CN103453319B - Compression container apparatus - Google Patents

Compression container apparatus Download PDF

Info

Publication number
CN103453319B
CN103453319B CN201310427315.XA CN201310427315A CN103453319B CN 103453319 B CN103453319 B CN 103453319B CN 201310427315 A CN201310427315 A CN 201310427315A CN 103453319 B CN103453319 B CN 103453319B
Authority
CN
China
Prior art keywords
compressor
pipe
compression
natural gas
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310427315.XA
Other languages
Chinese (zh)
Other versions
CN103453319A (en
Inventor
吕新农
赵永明
王跃文
张军
米红学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201310427315.XA priority Critical patent/CN103453319B/en
Publication of CN103453319A publication Critical patent/CN103453319A/en
Application granted granted Critical
Publication of CN103453319B publication Critical patent/CN103453319B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Compressor (AREA)

Abstract

The present invention relates to container apparatus technical field, it is a kind of compression container apparatus, it comprises compression shipping container, compressor, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, compression set blowdown pipeline and compression set blow-down pipe; Compressor, compressor virgin gas admission line is installed with respectively, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, compression set blowdown pipeline and compression set blow-down pipe in compression shipping container.Reasonable and compact in structure of the present invention, easy to use, by by compressor and attached all pipeline installings thereof in shipping container, convenient resettlement, and the pipeline rapid pipe joint arranged on shipping container and the quick socket of cable facilitate the installation and removal of subsequent job, can not only save the production operation time, and device can use in duplication of production, effectively reduces cost of production.

Description

Compression container apparatus
Technical field
the present invention relates to container apparatus technical field, is a kind of compression container apparatus.
Background technique
at present in field produces, rock gas is generally transported to after central treating station purifies enters long defeated pipe network by entering primary tube net after well head pretreatment.At present when carrying rock gas or purifying, the device adopted all first needs to carry out laying the foundations, being then fixed on terrace by device, like this in production and construction process, not only lose time, and bring very big inconvenience to installation, dismounting and resettlement, meanwhile, add cost of production.
Summary of the invention
the invention provides a kind of compression container apparatus, overcome the deficiency of above-mentioned prior art, it can effectively solve, and existing natural gas transport purification plant is installed, dismounting and resettlement inconvenient, lose time, problem that cost of production is high.
technological scheme of the present invention is realized by following measures: a kind of compression container apparatus, comprise compression shipping container, compressor, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, compression set blowdown pipeline and compression set blow-down pipe, compressor is installed with respectively in compression shipping container, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, compression set blowdown pipeline and compression set blow-down pipe, left compression pipeline rapid pipe joint is installed with respectively in the left and right sides of compression shipping container, the quick socket of left compression cable, right compression pipeline rapid pipe joint and the quick socket of right compression cable, compressor inleting pipe line is installed with between the inlet end and compressor virgin gas admission line of compressor, between the outlet side of compressor and compressed natural gas discharge pipe, be installed with compressor to give vent to anger pipeline, compressor drain pipe is installed with between the blowdown end and compression set blowdown pipeline of compressor, compressor blow-down pipe is installed with between the emptying end and compression set blow-down pipe of compressor, blowpipe line is installed with compression set compressed-air line, compressor inleting pipe line and compressor are given vent to anger between pipeline and are installed with emptying bypass tube, emptying arm is installed with between emptying bypass tube and compressor blow-down pipe, virgin gas blow-down pipe is installed with between compressor virgin gas admission line and compressed natural gas discharge pipe, compressed natural gas blow-down pipe is installed with between compressed natural gas discharge pipe and compression set blow-down pipe, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, the left end of compression set blowdown pipeline and compression set blow-down pipe is fixedly installed togather with left compression pipeline rapid pipe joint respectively, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, the right-hand member of compression set blowdown pipeline and compression set blow-down pipe is fixedly installed togather with right compression pipeline rapid pipe joint respectively, at emptying bypass tube, emptying arm, virgin gas blow-down pipe and compressed natural gas blow-down pipe are installed with control valve respectively, compressor between emptying bypass tube and compressed natural gas discharge pipe is given vent to anger on pipeline and is installed with control valve, compressor inleting pipe line between emptying bypass tube and compressor virgin gas admission line is installed with control valve, compressor blow-down pipe between emptying arm and compression set blow-down pipe is installed with one-way valve, compressor virgin gas admission line between virgin gas blow-down pipe and left compression pipeline rapid pipe joint is installed with control valve, compressor virgin gas admission line between compressor inleting pipe line and right compression pipeline rapid pipe joint is installed with control valve, the compressed natural gas discharge pipe that compressor is given vent to anger between pipeline and left compression pipeline rapid pipe joint is installed with control valve, compressed natural gas discharge pipe between compressed natural gas blow-down pipe and right compression pipeline rapid pipe joint is installed with control valve, the compression set blowdown pipeline of compressor drain pipe both sides is installed with control valve respectively.
here is the further optimization and/or improvements to foregoing invention technological scheme:
above-mentioned compression shipping container is on the basis of 1BB standard container structure, and width is increased to 3000mm.
reasonable and compact in structure of the present invention, easy to use, by by compressor and attached all pipeline installings thereof in shipping container, convenient resettlement, and the pipeline rapid pipe joint arranged on shipping container and the quick socket of cable facilitate the installation and removal of subsequent job, can not only save the production operation time, and device can use in duplication of production, effectively reduces cost of production.
Accompanying drawing explanation
accompanying drawing 1 is the main TV structure schematic diagram of preferred embodiment.
coding in accompanying drawing is respectively: 1 is compression shipping container, 2 is compressor, 3 is compressor virgin gas admission line, 4 is compressed natural gas discharge pipe, 5 is fuel natural gas delivery pipe, 6 is blowpipe line, 7 is compression set blowdown pipeline, 8 is compression set blow-down pipe, 9 is compressor inleting pipe line, 10 to give vent to anger pipeline for compressor, 11 is compressor drain pipe, 12 is compressor blow-down pipe, 13 is compression set compressed-air line, 14 is emptying bypass tube, 15 is emptying arm, 16 is virgin gas blow-down pipe, 17 is compressed natural gas blow-down pipe, 18 is control valve, 19 is one-way valve.
Embodiment
the present invention by the restriction of following embodiment, can not determine concrete mode of execution according to technological scheme of the present invention and actual conditions.
in the present invention, for convenience of description, the description of the relative position relation of each parts is all be described according to the Butut mode of Figure of description 1, as: the position relationship of upper and lower, left and right etc. determines according to the Butut direction of Figure of description.
below in conjunction with embodiment and accompanying drawing, the invention will be further described:
as shown in Figure 1, this compression container apparatus comprises compression shipping container 1, compressor 2, compressor virgin gas admission line 3, compressed natural gas discharge pipe 4, fuel natural gas delivery pipe 5, blowpipe line 6, compression set blowdown pipeline 7 and compression set blow-down pipe 8, compressor 2 is installed with respectively in compression shipping container 1, compressor virgin gas admission line 3, compressed natural gas discharge pipe 4, fuel natural gas delivery pipe 5, blowpipe line 6, compression set blowdown pipeline 7 and compression set blow-down pipe 8, left compression pipeline rapid pipe joint is installed with respectively in the left and right sides of compression shipping container 1, the quick socket of left compression cable, right compression pipeline rapid pipe joint and the quick socket of right compression cable, compressor inleting pipe line 9 is installed with between the inlet end and compressor virgin gas admission line 3 of compressor 2, between the outlet side of compressor 2 and compressed natural gas discharge pipe 4, be installed with compressor to give vent to anger pipeline 10, compressor drain pipe 11 is installed with between the blowdown end and compression set blowdown pipeline 7 of compressor 2, compressor blow-down pipe 12 is installed with between the emptying end and compression set blow-down pipe 8 of compressor 2, blowpipe line 6 is installed with compression set compressed-air line 13, compressor inleting pipe line 9 and compressor are given vent to anger between pipeline 10 and are installed with emptying bypass tube 14, emptying arm 15 is installed with between emptying bypass tube 14 and compressor blow-down pipe 12, virgin gas blow-down pipe 16 is installed with between compressor virgin gas admission line 3 and compressed natural gas discharge pipe 4, compressed natural gas blow-down pipe 17 is installed with between compressed natural gas discharge pipe 4 and compression set blow-down pipe 8, compressor virgin gas admission line 3, compressed natural gas discharge pipe 4, fuel natural gas delivery pipe 5, blowpipe line 6, the left end of compression set blowdown pipeline 7 and compression set blow-down pipe 8 is fixedly installed togather with left compression pipeline rapid pipe joint respectively, compressor virgin gas admission line 3, compressed natural gas discharge pipe 4, fuel natural gas delivery pipe 5, blowpipe line 6, the right-hand member of compression set blowdown pipeline 7 and compression set blow-down pipe 8 is fixedly installed togather with right compression pipeline rapid pipe joint respectively, at emptying bypass tube 14, emptying arm 15, virgin gas blow-down pipe 16 and compressed natural gas blow-down pipe 17 are installed with control valve 18 respectively, compressor between emptying bypass tube 14 and compressed natural gas discharge pipe 4 is given vent to anger on pipeline 10 and is installed with control valve 18, compressor inleting pipe line 9 between emptying bypass tube 14 and compressor virgin gas admission line 3 is installed with control valve 18, compressor blow-down pipe 12 between emptying arm 15 and compression set blow-down pipe 8 is installed with one-way valve 19, compressor virgin gas admission line 3 between virgin gas blow-down pipe 16 and left compression pipeline rapid pipe joint is installed with control valve 18, compressor virgin gas admission line 3 between compressor inleting pipe line 9 and right compression pipeline rapid pipe joint is installed with control valve 18, the compressed natural gas discharge pipe 4 that compressor is given vent to anger between pipeline 10 and left compression pipeline rapid pipe joint is installed with control valve 18, compressed natural gas discharge pipe 4 between compressed natural gas blow-down pipe 17 and right compression pipeline rapid pipe joint is installed with control valve 18, the compression set blowdown pipeline 7 of compressor drain pipe 11 both sides is installed with control valve 18 respectively.Front and back bisect door, inside comprises compressor 2, variable-frequency motor and control cabinet thereof, automatically can complete virgin gas air inlet buffering, compression, inter-stage dehydration, cooling, discharge buffering, possess Non-follow control function; The present invention by by compressor and attached all pipeline installings thereof in shipping container, convenient resettlement, and the pipeline rapid pipe joint arranged on shipping container and the quick socket of cable facilitate the installation and removal of subsequent job, the production operation time can not only be saved, and device can use in duplication of production, effectively reduces cost of production.
according to actual needs, above-mentioned compression container apparatus can be made further optimization and/or improvements:
as required, compression shipping container 1 is on the basis of 1BB standard container structure, and width is increased to 3000mm.Carry out the application that the compression shipping container 1 after nonstandard process is more suitable in road transport, truck load.
above technical characteristics constitutes most preferred embodiment of the present invention, and it has stronger adaptability and best implementation result, can increase and decrease non-essential technical characteristics according to actual needs, meet the demand of different situations.

Claims (2)

1. a compression container apparatus, it is characterized in that comprising compression shipping container, compressor, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, compression set blowdown pipeline and compression set blow-down pipe, compressor is installed with respectively in compression shipping container, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, compression set blowdown pipeline and compression set blow-down pipe, left compression pipeline rapid pipe joint is installed with respectively in the left and right sides of compression shipping container, the quick socket of left compression cable, right compression pipeline rapid pipe joint and the quick socket of right compression cable, compressor inleting pipe line is installed with between the inlet end and compressor virgin gas admission line of compressor, between the outlet side of compressor and compressed natural gas discharge pipe, be installed with compressor to give vent to anger pipeline, compressor drain pipe is installed with between the blowdown end and compression set blowdown pipeline of compressor, compressor blow-down pipe is installed with between the emptying end and compression set blow-down pipe of compressor, blowpipe line is installed with compression set compressed-air line, compressor inleting pipe line and compressor are given vent to anger between pipeline and are installed with emptying bypass tube, emptying arm is installed with between emptying bypass tube and compressor blow-down pipe, virgin gas blow-down pipe is installed with between compressor virgin gas admission line and compressed natural gas discharge pipe, compressed natural gas blow-down pipe is installed with between compressed natural gas discharge pipe and compression set blow-down pipe, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, the left end of compression set blowdown pipeline and compression set blow-down pipe is fixedly installed togather with left compression pipeline rapid pipe joint respectively, compressor virgin gas admission line, compressed natural gas discharge pipe, fuel natural gas delivery pipe, blowpipe line, the right-hand member of compression set blowdown pipeline and compression set blow-down pipe is fixedly installed togather with right compression pipeline rapid pipe joint respectively, at emptying bypass tube, emptying arm, virgin gas blow-down pipe and compressed natural gas blow-down pipe are installed with control valve respectively, compressor between emptying bypass tube and compressed natural gas discharge pipe is given vent to anger on pipeline and is installed with control valve, compressor inleting pipe line between emptying bypass tube and compressor virgin gas admission line is installed with control valve, compressor blow-down pipe between emptying arm and compression set blow-down pipe is installed with one-way valve, compressor virgin gas admission line between virgin gas blow-down pipe and left compression pipeline rapid pipe joint is installed with control valve, compressor virgin gas admission line between compressor inleting pipe line and right compression pipeline rapid pipe joint is installed with control valve, the compressed natural gas discharge pipe that compressor is given vent to anger between pipeline and left compression pipeline rapid pipe joint is installed with control valve, compressed natural gas discharge pipe between compressed natural gas blow-down pipe and right compression pipeline rapid pipe joint is installed with control valve, the compression set blowdown pipeline of compressor drain pipe both sides is installed with control valve respectively.
2. compression container apparatus according to claim 1, is characterized in that compression shipping container is on the basis of 1BB standard container structure, width is increased to 3000mm.
CN201310427315.XA 2013-09-18 2013-09-18 Compression container apparatus Active CN103453319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310427315.XA CN103453319B (en) 2013-09-18 2013-09-18 Compression container apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310427315.XA CN103453319B (en) 2013-09-18 2013-09-18 Compression container apparatus

Publications (2)

Publication Number Publication Date
CN103453319A CN103453319A (en) 2013-12-18
CN103453319B true CN103453319B (en) 2015-09-02

Family

ID=49735998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310427315.XA Active CN103453319B (en) 2013-09-18 2013-09-18 Compression container apparatus

Country Status (1)

Country Link
CN (1) CN103453319B (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498400A (en) * 2008-02-01 2009-08-05 安瑞科(廊坊)能源装备集成有限公司 Removable compressed natural gas gasification device
CN103256785B (en) * 2013-05-17 2017-08-11 徐毅 A kind of portable coal bed gas purifying and liquefying device
CN203517316U (en) * 2013-09-18 2014-04-02 中国石油集团西部钻探工程有限公司 Compression container device

Also Published As

Publication number Publication date
CN103453319A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN201891477U (en) Exhaust afterheat utilization system for natural gas engine
CN103527927B (en) Sledge dress gas gathering and transportation device
CN205261226U (en) Large -scale regulator of brief multi -functional incessant air feed
CN202868308U (en) Intermediate station pumping system device of long-distance pipeline coal transporting system
CN202746937U (en) Skid-mounted natural gas gathering and transportation device
CN103453319B (en) Compression container apparatus
CN203517316U (en) Compression container device
CN202338775U (en) Online blow-down apparatus for high-pressure natural gas pipeline
CN202561437U (en) Natural gas pressure regulating device
CN102913756B (en) Residual gas recovery system of gas station compressor
CN202569708U (en) Sludge feeding mechanism of plate-and-frame press filter with double diaphragms
CN102410442A (en) CNG (Compressed Natural Gas) storage and transportation gas filling trailer
CN205155554U (en) LPG busbar auto -change over device of electrified magnet valve
CN203517327U (en) High-pressure dehydration container device
CN204777658U (en) Economizer ash conveying system
CN102654242A (en) Natural gas pressure regulating device
CN103470957B (en) High press-dehydrating container apparatus
CN203081614U (en) Gas supply device of liquified natural gas automobile
CN203517314U (en) Manifold container device
CN203979871U (en) A kind of loader compressed natural gas air supply system
CN205656006U (en) NGV engine test bed frame gas air feed is equipped
CN203512406U (en) Natural gas power generation unit container device
CN204453807U (en) A kind of for upper sheet glass absorption glass system mechanism
CN203512407U (en) Inflatable column container device
CN204384118U (en) A kind of dismantled and assembled export structure of air bubble of raw coal bucket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant