CN211783432U - Level bar for dry hanging stone installation measurement - Google Patents

Level bar for dry hanging stone installation measurement Download PDF

Info

Publication number
CN211783432U
CN211783432U CN202020625390.2U CN202020625390U CN211783432U CN 211783432 U CN211783432 U CN 211783432U CN 202020625390 U CN202020625390 U CN 202020625390U CN 211783432 U CN211783432 U CN 211783432U
Authority
CN
China
Prior art keywords
level bar
level
installation
stone material
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020625390.2U
Other languages
Chinese (zh)
Inventor
康建军
郑贤好
陈培生
高俊
黄忠森
江然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xinxin Engineering Test Detection Co ltd
Anhui Sanjian Engineering Co Ltd
Original Assignee
Anhui Xinxin Engineering Test Detection Co ltd
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xinxin Engineering Test Detection Co ltd, Anhui Sanjian Engineering Co Ltd filed Critical Anhui Xinxin Engineering Test Detection Co ltd
Priority to CN202020625390.2U priority Critical patent/CN211783432U/en
Application granted granted Critical
Publication of CN211783432U publication Critical patent/CN211783432U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a level bar for hanging stone material installation measurement futilely, including the level bar body, level bar body one end is located and is equipped with the mounting hole on the vertical axis, fixed cover is equipped with L type peg in the mounting hole, and the fixed suit of transverse bar of L type peg is in the mounting hole and perpendicular mutually with the level bar, and the vertical pole of L type peg is with to tie up the parallel and directional level bar body other end of eating the body. When the stone material is hung futilely in the installation, operating personnel need not to get repeatedly and puts the level bar and measure the stone material, directly hangs the level bar in the stone material upper portion of installation, and the pendant is tied to alone operation adjustment stone material back of the body, makes the stone material side line of being installed parallel with the level bar that the bubble was placed in the middle. The construction efficiency and the installation precision of the dry hanging stone are improved. The quality is guaranteed, and a new construction method is provided for high-precision installation and construction of the dry-hanging stone on the outer vertical surface of the building.

Description

Level bar for dry hanging stone installation measurement
Technical Field
The utility model relates to a building engineering technical field building veneer construction, concretely relates to a level bar for hanging stone material installation measurement futilely.
Background
Along with the development of social economy, people have higher and higher requirements on the attractiveness of buildings, and a large amount of stone decoration on the outer vertical surfaces of the buildings appears, wherein compared with the traditional wet operation process, the dry hanging stone process avoids a grouting process, can shorten the construction period, reduce the self weight of the buildings, improve the anti-seismic performance, more importantly, effectively prevent the permeation pollution of pigments such as salt alkali in grouting and the like to the stone, improve the decoration quality and the impression effect, and is widely used.
The dry hanging method of stone is also called empty hanging method. The method uses metal hanging pieces to directly hang the facing stone on the wall surface or hang the facing stone on a steel frame in the air. The stone is fixed on the building through the metal hanging piece to form the stone decorative curtain wall.
Generally, the stone plates are installed from bottom to top, two horizontal control lines are pulled at the upper opening and the lower opening of the lowest row of plate installation positions on the outer wall surface to control the levelness of the plates, the levelness of the plates is based on the preset ash cakes, the plates are hung straight by the lines, and the plates are fixed after being calibrated. And after the installation of the plate in the next row is finished, taking the plate as a reference, and then installing the plate in the previous row. Generally, two methods are used for installing the plates in the upper row, and one method is the same as the method for installing the plates in the lowest row, so that the method is low in efficiency. The other method utilizes a horizontal ruler, takes the mounted lowest row of plates as a reference, measures the verticality and the flatness of the upper row of plates through the horizontal ruler, and adjusts the mounted plates. And measuring the plate by using a horizontal ruler, finding the plate deviation, and adjusting the back bolt to adjust the plate. Usually, a horizontal ruler needs to be repeatedly taken and placed for measuring and adjusting a plate during installation until the plate meets the requirement, so that the construction efficiency is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for hanging stone material installation measuring level bar futilely. When the stone material is hung futilely in the installation, operating personnel need not to get repeatedly and puts the level bar and measure the stone material, only need hang the level bar on the stone material of installation, and the pendant is tied to alone operation, adjustment stone material back of the body, makes the stone material side line of being installed parallel with the level bar between two parties of bubble to improve and hang stone material efficiency of construction and installation accuracy futilely.
The utility model provides a technical scheme that its technical problem adopted as follows:
the utility model provides a be used for hanging stone material installation measuring level bar futilely, including the level bar body, its characterized in that: the horizontal ruler comprises a horizontal ruler body and is characterized in that one end of the horizontal ruler body is located on a longitudinal central axis and is provided with a mounting hole, an L-shaped hanging rod is fixedly sleeved in the mounting hole, a transverse rod of the L-shaped hanging rod is fixedly sleeved in the mounting hole and is perpendicular to the horizontal ruler, and a longitudinal rod of the L-shaped hanging rod is parallel to a leveling eating body and points to the other end of the horizontal ruler body.
A level bar for hanging stone material installation measuring futilely, its characterized in that: the end part of the transverse rod is provided with a thread section, and the end part of the transverse rod is clamped and fixedly installed in an installation hole of the level ruler through a nut and a gasket.
A level bar for hanging stone material installation measuring futilely, its characterized in that: the L-shaped hanging rod is formed by bending round steel.
A level bar for hanging stone material installation measuring futilely, its characterized in that: one end and the middle part of the level bar body are provided with level bubbles.
The level bar body is a high-precision level bar sold on the market, a round hole is formed near a level bubble at one end of the level bar, and the round hole is a mounting hole. The round hole is used for fixing the L-shaped hanging rod, one end of the L-shaped hanging rod is sleeved with the screw teeth, one end of the L-shaped hanging rod with the screw teeth penetrates through the round hole in the leveling ruler made of the aluminum alloy material, and the L-shaped hanging rod is clamped and fixed on the leveling ruler by nuts and gaskets matched with the screw teeth on the L-shaped hanging rod.
The horizontal ruler is 1200mm in length and 50mm in width sold on the market. One end and the middle part of the level bar are respectively provided with a level bubble. A round hole is arranged near the leveling tube at one end of the leveling rod and at the longitudinal middle shaft position. The leveling rod is made of aluminum alloy. The L-shaped hanging rod is 6mm in diameter, one section with the screw teeth is 70mm in length, and the other section is 80mm in length. The horizontal ruler is suitable for dry hanging of 1000mm 500mm 30mm granite stones, and if other types of plate stones with different specifications are constructed, the corresponding sizes of the horizontal ruler are adjusted, but the structure of the horizontal ruler is unchanged.
The utility model discloses when hanging the outer facade stone material board of building futilely, hang the L type peg that is used for hanging stone material installation measuring level bar futilely in stone material board top, the level bar is parallel with the panel side, and the adjustment is hung stone material back pendant futilely, makes the level bar bubble placed in the middle, then this stone material hangs down straightness and roughness and meets the requirements. A level for dry-hang stone installation measurement fulfills this technical requirement.
The utility model has the advantages as follows:
the utility model discloses when hanging the stone material futilely in the installation, operating personnel need not to get repeatedly and puts the level bar and measure the stone material, only need hang the level bar on the stone material of installation, and one man operation adjusts the stone material back of the body and ties the pendant, makes the stone material side line of being installed parallel with the level bar between two parties of bubble. The construction efficiency and the installation precision of the dry hanging stone are improved. The quality is guaranteed, and a new construction method is provided for high-precision installation and construction of the dry-hanging stone on the outer vertical surface of the building.
Drawings
Fig. 1 is a construction elevation view of the present invention.
Fig. 2 is a plan view of the L-shaped hanging rod, nut and gasket of the present invention.
FIG. 3 is a vertical view of the practical use of the present invention
FIG. 4 is a side view of the present invention in practical use
The numerical designations in the drawings are: 1. the horizontal ruler comprises a level ruler body, 21L-shaped hanging rods, 22L-shaped hanging rod nuts, 23L-shaped hanging rod gaskets and 3 stone materials.
Detailed Description
The invention will be described in further detail with reference to the accompanying drawings and specific embodiments, which are shown in the drawings.
The utility model provides a level bar for hanging stone material installation is measured futilely, includes level bar body 1, body 1 is the high accuracy aluminum alloy level bar of market sales, and aluminum alloy level bar 1 has a round hole near being close to one end air level. The round hole is a mounting hole and used for fixing the L-shaped hanging rod 21, a thread section is arranged at one end of the L-shaped hanging rod 21, a thread is sleeved on the L-shaped hanging rod 21, one end of a transverse rod of the L-shaped hanging rod 21 penetrates through the round hole of the aluminum alloy leveling ruler 1, and the L-shaped hanging rod 21 is clamped and fixed on the leveling ruler 1 through a nut 22 and a gasket 23 matched with the thread on the L-shaped hanging rod 21. The L-shaped hanging rod 21 is hung at the upper end of the granite plate 3 to be installed and debugged.
A construction step for hanging stone installation measuring spirit level futilely is as follows:
1. manufacture of L-shaped hanging rod 21 and purchase of matched nut 22 and gasket 23
Selecting round steel with the diameter of 6mm, blanking according to the size, sleeving a threading tooth at one end, and then bending the round steel into an L shape according to the designed size. Purchasing two sets of nuts and gaskets according to round steel wire teeth
2. Mounting L-shaped hanging rod 21 on level 1
When purchasing the level 1, a round hole is arranged near a level bubble at one end of the finished level 1. If not, drilling holes on the level 1 by using an electric drill.
The thread section of the L-shaped hanging rod 21 penetrates through the round hole of the level ruler 1, and the L-shaped hanging rod 21 is fixed by a gasket 23 and a nut 22 and is clamped on the level ruler 1.
3. The level bar 1 is hung on the upper part of the granite plate 3 through an L-shaped hanging rod 21
When granite stone 3 is installed, stone 3 is temporarily fixed on the back bolt support, and an L-shaped hanging rod 21 on a horizontal ruler 1 is hung on the upper part of the stone 3 to be installed and debugged, so that the horizontal ruler 1 is parallel to the side edge of the stone 3. And then adjusting the 3-back bolt hanging piece of the stone to enable the level bubble of the level 1 to be centered until the verticality and the flatness of the stone meet the requirements, and then fixing the stone.
The above, only be the preferred example of the utility model discloses, not be used for the restriction the utility model discloses, all basis the utility model discloses a technical entity is any slight modification, equivalent replacement and improvement to do the above embodiment, all should be contained within the technical scheme's of the utility model protection within range.

Claims (4)

1. The utility model provides a be used for hanging stone material installation measuring level bar futilely, including the level bar body, its characterized in that: the horizontal ruler comprises a horizontal ruler body and is characterized in that one end of the horizontal ruler body is located on a longitudinal central axis and is provided with a mounting hole, an L-shaped hanging rod is fixedly sleeved in the mounting hole, a transverse rod of the L-shaped hanging rod is fixedly sleeved in the mounting hole and is perpendicular to the horizontal ruler, and a longitudinal rod of the L-shaped hanging rod is parallel to a leveling eating body and points to the other end of the horizontal ruler body.
2. The level for dry hanging stone installation measurement as claimed in claim 1, wherein: the end part of the transverse rod is provided with a thread section, and the end part of the transverse rod is clamped and fixedly installed in an installation hole of the level ruler through a nut and a gasket.
3. The level for dry hanging stone installation measurement as claimed in claim 1, wherein: the L-shaped hanging rod is formed by bending round steel.
4. The level for dry hanging stone installation measurement as claimed in claim 1, wherein: one end and the middle part of the level bar body are provided with level bubbles.
CN202020625390.2U 2020-04-23 2020-04-23 Level bar for dry hanging stone installation measurement Active CN211783432U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020625390.2U CN211783432U (en) 2020-04-23 2020-04-23 Level bar for dry hanging stone installation measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020625390.2U CN211783432U (en) 2020-04-23 2020-04-23 Level bar for dry hanging stone installation measurement

Publications (1)

Publication Number Publication Date
CN211783432U true CN211783432U (en) 2020-10-27

Family

ID=72956375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020625390.2U Active CN211783432U (en) 2020-04-23 2020-04-23 Level bar for dry hanging stone installation measurement

Country Status (1)

Country Link
CN (1) CN211783432U (en)

Similar Documents

Publication Publication Date Title
CN210857803U (en) Circular stone decorative column
CN209585094U (en) A kind of bracket basis installation of embedded parts auxiliary mould
CN202090569U (en) Plastering screed strip template
CN111287367A (en) Curtain wall mounting structure
CN211783432U (en) Level bar for dry hanging stone installation measurement
CN106401149A (en) Aluminum alloy multifunctional wall surface floating ruler
CN205637514U (en) Multi -functional darby of plastering
CN210141865U (en) Bridge pier stud template straightness detection device that hangs down
CN201386378Y (en) Building plaster tool
CN104878909B (en) It is a kind of to be easy to hold the Horizontal scrapping rule taken
CN212482495U (en) Building engineering is with straightness detection device that hangs down
CN106677495B (en) A kind of multi-functional charge veins device of automatically calibrating verticality
CN213208886U (en) Hang portable prefabricated component straightness detection chi that hangs
CN210508258U (en) Hanging ruler for assisting in leveling of suspended ceiling framework
CN207499463U (en) A kind of cast-in-place concrete floor elevation control device
CN209066818U (en) Auxiliary guiding ruler component for the production of metope ash cake
CN209764066U (en) Portable civil engineering construction measuring device
CN207260444U (en) Steel bar spacer
CN214834324U (en) A anchor clamps that is used for hanging stone material roughness survey and regulate futilely
CN210426391U (en) Verticality measuring tool for aluminum die
CN210833518U (en) Novel high-precision horizontal measuring instrument
CN216791217U (en) Wall face verticality detection device for building construction
CN217687228U (en) High-precision blue light projection control instrument for wall and secondary structure
CN218545616U (en) Simple and easy exterior wall board roughness inspection device
CN211714627U (en) Curtain built-in fitting positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant