CN103453884A - Integral ground feature mapping working method based on partitioning - Google Patents

Integral ground feature mapping working method based on partitioning Download PDF

Info

Publication number
CN103453884A
CN103453884A CN2013103896172A CN201310389617A CN103453884A CN 103453884 A CN103453884 A CN 103453884A CN 2013103896172 A CN2013103896172 A CN 2013103896172A CN 201310389617 A CN201310389617 A CN 201310389617A CN 103453884 A CN103453884 A CN 103453884A
Authority
CN
China
Prior art keywords
atural object
partitioning
working method
integrality
feature mapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103896172A
Other languages
Chinese (zh)
Other versions
CN103453884B (en
Inventor
周奎
赵勇
冯涛
宋军
张胜柱
王冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Institute of Surveying and mapping Co.,Ltd.
TIANJIN JINYU INFORMATION TECHNOLOGY Co.,Ltd.
Original Assignee
TIANJIN JINYU INFORMATION TECHNOLOGY Co Ltd
TIANJIN INSTITUTE OF SURVEYING AND MAPPING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JINYU INFORMATION TECHNOLOGY Co Ltd, TIANJIN INSTITUTE OF SURVEYING AND MAPPING filed Critical TIANJIN JINYU INFORMATION TECHNOLOGY Co Ltd
Priority to CN201310389617.2A priority Critical patent/CN103453884B/en
Publication of CN103453884A publication Critical patent/CN103453884A/en
Application granted granted Critical
Publication of CN103453884B publication Critical patent/CN103453884B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The invention relates to an integral ground feature mapping working method based on partitioning. The integral ground feature mapping working method comprises the following steps: (1) partitioning ground features: partitioning the ground features to be detected to form measuring units, wherein all the measuring units take a cadastral street, a lane boundary line, a water system central line and a road central line as boundary lines so as to maintain the integrality of the ground features and corresponding side boundaries between the adjacent measuring units are overlapped; (2) carrying out field measurement; and (3) carrying out office work treatment. Aiming at a current working manner, the integral ground feature mapping working method is convenient for field annotation/mapping and the edge snapping work amount of office work is reduced; the partitioning is reasonable so that river-spanning and road-spanning work is reduced to the greatest extent and result data is prevented from being cut; the edge snapping work amount is eliminated basically and the integrality of the ground features is maintained to the greatest extent. The integral ground feature mapping working method based on the partitioning is applicable to a field working mode; the edge snapping work amount is nearly zero and the edge snapping work amount of traditional framing data accounts for 1%-3% of the working amount of a whole picture; the integrality of the ground features is effectively maintained and the integral ground feature mapping working method is applicable to data management.

Description

Complete atural object mapping operational method based on subregion
Technical field
The invention belongs to mapping operation field, especially a kind of complete atural object mapping operational method based on subregion.
Background technology
At present, China basis mapping work pattern can be summarized as substantially: measure/repair survey-interior industry by the map sheet field operation and process-arrange warehouse-in.In existing atural object mapping method, framing adopts rectangular mapsubdivision or Trapeze according to " national basic-scale topographic map framing and numbering ", there are the following problems in the mapping operation for this kind of framing mode: 1, in field operation, increase the workload that field operation is measured, for example the framing line has been crossed in house to be measured, in two width figure each some, if this two width figure is distributed to different measuring team and is repaiied side, so in order to guarantee the integrality of atural object, this house will be measured unit by two and measure respectively once; Owing to limited by framing and natural conditions, field operation is adjusted often to paint/survey and draw and is surveyed opposite bank because the map sheet cross a river turns, and the achievement of measuring by sheet also needs to cut into the framing achievement, has increased workload, also causes work inconvenience, and destroys integrality; 2, in interior industry, newly survey compilation or repair and survey compilation or reduce the staff no matter be, edge fit is all necessary operation, and the workload of edge fit is very large, take greatly the time that data are processed, and the error of edge fit process and mistake also be difficult to avoid, lost data precision that can be artificial, hinder the lifting of the quality of data.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of complete atural object mapping operational method based on subregion is provided, the method not only scope is divided the inconvenience of reasonably avoiding field operation, also allows the edge fit workload level off to zero, and has farthest safeguarded the integrality of atural object.
The present invention solves its technical matters and is achieved through the following technical solutions:
A kind of complete atural object mapping operational method based on subregion, its step is as follows:
(1), atural object subregion: tested atural object is carried out to subregion, form measuring unit, take ,Fang boundary line, land deeds street, water system center line and road axis between each measuring unit is separatrix, safeguards the atural object integrality, and between adjacent measurement, corresponding sideline overlaps;
(2), field operation is measured: use GPS, total powerstation, spirit-leveling instrument to carry out control survey, measure the smashed parts, the positional information of atural object, landforms and corresponding attribute information in pickup area;
(3), interior industry is processed: by interior industry Become the picture software by the atural object of field data acquisition, the plotting on computers of landforms position, corresponding attribute information, configure corresponding line style, symbol, word annotation, be met the cartographic data of the graphic requirement of GB, complete atural object mapping operation.
And in described tested atural object, the separatrix of river, irrigation canals and ditches is arranged on the right-hand or below of water system center line.
And in described tested atural object, the separatrix of road is arranged on the right-hand or below of road axis, safeguards the atural object integrality.
Advantage of the present invention and beneficial effect are:
This complete atural object mapping operational method based on subregion is for current operating type, facilitating field operation to adjust paints/surveys and draws, industry edge fit workload in reducing, rationalization partition, farthest reduced cross a river ,Kua road operation, stop to cut the achievement data, substantially eliminated the edge fit workload, farthest safeguarded the atural object integrality.The present invention adapts to the field operation work pattern, and the edge fit workload levels off to zero, and traditional framing data edge fit workload accounts for 1% to 3% of view picture figure workload and do not wait, and effectively safeguards the integrality of atural object, is applicable to data management.
The accompanying drawing explanation
Fig. 1 is the tested atural object subregion of the present invention schematic diagram.
Embodiment
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of complete atural object mapping operational method based on subregion, its step is as follows:
(1), atural object subregion: tested atural object is carried out to subregion, form measuring unit, ,Fang boundary line, land deeds street, water system center line and road axis take between each measuring unit as separatrix 1, safeguard the atural object integrality, between adjacent measurement, corresponding sideline overlaps, in tested atural object, the separatrix of river, irrigation canals and ditches is arranged on the right-hand or below of water system center line, and in tested atural object, the separatrix of road is arranged on the right-hand or below of road axis, safeguards the atural object integrality;
(2), field operation is measured: use GPS, total powerstation, spirit-leveling instrument to carry out control survey, measure the smashed parts, the positional information of atural object, landforms and corresponding attribute information in pickup area;
(3), interior industry is processed: by interior industry Become the picture software by the atural object of field data acquisition, the plotting on computers of landforms position, corresponding attribute information, configure corresponding line style, symbol, word annotation, be met the cartographic data of the graphic requirement of GB, complete atural object mapping operation.
The administrative division boundary line be take as main reference line in measuring unit of the present invention separatrix, in conjunction with situation on the spot, in principle the following rank administrative boundary in district is made the appropriate adjustments, district and above rank administrative boundary must not be adjusted in principle, can the adjusting as one sees fit of the important atural objects such as gland house.When in the present invention, the linear ground objects such as railway, line of electric force are inevitably cut in the measuring unit separatrix, should suitably adjust the boundary line crosscut, be convenient to edge fit.Measuring unit is divided the integrality that should suitably take into account the important areas such as important commercial street, cultural street, and measuring unit is of moderate size, and take 1:2000 as example, comprises 10 to 30 width standard framings and is advisable.

Claims (3)

1. the complete atural object based on subregion is surveyed and drawn operational method, and it is characterized in that: the step of the method is as follows:
(1), atural object subregion: tested atural object is carried out to subregion, form measuring unit, take ,Fang boundary line, land deeds street, water system center line and road axis between each measuring unit is separatrix, safeguards the atural object integrality, and between adjacent measurement, corresponding sideline overlaps;
(2), field operation is measured: use GPS, total powerstation, spirit-leveling instrument to carry out control survey, measure the smashed parts, the positional information of atural object, landforms and corresponding attribute information in pickup area;
(3), interior industry is processed: by interior industry Become the picture software by the atural object of field data acquisition, the plotting on computers of landforms position, the corresponding attribute information of typing, configure corresponding line style, symbol, word annotation, be met the cartographic data of the graphic requirement of GB, complete atural object mapping operation.
2. the complete atural object based on subregion according to claim 1 is surveyed and drawn operational method, and it is characterized in that: in described tested atural object, the separatrix of river, irrigation canals and ditches is arranged on the right-hand or below of water system center line.
3. the complete atural object based on subregion according to claim 1 is surveyed and drawn operational method, and it is characterized in that: in described tested atural object, the separatrix of road is arranged on the right-hand or below of road axis, safeguards the atural object integrality.
CN201310389617.2A 2013-08-30 2013-08-30 Based on the complete atural object mapping operational method of subregion Active CN103453884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310389617.2A CN103453884B (en) 2013-08-30 2013-08-30 Based on the complete atural object mapping operational method of subregion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310389617.2A CN103453884B (en) 2013-08-30 2013-08-30 Based on the complete atural object mapping operational method of subregion

Publications (2)

Publication Number Publication Date
CN103453884A true CN103453884A (en) 2013-12-18
CN103453884B CN103453884B (en) 2015-12-02

Family

ID=49736514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310389617.2A Active CN103453884B (en) 2013-08-30 2013-08-30 Based on the complete atural object mapping operational method of subregion

Country Status (1)

Country Link
CN (1) CN103453884B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104765887A (en) * 2015-04-29 2015-07-08 天津市测绘院 Method for extracting road attribute data in synthetic aperture radar interference measurement data
CN107063210A (en) * 2017-04-20 2017-08-18 中博宇图信息科技有限公司 The mapping method of project is renovated in a kind of reallocation of land
CN110645969A (en) * 2019-10-29 2020-01-03 广州国苑规划设计有限公司 Land surveying and mapping method for homeland planning
CN113587911A (en) * 2021-08-02 2021-11-02 胡炫楠 Complete ground feature surveying and mapping operation method based on partition

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000329567A (en) * 1999-05-24 2000-11-30 Clarion Co Ltd Method for displaying landmark, and navigation apparatus
CN1372126A (en) * 2002-01-12 2002-10-02 中国水利水电第四工程局 Method for digital photographic measurement by non-measurement camera
EP1508777A1 (en) * 2003-08-16 2005-02-23 DaimlerChrysler AG Method for updating a digital map
CN1588375A (en) * 2004-09-28 2005-03-02 东南大学 Treating method for land investigation information data
CN103247055A (en) * 2013-05-27 2013-08-14 武汉大学 Seam line optimization method based on long-span region extraction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000329567A (en) * 1999-05-24 2000-11-30 Clarion Co Ltd Method for displaying landmark, and navigation apparatus
CN1372126A (en) * 2002-01-12 2002-10-02 中国水利水电第四工程局 Method for digital photographic measurement by non-measurement camera
EP1508777A1 (en) * 2003-08-16 2005-02-23 DaimlerChrysler AG Method for updating a digital map
CN1588375A (en) * 2004-09-28 2005-03-02 东南大学 Treating method for land investigation information data
CN103247055A (en) * 2013-05-27 2013-08-14 武汉大学 Seam line optimization method based on long-span region extraction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104765887A (en) * 2015-04-29 2015-07-08 天津市测绘院 Method for extracting road attribute data in synthetic aperture radar interference measurement data
CN107063210A (en) * 2017-04-20 2017-08-18 中博宇图信息科技有限公司 The mapping method of project is renovated in a kind of reallocation of land
CN110645969A (en) * 2019-10-29 2020-01-03 广州国苑规划设计有限公司 Land surveying and mapping method for homeland planning
CN113587911A (en) * 2021-08-02 2021-11-02 胡炫楠 Complete ground feature surveying and mapping operation method based on partition

Also Published As

Publication number Publication date
CN103453884B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103711080B (en) Utilize the method for locating between coordinate method of comparison determination steel pipe arch bridge arch rib
CN103453884B (en) Based on the complete atural object mapping operational method of subregion
CN103791886B (en) Plains region Google Earth assists the flat section survey method of short distance transmission line of electricity
CN104732038A (en) City ventilated corridor computing method and system based on GIS
CN103954741B (en) Portable soil corrodes observation device
CN103425054B (en) A kind of based on digitized electric power tunnel construction control method
CN108345318A (en) A kind of beam sections free cantilever erection pier top block installation measurement method
CN104599069A (en) Power transmission line route planning method based on environment factors and geographic features
CN104514201A (en) Bridge jacking applied three-axis parallel mechanism
CN103605680A (en) Function realization method for database map
CN104298862A (en) Method for obtaining routing inspection in-place data of city pipe network
CN105467100A (en) County territory soil erosion time-space dynamic monitoring method based on remote sensing and GIS
CN104296824A (en) Video water level gauge
CN105203070B (en) A kind of double-O-tube shield tunnel construction deflection causes the computational methods of soil deformation
CN116542060A (en) Drainage and waterlogging prevention planning terrain model construction method based on legal graph planning
CN202964636U (en) Margin line marking tool
CN107239636B (en) Windward side density computational methods based on the horizontal profile minimum enclosed rectangle of building
CN115690340A (en) Cross geological profile boundary adjusting method based on two-dimensional and three-dimensional real-time linkage
CN112182812B (en) Distribution line design method
CN107644139A (en) A kind of attribute mapping method from CAD model to CAE models
CN204128621U (en) Video water-level gauge
Guang et al. Research on impact of ground control point distribution on image geometric rectification based on voronoi diagram
CN206722409U (en) A kind of telescopic adjusted size of square locator of cell
CN103021256B (en) Be applicable to the road base map information processing method of rapid transit accident treatment
CN101916316B (en) Scutcheon scale value drawing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210222

Address after: 300000 9 Changling Road, liqizhuang, Xiqing District, Tianjin

Patentee after: Tianjin Institute of Surveying and mapping Co.,Ltd.

Patentee after: TIANJIN JINYU INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 300381 Tianjin Institute of Surveying and mapping, Changling Road, liqizhuang, Xiqing District, Tianjin

Patentee before: Tianjin City

Patentee before: TIANJIN JINYU INFORMATION TECHNOLOGY Co.,Ltd.