CN103472742A - 基于长距离以太网电解流程的测控方法 - Google Patents

基于长距离以太网电解流程的测控方法 Download PDF

Info

Publication number
CN103472742A
CN103472742A CN2013104082576A CN201310408257A CN103472742A CN 103472742 A CN103472742 A CN 103472742A CN 2013104082576 A CN2013104082576 A CN 2013104082576A CN 201310408257 A CN201310408257 A CN 201310408257A CN 103472742 A CN103472742 A CN 103472742A
Authority
CN
China
Prior art keywords
electrolysis
measurement
parameter
flow process
electrolysis process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013104082576A
Other languages
English (en)
Inventor
郁彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN AODELU AUTOMATION TECHNOLOGY Co Ltd
Original Assignee
KUNSHAN AODELU AUTOMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN AODELU AUTOMATION TECHNOLOGY Co Ltd filed Critical KUNSHAN AODELU AUTOMATION TECHNOLOGY Co Ltd
Priority to CN2013104082576A priority Critical patent/CN103472742A/zh
Publication of CN103472742A publication Critical patent/CN103472742A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Non-Metals, Compounds, Apparatuses Therefor (AREA)

Abstract

本发明涉及电解流程的测控方法,为了解决现有电解流程的测控方法中人为误差和测量误差很大,过程监测和测控能力很差,测控模式单一,参数难以实时记录的问题。本发明的步骤如下:一:系统初始化;二:选择处理对象;三:设置测控参数;四:电解生产前的电解参数校准;五:电解流程中的数据读写;六:电解流程结束与数据存储;七:结束本系统运行。本方法通过长距离以太网实现电解工艺参数的给定和反馈,实时存储电解工艺曲线和数据,多种材料电解工艺的测控,电流恒定或电压恒定测控,远程网络的阅览监控功能。

Description

基于长距离以太网电解流程的测控方法
技术领域
本发明涉及一种电解流程的测控方法。
背景技术
目前电解行业的生产仍然以手工操作为主,生产过程中各种参数的设定也人工调整,流程信息也为人工填写。这种人为误差对电解效果的影响很大,过程监测和测控能力很差,因而造成了质量良莠不齐、资源浪费。
发明内容
为了解决现有电解流程的测控方法中人为误差和测量误差很大的问题,本发明提出了基于长距离以太网电解流程的测控方法。
本发明的步骤如下:
步骤一:系统初始化;
步骤二:选择处理对象:在控制软件中选择设备的ID,然后系统显示该设备的参数;
步骤三:设置测控参数:参数的模式选择窗口中选择工作模式、测控模式和显示模式状态,根据不同模式输入电解参数;
步骤四:电解生产前的电解参数校准;
步骤五:电解流程中的数据读写;
步骤六:电解流程结束与数据存储;
步骤七:结束本系统运行。
本方法通过长距离以太网实现远程网络的阅览监控功能,使管理人员在办公室便能了解设备的工作状态。长距离以太网中主机给定电解过程测控参数,使其给定测控参数更为准确,其中反馈功能,确定参数输出的正确与否。其次高精度实时存储电解工艺曲线和数据,通过实时数据库可以方便的进行实时数据处理、历史数据存贮、报警处理、统计数据管理等操作,使电解过程更为准确、精细,并能通过SQL函数同相关数据库通讯。在电解过程中采用了电解电压测控模式和电解电流测控模式,能够实现对电解过程的电流恒定或电压恒定测控。电解过程结束后历史数据与曲线的回放,达到分析已有电解流程的目的,采用此方法还具有断电数据保存功能,还能实现生产中不同材料所需要的多种电解工艺循环。强化电解生产流程监测和测控能力,提高流程网络信息化水平,提高生产效率和产品质量,优化生产管理业务流程和全过程质量测控,从而逐步实现精细工艺。
附图说明
图1是本发明流程框图;
图2是电解电源测控器的结构示意图。
具体实施方式
下面结合附图1来说明本发明的具体实施方式,本实施方式的步骤如下:
步骤一:系统初始化;
步骤二:选择处理对象:在控制软件中选择设备的ID,然后系统显示该设备的参数;
步骤三:设置测控参数:参数的模式选择窗口中选择工作模式、测控模式和显示模式状态,根据不同模式输入电解参数;
步骤四:电解生产前的电解参数校准;
步骤五:电解流程中的数据读写;
步骤六:电解流程结束与数据存储;
步骤七:结束本系统运行。
其中,步骤三中的参数的模式选择窗口中工作模式分为正常电解模式、除油模式;测控模式为电流恒定模式和电压恒定模式;显示模式为视图模式和反馈模式。步骤五,在电解流程中,本系统将用长距离以太网实时发送电解电源测控器发来的电解数据,根据设定的正常参数范围进行对比,超出正常范围,系统将自动报警,并停止电解流程。

Claims (3)

1.基于长距离以太网电解流程的测控方法,其特征在于它步骤如下:
步骤一:系统初始化;
步骤二:选择处理对象:在控制软件中选择设备的ID,然后系统显示该设备的参数;
步骤三:设置测控参数:参数的模式选择窗口中选择工作模式、测控模式和显示模式状态,根据不同模式输入电解参数;
步骤四:电解生产前的电解参数校准;
步骤五:电解流程中的数据读写;
步骤六:电解流程结束与数据存储;
步骤七:结束本系统运行。
2.根据权利要求1所述的基于长距离以太网电解流程的测控方法,其特征在于步骤三中的参数的模式选择窗口中工作模式分为正常电解模式、除油模式;测控模式为电流恒定模式和电压恒定模式;显示模式为视图模式和反馈模式。
3.根据权利要求1所述的基于长距离以太网电解流程的测控方法,其特征在于步骤五,在电解流程中,本系统将用长距离以太网实时发送电解电源测控器发来的电解数据,根据设定的正常参数范围进行对比,超出正常范围,系统将自动报警,并停止电解流程。
CN2013104082576A 2013-09-10 2013-09-10 基于长距离以太网电解流程的测控方法 Pending CN103472742A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013104082576A CN103472742A (zh) 2013-09-10 2013-09-10 基于长距离以太网电解流程的测控方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013104082576A CN103472742A (zh) 2013-09-10 2013-09-10 基于长距离以太网电解流程的测控方法

Publications (1)

Publication Number Publication Date
CN103472742A true CN103472742A (zh) 2013-12-25

Family

ID=49797633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013104082576A Pending CN103472742A (zh) 2013-09-10 2013-09-10 基于长距离以太网电解流程的测控方法

Country Status (1)

Country Link
CN (1) CN103472742A (zh)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109099A (zh) * 2007-04-30 2008-01-23 哈尔滨工业大学 基于工业以太网电镀生产过程的控制方法
US20130213818A1 (en) * 2012-02-17 2013-08-22 Sabic Innovative Plastics Ip B.V. Apparatus and method for liquid level measurement in electrolytic cells

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101109099A (zh) * 2007-04-30 2008-01-23 哈尔滨工业大学 基于工业以太网电镀生产过程的控制方法
US20130213818A1 (en) * 2012-02-17 2013-08-22 Sabic Innovative Plastics Ip B.V. Apparatus and method for liquid level measurement in electrolytic cells

Similar Documents

Publication Publication Date Title
CA2687734C (en) System and method for performing oilfield production operations
CN105895056A (zh) 亮度补偿模型的建立方法、屏幕亮度的补偿方法及装置
CN103678093A (zh) 一种自动化测试框架及测试方法
CN103954898A (zh) 一种oled产品寿命的测试方法
CN102622002B (zh) 无线智能扭矩管理系统
CN104217068A (zh) 一种plc图形化组态设计系统和方法
CN103914501A (zh) 基于海量实时数据库的电力行业实时报表方法
CN107146165B (zh) 一种配网规划数据管理方法及系统
CN104679858A (zh) 一种查询数据的方法和装置
CN103472742A (zh) 基于长距离以太网电解流程的测控方法
CN111614520B (zh) 一种基于机器学习算法的idc流量数据预测方法及装置
CN104142897A (zh) 集成电路生产线监控系统的可视化配置方法
DE102008045840A1 (de) Verfahren zum Betreiben einer Prozess-Messstelle
CN102013054A (zh) 一种smt生产管理信息自动化系统
CN116976700A (zh) 一种施工进度和成本预测方法、装置、设备及存储介质
CN101109099A (zh) 基于工业以太网电镀生产过程的控制方法
CN109522536B (zh) 一种表格自动填写方法
CN102981071A (zh) 应用于电网调度自动化系统的电力系统主要参数监测方法
CN109636540A (zh) 用于窗户订制的报价单生成方法、装置、存储介质及终端
CN109808225B (zh) 一种用于数控压管的方法及系统
CN103530230A (zh) 报告自动生成方法及自动生成系统
CN105137845A (zh) 一种舞台设备表演校准装置
CN105549559A (zh) 用于获得基于班组的连续型化工生产工艺符合度的方法及装置
DE102011010985A1 (de) Verfahren und Anordnung zur Bestimmung der Restlebensdauer einer Batterie für batteriebetriebene elektronische Geräte
CN205015662U (zh) 一种舞台设备表演校准装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131225