CN103474909B - Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string - Google Patents

Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string Download PDF

Info

Publication number
CN103474909B
CN103474909B CN201310439689.3A CN201310439689A CN103474909B CN 103474909 B CN103474909 B CN 103474909B CN 201310439689 A CN201310439689 A CN 201310439689A CN 103474909 B CN103474909 B CN 103474909B
Authority
CN
China
Prior art keywords
electrician
earth potential
drainage thread
insulator
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310439689.3A
Other languages
Chinese (zh)
Other versions
CN103474909A (en
Inventor
肖春伟
朱玉伟
周乐超
金会军
王华宾
平林涛
范松坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201310439689.3A priority Critical patent/CN103474909B/en
Publication of CN103474909A publication Critical patent/CN103474909A/en
Application granted granted Critical
Publication of CN103474909B publication Critical patent/CN103474909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of method that drainage thread supports expansion live-line replacing multiloop strain insulator string, in the method operating process, without having a power failure, upper phase drainage thread with operation cross-arm spacing is less, be unsatisfactory for normal operation space requirement in the case of, operating personnel can effectively arrive multiloop strain rod tower cross arm end and treat that operation edge place carries out detection or the replacing of multiple-loop line road insulator, easy and simple to handle, safe and reliable, working performance is high.Can be widely applied to earth potential live replacing straight line bunch of insulator operation, in the work of the electric operating such as earth potential live replacing linear string monolithic insulator, earth potential live detection of straight lines zero resistance insulator, earth potential live replacing drainage thread transfusion bottle.

Description

Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string
Technical field
The present invention relates to change multiloop linear insulator technical field, particularly relate to a kind of drainage thread support expansion live-line replacing many The method of loop strain insulator string.
Background technology
At present, in Regulation, staff when multiple-loop line road strain rod tower carries out isolator detecting or charged for replacement, It is frequently encountered by phase drainage thread less with operation cross-arm spacing, is unsatisfactory for the situation of normal operation space requirement, it is impossible to by work people Member directly carries out multiple-loop line road strain rod tower and carries out isolator detecting or charged for replacement, and its effective operation space does not allow operation people Member enters, traditional detection or the method for replacing insulator under electrified, generally uses insulating bar remotely to operate or do circuit and has a power failure Measure, insulating bar remotely operates, and wastes time and energy, inefficiency;Power down is taked then to cause large area electrical network to break Electricity, drastically influence power supply reliability and the power-on time of electrical network.
Summary of the invention
It is an object of the invention to aim to provide a kind of method that drainage thread supports expansion live-line replacing multiloop strain insulator string, should In method operating process, it is not necessary to have a power failure, at upper phase drainage thread with operation cross-arm spacing is less, be unsatisfactory for normal operation space requirement In the case of, operating personnel can effectively arrive multiloop strain rod tower cross arm end, and to treat that operation edge place carries out multiple-loop line road exhausted The detection of edge or replacing, easy and simple to handle, safe and reliable, working performance is high.
Be the technical scheme is that a kind of drainage thread support expansion live-line replacing multiloop strain insulator is exhausted by realizing the purpose of the present invention The method of edge substring, comprises the steps:
1) application inactive line reclosing, the verification dual title of circuit and bar number;
2) division of labor and lines of specialities, safety measure and points for attention are clearly made;
3) staff uses the insulation resistance of megameter detection insulating tool, checks that bearing tool is the most intact flexibly, and screening clothing is No intact;
4) at earth potential electrician, isoelectric level electrician Deng Ta to cross-arm, it is, hangs up properly seat belt, insulation transmission rope is suspended on suitable position Putting, earth potential electrician coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is secured in place, logical Cross drainage thread and support expansion device by the drainage thread above job position to outer support expansion;
5) earth potential electrician coordinates in special isolation pivoted arm ladder system to tower and be fixed on tower body appropriate location, isoelectric level with ground electrician Electrician fixes two anti-ropes, and ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, isoelectric level electrician Enter highfield;
6) the front card of fixture is passed to isoelectric level electrician with insulating bar by earth potential electrician, and front card is connected in horizontal stroke by isoelectric level electrician In load, rear card is placed on cross-arm by earth potential electrician, adjusts the adjusting screw of fixture simultaneously;
7) old insulator chain is removed:
A) on tower, earth potential electrician, isoelectric level electrician coordinate mounting bracket bottle stand;
B) on isoelectric level electrician and Ta, the locking pin at two ends is taken out by earth potential electrician respectively;
C) earth potential electrician tightens up leading screw, makes fixture stress, isoelectric level electrician by insulator chain conductor wire end disengage, earth potential electrician with Isoelectric level electrician coordinates the disengagement of insulator chain cross-arm-end;
8) earth potential electrician and ground electrician fit through insulation transmission rope old insulator chain is put down, follow with stylish insulator chain To operating position;
9) new insulator chain is installed: the installation procedure of new insulator chain is contrary to the above;
10) installing two ends locking pin, earth potential electrician unclamps leading screw, checks insulator chain stressing conditions, it is ensured that safe and reliable;
11) isopotential electrical coordinates dismounting Work tool with earth potential electrician, prepares to exit highfield;
12), after isopotential electrical work area is steady, highfield is left in signal, and ground electrician controls special isolation pivoted arm ladder and pulls it toward at cross-arm, Isoelectric level electrician is rapidly separated, steadily to cross-arm;
13) earth potential electrician removes on tower power tool and is transferred to ground by insulation transmission rope, and drainage thread is recovered shape to operation State;
14) after on tower, electrician checks that on tower, nothing leaves over instrument, the steady lower tower of back of the body insulation transmission rope;
15) finisher's utensil, site clearing, recover circuit re-switching.
In described step 4, earth potential electrician uses drainage thread to support expansion device by the drainage thread above job position to outer support expansion After, above job position, cross-arm corresponding position hangs the early warning type spacing umbrella of insulation.
When the insulator chain changed is dish type porcelain insulator string, after described step 4, ground electrician assembles surveying zero bar Passing to electrician on tower with insulation transmission rope afterwards, on tower, electrician detects the zero resistance insulator quantity of insulator chain to be changed.
Drainage thread is fixed and to outer support by the present invention by using drainage thread to support expansion device, has effectively ensured that drainage thread supports and has expanded Away from stability, add the distance between phase drainage thread and operation cross-arm, ensured that earth potential working personnel make at lower phase cross-arm Can there be enough working spaces during industry, thus have effectively achieved earth potential working personnel and arrive multiloop strain rod tower cross-arm-end Portion treat operation edge place carry out multiple-loop line road insulator detection or change operation, closely operation, easy and simple to handle, safety can Leaning on, working performance is high, and operation quality is secure.
Earth potential electrician of the present invention coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is secured in place, Effectively support expansion device by the drainage thread above job position to outer support expansion by drainage thread, thus ensure earth potential Operating personnel can have enough working spaces when lower phase cross-arm operation;Then earth potential electrician coordinates will insulate with ground electrician Pivoted arm ladder is fixed on tower body appropriate location, installs fixing reliable, and is easy to the rotation of pivoted arm ladder, enables isoelectric level electrician to enter safely Enter or depart from highfield;Earth potential electrician and isoelectric level electrician coordinate and utilize fixture to be connected with cross-arm by wire, it is achieved to wire and The regulation of cross-arm distance, in order to dismantle and install insulator chain;Then earth potential electrician and isoelectric level electrician's coordinated complete peace Fill bottle-holding rack, taking-up insulator chain two ends locking pin, tighten up leading screw disengagement insulator chain conductor wire end, disengagement insulator chain cross-arm-end Deng a series of activities, it is achieved the dismounting to old insulator chain;Then earth potential electrician coordinates old insulator chain with ground electrician Reach ground, reach operating position with stylish insulator chain;According still further to the flow process contrary with removing old insulator chain, new insulation is installed Substring, and unclamp leading screw inspection insulator chain stressing conditions, it is ensured that safe and reliable;Thus have effectively achieved new and old insulator chain Replacing, earth potential electrician and isoelectric level electrician closely operate, easy to operate, working performance is high, and reliable in quality has guarantor Barrier.Isoelectric level electrician, by insulation pivoted arm ladder, is rapidly separated highfield under the control of ground electrician, the most mobile to cross-arm, Avoid isoelectric level electrician to produce phenomenon of arc discharge when departing from highfield, ensure operating personnel and the safety of grid equipment;Removing tower Upper power tool after being transferred to ground, puts down drainage thread, recovers state to operation, make power system restoration to normal table shape State.
The drainage thread of the present invention supports the method for expansion live-line replacing multiloop strain insulator string, can be widely applied to earth potential band Charged renewal straight line bunch of insulator operation, earth potential live replacing linear string monolithic insulator, earth potential live detection of straight lines null value In the electric operating work such as insulator, earth potential live replacing drainage thread transfusion bottle, support expansion measure by drainage thread, effectively Add the distance between phase drainage thread and operation cross-arm, ensured that earth potential working personnel can have foot when lower phase cross-arm operation Enough working spaces, thus have effectively achieved earth potential working personnel and arrive multiloop strain rod tower cross arm end and treat operation edge Place carries out the detection of multiple-loop line road insulator or changes operation, closely operation, easy and simple to handle, operating flexibility degree height, effectively Ground improves working performance height, multi-mass work guarantee, makes upkeep operation personnel have the more job task of more time-triggered protocol, carries The high security maintenance dynamics to operation of power networks, ensures electrical network and the safe and stable operation of electrical equipment.
Detailed description of the invention
Drainage thread of the present invention supports the method for expansion live-line replacing multiloop strain insulator string, employing following steps:
Step 1: application inactive line reclosing, the verification dual title of circuit and bar number;
Work director goes into operation to dispatching of power netwoks person's application, and content is: this artificial work exists day by day director XXX, X X month X Strain insulator string operation, this job request inactive line reclosing device is changed, if meeting on XX kV XX multi-loop line Line tripping, without contact, must not send by force;Obtain scheduling grant, the verification dual title of circuit and bar number;Avoid circuit to go out When now tripping, dispatcher's strong power transmission in the case of unwitting causes grid equipment to damage or the generation of human casualty accident;Logical Cross the dual title of verification circuit and bar number, it is to avoid fault rod climbing, change the generation of insulation by mistake, stop unnecessary human and material resources, wealth Power and waste of time, improve working performance.
Step 2: clearly make division of labor and lines of specialities, safety measure and points for attention;
Job crew member line up, and work ticket, the task that hands over work to one's successor, safety measure and technical measures are read out in work director scene;Look into See that operating personnel's mental status, dressing situation and Work tool are the most intact complete;Explain dangerous spot and preventive measure, specify operation The division of labor and safety measure and points for attention;Safety first, ensures that operating personnel has a good mental status, and the moment keeps Watchful, specify safety measure and points for attention, ensure the safety in operation process to greatest extent.
Step 3: staff uses the insulation resistance of megameter detection insulating tool, checks that bearing tool is the most intact flexibly, shielding Take the most intact;
Ensure that power tool is safe and reliable, flexible, it is to avoid the fortuitous event caused due to instrument inconvenience in operating process occurs.
Step 4: at earth potential electrician, isoelectric level electrician Deng Ta to cross-arm, be, hang up properly seat belt, is suspended on suitable by insulation transmission rope Working as position, earth potential electrician coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is fixed on suitable position Putting, earth potential electrician supports expansion device by the drainage thread above job position to outer support expansion and in operation position by drainage thread Put cross-arm corresponding position, top and hang the early warning type spacing umbrella of insulation;
When the insulator chain changed is dish type porcelain insulator string, after described step 4, ground electrician assembles surveying zero bar Passing to electrician on tower with insulation transmission rope afterwards, on tower, electrician detects the zero resistance insulator quantity of insulator chain to be changed;
Described drainage thread supports expansion device and includes that supporting mechanism and fixed mechanism, described supporting mechanism can use applicant's earlier application Livewire work drain supports operation instrument, and its Application No. 201120419582.9, described fixed mechanism can use applicant formerly The multiloop universal fixing device of livewire work support bar of application, its Application No. 201120419578.2.Carry out drainage thread support During expansion, the connecting plate first rotating livewire work drain support operation instrument makes gear fork increase with the gap at hook position, and ground is electric Drainage thread is inserted in hook by position electrician by action bars, and stumbling due to hook can not rotate on drainage thread, passes through rotation process Bar, gear fork is gradually reduced with the gap in hook and by the closure of openings of hook, and drainage thread will not be deviate from, by 2 from hook Drainage thread just can outwards be supported and come by individual action bars, and it is universal solid that 2 action bars are respectively adopted multiloop livewire work support bar Determining device, be fixed on cross-arm, the U-shaped deck of the universal fixing device of multiloop livewire work support bar can be with holding at cross-arm Any position, locked by trip bolt, the hook of action bars afterbody is through in the ring head of eye bolt, can make action bars Position immobilizes, by eye bolt rotation in U-shaped deck, it is achieved the all-directional rotation of action bars, by regulation The angle of the universal fixing device of multiloop livewire work support bar and the length of action bars can realize fixing action bars and drain Alignment outer support expansion, thus ensured that earth potential working personnel can have enough working spaces when lower phase cross-arm operation, logical Cross employing and rotate livewire work drain support operation instrument and the universal fixing device of multiloop livewire work support bar, make drainage thread Support expansion is simpler, operates easier, safe and reliable secure, drastically increases working performance.
Step 5: earth potential electrician coordinates in special isolation pivoted arm ladder system to tower and be fixed on tower body appropriate location with ground electrician, etc. Current potential electrician fixes two anti-ropes, and ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, isoelectric level Electrician enters highfield;
Earth potential electrician coordinates with ground electrician special isolation pivoted arm ladder is fixed on tower body appropriate location, installs fixing reliable, and is easy to Pivoted arm ladder rotates, and isoelectric level electrician fixes two anti-ropes, applies for entering highfield to work director, obtains work director same After meaning, ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, enables isoelectric level electrician to enter safely Entering highfield, by ground, electrician pulls tail rope, makes isoelectric level electrician's quick and stable carry out highfield, it is to avoid sending out of phenomenon of arc discharge Raw, effectively ensure the personal safety of isoelectric level electrician.
Step 6: the front card of fixture is passed to isoelectric level electrician with insulating bar by earth potential electrician, isoelectric level electrician is by front card clamping On cross-arm, rear card is placed on cross-arm by earth potential electrician, adjusts the adjusting screw of fixture simultaneously;
By front card and rear card, effectively ensure that special isolation pivoted arm ladder is reliable and stable, it is to avoid special isolation pivoted arm ladder is at operation process The middle generation that rotational displacement situation occurs.
Step 7: old insulator chain is removed:
A) on tower, earth potential electrician, isoelectric level electrician coordinate mounting bracket bottle stand;
B) on isoelectric level electrician and Ta, the locking pin at two ends is taken out by earth potential electrician respectively;
C) earth potential electrician tightens up leading screw, makes fixture stress, isoelectric level electrician by insulator chain conductor wire end disengage, earth potential electrician with Isoelectric level electrician coordinates the disengagement of insulator chain cross-arm-end;
Earth potential electrician operates with isoelectric level electrician's coordinated, is and closely operates, easy to operate, and working performance is high, and quality can By secure.
Step 8: earth potential electrician and ground electrician fit through insulation transmission rope and put down by old insulator chain, with stylish insulator chain Follow to operating position;Transmittance process notes controlling well the position of the most upper and lower two insulator string strings, prevents mutually to touch Hit.
Step 9: new insulator chain is installed: the installation procedure of new insulator chain is contrary to the above;
Step 10: install two ends locking pin, earth potential electrician unclamps leading screw, checks insulator chain stressing conditions, it is ensured that safety can Lean on.
Step 11: isopotential electrical coordinates dismounting Work tool with earth potential electrician, prepares to exit highfield.
Step 12: after isopotential electrical work area is steady, highfield is left in signal, and ground electrician controls special isolation pivoted arm ladder and pulls it toward horizontal stroke At load, isoelectric level electrician is rapidly separated, steadily to cross-arm;Avoid the generation of phenomenon of arc discharge, effectively ensure isoelectric level electrician Personal safety.
Step 13: earth potential electrician removes on tower power tool and is transferred to ground by insulation transmission rope, recovers drainage thread to making State before industry.
Step 14: after electrician checks that on tower, nothing leaves over instrument on tower, the steady lower tower of back of the body insulation transmission rope.
Step 15: finisher's utensil, site clearing, recover circuit re-switching.
Ground electrician arranges all Work tools, and work director or guardian check Work tool site clearing;Work director converges to scheduling Report, content is: this artificial work director XXX, XX kV XXX circuit charged changing tension-resisting insulator work is tied Bundle, on tower, personnel withdraw, and without legacy on tower, on line, wire, insulator and gold utensil etc. have restored to the original state, can recover line Road reclosing device.
Embodiment one
Drainage thread is utilized to support method charged for replacement on certain 220kV circuit of expansion live-line replacing multiloop strain insulator string Strain insulator string, comprises the steps:
1) work director goes into operation to dispatching of power netwoks person's application: this artificial work exists day by day director XXX, X X month X Charged changing tension-resisting insulator on 220kV XX circuit, this job request inactive line reclosing device, jump if meeting circuit Lock, without contact, must not send by force;After obtaining scheduling grant, the verification dual title of circuit and bar number;
2) work ticket, the task that hands over work to one's successor, safety measure and technical measures are read out in work director scene;Check operating personnel's spirit Situation, dressing situation and Work tool are the most intact complete;Explain dangerous spot and preventive measure, clearly make division of labor and lines of specialities and safety is arranged Execute and points for attention;
3) staff uses the insulation resistance of megameter detection insulating tool, checks that bearing tool is the most intact flexibly, and screening clothing is No intact;
4) at earth potential electrician, isoelectric level electrician Deng Ta to cross-arm, it is, hangs up properly seat belt, insulation transmission rope is suspended on suitable position Putting, earth potential electrician coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is secured in place, logical Cross drainage thread and support expansion device by the drainage thread above job position to outer support expansion;
5) earth potential electrician coordinates in special isolation pivoted arm ladder system to tower and be fixed on tower body appropriate location, isoelectric level with ground electrician Electrician fixes two anti-ropes, and ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, isoelectric level electrician Enter highfield;
6) the front card of fixture is passed to isoelectric level electrician with insulating bar by earth potential electrician, and isoelectric level electrician is connected in before pacifying On cross-arm, rear card is placed on cross-arm by earth potential electrician, adjusts the adjusting screw of fixture simultaneously;
7) old insulator chain is removed:
A) on tower, earth potential electrician, isoelectric level electrician coordinate mounting bracket bottle stand;
B) on isoelectric level electrician and Ta, the locking pin at two ends is taken out by earth potential electrician respectively;
C) earth potential electrician tightens up leading screw, makes fixture stress, isoelectric level electrician by insulator chain conductor wire end disengage, earth potential electrician with Isoelectric level electrician coordinates the disengagement of insulator chain cross-arm-end;
8) earth potential electrician and ground electrician fit through insulation transmission rope old insulator chain is put down, follow with stylish insulator chain To operating position;
9) new insulator chain is installed: the installation procedure of new insulator chain is contrary to the above;
10) installing two ends locking pin, earth potential electrician unclamps leading screw, checks insulator chain stressing conditions, it is ensured that safe and reliable;
11) isopotential electrical coordinates dismounting Work tool with earth potential electrician, prepares to exit highfield;
12), after isopotential electrical work area is steady, highfield is left in signal, and ground electrician controls special isolation pivoted arm ladder and pulls it toward at cross-arm, Isoelectric level electrician is rapidly separated, steadily to cross-arm;
13) earth potential electrician removes on tower power tool and is transferred to ground by insulation transmission rope, and drainage thread is recovered shape to operation State;
14) after on tower, electrician checks that on tower, nothing leaves over instrument, the steady lower tower of back of the body insulation transmission rope;
15) ground electrician arranges all Work tools, and work director or guardian check Work tool site clearing;
16) work director reports to scheduling: this artificial work director xxx, 220kV XX circuit changing tension insulator in live line String work terminates, and personnel withdraw, and without legacy on tower, on wire, wire, insulator and gold utensil etc. have restored to the original state, Circuit re-switching device can be recovered.
Embodiment two
Drainage thread is utilized to support method charged for replacement on certain 220kV circuit of expansion live-line replacing multiloop strain insulator string Dish type porcelain strain insulator string, comprises the steps:
1) application inactive line reclosing, the verification dual title of circuit and bar number;
2) division of labor and lines of specialities, safety measure and points for attention are clearly made;
3) staff uses the insulation resistance of megameter detection insulating tool, checks that bearing tool is the most intact flexibly, and screening clothing is No intact;
4) at earth potential electrician, isoelectric level electrician Deng Ta to cross-arm, it is, hangs up properly seat belt, insulation transmission rope is suspended on suitable position Putting, earth potential electrician coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is secured in place, logical Cross drainage thread and support expansion device by the drainage thread above job position to outer support expansion, cross-arm corresponding position above job position Hang the early warning type spacing umbrella ground electrician of insulation and pass to tower on electrician with insulation transmission rope surveying after zero bar assembles, electrician on tower Detect the zero resistance insulator quantity of insulator chain to be changed;
5) earth potential electrician coordinates in special isolation pivoted arm ladder system to tower and be fixed on tower body appropriate location with ground electrician, waits electricity Position electrician fixes two anti-ropes, and ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, isopotential electrical Work enters highfield;
6) the front card of fixture is passed to isoelectric level electrician with insulating bar by earth potential electrician, and isoelectric level electrician is connected in horizontal stroke before pacifying In load, rear card is placed on cross-arm by earth potential electrician, adjusts the adjusting screw of fixture simultaneously;
7) old insulator chain is removed:
A) on tower, earth potential electrician, isoelectric level electrician coordinate mounting bracket bottle stand;
B) on isoelectric level electrician and Ta, the locking pin at two ends is taken out by earth potential electrician respectively;
C) earth potential electrician tightens up leading screw, makes fixture stress, and insulator chain conductor wire end is disengaged by isoelectric level electrician, earth potential electrician Coordinate with isoelectric level electrician and insulator chain cross-arm-end is disengaged;
8) earth potential electrician and ground electrician fit through insulation transmission rope old insulator chain is put down, follow with stylish insulator chain To operating position;
9) new insulator chain is installed: the installation procedure of new insulator chain is contrary to the above;
10) installing two ends locking pin, earth potential electrician unclamps leading screw, checks insulator chain stressing conditions, it is ensured that safe and reliable;
11) isopotential electrical coordinates dismounting Work tool with earth potential electrician, prepares to exit highfield;
12), after isopotential electrical work area is steady, highfield is left in signal, and ground electrician controls special isolation pivoted arm ladder and pulls it toward at cross-arm, Isoelectric level electrician is rapidly separated, steadily to cross-arm;
13) earth potential electrician removes on tower power tool and is transferred to ground by insulation transmission rope, and drainage thread is recovered shape to operation State;
14) after on tower, electrician checks that on tower, nothing leaves over instrument, the steady lower tower of back of the body insulation transmission rope;
15) finisher's utensil, site clearing, recover circuit re-switching.
Embodiment three
Drainage thread is utilized to support method charged for replacement on certain 110kV circuit of expansion live-line replacing multiloop strain insulator string Dish type porcelain strain insulator string, comprises the steps:
1) application inactive line reclosing, the verification dual title of circuit and bar number;
2) division of labor and lines of specialities, safety measure and points for attention are clearly made;
3) staff uses the insulation resistance of megameter detection insulating tool, checks that bearing tool is the most intact flexibly, and screening clothing is No intact;
4) at earth potential electrician, isoelectric level electrician Deng Ta to cross-arm, it is, hangs up properly seat belt, insulation transmission rope is suspended on suitable position Putting, earth potential electrician coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is secured in place, logical Cross drainage thread and support expansion device by the drainage thread above job position to outer support expansion;After ground electrician assembles survey zero bar Passing to electrician on tower with insulation transmission rope, on tower, electrician detects the zero resistance insulator quantity of insulator chain to be changed;
5) earth potential electrician coordinates in special isolation pivoted arm ladder system to tower and be fixed on tower body appropriate location, isoelectric level with ground electrician Electrician fixes two anti-ropes, and ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, isoelectric level electrician Enter highfield;
6) the front card of fixture is passed to isoelectric level electrician with insulating bar by earth potential electrician, and isoelectric level electrician is connected in horizontal stroke before pacifying In load, rear card is placed on cross-arm by earth potential electrician, adjusts the adjusting screw of fixture simultaneously;
7) old insulator chain is removed:
A) on tower, earth potential electrician, isoelectric level electrician coordinate mounting bracket bottle stand;
B) on isoelectric level electrician and Ta, the locking pin at two ends is taken out by earth potential electrician respectively;
C) earth potential electrician tightens up leading screw, makes fixture stress, isoelectric level electrician by insulator chain conductor wire end disengage, earth potential electrician with Isoelectric level electrician coordinates the disengagement of insulator chain cross-arm-end;
8) earth potential electrician and ground electrician fit through insulation transmission rope old insulator chain is put down, follow with stylish insulator chain To operating position;
9) new insulator chain is installed: the installation procedure of new insulator chain is contrary to the above;
10) installing two ends locking pin, earth potential electrician unclamps leading screw, checks insulator chain stressing conditions, it is ensured that safe and reliable;
11) isopotential electrical coordinates dismounting Work tool with earth potential electrician, prepares to exit highfield;
12), after isopotential electrical work area is steady, highfield is left in signal, and ground electrician controls special isolation pivoted arm ladder and pulls it toward at cross-arm, Isoelectric level electrician is rapidly separated, steadily to cross-arm;
13) earth potential electrician removes on tower power tool and is transferred to ground by insulation transmission rope, and drainage thread is recovered shape to operation State;
14) after on tower, electrician checks that on tower, nothing leaves over instrument, the steady lower tower of back of the body insulation transmission rope;
15) finisher's utensil, site clearing, recover circuit re-switching.

Claims (4)

1. the method that drainage thread supports expansion live-line replacing multiloop strain insulator string, it comprises the steps:
1) application inactive line reclosing, the verification dual title of circuit and bar number;
2) division of labor and lines of specialities, safety measure and points for attention are clearly made;
3) staff uses the insulation resistance of megameter detection insulating tool, checks that bearing tool is the most intact flexibly, and whether screening clothing Intact;
4) use drainage thread to support expansion device and carry out the support expansion of drainage thread;
5) the front card of fixture is passed to isoelectric level electrician with insulating bar by earth potential electrician, and front card is connected in cross-arm by isoelectric level electrician On, rear card is placed on cross-arm by earth potential electrician, adjusts the adjusting screw of fixture simultaneously;
6) old insulator chain is removed:
A. on tower, earth potential electrician, isoelectric level electrician coordinate mounting bracket bottle stand;
B. on isoelectric level electrician and Ta, the locking pin at two ends is taken out by earth potential electrician respectively;
7) earth potential electrician and ground electrician fit through insulation transmission rope old insulator chain is put down, with stylish insulator chain follow to Operating position;
8) new insulator chain is installed: the installation procedure of new insulator chain is contrary to the above;
9) installing two ends locking pin, earth potential electrician unclamps leading screw, checks insulator chain stressing conditions, it is ensured that safe and reliable;
10) isopotential electrical coordinates dismounting Work tool with earth potential electrician, prepares to exit highfield;
11) earth potential electrician removes on tower power tool and is transferred to ground by insulation transmission rope, and drainage thread is recovered shape to operation State;
12) after on tower, electrician checks that on tower, nothing leaves over instrument, the steady lower tower of back of the body insulation transmission rope;
13) finisher's utensil, site clearing, recover circuit re-switching;
It is characterized in that: the method also includes:
A. earth potential electrician coordinates in special isolation pivoted arm ladder system to tower and be fixed on tower body appropriate location, isopotential electrical with ground electrician Work fixes two anti-ropes, and ground electrician controls special isolation pivoted arm ladder tail rope, is pulled at wire operation, and isoelectric level electrician enter Enter highfield;
B., after isopotential electrical work area is steady, highfield is left in signal, and ground electrician controls special isolation pivoted arm ladder and pulls it toward at cross-arm, etc. Current potential electrician is rapidly separated, steadily to cross-arm;
Described step 4) in, at earth potential electrician, isoelectric level electrician Deng Ta to cross-arm, it is, hangs up properly seat belt, by insulation transmission rope Being suspended on appropriate location, earth potential electrician coordinates with ground electrician and drainage thread supports expansion device is transferred on tower, and is fixed on Appropriate location, supports expansion device by the drainage thread above job position to outer support expansion by drainage thread;
Described step 6) in, earth potential electrician tightens up leading screw, makes fixture stress, and insulator chain conductor wire end is disengaged by isoelectric level electrician, Earth potential electrician coordinates the disengagement of insulator chain cross-arm-end with isoelectric level electrician.
2. the method that drainage thread as claimed in claim 1 supports expansion live-line replacing multiloop strain insulator string, its feature Being: in described step 4, earth potential electrician uses drainage thread to support expansion device and is outwards propped up by the drainage thread above job position After support expansion, above job position, cross-arm corresponding position hangs the early warning type spacing umbrella of insulation.
3. the method that drainage thread as claimed in claim 1 or 2 supports expansion live-line replacing multiloop strain insulator string, its Being characterised by: when the insulator chain changed is dish type porcelain insulator string, after described step 4, ground electrician is surveying Zero bar passes to electrician on tower with insulation transmission rope after assembling, and on tower, electrician detects the zero resistance insulator of insulator chain to be changed Quantity.
4. the method that drainage thread as claimed in claim 1 or 2 supports expansion live-line replacing multiloop strain insulator string, its It is characterised by can be widely applied to earth potential replacement straight line bunch of insulator operation, earth potential replacement linear string monolithic insulator, In potentiometric detection straight line zero resistance insulator, earth potential live replacing drainage thread transfusion bottle operation.
CN201310439689.3A 2013-09-25 2013-09-25 Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string Active CN103474909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310439689.3A CN103474909B (en) 2013-09-25 2013-09-25 Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310439689.3A CN103474909B (en) 2013-09-25 2013-09-25 Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string

Publications (2)

Publication Number Publication Date
CN103474909A CN103474909A (en) 2013-12-25
CN103474909B true CN103474909B (en) 2016-08-17

Family

ID=49799655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310439689.3A Active CN103474909B (en) 2013-09-25 2013-09-25 Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string

Country Status (1)

Country Link
CN (1) CN103474909B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111987639A (en) * 2020-08-04 2020-11-24 中国电建集团河南工程有限公司 Construction method for replacing tension porcelain insulator

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103746314A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN104051986A (en) * 2014-06-27 2014-09-17 国网河南省电力公司平顶山供电公司 Tower minimum space operating method based on insulated isolation umbrella
CN104218493B (en) * 2014-08-13 2017-03-01 国家电网公司 ± 800kV UHVDC Transmission Lines live-line replacing strain hard tube mother's wire jumper insulator technique
CN116260073B (en) * 2023-05-16 2023-08-04 山西晋缘电力化学清洗中心有限公司 Operation method for live replacement of 35kV linear insulator string

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286624A (en) * 2008-03-07 2008-10-15 福建省厦门电业局 Safety distance extending method for live operation with earth electric potential of tension resistant tower crossarm
CN201440584U (en) * 2009-06-11 2010-04-21 华北电力科学研究院有限责任公司 Ground potential replacement device for tension tower insulators and accessories in power transmission line

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01126119A (en) * 1987-05-29 1989-05-18 Tokyo Electric Power Co Inc:The Method of anchoring through wire

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286624A (en) * 2008-03-07 2008-10-15 福建省厦门电业局 Safety distance extending method for live operation with earth electric potential of tension resistant tower crossarm
CN201440584U (en) * 2009-06-11 2010-04-21 华北电力科学研究院有限责任公司 Ground potential replacement device for tension tower insulators and accessories in power transmission line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111987639A (en) * 2020-08-04 2020-11-24 中国电建集团河南工程有限公司 Construction method for replacing tension porcelain insulator

Also Published As

Publication number Publication date
CN103474909A (en) 2013-12-25

Similar Documents

Publication Publication Date Title
CN103474909B (en) Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string
CN104991162B (en) A kind of positioning device and application method of single-phase grounded malfunction in grounded system of low current
CN102185265B (en) Construction method for replacing cross arm of 35kV line linear rod
CN101640391B (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
CN103618249A (en) technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
CN103618252A (en) Operation method for replacing tension insulator for 35kV overhead line in electrified mode
CN103746314A (en) Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN104767050B (en) Hook type personal security line
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN103474908A (en) Operation method utilizing remote control tightening device ground potential for replacing multi-loop linear insulator string
WO2012057423A1 (en) Multi-cap for installing neutral wire combined with overhead ground wire
CN101520484A (en) Grounded failure detection and judgment of DC system
CN105356371A (en) Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN105186370B (en) Straight line pole overhead transmission line take-up
CN106356758A (en) Operating method for replacing pole-mounted switch live on indirect bypass of 10 KV line insulating pole
CN104113007A (en) Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN108233309A (en) A kind of conductor spacer with monitoring function
CN106058819A (en) Voltage-blocking arc protection system and method
CN207818940U (en) A kind of intelligent high-low pressure ground wire
CN103474907A (en) Hot-line work method with activity space of operating personnel being limited in forced mode
CN102064498B (en) New line bridging method and special bridging line
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN107913479A (en) The rescue mode of the oblique rope bridge-type of high-voltage power line conductive line bar tower trapped person
KR20110043512A (en) System and method for deciding a fault type of power transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant