CN109488001A - Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering - Google Patents
Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering Download PDFInfo
- Publication number
- CN109488001A CN109488001A CN201811387846.XA CN201811387846A CN109488001A CN 109488001 A CN109488001 A CN 109488001A CN 201811387846 A CN201811387846 A CN 201811387846A CN 109488001 A CN109488001 A CN 109488001A
- Authority
- CN
- China
- Prior art keywords
- pressing plate
- vertical
- horizontal
- column
- jointing column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000003825 pressing Methods 0.000 claims abstract description 71
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 35
- 239000011505 plaster Substances 0.000 claims description 21
- 239000011449 brick Substances 0.000 claims description 2
- 238000000034 method Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 239000000919 ceramic Substances 0.000 description 4
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/165—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
- E04F21/1652—Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers for smoothing and shaping joint compound to a desired contour
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses brickwork joint light instrument and construction method are hooked after a kind of external wall plastering, including pressing plate, horizontal jointing column, vertical jointing column and handle, it is characterized in that, the horizontal jointing column and vertical jointing column are several, according to a fixed spacing along the horizontally and vertically setting of pressing plate;The handle is two, and the another side far from horizontal jointing column and vertical jointing column of pressing plate is arranged in.Horizontal mortar joint slot, the vertical grey slot i.e. production of " brickwork joint " can be rapidly completed by manual pressure, structure is simple, and easy to use, practical, horizontal mortar joint slot, the vertical mortar joint slot image suppressed is true to nature, and three-dimensional sense is strong, aesthetic in appearance.
Description
Technical field
The present invention relates to a kind of construction equipments of decorating outer wall of building technical field, after a kind of external wall plastering
Hook brickwork joint light instrument and construction method.
Background technique
Currently, to reduce cost and security consideration, decorating outer wall of building is generally using plastering in technical field of building construction
Swabbing substitution tiling or marmorean form of construction work afterwards.It is economical and practical using swabbing mode after plastering, but appearance is not beautiful
It sees, Integral decoration seems not " on tall and big ", for this purpose, someone uses external wall spraying coating, then draws " ceramic tile " pattern, that is, draws out
The construction technology of horizontal mortar joint and vertical mortar joint not only solves the high problem of exterior wall cost, eliminates what ceramic tile was fallen
Security risk, while also solving the problems, such as that exterior wall is specious.This horizontal mortar joint, the vertical mortar joint for drawing " ceramic tile " is now big
Mostly by manpower work scribing line draw, there is the thicknesses of grey suture it is different, lines are not straight the problems such as, it is important to efficiency is too low, worker
Labor intensity is too big.
Chinese patent CN206521926U discloses " a kind of exterior coating horizontal mortar joint and vertical mortar joint drawing apparatus ", though
So solve these problems, but horizontal mortar joint, vertical mortar joint are still what " pictures " got on, far see still, closely see that there are still scarce
Weary three-dimensional sense, inaesthetic problem.
Summary of the invention
To overcome prior art defect, the technical problem to be solved by the present invention is to provide brickwork joint letter is hooked after a kind of external wall plastering
Easy tool and construction method, structure is simple, easy to use, practical, and horizontal mortar joint slot, vertical grey slot i.e. " brick can be rapidly completed
The production of seam ", lifelike image, three-dimensional sense are strong, aesthetic in appearance.
In order to achieve the above object, the present invention is implemented with the following technical solutions:
Brickwork joint light instrument, including pressing plate, horizontal jointing column, vertical jointing column and handle are hooked after a kind of external wall plastering,
It is characterized in that, the horizontal jointing column and vertical jointing column are several, according to a fixed spacing along the level side of pressing plate
It is arranged to vertical direction;The handle is two, and the another far from horizontal jointing column and vertical jointing column of pressing plate is arranged in
Face.
The horizontal jointing column and vertical jointing column are in 90 ° of settings of reporting to the leadship after accomplishing a task, and constitute the rib of horizontal mortar joint, vertical mortar joint groove
Rod structure.
The length of the pressing plate is 800~1200mm, width is 400~600mm.
The operating method that brickwork joint is hooked after a kind of external wall plastering is:
After external wall plastering hook " brickwork joint " operation carried out after conventional external wall plastering, before swabbing, below with from top to bottom, from
The construction method of the invention device is specifically described for from left to right construction:
1) worker's both hands hold handle, the top of pressing plate are aligned with the upper edge of wall, the left side of pressing plate and wall
Left margin alignment, firmly pressing makes horizontal jointing column and vertical jointing column get into coat of plaster, the i.e. surface of pressing plate and plastering completely
Layer is concordant;
2) pressing plate is lifted, moving right makes the left margin of pressing plate be aligned, press with the vertical grey slot of the rightmost side just extruded
The top of plate is aligned with the upper edge of wall, and firmly pressing makes horizontal jointing column and vertical jointing column get into coat of plaster completely, i.e.,
The surface of pressing plate is concordant with coat of plaster;
3) step 2) is repeated up to the rightmost of wall, completes the compacting of the breadth horizontal mortar joint slot, vertical grey slot;
4) lift pressing plate, move down be aligned the left side of pressing plate with the left margin of wall, the top of pressing plate and step 1)
~3) the horizontal mortar joint slot alignment bottom extruded, firmly pressing makes horizontal jointing column and vertical jointing column get into plastering completely
Layer, i.e., the surface of pressing plate is concordant with coat of plaster;
5) pressing plate is lifted, moving right makes the left margin of pressing plate be aligned, press with the vertical grey slot of the rightmost side just extruded
The top of plate and step 1)~3) the horizontal mortar joint slot bottom that extrudes be aligned, and firmly pressing makes horizontal jointing column and vertical hook
Seam column gets into coat of plaster completely, i.e. the surface of pressing plate is concordant with coat of plaster;
6) step 5) is repeated up to the rightmost of wall, completes the compacting of the breadth horizontal mortar joint slot, vertical grey slot;
7) step 4)~6 are repeated) until the metope horizontal mortar joint slot, vertical grey slot bottom, can be completed in wall
That is the compacting of " brickwork joint ".
Compared with prior art, the beneficial effects of the present invention are:
1) structure is simple, easy to use, practical, and horizontal mortar joint slot, the vertical grey slot i.e. pressure of " brickwork joint " can be rapidly completed
System, lifelike image, three-dimensional sense are strong;
2) " ceramic tile " horizontal mortar joint slot, the vertical grey slot suppressed is uniform, beautiful;
3) labor intensity of workers is small, and work efficiency is high.
Detailed description of the invention
Fig. 1 is structural representation front view of the invention;
Fig. 2 is structural representation left view of the invention;
Fig. 3 is structural representation top view of the invention.
In figure: the vertical jointing column 4- handle of the horizontal jointing column 3- of 1- pressing plate 2-
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing:
See Fig. 1-Fig. 3, hook brickwork joint light instrument after a kind of external wall plastering of the present invention, including pressing plate 1, horizontal hooks
Column 2, vertical jointing column 3 and handle 4 are stitched, the horizontal jointing column 2 and vertical jointing column 3 are several, according to a fixed spacing
Along the horizontally and vertically setting of pressing plate 1;The handle 4 is two, and the separate horizontal jointing column of pressing plate 1 is arranged in
2 and vertical jointing column 3 another side.
The horizontal jointing column 2 and vertical jointing column 3 be in 90 ° of settings of reporting to the leadship after accomplishing a task, composition horizontal mortar joint, vertical mortar joint groove
Prism structure.
The length of the pressing plate 1 is 800~1200mm, width is 400~600mm.
The operating method that brickwork joint is hooked after a kind of external wall plastering is:
After external wall plastering hook " brickwork joint " operation carried out before swabbing after conventional external wall plastering, below with from top to bottom, from
The construction method of the invention device is specifically described for from left to right construction:
1) worker's both hands hold handle 4, the top of pressing plate 1 are aligned with the upper edge of wall, the left side of pressing plate 1 and wall
Left margin alignment, firmly pressing makes horizontal jointing column 2 and vertical jointing column 3 get into coat of plaster completely, i.e., the surface of pressing plate 1 with
Coat of plaster is concordant;
2) lift pressing plate 1, move right be aligned the left margin of pressing plate 1 with the vertical grey slot of the rightmost side that just extrudes,
The top of pressing plate 1 is aligned with the upper edge of wall, and firmly pressing makes horizontal jointing column 2 and vertical jointing column 3 get into plastering completely
Layer, i.e., the surface of pressing plate 1 is concordant with coat of plaster;
3) step 2) is repeated up to the rightmost of wall, completes the compacting of the breadth horizontal mortar joint slot, vertical grey slot;
4) lift pressing plate 1, move down be aligned the left side of pressing plate 1 with the left margin of wall, the top of pressing plate 1 and step
1) the horizontal mortar joint slot alignment bottom~3) extruded, firmly pressing gets into horizontal jointing column 2 and vertical jointing column 3 completely
Coat of plaster, the i.e. surface of pressing plate 1 are concordant with coat of plaster;
5) lift pressing plate 1, move right be aligned the left margin of pressing plate 1 with the vertical grey slot of the rightmost side that just extrudes,
The top of pressing plate 1 and step 1)~3) the horizontal mortar joint slot bottom that extrudes be aligned, and firmly pressing makes horizontal 2 He of jointing column
Vertical jointing column 3 gets into coat of plaster completely, i.e. the surface of pressing plate 1 is concordant with coat of plaster;
6) step 5) is repeated up to the rightmost of wall, completes the compacting of the breadth horizontal mortar joint slot, vertical grey slot;
7) step 4)~6 are repeated) until the metope horizontal mortar joint slot, vertical grey slot bottom, can be completed in wall
Compacting.
Claims (4)
1. brickwork joint light instrument, including pressing plate, horizontal jointing column, vertical jointing column and handle are hooked after a kind of external wall plastering,
It is characterized in that, the horizontal jointing column and vertical jointing column are several, according to a fixed spacing along the horizontal direction of pressing plate
It is arranged with vertical direction;The handle is two, and the another side far from horizontal jointing column and vertical jointing column of pressing plate is arranged in.
2. hooking brickwork joint light instrument after a kind of external wall plastering according to claim 1, which is characterized in that the horizontal hook
It stitches column and vertical jointing column is in 90 ° of settings of reporting to the leadship after accomplishing a task, constitute the prism structure of horizontal mortar joint, vertical mortar joint groove.
3. hooking brickwork joint light instrument after a kind of external wall plastering according to claim 1, which is characterized in that the pressing plate
Length is 800~1200mm, width is 400~600mm.
4. hooking the application method of brickwork joint light instrument after realizing a kind of external wall plastering described in claim 1, which is characterized in that
The following steps are included:
" brickwork joint " operation is hooked after external wall plastering to carry out after conventional external wall plastering, before swabbing, below with from top to bottom, from left-hand
The construction method of the invention device is specifically described for right construction:
1) worker's both hands hold handle, the top of pressing plate are aligned with the upper edge of wall, the left side on the left side of pressing plate and wall
Along alignment, firmly pressing makes horizontal jointing column and vertical jointing column get into coat of plaster completely, i.e. the surface of pressing plate and coat of plaster is flat
It is neat;
2) lift pressing plate, move right be aligned the left margin of pressing plate with the vertical grey slot of the rightmost side that just extrudes, pressing plate
Top is aligned with the upper edge of wall, and firmly pressing makes horizontal jointing column and vertical jointing column get into coat of plaster, i.e. pressing plate completely
Surface it is concordant with coat of plaster;
3) step 2) is repeated up to the rightmost of wall, completes the compacting of the breadth horizontal mortar joint slot, vertical grey slot;
4) lift pressing plate, move down be aligned the left side of pressing plate with the left margin of wall, the top and step 1)~3 of pressing plate)
The horizontal mortar joint slot alignment bottom extruded, firmly pressing makes horizontal jointing column and vertical jointing column get into coat of plaster completely,
I.e. the surface of pressing plate is concordant with coat of plaster;
5) lift pressing plate, move right be aligned the left margin of pressing plate with the vertical grey slot of the rightmost side that just extrudes, pressing plate
Top and step 1)~3) the horizontal mortar joint slot bottom that extrudes be aligned, and firmly pressing makes horizontal jointing column and vertical jointing column
Coat of plaster is got into completely, i.e. the surface of pressing plate is concordant with coat of plaster;
6) step 5) is repeated up to the rightmost of wall, completes the compacting of the breadth horizontal mortar joint slot, vertical grey slot;
7) step 4)~6 are repeated) until the metope horizontal mortar joint slot, vertical grey slot i.e. " brick bottom, can be completed in wall
The compacting of seam ".
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811387846.XA CN109488001A (en) | 2018-11-21 | 2018-11-21 | Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811387846.XA CN109488001A (en) | 2018-11-21 | 2018-11-21 | Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109488001A true CN109488001A (en) | 2019-03-19 |
Family
ID=65696417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811387846.XA Pending CN109488001A (en) | 2018-11-21 | 2018-11-21 | Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109488001A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056170A (en) * | 2019-05-16 | 2019-07-26 | 中国一冶集团有限公司 | A kind of pointing device of novel and multifunctional environmental protection |
CN110094072A (en) * | 2019-05-07 | 2019-08-06 | 苏州市职业大学 | A kind of pointing device of building a wall of adaptive wall slit width degree |
CN113482297A (en) * | 2021-07-22 | 2021-10-08 | 中铁四局集团有限公司 | Mortar joint control method for antique clean water brick curtain wall |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200348677Y1 (en) * | 2004-02-02 | 2004-05-03 | 강희인 | Handiness Cement A Trowel |
CN203684619U (en) * | 2013-11-27 | 2014-07-02 | 重庆思贝肯节能技术开发有限公司 | Device for jointing of exterior wall tiles |
CN203684618U (en) * | 2013-11-27 | 2014-07-02 | 重庆思贝肯节能技术开发有限公司 | Tool for joint pointing of external wall bricks |
CN106639266A (en) * | 2016-11-21 | 2017-05-10 | 中国三冶集团有限公司 | Exterior wall paint horizontal mortar joint and vertical mortar joint drawing device and method |
CN209509427U (en) * | 2018-11-21 | 2019-10-18 | 中国三冶集团有限公司 | " brickwork joint " is hooked after a kind of external wall plastering uses light instrument |
-
2018
- 2018-11-21 CN CN201811387846.XA patent/CN109488001A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200348677Y1 (en) * | 2004-02-02 | 2004-05-03 | 강희인 | Handiness Cement A Trowel |
CN203684619U (en) * | 2013-11-27 | 2014-07-02 | 重庆思贝肯节能技术开发有限公司 | Device for jointing of exterior wall tiles |
CN203684618U (en) * | 2013-11-27 | 2014-07-02 | 重庆思贝肯节能技术开发有限公司 | Tool for joint pointing of external wall bricks |
CN106639266A (en) * | 2016-11-21 | 2017-05-10 | 中国三冶集团有限公司 | Exterior wall paint horizontal mortar joint and vertical mortar joint drawing device and method |
CN209509427U (en) * | 2018-11-21 | 2019-10-18 | 中国三冶集团有限公司 | " brickwork joint " is hooked after a kind of external wall plastering uses light instrument |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110094072A (en) * | 2019-05-07 | 2019-08-06 | 苏州市职业大学 | A kind of pointing device of building a wall of adaptive wall slit width degree |
CN110056170A (en) * | 2019-05-16 | 2019-07-26 | 中国一冶集团有限公司 | A kind of pointing device of novel and multifunctional environmental protection |
CN110056170B (en) * | 2019-05-16 | 2020-11-27 | 中国一冶集团有限公司 | Novel multi-functional environmental protection's pointing device |
CN113482297A (en) * | 2021-07-22 | 2021-10-08 | 中铁四局集团有限公司 | Mortar joint control method for antique clean water brick curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109488001A (en) | Brickwork joint light instrument and construction method are hooked after a kind of external wall plastering | |
CN106193633B (en) | A kind of masonry horizontal mortar joint controller and construction method | |
CN108343181A (en) | A kind of novel clay brick exterior wall and construction method | |
CN209509427U (en) | " brickwork joint " is hooked after a kind of external wall plastering uses light instrument | |
CN202090569U (en) | Plastering screed template | |
CN103899072A (en) | Hanging member for wet hanging of stone or tiles and wet hanging method | |
CN205046791U (en) | Artificial stone plate material connection structure convenient to hang dress | |
CN203905374U (en) | Hanging piece for hanging stones or tiles in wet hanging mode | |
CN103806655A (en) | construction method for glass brick wall | |
CN106088533B (en) | A kind of construction method and constructing device of building decoration gray line | |
CN103758315A (en) | Manufacturing method of reversed-hitting type pebble decorative sheet through dewaxing method | |
CN204311711U (en) | A kind of flexible nose bar for levelling tile paste face | |
CN205134858U (en) | Ceramic tile mounting | |
CN206091339U (en) | Build horizontal mortar joint controller by laying bricks or stones | |
CN208396211U (en) | A kind of vitrified tile wall surface dry-hang device | |
CN104878909B (en) | It is a kind of to be easy to hold the Horizontal scrapping rule taken | |
CN206521926U (en) | A kind of exterior coating horizontal mortar joint and vertical mortar joint drawing apparatus | |
CN106906987A (en) | A kind of functional form floating screed does angle equipment and its installation method | |
CN205025042U (en) | Big unit pottery sheet metal back of body kiss -coating bonds and constructs | |
CN209837564U (en) | Novel wall ceramic tile dry-hanging bracket | |
CN204609183U (en) | There is the inorganic non-combustible lightweight embossed decorative sheet material of heat insulation function | |
CN206737320U (en) | A kind of caulking device | |
CN106639335A (en) | Control device and method of horizontal and vertical mortar joints | |
CN207549530U (en) | Polystyrene foam plate drapes over one's shoulders water processing unit (plant) | |
CN107476552B (en) | A kind of restricted turnover device of Dali stone ceramic tile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |