waste filling that produces in mine other exploitation working faces is entered into shortwall, shortwall carries out staying lane along filling face edge and the supporting of entity coal side anchor pole, utilizes the exploitation for staying lane to carry out Adjacent Working Face.The present invention mainly replaces coal body by spoil, realizes the maximization of the utilization of resources, at the same again can complete controlroof, realize that lossless melt of rock stratum is adopted, application value is high.

Description

Spoil zero-emission short face is without coal pillar mining method
Technical field
The present invention relates to a kind of spoil zero-emission short face without coal pillar mining method, mine spoil zero discharge treatment is particularly suitable for When use.
Background technology
China's coal-mine produces more than one hundred million tons of spoil per annual meeting, and the major way of the spoil of colliery processing now is exactly outdoor heap Put, so that substantial amounts of soil can be taken, not only pile things on or destroy original landforms vegetation, and air storage can be easy to from Combustion, noxious material can all cause serious harm to environment for human survival and mining area ecological environment caused by spontaneous combustion.
China has explored the mode of a variety of processing spoils, but is all that colliery first emits spoil mostly, then It is utilized, although therefrom having handled part spoil, while a large amount of dust is also produced in discharge and processing procedure, to environment Secondary pollution is caused, is currently badly in need of a kind of coal-mining method of downhole gangue zero-emission.
The content of the invention
Technical problem:The purpose of the present invention is overcome the shortcomings of in prior art, there is provided a kind of method is simple, realizes effect Good and sound spoil zero-emission short face is without coal pillar mining method.
Technical solution:A kind of spoil zero-emission short face is without coal pillar mining method, it is characterised in that step is as follows:
A. according to actual condition of mines, shortwall is being set near mine shaft station, shortwall exploitation Exploited apart from shaft station 500m~1000m, shortwall to the direction away from shaft station initial position;
B. by mine, other are exploited the spoil produced in working faces and all transport to shortwall, and shortwall is used and is adopted entirely The mode filled entirely is exploited, using spoil to shortwall filling mining, while during exploitation to back and Side wall carries out suspension roof support, and suspension roof support includes filling the supporting of face edge and in entity coal side supporting along shortwall, and Formed after supporting on the outside of shortwall and stay lane, while the digging laneway on the outside of the adjacent shortwall of current shortwall;
C. after tunnelling is complete, open-off cut is tunneled from tunnel to current shortwall, using staying lane and adjacent driving The filling mining working face that tunnel forms adjacent shortwall is continued to be exploited in a manner of Quan Caiquan fills and is returned using spoil Fill out, while shift adjacent tunnel and open-off cut that heading equipment tunnels next shortwall, opened for ensuing shortwall Adopt and prepare;
E. repeat step b and c, so as to fulfill the continuous exploitation of the shortwall of mine processing spoil, until handling completion All spoils of lower generation, realize the zero-emission of ground spoil.
The shortwall is used for underground storage spoil, and shortwall width is 30~50m, is highly coal seam height, Length is 1000m~3000m.The lanewidth degree that stays is 3~6m.The shortwall mining sequence is protrusive with retreating Alternately, tunnelling order is protrusive always to formula.
Beneficial effect:By adopting the above-described technical solution, the present invention has the following advantages that compared with prior art:
(1) solid waste such as all spoils produced in progress of coal mining are by backfilling directly in down-hole treatment, nothing Ground need to be discharged into again, realize the target of spoil zero-emission, avoid spoil discharge and caused by environmental pollution, while significantly Degree reduces the cost of floor treatment spoil.
(2) shortwall exploitation only needs the filling hydraulic support of small-sized coalcutter and ten framves or so, avoids mine The input of high cost, and overcome that production efficiency caused by current filling technique is low, delays the problem of normal production.
(3) shortwall filling mining Hou Liu lanes, reduce tunnelling, reduce the cost of tunnelling.
(4) coal body is replaced by spoil, while eliminates coal column, realize the maximization of the utilization of resources, shortwall is complete Adopt it is complete fill again can complete controlroof, realize that lossless melt of rock stratum is adopted, application value height.
Brief description of the drawings
Fig. 1 is short face advance mining of the spoil zero-emission short face without coal pillar mining method of the present invention;
Fig. 2 is that short face of the spoil zero-emission short face of the present invention without coal pillar mining method is retreated.
In figure:1- shortwalls;2- stays lane;3- tunnels;4- open-off cuts;The adjacent shortwalls of 5-;The adjacent tunnels of 6-.
Embodiment
One embodiment of the present of invention is further described below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, spoil zero-emission short face of the invention is without coal pillar mining method, it is characterised in that step is as follows:
A. according to actual condition of mines, shortwall 1, the shortwall are being set near mine shaft station 1 is used for underground storage spoil, and shortwall width is 30~50m, is highly coal seam height, length is 1000m~3000m, short Opened apart from shaft station 500m~1000m, shortwall 1 to the direction away from shaft station the initial position of working face mining Adopt, sequentially for protrusive and retrusive alternately, the shortwall 1 tunnels 1 working face mining of shortwall Order is protrusive always;
B. by mine, other are exploited the spoil produced in working faces and all transport to shortwall 1, to shortwall 1 using complete Adopt the mode filled entirely to be exploited, using spoil to 1 filling mining of shortwall, while to back during exploitation Suspension roof support is carried out with side wall, suspension roof support includes filling the supporting of face edge and in entity coal side supporting along shortwall 1, and Being formed after supporting in the outside of shortwall 1 and stay lane 2,2 width of lane that stays is 3~6m, while in current shortwall 1 Adjacent 5 outside digging laneway 3 of shortwall;
C. after having been tunneled after tunnel 3, open-off cut 4 is tunneled from tunnel 3 to current shortwall 1, using staying lane 2 and adjacent pick Into tunnel 3 form the filling mining working face of adjacent shortwall 5 and continue in a manner of Quan Caiquan fills to be exploited and utilized Gangue refill, while adjacent tunnel 6 and open-off cut 4 that heading equipment tunnels next shortwall are shifted, it is ensuing short Working face mining is prepared;
E. repeat step b and c, so as to fulfill the continuous exploitation of the shortwall 1 of mine processing spoil, until handling completion All spoils of lower generation, realize the zero-emission of downhole gangue.

Claims (4)

1. a kind of spoil zero-emission short face is without coal pillar mining method, it is characterised in that step is as follows:
A. according to actual condition of mines, shortwall is being set near mine shaft station(1), of shortwall exploitation Beginning positional distance shaft station 500m ~ 1000m, shortwall(1)Exploited to the direction away from shaft station;
B. by mine, other are exploited the spoil produced in working faces and all transport to shortwall(1), to shortwall(1)Using complete Adopt the mode filled entirely to be exploited, using spoil to shortwall(1)Filling mining, while to tunnel during exploitation (3)Top plate and side wall carry out suspension roof support, suspension roof support is included along shortwall(1)Filling face edge supporting and in entity The collateral shield of coal, and in shortwall after supporting(1)Outside forms and stays lane(2), while in current shortwall(1)It is adjacent short Working face(5)Outside digging laneway(3);
C. tunnel is treated(3)After having tunneled, from tunnel(3)To current shortwall(1)Tunnel open-off cut(4), using staying lane(2)And The tunnel of adjacent driving(3)Form adjacent shortwall(5)Filling mining working face continue carried out in a manner of Quan Caiquan fills Exploit and utilize gangue refill, while shift the adjacent tunnel that heading equipment tunnels next shortwall(6)And open-off cut (4), prepare for the exploitation of ensuing shortwall;
E. repeat step b and c, so as to fulfill the shortwall of mine processing spoil(1)Continuous exploitation, until handling under completion All spoils produced, realize the zero-emission of downhole gangue.
2. spoil zero-emission short face according to claim 1 is without coal pillar mining method, it is characterized in that:The shortwall (1)Spoil is stored for underground, shortwall width is 30 ~ 50m, is highly coal seam height, length is 1000m ~ 3000m.
3. spoil zero-emission short face according to claim 1 is without coal pillar mining method, it is characterized in that:Described stays lane(2)It is wide Spend for 3 ~ 6m.
4. spoil zero-emission short face according to claim 1 is without coal pillar mining method, it is characterized in that:The shortwall (1)Mining sequence for protrusive and retrusive alternately, the tunnel(3)Tunneling sequence is protrusive always.
CN201711290733.3A 2017-12-08 2017-12-08 Spoil zero-emission short face is without coal pillar mining method Pending CN108035714A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201711290733.3A CN108035714A (en) 2017-12-08 2017-12-08 Spoil zero-emission short face is without coal pillar mining method
PCT/CN2018/087977 WO2019109602A1 (en) 2017-12-08 2018-05-23 Short-face coal-pillar-free mining method having zero gangue discharge
AU2018308953A AU2018308953A1 (en) 2017-12-08 2018-05-23 Zero-gangue-discharge short-wall face pillar-free mining method
JP2018555277A JP6684922B2 (en) 2017-12-08 2018-05-23 Zero-discharging short-faced pillarless coal mining method
US16/319,033 US20210310356A1 (en) 2017-12-08 2018-05-23 Zero-gangue-discharge short-wall face pillar-free mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711290733.3A CN108035714A (en) 2017-12-08 2017-12-08 Spoil zero-emission short face is without coal pillar mining method

Publications (1)

Publication Number Publication Date
CN108035714A true CN108035714A (en) 2018-05-15

Family

ID=62096112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711290733.3A Pending CN108035714A (en) 2017-12-08 2017-12-08 Spoil zero-emission short face is without coal pillar mining method

Country Status (5)

Country Link
US (1) US20210310356A1 (en)
JP (1) JP6684922B2 (en)
CN (1) CN108035714A (en)
AU (1) AU2018308953A1 (en)
WO (1) WO2019109602A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019109602A1 (en) * 2017-12-08 2019-06-13 中国矿业大学 Short-face coal-pillar-free mining method having zero gangue discharge
CN110424966A (en) * 2019-07-25 2019-11-08 中国矿业大学 A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method
CN111156000A (en) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 Low seam coal-pillar-free retreating type coal mining method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130899B (en) * 2019-07-09 2019-11-05 北京中矿创新联盟能源环境科学研究院 Coal mining method without coal pillar, roadway and tunneling in whole mining area
CN116084945A (en) * 2022-11-30 2023-05-09 天地(榆林)开采工程技术有限公司 Fully-separated filling method for short-wall fully-mechanized coal mining face mining

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1936271A (en) * 2006-08-21 2007-03-28 山东盛泉矿业有限公司 Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN102261247A (en) * 2011-08-02 2011-11-30 中国矿业大学 Secondary coal-mining method for reversely filling paste in stripes
CN103410515A (en) * 2013-08-23 2013-11-27 山东科技大学 Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method
CN106522948A (en) * 2016-11-25 2017-03-22 山东科技大学 Short-wall waste rock gluing continuous mining and continuous filling mining method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3852967A (en) * 1970-11-04 1974-12-10 Dow Chemical Co Method of filling subterranean voids with a particulate material
CN1483921A (en) * 2002-09-18 2004-03-24 杨新兴 Cavern filling type coal mining method
JP4459966B2 (en) * 2007-01-05 2010-04-28 栄一 鈴木 Stone mining method
CN105089668A (en) * 2014-05-19 2015-11-25 梁捷 Longwall working face coal-pillar-free mining method
CN108035714A (en) * 2017-12-08 2018-05-15 中国矿业大学 Spoil zero-emission short face is without coal pillar mining method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1936271A (en) * 2006-08-21 2007-03-28 山东盛泉矿业有限公司 Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock
CN102261247A (en) * 2011-08-02 2011-11-30 中国矿业大学 Secondary coal-mining method for reversely filling paste in stripes
CN103410515A (en) * 2013-08-23 2013-11-27 山东科技大学 Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method
CN106522948A (en) * 2016-11-25 2017-03-22 山东科技大学 Short-wall waste rock gluing continuous mining and continuous filling mining method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019109602A1 (en) * 2017-12-08 2019-06-13 中国矿业大学 Short-face coal-pillar-free mining method having zero gangue discharge
CN110424966A (en) * 2019-07-25 2019-11-08 中国矿业大学 A kind of pumping of ultrahigh water material filling working face spoil stays lane without pillar mining method
CN111156000A (en) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 Low seam coal-pillar-free retreating type coal mining method

Also Published As

Publication number Publication date
JP2020504253A (en) 2020-02-06
US20210310356A1 (en) 2021-10-07
WO2019109602A1 (en) 2019-06-13
AU2018308953A1 (en) 2019-06-27
JP6684922B2 (en) 2020-04-22

Similar Documents

Publication Publication Date Title
CN108035714A (en) Spoil zero-emission short face is without coal pillar mining method
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN106223958B (en) The slant middle thick orebody subregion rock drilling stage falls ore deposit afterwards filling collaboration mining codes
CN104405437A (en) Mining method employing solid filling and fully-mechanized coal mining hybrid working face
CN111364998B (en) Single-side edge filling and tunneling mining method for open-pit mine end slope coal pressing
CN102392642A (en) Method for arranging roadways on coal-pillar-free stope
CN111691885B (en) Efficient filling mining method for ultra-thick coal seam
CN109681206A (en) A method of filling control ground settlement of mining
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN107524443B (en) Special big thick ore body strides continuous block caving mining method built on the sand
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN103993881A (en) Long-wall roadway type cemented filling mining method
CN108756875B (en) The continuous quarrying apparatus of row's open coal mine medium-thickness seam and method in a kind of
CN100590294C (en) Waste filling thin coal seam tunnelling method
CN106837335A (en) Truck cooperates with ore removal sill pillars sublevel caving method
CN109630112A (en) A kind of N00 mining codes for cutting top filling
CN116163730A (en) Method for mining and sealing carbon dioxide by bidirectional forward filling of thin coal layer drilling machine
CN110644993B (en) Z-shaped strip working face mining method
CN105971607A (en) Method for gob-side entry retaining of medium-thickness coal seam
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN111828005B (en) Face mining method
CN208456613U (en) A kind of Mechanized roadway layout structure
CN112647947A (en) Non-coal-pillar mining method for mining area
CN114183140B (en) Mining and filling method for advanced replacement section coal pillar
CN203570313U (en) Double-alley chain type stoping and filling arrangement structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180515

RJ01 Rejection of invention patent application after publication