CN103470016A - Substrate wall tile supporting device - Google Patents

Substrate wall tile supporting device Download PDF

Info

Publication number
CN103470016A
CN103470016A CN201310407601XA CN201310407601A CN103470016A CN 103470016 A CN103470016 A CN 103470016A CN 201310407601X A CN201310407601X A CN 201310407601XA CN 201310407601 A CN201310407601 A CN 201310407601A CN 103470016 A CN103470016 A CN 103470016A
Authority
CN
China
Prior art keywords
accompanying
tile
substrate wall
supporting device
props
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310407601XA
Other languages
Chinese (zh)
Inventor
贺国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310407601XA priority Critical patent/CN103470016A/en
Publication of CN103470016A publication Critical patent/CN103470016A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention provides a set of supporting tools for decorating industry substrate wall tile construction. Traditionally and at present, tiling workers use bricks, wood blocks and tiles to support substrate wall tiles just pasted in our country. No special supporting tools exist. Tile pasting is hard, and the construction efficiency is low. A supporting device (figure 1) is operated clockwise and anticlockwise through a wing nut (figure 5). The supporting device is lifted and lowered optionally to be located in a 2-230mm elevation space to support wall tiles just pasted on any elevation. By means of the substrate wall tile supporting device (figure 1), substrate wall tile pasting is achieved, and production efficiency and decorating quality and effect are improved. The technical effect of supporting the substrate wall tiles is one tenth millimeter. Potential social and economic benefit is good.

Description

The base course wall ceramic tile props up apical organ
One, technical field.
The present invention adopts the five metals technology, and for the construction of decoration industry furring tile provides, a set of special tool---the base course wall ceramic tile props up apical organ
Two, background technology.
The wall covering surface ceramic tile, key is posting basic unit's first row ceramic tile.Basic unit's first row ceramic tile, the horizontal flat heavily fortified point of subsides is straight, and the horizontal flat heavily fortified point that top each layer ceramic tile also can paste is straight.Especially modern house ornamentation, require to paste Seamless brick.One millimeter of basic unit's ceramic tile error, the top layer ceramic tile will error 8mm-10mm.Paste the technical requirements of Seamless brick, be not less than the manufacture installation specification of dynamic power machine.
Wall covering surface basic unit ceramic tile, do not paste by ground, but unsettled subsides on the wall.Sometimes for attractive in appearance, bat is attached to bottom, full sized brick is attached to more than two layers, just full sized brick has pasted, later pastes the bottom bat.Therefore, almost the first floor ceramic tile is all unsettled being attached on metope.Above 20 centimeters of kitchen in house ornamentation, washroom, balcony, ground---30 centimeters places are waterproof, only have not a half brick can be attached on cement wall surface, and most of waterproof and cement do not have affinity, do not paste ceramic tile.Only have the brick of using during patch block, wooden unit, ceramics carry out the support top ceramic tile, after theing cement solidifies, just brick, wooden unit, ceramics are taken down, and fill cement.Be exactly that planar base is not done waterproof, the ceramic tile short time of sticking does not solidify yet.Ceramic tile also can fall down.Customer requirement is pasted Seamless brick, and mass effect requires again very high.Brick, wooden unit, ceramics use really improper.In any case what it also can't be by the ceramic tile support top is tally in every detail.But up to the present, also not the same instrument replaces it.
What the patch block work was had a headache, feels embarrassed most most is exactly basic unit's ceramic tile construction.Every new house tile fixing.Brick, wooden unit, ceramics also can not find, and have to downstairs in rubbish heap, pick up.Some patch block works, without the support top thing, are sprinkled upon in brickwork joint by dry cement, and moisture content is blotted.It is all right that this method is posted the seam ceramic tile, and the Seamless brick subsides are uneven, and the waste building materials, pollutes decorative cover.Speed is very slow.
No matter the wall covering surface ceramic tile uses existing what method, all feels that too difficulty is too slow.This is the common recognition of each patch block work.If not objective labor cost, patch block work majority will be changed one's profession.Perhaps they do not know to lack a support top instrument.
Three, summary of the invention:
The base course wall ceramic tile props up apical organ technical scheme (Fig. 1):
According to present 300mmX450mm furring tile commonly used, design the special tool of energy support top furring tile on the space length of 2mm-230mm absolute altitude.
First design and produce a main body slideway (Fig. 2), one top arm (Fig. 3), one piece of coach screw (Fig. 4), a wing nut (Fig. 5), each of rubber sheet gasket and metallic gasket (Fig. 6).With coach screw (Fig. 4), wing nut (Fig. 5), by four component (Fig. 7) with 3., 6., 2., order 6. runs through and combines.It is middle with a top arm (Fig. 3) that rubber sheet gasket is contained in slideway (Fig. 2), is used for increasing resistance.
Unscrew in the direction of the clock wing nut (Fig. 5), a top arm (Fig. 3) can easily promote and depress, and lifting freely.Tighten in the direction of the clock wing nut, a top arm (Fig. 3) can be located motionless.By wing nut (Fig. 5), along inverse operation, an apical organ (Fig. 1) is at 2mm---and in 230mm absolute altitude space, lifting is located arbitrarily; Furring tile on the required any absolute altitude of support top, that just sticked.More than the 110mm absolute altitude, use top hand (Fig. 1 3.) support top; The 110mm absolute altitude is following by lower hand (Fig. 1 2.) support top.
Eight of this apical organs (Fig. 1) are kit, during construction, can rotation use, and do not affect construction speed.
The technique effect that props up apical organ (Fig. 1) support top ceramic tile reaches 1/10th millimeters.Once this technical scheme is converted into productivity, can improve 40% production efficiency, dissolve a difficult problem of pasting the base course wall ceramic tile.Decorative quality and the effect of furring tile have been improved.Market, the new tool side of throwing, economical, societal benefits are necessarily fine.
Four, accompanying drawing explanation:
Fig. 1: furring tile props up apical organ model machine figure.This figure is that furring tile props up apical organ.Be used for support top first floor furring tile during constructor's wall covering surface ceramic tile.Being mainly the furring tile construction lays foundation---and row's brick is used.Explain: 1. top arm is propped up in lifting; 2. a lower hand: 3. go up the top hand; 4. slideway footing; 5. slideway main body; 6. coach screw; 7. wing nut and pad.
Main material: aluminium alloys or stainless steel materials.Ratio: 1:1.Technique: assembling, supporting.Quantity: 8 (a set of).
Fig. 2: a top arm slideway.The main component of instrument.Material: aluminium alloys or stainless steel materials.Ratio: 1:1.Technique: cutting, curved, the perforate of metal plate.Quantity: 8.
Fig. 3: top arm is propped up in lifting.This workpiece has upper top hand, and a lower hand can rise and can fall, can be on the absolute altitude of needs the support top furring tile.Material: aluminium alloys or stainless steel materials.Ratio: 1:1.Technique: cutting, curved, the perforate of metal plate.Quantity: 8.
Fig. 4: coach screw.Fig. 5 wing nut.Two figure altogether, for running through, fixing, locate by lifting.Material: carbon steel.Ratio: 1:1 technique: system nail base, cover external screw thread processed and moulding, threaded internal thread.Quantity: 8 covers.Technical requirements: 1, dextrorotation to; 2 pitch 3mm; 3, M tooth form.
Fig. 6: pad.The pad that this figure is two kinds of unlike materials of the same form, one is metallic gasket, the external application shearing resistance, one is rubber sheet gasket, interior with increasing resistance.Ratio: 2:1.Technique: shape cutting.Quantity: 8 covers.
Fig. 7: part aggregation and assembly drawing.Order, position when this figure is another part assembling.
Explain: 2. prop up the top arm slideway; 3. top arm is propped up in lifting; 4. coach screw; 5. wing nut; 6. metal and rubber sheet gasket.
Five, the specific embodiment:
(Fig. 2), (Fig. 3), (Fig. 6) part of accompanying drawing explanation, need following equipment, instrument manufacture, processing.
1, production equipment: (1), table type numerical control plasma flame cutting machine; (2), copying cutting machine; (3), small-sized plate shearing machine; (4), small-sized metal plate bender; (5), abrasive machine.
2, the tool of production: slide measure, tape measure, compasses, scissors.
3, coach screw (Fig. 4), wing nut (Fig. 5) set of parts, because the production technology difficulty is large, required professional screw manufactory orders.
4, new tool assembling (Fig. 7)
By order, the position of (Fig. 7), by part prop up top arm 3., rubber sheet gasket 6. the main body slideway 2., metallic gasket 6., four holes are aimed at, and with coach screw (Fig. 4), through four hole in piece part, in the direction of the clock, load onto wing nut.One apical organ (Fig. 1) has been assembled.
In the same way, assemble 8 apical organs (Fig. 1), become a set of product.

Claims (5)

  1. Prop up comprehensive innovative content of apical organ according to the described base course wall ceramic tile of manual, propose following five claims:
    1. protection basic unit furring tile props up apical organ, the technical scheme in summary of the invention.
  2. 2. protection basic unit furring tile props up apical organ (accompanying drawing 2) pattern, structural feature.
  3. 3. protect part support top slideway (accompanying drawing 1 2.), the pattern feature of top arm (accompanying drawing 1 3.) is propped up in lifting.
  4. 4. protect the pad (accompanying drawing 1 6.) of new tool unlike material, interior use is rubber sheet gasket; External application is metallic gasket.
  5. 5. the production material that the protection base course wall props up apical organ (accompanying drawing 2), except interior, with pad (accompanying drawing 1 6.), other material is metal.
CN201310407601XA 2013-08-30 2013-08-30 Substrate wall tile supporting device Pending CN103470016A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310407601XA CN103470016A (en) 2013-08-30 2013-08-30 Substrate wall tile supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310407601XA CN103470016A (en) 2013-08-30 2013-08-30 Substrate wall tile supporting device

Publications (1)

Publication Number Publication Date
CN103470016A true CN103470016A (en) 2013-12-25

Family

ID=49795044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310407601XA Pending CN103470016A (en) 2013-08-30 2013-08-30 Substrate wall tile supporting device

Country Status (1)

Country Link
CN (1) CN103470016A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581614Y (en) * 2002-06-10 2003-10-22 罗忠胜 Device for sticking wall and floor tile
CN101146972A (en) * 2005-02-22 2008-03-19 达芬奇意大利/美国集团有限责任公司 Tile alignment and leveling device and method for using same
CN101220707A (en) * 2007-12-04 2008-07-16 中铁建设集团有限公司 Full-automatically tile gluing machine
CN101892735A (en) * 2010-07-24 2010-11-24 邵金贵 Tile positioner
CN202559688U (en) * 2012-05-14 2012-11-28 赵士立 Paving device of ceramic tile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2581614Y (en) * 2002-06-10 2003-10-22 罗忠胜 Device for sticking wall and floor tile
CN101146972A (en) * 2005-02-22 2008-03-19 达芬奇意大利/美国集团有限责任公司 Tile alignment and leveling device and method for using same
CN101220707A (en) * 2007-12-04 2008-07-16 中铁建设集团有限公司 Full-automatically tile gluing machine
CN101892735A (en) * 2010-07-24 2010-11-24 邵金贵 Tile positioner
CN202559688U (en) * 2012-05-14 2012-11-28 赵士立 Paving device of ceramic tile

Similar Documents

Publication Publication Date Title
CN108868072B (en) Cement equipment is paintd on ceramic tile back for construction
CN206554473U (en) A kind of cross clip laid for floor tile
CN106284929A (en) A kind of furring tile anti-hollowing edge patch construction method
CN202090569U (en) Plastering screed template
CN205224549U (en) Mechanical float with two boards of plastering
CN103556808B (en) A kind of electric rubber hammer
CN103470016A (en) Substrate wall tile supporting device
CN204645456U (en) waterproof wall tile structure
CN204590550U (en) Nail and rake type wood floor bolck cement bonded sand bed course chipping darby
CN201991169U (en) Stone tiling composite board
RU103830U1 (en) CONSTRUCTION PROTECTIVE DECORATIVE WALL PANEL
CN201972409U (en) Adjustable leveling bench
CN202073299U (en) Trowel
CN202596045U (en) Pseudo-classic architectural concrete eave with reversely nailed wooden rafter and reversely constructed roof boarding
CN104878909B (en) It is a kind of to be easy to hold the Horizontal scrapping rule taken
AU2013375539A1 (en) Interior decoration method
CN207808008U (en) A kind of building board production presser device
CN205335776U (en) Lay ground and decorate adjustable sectional shelf -unit of integration wire casing
CN209413328U (en) A kind of Novel wall building brick clay constructing device
CN207794492U (en) A kind of integrated finishing component of integration environmental friendly indoor
CN102277954B (en) Plastering device
CN202866165U (en) Plaster paper panel or calcium silicate plate of keel corresponding line for safe installation
CN202194362U (en) Double-head dual-purpose mortar joint cutter
CN207194408U (en) A kind of negative and positive trowel for building with rubber hammer
CN103469978A (en) Wall surface construction technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: He Guolin

Document name: Notification that Application Deemed not to be Proposed

DD01 Delivery of document by public notice

Addressee: He Guolin

Document name: Notification of before Expiration of Request of Examination as to Substance

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: He Guolin

Document name: Notification of Patent Invention Entering into Substantive Examination Stage

DD01 Delivery of document by public notice

Addressee: He Guolin

Document name: the First Notification of an Office Action

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: He Guolin

Document name: Notification that Application Deemed to be Withdrawn

DD01 Delivery of document by public notice
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131225