CN104878909B - It is a kind of to be easy to hold the Horizontal scrapping rule taken - Google Patents
It is a kind of to be easy to hold the Horizontal scrapping rule taken Download PDFInfo
- Publication number
- CN104878909B CN104878909B CN201510258666.1A CN201510258666A CN104878909B CN 104878909 B CN104878909 B CN 104878909B CN 201510258666 A CN201510258666 A CN 201510258666A CN 104878909 B CN104878909 B CN 104878909B
- Authority
- CN
- China
- Prior art keywords
- side plate
- plate
- floating rule
- easy
- oblique
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to construction nose bar, refer in particular to a kind of be easy to hold the Horizontal scrapping rule taken.Including floating rule bottom plate, floating rule top plate and perpendicular side plate made of aluminium alloy extrusions, the opening side that the upper and lower side of perpendicular side plate connects Xing Cheng Xi cavity Xi cavity with floating rule bottom plate, floating rule top plate Lian respectively is provided with and is easy to scrape the oblique side plate smeared and for hand-held side plate A, the lower end of oblique side plate is connected with floating rule bottom plate, side plate A upper end and floating rule top plate vertical connection;Flat board is provided between side plate A lower end and the upper end of oblique side plate, side plate A lower end is connected by the upper end of flat board and oblique side plate.When in use, perpendicular side plate and side plate A are grasped, convenient use person grasps, is not easy to skid;During for repairing surface scraping, oblique side plate scrape repairing together with floating rule bottom plate to corner side, effectively reduces the difficulty of metope corner construction, can scrape to smear floated coat easily and reaches smooth with closely knit requirement, saving of work and time and beneficial to the purpose for ensureing construction quality.
Description
Technical field
The present invention relates to construction nose bar, refer in particular to a kind of be easy to hold the Horizontal scrapping rule taken.
Background technology
With the continuous lifting of the aesthetic conceptions of people, also more and more higher is required to the finishing of building, particularly to metope
Finishing, decoration seem particularly harsh.To the finishing of house wall surface, the cement mortar for needing plaster batch is arrived wall by typically worker
Face, then with hand-held tool by wall surface leveling.In order to provide operating efficiency and reduce labor intensity, can all be borrowed in practice of construction
Help some nose bars or floating rule to carry out metope it is smooth.
Construction plastering darby is the levelling specific purpose tool of metope, in practice of construction, typically using duroplasts, aluminium
Alloy ruler is as leveling tool, but above-mentioned instrument has some inconvenient places, such as easy to wear, yielding, not square
Just user holds, and the shortcomings of easily skidding, it is more difficult that especially metope corner is constructed, and speed of application is slow.
The content of the invention
The present invention is easy to hold the Horizontal scrapping rule taken for problem of the prior art offer is a kind of, convenient use, reduces metope
The difficulty of corner construction, improves efficiency of construction.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
It is a kind of to be easy to hold the Horizontal scrapping rule taken, including floating rule bottom plate, floating rule top plate and vertical made of aluminium alloy extrusions
Side plate, the upper and lower side of the perpendicular side plate connect Xing Cheng Xi cavity , Xi cavity with floating rule bottom plate, floating rule top plate Lian respectively
Opening side, which is provided with, to be easy to scrape the oblique side plate smeared and connects for hand-held side plate A, lower end and the floating rule bottom plate of the oblique side plate
Connect, upper end and the floating rule top plate vertical connection of the side plate A;It is provided between the lower end of the side plate A and the upper end of oblique side plate flat
Plate, side plate A lower end are connected by the upper end of flat board and oblique side plate.
As preferable, acute angle is formed between the oblique side plate and floating rule bottom plate, the size of the acute angle is 35 °~45 °.
As another preferable, side plate B, the side plate B and floating rule are additionally provided between the oblique side plate and floating rule bottom plate
Bottom plate vertical connection, side plate B upper end are connected with side plate A lower end.
Further, the floating rule bottom plate has extension plate its junction with side plate B is outwards horizontal-extending.
Wherein, the side plate A is connected with flat board to form L-shaped and holds with a firm grip portion.
Further , Suo Shu Xi cavity, L-shaped hold portion with a firm grip and oblique side plate encloses the accommodating cavity of composition one, in accommodating cavity
It is arranged with stair-stepping corner nose bar.
Wherein, the outer surface of the perpendicular side plate is provided with three graduation marks, and that graduation mark positioned at centre is set to red
Line, the graduation mark positioned at red line both sides are set to blue line.
Wherein, a rectangle vacancy is provided between the floating rule top plate and perpendicular side plate, is installed in rectangle vacancy
There is a rectangular transparent levelling rod.
Beneficial effects of the present invention:
It is provided by the present invention it is a kind of be easy to hold the Horizontal scrapping rule taken, including made of aluminium alloy extrusions floating rule bottom plate,
Floating rule top plate and perpendicular side plate, and be easy to scrape the oblique side plate smeared and the side plate A for holding, the lower end of the oblique side plate is with scraping
Chi bottom plate connects, upper end and the floating rule top plate vertical connection of the side plate A;The lower end of the side plate A and the upper end of oblique side plate it
Between be provided with flat board, side plate A lower end passes through the upper end of flat board and oblique side plate and connected.When in use, grasp perpendicular side plate and
Side plate A, convenient use person grasp, are not easy to skid;During for repairing surface scraping, oblique side plate is carried out together with floating rule bottom plate to corner side
Scrape and repair, effectively reduce the difficulty of metope corner construction, can scrape to smear floated coat easily and reach smooth with closely knit requirement, save
Work is time saving and beneficial to the purpose for ensureing construction quality.
Brief description of the drawings
Fig. 1 is that a kind of of embodiment one is easy to hold the Horizontal scrapping rule structural representation taken.
Fig. 2 is that a kind of of embodiment two is easy to hold the Horizontal scrapping rule structural representation taken.
Fig. 3 is the structural representation of Z-shaped corner nose bar
Reference in Fig. 1 to Fig. 3 includes:
1-floating rule bottom plate 2-floating rule, 3-perpendicular side plate of top plate
4-oblique side plate, 5-side plate, 6-side plates of A B
7-flat board, 8-corner nose bar 9-extension plate
10-graduation mark.
Embodiment
For the ease of the understanding of those skilled in the art, the present invention is made further with reference to embodiment and accompanying drawing
Bright, the content that embodiment refers to not is limitation of the invention.Referring to Fig. 1 to Fig. 3, the present invention is carried out below in conjunction with accompanying drawing
Detailed description.
Embodiment one.
As shown in figure 1, the present embodiment one provided it is a kind of be easy to hold the Horizontal scrapping rule taken, including by aluminium alloy extrusions system
Into floating rule bottom plate 1, floating rule top plate 2 and perpendicular side plate 3, the upper and lower side of the perpendicular side plate 3 respectively with floating rule bottom plate 1, floating rule
The opening side that the Lian of top plate 2 connects Xing Cheng Xi cavity , Xi cavity is provided with and is easy to scrape the oblique side plate 4 smeared and for hand-held
Side plate A 5, the lower end of the oblique side plate 4 are connected with floating rule bottom plate 1, and the upper end of the side plate A 5 is vertical with floating rule top plate 2 to be connected
Connect;Flat board 7 is provided between the lower end of the side plate A 5 and the upper end of oblique side plate 4, side plate A 5 lower end passes through flat board 7 and oblique side
The upper end connection of plate 4.As preferable, acute angle is formed between the oblique side plate 4 and floating rule bottom plate 1, the size of the acute angle is 35 °
~45 °.Wherein, the side plate A 5 is connected with flat board 7 to form L-shaped and holds with a firm grip portion, namely the flat board 7 is parallel with floating rule bottom plate 1.
When in use, perpendicular side plate and side plate A are grasped(That is L-shaped is held with a firm grip portion), can be grasped with convenient use person, be not easy to skid.When
Corner side scrape when repairing, the side of oblique side plate 4 is constructed base by the way that floating rule bottom plate 1 is ridden over into coat of plaster against corner side
On quasi- face, the angle between the working face and datum plane of the floating rule bottom plate 1 is more than 3 ° and less than 33 °, is displaced outwardly wall
Mortar on face is scraped floating whole.The difficulty of metope corner construction is thus effectively reduced, corner side coat of plaster can be scraped easily and smeared
Reach smooth with closely knit requirement, saving of work and time and beneficial to the purpose for ensureing construction quality.
In the present embodiment one, the outer surface of the perpendicular side plate 3 is provided with three graduation marks 10, that quarter positioned at centre
Degree line 10 is set to red line, and the graduation mark 10 positioned at red line both sides is set to blue line.When this Horizontal scrapping rule is used as nose bar
On the way --- aid in building ceramic tile using three graduation marks 10.Wherein, during Horizontal scrapping rule patch wall, that red line positioned at centre
It is 12mm apart from wall side, the auxiliary thickness for building tile of this thickness optimum.If the relatively thin ceramics of auxiliary block is referred in red
That blue line on the nearly wall side of line;If auxiliary build thicker ceramic tile, another-bar blueness line outside red line may be selected.
This Horizontal scrapping rule is made up of aluminium alloy extrusions, to be hollow inside the Horizontal scrapping rule.Specifically, Suo Shu Xi cavity, L
Shape holds portion with a firm grip and oblique side plate 4 encloses the accommodating cavity of composition one, it is necessary to be worked with reference to multiple types of tools when usually scratching above, accommodating
Stair-stepping corner nose bar 8 is arranged with cavity;Horizontal scrapping rule so can be not only made full use of, and is easy to carry and places
Corner nose bar 8;Further, the corner nose bar 8 is hollow Z-shaped corner nose bar.
The Z-shaped corner nose bar has multiple functions:The Dian of function one difficulty in column cap tiling piece is larger, this Z-shaped corner
Nose bar has the design at two various sizes of 90 degree of Inner angles, and post surrounding has angle to pave, and when use, this Z-shaped corner nose bar can
Difficulty is set to be readily solved.As long as 90 degree of Inner angles of this Z-shaped corner nose bar and column cap side end are spelled together, and perpendicularity is calibrated, then
This Z-shaped corner nose bar is fixedly clamped.At this moment need to be with reference to tiling in 90 degree of Inner angles arms of angle of this Z-shaped corner nose bar only
Can, if by ceramic tile while and when ceramic tile face and nose bar and nose bar edged surface is spelled neat, will be connected into by the ceramic tile of auxiliary block-vertical flat
Face, it is simple neat quick.
Embodiment two.
As shown in Fig. 2 the basic structure of the present embodiment two is approximate with embodiment one, the convenient use person that all prepares for the postgraduate qualifying examination grasp and
Floating whole corner side is quickly scraped, its identical point is no longer burdensome herein.Its difference is:Between the oblique side plate 4 and floating rule bottom plate 1
Side plate B 6, the side plate B 6 and the vertical connection of floating rule bottom plate 1 are additionally provided with, side plate B 6 upper end connects with side plate A 5 lower end
Connect.Further, the floating rule bottom plate 1 has extension plate 9 its junction with side plate B 6 is outwards horizontal-extending.Using
Before, two small holes are provided with the upper and lower side of the Horizontal scrapping rule, can be suspended on this Horizontal scrapping rule on wall by screw;And
The distance between adjustable wall body and the Horizontal scrapping rule that is hung, promote or pull out adjustment horizontal location, make-bar puts down
Face vertical line.Then can carry out plaster work at the plane of extension plate 9, the cement mortar on plaster on nose bar side soon
It will solidify, at this moment the Horizontal scrapping rule described in embodiment one can be used to press close to oblique side plate 4 in place of the good cement mortar of plaster
Firmly push-and-pull, the cement mortar on the Horizontal scrapping rule side will form-bar vertical reference upper thread at once.By using this implementation
The Horizontal scrapping rule and construction method of example two, the engineering time of plaster connection datum plane line can be saved, improve the effect of metope plaster
Rate.
In the present invention, a rectangle vacancy is provided between the floating rule top plate 2 and perpendicular side plate 3(Do not marked in figure
Go out), a rectangular transparent levelling rod is installed in rectangle vacancy.The present invention combines the function of transparent levelling rod,
Cement can measure simultaneously when painting operation, improve complicated and time-consuming step and lifting construction efficiency.
Above content is only presently preferred embodiments of the present invention, for one of ordinary skill in the art, according to the present invention's
Thought, there will be changes, this specification content should not be construed as to the present invention in specific embodiments and applications
Limitation.
Claims (4)
1. a kind of be easy to hold the Horizontal scrapping rule taken, including floating rule bottom plate, floating rule top plate and vertical side made of aluminium alloy extrusions
Plate, the upper and lower side of the perpendicular side plate connect Xing Cheng Xi cavity with floating rule bottom plate, floating rule top plate Lian respectively, it is characterised in that:
The opening side of Xi cavity, which is provided with, is easy to scrape the oblique side plate smeared and for hand-held side plate A, the lower end of the oblique side plate with
Floating rule bottom plate connects, upper end and the floating rule top plate vertical connection of the side plate A;The lower end of the side plate A and the upper end of oblique side plate
Between be provided with flat board, side plate A lower end passes through the upper end of flat board and oblique side plate and connected;Between the oblique side plate and floating rule bottom plate also
Side plate B, the side plate B and floating rule bottom plate vertical connection are provided with, side plate B upper end is connected with side plate A lower end;The side plate
A is connected with flat board to be formed L-shaped and holds with a firm grip portion;The floating rule bottom plate has extension board its junction with side plate B is outwards horizontal-extending
Block;A rectangle vacancy is provided between the floating rule top plate and perpendicular side plate, be provided with rectangle vacancy one it is rectangular
The transparent levelling rod of shape.
2. a kind of it is easy to hold the Horizontal scrapping rule taken according to claim 1, it is characterised in that:The oblique side plate and floating rule bottom
Acute angle is formed between plate, the size of the acute angle is 35 °~45 °.
3. a kind of it is easy to hold the Horizontal scrapping rule taken according to claim 1, it is characterised in that:Suo Shu Xi cavity, L-shaped are held
Tight portion and oblique side plate enclose the accommodating cavity of composition one, and stair-stepping corner nose bar is arranged with accommodating cavity.
4. a kind of it is easy to hold the Horizontal scrapping rule taken according to claim 1, it is characterised in that:The appearance of the perpendicular side plate
Face is provided with three graduation marks, and that graduation mark positioned at centre is set to red line, and the graduation mark positioned at red line both sides is set to
Blue line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510258666.1A CN104878909B (en) | 2015-05-20 | 2015-05-20 | It is a kind of to be easy to hold the Horizontal scrapping rule taken |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510258666.1A CN104878909B (en) | 2015-05-20 | 2015-05-20 | It is a kind of to be easy to hold the Horizontal scrapping rule taken |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104878909A CN104878909A (en) | 2015-09-02 |
CN104878909B true CN104878909B (en) | 2017-11-10 |
Family
ID=53946568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510258666.1A Active CN104878909B (en) | 2015-05-20 | 2015-05-20 | It is a kind of to be easy to hold the Horizontal scrapping rule taken |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104878909B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756327A (en) * | 2016-04-22 | 2016-07-13 | 李海兵 | Plastering flat ruler |
CN106401149A (en) * | 2016-09-29 | 2017-02-15 | 中国十七冶集团有限公司 | Aluminum alloy multifunctional wall surface floating ruler |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201714038U (en) * | 2010-07-07 | 2011-01-19 | 王汉猷 | Plastic hollow splayed plaster ground plate |
CN204826576U (en) * | 2015-05-20 | 2015-12-02 | 陈知丰 | Horizontal floating rule convenient to hold and take |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201420381Y (en) * | 2009-05-18 | 2010-03-10 | 陈建军 | Plastering darby for building construction |
CN201627348U (en) * | 2009-10-30 | 2010-11-10 | 廖崇德 | Novel putty screeder |
RU102363U1 (en) * | 2010-10-22 | 2011-02-27 | Азер Кахраман Оглы Бабаев | RULE |
GB201111168D0 (en) * | 2011-06-30 | 2011-08-17 | Scott Cutters Ltd | Skimming tool |
CN202359802U (en) * | 2011-07-26 | 2012-08-01 | 东莞市彩丽建筑维护技术有限公司 | A component for scraping and flattening wall surface plaster layers |
-
2015
- 2015-05-20 CN CN201510258666.1A patent/CN104878909B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201714038U (en) * | 2010-07-07 | 2011-01-19 | 王汉猷 | Plastic hollow splayed plaster ground plate |
CN204826576U (en) * | 2015-05-20 | 2015-12-02 | 陈知丰 | Horizontal floating rule convenient to hold and take |
Also Published As
Publication number | Publication date |
---|---|
CN104878909A (en) | 2015-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202090569U (en) | Plastering screed template | |
CN104878909B (en) | It is a kind of to be easy to hold the Horizontal scrapping rule taken | |
CN204826576U (en) | Horizontal floating rule convenient to hold and take | |
CN109488001A (en) | Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering | |
CN205502542U (en) | When marking time fitment, stair put instrument of control line | |
CN102561713B (en) | Method for controlling building quality of concrete frame structure walls | |
CN206158117U (en) | Wall ground floating screed instrument of making level | |
CN214364741U (en) | Adjustable wall body reentrant corner fillet forming device | |
CN206091339U (en) | Build horizontal mortar joint controller by laying bricks or stones | |
CN201598812U (en) | Plastering and finishing trowel | |
CN204899171U (en) | Stair controlling means that wipes one's face | |
CN209509427U (en) | " brickwork joint " is hooked after a kind of external wall plastering uses light instrument | |
CN206538990U (en) | One kind carries the special mud patter of frame level civil construction | |
CN208844945U (en) | Integrated scale | |
CN208934446U (en) | Build brick plain type mud limiting device | |
CN203201163U (en) | Bricklaying trowel | |
CN2503458Y (en) | Horizontal bricks paving instrument | |
CN209855153U (en) | Ground ash laying tool | |
CN105442818A (en) | Trowel for moisture-proof paint | |
CN211317305U (en) | Surveying and mapping device for indoor design convenient to carry | |
CN211783432U (en) | Level bar for dry hanging stone installation measurement | |
CN207160523U (en) | A kind of adjustable combined type is wiped one's face device | |
CN205822733U (en) | A kind of wall-surface screeding robot | |
CN204645551U (en) | A kind of multi-functional plaster trowel | |
CN216276960U (en) | One-step forming tool for concrete floor water dripping line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |